CN103064490A - Method and device of battery sharing - Google Patents
Method and device of battery sharing Download PDFInfo
- Publication number
- CN103064490A CN103064490A CN2011103261387A CN201110326138A CN103064490A CN 103064490 A CN103064490 A CN 103064490A CN 2011103261387 A CN2011103261387 A CN 2011103261387A CN 201110326138 A CN201110326138 A CN 201110326138A CN 103064490 A CN103064490 A CN 103064490A
- Authority
- CN
- China
- Prior art keywords
- operating system
- battery
- result
- information
- strategy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 42
- 238000012545 processing Methods 0.000 claims abstract description 32
- 238000009434 installation Methods 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 10
- 238000005516 engineering process Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000009977 dual effect Effects 0.000 description 2
- 239000012467 final product Substances 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Images
Landscapes
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Telephone Function (AREA)
Abstract
The invention discloses a method and a device of battery sharing, and the method and the device of the battery sharing are applied to a first electronic device. The first electronic device comprises a first hardware system, a first battery and a connecting port, wherein the first battery provides power for the first hardware system. The method of battery sharing comprises steps as below: judging whether the connecting port is connected with a second electronic device and generating a judgment result; when the judgment result shows that the connecting port is connected with the second electronic device, obtaining parameter information; obtaining a prestored standard information which is used for determining power-supplying strategy of a first battery; processing the parameter information and the prestored standard information and generating a processing result; controlling the first battery to provide power for the first electronic device and/or the second electronic device. The method and the device of the battery sharing are capable of sharing a battery more reasonably.
Description
Technical field
The application relates to the communications field, relates in particular to a kind of battery and shares method and device.
Background technology
Along with the development of terminal technology, the portable equipment around individual calculus emerges in an endless stream at present, such as smart mobile phone, and notebook computer, panel computer etc.Can exist between these computing equipments in the situation of collaborative work (such as calculating etc.), also have the situation of sharing battery.For example, battery can share to equipment B in the device A, is the power supply of device A and equipment B simultaneously.
General, during existing battery was shared, as long as device A is connected with equipment B, the battery in the device A just shared to equipment B, and for example, when mobile phone was connected to the USB interface of computer, the computer expert crossed USB interface mobile phone is powered.
But, in the research and practice process to prior art, the present inventor finds, if what carry out in the device A is very important or urgent task, and the task in the relative device A of carrying out in the equipment B of task is unimportant or when urgent, and the battery of device A is shared to equipment B, will inevitably consumer device A in the electric weight of battery, thereby exist the battery electric quantity in the device A to gradually reduce, finally can't support equipment A in the hidden danger carried out smoothly of extremely important or urgent task.Obviously, under being similar to above-mentioned situation, carry out battery in the device A share and unreasonable.
Summary of the invention
In view of this, the technical matters that the application will solve is, provides a kind of battery to share method and device, can more reasonably carry out battery and share.
For this reason, the embodiment of the present application adopts following technical scheme:
The method that the embodiment of the present application provides a kind of battery to share, described method is applied in one first electronic equipment, and described the first electronic equipment has the first hardware system, the first battery and a connecting interface, wherein, described the first battery provides electric power for described the first hardware system, and described method comprises:
Judge that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
When described judged result represents that described connecting interface connects described second electronic equipment, obtain a parameter information;
Obtain a pre-stored standard information, described standard information is used for determining the strategy that electric power is provided of described the first battery;
Described parameter information and described standard information are processed, produced a result;
When described result is designated as the first strategy, controls described the first battery and keep described the first power electronic equipment;
When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously;
When described result is designated as the 3rd strategy, control described the first battery to described the second power electronic equipment.
The device that the embodiment of the present application also provides a kind of battery to share, it is characterized in that, described application of installation is in one first electronic equipment, described the first electronic equipment has the first hardware system, the first battery and a connecting interface, wherein, described the first battery provides electric power for described the first hardware system, and described device comprises:
The first judging unit is used for judging that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
The gain of parameter unit is used for obtaining a parameter information when described judged result represents that described connecting interface connects described second electronic equipment;
Standard information obtains the unit, is used for obtaining a pre-stored standard information, and described standard information is used for determining the strategy that electric power is provided of described the first battery;
Processing unit is used for described parameter information and described standard information are processed, and produces a result;
Supply control unit is used for when described result is designated as the first strategy, controls described the first battery and keeps described the first power electronic equipment; When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously; When described result is designated as the 3rd strategy, control described the first battery to described the second power electronic equipment.
Can find out from above-described embodiment, the embodiment of the present application is applied in one first electronic equipment, described the first electronic equipment has the first hardware system, the first battery and a connecting interface, wherein, described the first battery provides electric power for described the first hardware system, described method comprises: judge that whether described connecting interface is connected with the second electronic equipment, produces a judged result; When described judged result represents that described connecting interface connects described second electronic equipment, obtain a parameter information; Obtain a pre-stored standard information, described standard information is used for determining the strategy that electric power is provided of described the first battery; Described parameter information and described standard information are processed, produced a result; When described result is designated as the first strategy, controls described the first battery and keep described the first power electronic equipment; When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously; When described result is designated as the 3rd strategy, control described the first battery to described the second power electronic equipment.Use the embodiment of the present application, obtain indicating the result of Different Strategies according to parameter information and standard information, result according to the indication Different Strategies is determined the power supply object of the first battery, thereby has solved the shared irrational problem of the first battery in the prior art.
Description of drawings
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, the below will do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art, apparently, for those of ordinary skills, under the prerequisite of not paying creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is that the application's battery is shared method the first embodiment schematic flow sheet;
Fig. 2 is that the application's battery is shared method the second embodiment schematic flow sheet;
Fig. 3 is that the application's battery is shared method the 3rd embodiment schematic flow sheet;
Fig. 4 is that the application's battery is shared method the 4th embodiment schematic flow sheet;
Fig. 5 is that the application's battery is shared method the 5th embodiment schematic flow sheet;
Fig. 6 is the application's battery sharing means example structure synoptic diagram;
Fig. 7 is the first example structure synoptic diagram of processing unit in the application's battery sharing means;
Fig. 8 is the second example structure synoptic diagram of processing unit in the application's battery sharing means;
Fig. 9 is the 3rd example structure synoptic diagram of processing unit in the application's battery sharing means;
Figure 10 is the 4th example structure synoptic diagram of processing unit in the application's battery sharing means.
Embodiment
The following embodiment of the application provides battery to share method and device.
In order to make those skilled in the art person understand better technical scheme in the embodiment of the present application, and the above-mentioned purpose of the embodiment of the present application, feature and advantage can be become apparent more, below in conjunction with accompanying drawing technical scheme in the embodiment of the present application is described in further detail.
Wherein, the shared method of the application's battery and application of installation are in the first electronic equipment, and described the first electronic equipment has the first hardware system, the first battery and a connecting interface, and wherein, described the first battery provides electric power for described the first hardware system; Described connecting interface is specifically as follows the hardware interface of entity, also can be the interface of wireless connections, and this connecting interface is used for connecting the second electronic equipment.
Preferably, the second electronic equipment has the second hardware system and a connecting interface, and the connecting interface of the second electronic equipment cooperates with the connecting interface of the first electronic equipment, realizes that the entity of two electronic equipments connects or wireless connections; Connecting interface among the application is mainly used in determining whether be in connection status between the first electronic equipment and the second electronic equipment, whether realize that in actual applications other functions do not limit here.
In addition, can comprise the second battery in the second electronic equipment; Perhaps, the second electronic equipment also can not comprise the second battery, and only provide electric power by the first battery in the first electronic equipment for the second hardware system of the second electronic equipment, at this moment, can realize being connected by described connecting interface between the second hardware system of the first battery and the second electronic equipment, perhaps, also can connect by other Interface realization, do not limit here.
Wherein, the first electronic equipment can be two identical or different terminal devices with the second electronic equipment, can pass through the connecting interface collaborative work; For example, described terminal device can for: at the terminal device of X86 hardware system operation windows operating system or (SuSE) Linux OS or Mac operating system, perhaps, at the terminal device of ARM hardware system operation Android operating system or iOS operating system etc.
In a concrete application example, this first electronic equipment is preferred, be the equipment that comprises main frame and display screen, also can be described as BASE equipment, this equipment is consistent with common being seen notebook computer or all-in-one profile, the second electronic equipment can be preferably an integrated integrated circuit board of SOS, the slot of this integrated circuit board by arranging on the first electronic equipment, insert in this slot, be combined into the portable terminal device of dual system with the first electronic equipment.Wherein, described slot can corresponding described connecting interface.
In another concrete application example, the main process equipment that this first electronic equipment does not preferably contain display screen (comprises the first hardware system and for example comprises X86 operating system, operation has for example windows operating system of the first operating system), the second electronic equipment is preferably the touch display device and (comprises for example ARM operating system of the second operating system, move for example Android operating system of the second operating system), preferably, the second electronic equipment integrated display screen, the first electronic equipment and the second electronic equipment link together by connecting interface and form the dual system portable terminal device.Wherein, the first electronic equipment and the second electronic equipment can be realized electric channel, data channel and stator channel etc. by this connecting interface; For example in follow-up embodiment, described battery electric quantity can transmit by stator channel, the electric energy of the first battery can be transferred to the second electronic equipment by electric channel in the first electronic equipment, and the first electronic equipment can transmit by data channel to the task of the second electronic equipment distribution and the data messages such as progress information that obtain from the second electronic equipment.
Fig. 1 is the first embodiment schematic flow sheet that the application's battery is shared method, and as shown in Figure 1, the method comprises:
Step 101: judge that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
Step 102: when described judged result represents that described connecting interface connects described second electronic equipment, obtain a parameter information;
Step 103: obtain a pre-stored standard information, described standard information is used for determining the strategy that electric power is provided of described the first battery;
There is not the execution sequence restriction between step 102 and the step 103.
Step 104: described parameter information and described standard information are processed, produced a result;
Step 105: when described result is designated as the first strategy, controls described the first battery and keep described the first power electronic equipment; When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously; When described result is designated as the 3rd strategy, control described the first battery to described the second power electronic equipment.
Wherein, in actual applications, be not to use simultaneously the first strategy, the second strategy and three kinds of strategies of the 3rd strategy, can only use one or both strategies wherein, do not limit here.
Based on the above embodiments as can be known, obtain indicating the result of three kinds of Different Strategies according to parameter information and standard information, result according to the indication Different Strategies determines that the power supply object of the first battery is the first electronic equipment and/or the second electronic equipment, thereby has solved the shared irrational problem of the first battery in the prior art.
Preferably, in the embodiment of the present application shown in Figure 1, when described the second electronic equipment comprises the second hardware system and the second battery, when described the second battery provided electric power for described the second hardware system, described the first battery can comprise described the second power electronic equipment:
Control described the first battery and provide electric power for described the second hardware system, control simultaneously described the first battery described the second battery is charged;
Perhaps, control described the first battery and provide electric power for described the second hardware system;
Perhaps, controlling described the first battery charges to described the second battery.
Preferably, described the first battery can also comprise described the second power electronic equipment:
Obtain the electric weight of the second battery, judge that whether the electric weight of the second battery is less than default power threshold;
The electric weight of judging the second battery is carried out the step that described the first battery of described control charges to described the second battery during less than default power threshold.
And, if the second electronic equipment comprises the second battery, when the first battery provided electric power for the second electronic equipment, the first battery can also be when providing electric power for the second hardware system, be the second powered battery, thereby further reduced the generation of the shared unreasonable situation of the first battery; Further, can also obtain the electric weight of the second battery, judge that whether the electric weight of the second battery is less than default power threshold, only at the electric weight of the second battery during less than default power threshold, just carry out the step that described the first battery of described control charges to described the second battery, thereby further reduced the generation of the shared unreasonable situation of the first battery.
Preferably, parameter information described in the application can be the electric weight of the electric weight of the first battery and the second battery; Described standard information can comprise: the difference threshold of two battery electric quantities;
Then described described parameter information and described standard information are processed, are produced a result and comprise:
Judge that whether difference between the electric weight of the electric weight of the first battery and the second battery is greater than described difference threshold;
Difference between the electric weight of the electric weight of the first battery and the second battery produces the result of indication the second strategy during greater than described difference threshold;
When the difference between the electric weight of the electric weight of the first battery and the second battery is not more than described difference threshold, produce the result of indication the first strategy.
Perhaps, parameter information described in the application can be the electric weight of the electric weight of the first battery and the second battery; Described standard information can comprise: the ratio threshold value of two battery electric quantities;
Then described described parameter information and described standard information are processed, are produced a result and comprise:
Judge that whether ratio between the electric weight of the electric weight of the first battery and the second battery is greater than described ratio threshold value;
Ratio between the electric weight of the electric weight of the first battery and the second battery produces the result of indication the second strategy during greater than described ratio threshold value;
When the ratio between the electric weight of the electric weight of the first battery and the second battery is not more than described ratio threshold value, produce the result of indication the first strategy.
Preferably, in the first electronic equipment, can move the first operating system based on the first hardware system among the application; In the second electronic equipment, can move the second operating system based on the second hardware system;
At this moment, described parameter information and standard information can have different implementations, below are described in more detail by Fig. 2~embodiment shown in Figure 5.
Referring to Fig. 2, be the second embodiment schematic flow sheet in the shared method of the application's battery, wherein,
Step 201: judge that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
Step 202: when described judged result represents that described connecting interface connects described second electronic equipment, obtain a parameter information;
Wherein, described parameter information can comprise: the application of the application of the first operating system and the second operating system.
Wherein, described application can comprise: the application program of operating system and/or the process of operating system etc. can specifically arrange in actual applications.
Step 203: obtain a pre-stored standard information, described standard information is used for determining the strategy that electric power is provided of described the first battery.
Wherein, described standard information can comprise: each uses corresponding importance information.
In actual applications, standard information can be realized record in tables of data by default tables of data form: the corresponding relation between application and the importance information.
How other quantity of described significance level and each application carry out other division of significance level can independently be set in actual applications, for example, importance information can be divided into basic, normal, high three kinds of importance information etc.; Then described standard information can be routine as shown in table 1:
Table 1
Apply Names | Importance information |
Background music is play | Low |
Data are calculated | High |
Movie download | In |
The realization of following steps 204~step 207 is described to be processed described parameter information and described standard information, produces the step of a result.
Step 204: determine the importance information of each application of the first operating system according to described standard information, and, determine the importance information of each application of the second operating system according to described standard information.
Step 205: determine the importance information of the first operating system according to the importance information of each application of the first operating system, and, determine the importance information of the second operating system according to the importance information of each application of the second operating system.
Wherein, when determining the importance information of operating system according to the importance information of each application of operating system, can be directly from the importance information of each application of operating system, find the highest importance information as the importance information of operating system, perhaps, also can give numerical value for different importance information, calculate the importance information average as importance information of operating system etc. according to the importance information of each application of operating system, do not limit here.
Step 206: other height of significance level that compares two operating systems;
Step 207: when the importance information of the first operating system is higher than the importance information of the second operating system, produce the result of indication the first strategy; When the importance information of the importance information of the first operating system and the second operating system is identical, produce the result of indication the second strategy; When the importance information of the first operating system is lower than the importance information of the second operating system, produce the result of indication the 3rd strategy.
Step 208: when described result is designated as the first strategy, controls described the first battery and keep described the first power electronic equipment; When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously; When described result is designated as the 3rd strategy, control described the first battery to described the second power electronic equipment.
In this embodiment, obtain the application of the first operating system and the application of the second operating system, determine the importance information of each application, and then the importance information of definite the first operating system and the second operating system, other height of significance level according to two operating systems, determine the first battery powered object, thereby preferentially guarantee the power supply of the operating system that importance information is high in two operating systems, so that sharing of the first battery is more reasonable.
Fig. 3 is that the application's battery is shared the third embodiment schematic flow sheet in the method, wherein,
Step 301: judge that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
Step 302: when described judged result represents that described connecting interface connects described second electronic equipment, obtain a parameter information;
Wherein, described parameter information can comprise: the application of the second operating system.
Step 303: obtain a pre-stored standard information, described standard information is used for determining the strategy that electric power is provided of described the first battery.
Wherein, described standard information can comprise: use corresponding importance information.
Here, the realization of standard information sees also the description in the step 302, does not give unnecessary details here.
Below realize described described parameter information and described standard information being processed by step 304~step 309, produce the step of a result.
Step 304: the importance information of determining each application of the second operating system;
Step 305: judge whether exist importance information to be higher than the application of the first level threshold in the described application;
Step 306: when existing importance information to be higher than the application of the first level threshold in the described application, produce the result of indication the 3rd strategy; Execution in step 310;
Step 307: when not existing importance information to be higher than the application of the first level threshold in the described application, judge whether there is the application that is higher than the second level threshold value in the described application; The first level threshold is greater than the second level threshold value;
Step 308: exist when being higher than the application of second level threshold value, produce the result of indication the second strategy; Execution in step 310;
Step 309: when not having the application that is higher than the second level threshold value, produce the result of indication the first strategy; Execution in step 310;
Step 310: when described result is designated as the first strategy, controls described the first battery and keep described the first power electronic equipment; When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously.
In this embodiment, obtain the application of the second operating system, determine the importance information of each application, and then according to the importance information of each application in the second operating system and the relation between the first level threshold and the second level threshold value, determine the first battery powered object, when thereby the importance of only using at the second operating system was higher than the second level threshold value, the first battery just was the second power electronic equipment; And then when the importance of the second operating system application was higher than the first level threshold, the first battery only was the second power electronic equipment, thereby so that sharing of the first battery is more reasonable.
Fig. 4 is that the application's battery is shared the 4th kind of embodiment schematic flow sheet in the method, wherein,
Step 401: judge that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
Step 402: when described judged result represents that described connecting interface connects described second electronic equipment, obtain a parameter information;
Wherein, described parameter information can comprise: the information whether whether the first operating system receive the result of this task to information and first operating system of the second operating system allocating task.
Step 403: obtain a pre-stored standard information, described standard information is used for determining the strategy that electric power is provided of described the first battery.
Described standard information comprises: the processing result information whether whether the first operating system receive this task to information and first operating system of the second operating system allocating task and the corresponding relation between the strategy; Concrete, can comprise: the first operating system is not to the corresponding relation between the second operating system allocating task and the first strategy, the first operating system is to the second operating system allocating task and do not receive the result of task and the corresponding relation between the second strategy, and the first operating system is to the second operating system allocating task and receive the result of task and the corresponding relation between the first strategy.
Below realize described described parameter information and described standard information being processed by step 404~step 408, produce the step of a result.
Step 404: judge that whether the first operating system is to the second operating system allocating task;
Step 405: the first operating system produces the result of indication the first strategy during not to the second operating system allocating task; Execution in step 409;
Step 406: the first operating system judges whether the first operating system receives the result of this task during to the second operating system allocating task;
Step 407: when the first operating system receives the result of this task, produce the result of indication the first strategy; Execution in step 409;
Step 408: when the first operating system does not receive the result of this task, produce the result of indication the second strategy; Execution in step 409;
Step 409: when described result is designated as the first strategy, controls described the first battery and keep described the first power electronic equipment; When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously.
In this embodiment, obtain the information whether whether the first operating system receive the result of this task to information and first operating system of the second operating system allocating task, and then according to this information, determine the first battery powered object, thereby the first operating system is to the second operating system allocating task and when not receiving the result of task, the first battery just is the second power electronic equipment, also namely shares to the second electronic equipment, thereby so that sharing of the first battery is more reasonable.
Preferably, in the embodiment shown in fig. 4, described parameter information can also comprise: the electric weight of the second battery;
At this moment, described standard information specifically comprises: the information of the result whether whether electric weight of the second battery, the first operating system receive this task to information and first operating system of the second operating system allocating task and the corresponding relation between the strategy; This concrete corresponding relation can comprise:
The first operating system is not to the corresponding relation between the second operating system allocating task and the first strategy; The first operating system to the second operating system allocating task, the result that does not receive task and the second battery electric quantity less than the corresponding relation between default power threshold and the second strategy; The first operating system is not less than the corresponding relation of presetting between power threshold and the first strategy to the second operating system allocating task, the result that does not receive task and the second battery electric quantity; The first operating system is to the second operating system allocating task and receive the result of task and the corresponding relation between the first strategy.
At this moment, step 408 also comprises:
When the first operating system does not receive the result of this task to the second operating system allocating task and the first operating system, judge that whether the electric weight of the second battery is less than default power threshold;
The electric weight of the second battery is carried out the step that the result of the second strategy is indicated in described generation during less than default power threshold;
When the electric weight of the second battery is not less than default power threshold, produce the result of indication the first strategy.
At this moment, in this embodiment, only has the first operating system to the electric weight of the second operating system allocating task, the result that does not receive task and the second battery during less than default power threshold, the first battery just is the second power electronic equipment, also namely share to the second electronic equipment, thereby so that sharing of the first battery is more reasonable.
Fig. 5 is that the application's battery is shared the 5th kind of embodiment schematic flow sheet in the method, wherein,
Step 501: judge that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
Step 502: when described judged result represents that described connecting interface connects described second electronic equipment, obtain a parameter information;
Wherein, described parameter information can comprise: the application number of the first operating system and the application number of the second operating system.
Step 503: obtain a pre-stored standard information, described standard information is used for determining the strategy that electric power is provided of described the first battery.
Described standard information can comprise: the corresponding relation between the application number of the first operating system and the application number of the second operating system and the strategy; Concrete, can comprise: the application number of the first operating system is not that the application number of the 0 and second operating system is 0, the corresponding relation between itself and the first strategy; The application number of the first operating system is not that the application number of the 0 and second operating system is not 0, the corresponding relation between itself and the second strategy; The application number of the first operating system is that the application number of the 0 and second operating system is not 0, the corresponding relation between itself and the 3rd strategy.
Below realize described described parameter information and described standard information being processed by step 504~step 505, produce the step of a result.
Step 504: whether the application number of judging the first operating system is 0, and, judge whether the application number of the second operating system is 0;
Step 505: the application number of the first operating system is not that the application number of 0, the second operating system is 0 o'clock, produces the result of indication the first strategy; The application number of the first operating system is not that the application number of 0, the second operating system is not 0 o'clock, produces the result of indication the second strategy; The application number of the first operating system is that the application number of 0, the second operating system is not 0 o'clock, produces the result of indication the 3rd strategy.
Step 506: when described result is designated as the first strategy, controls described the first battery and keep described the first power electronic equipment; When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously; When described result is designated as the 3rd strategy, control described the first battery to described the second power electronic equipment.
In this embodiment, whether be 0 according to the application number of the first operating system and the application number of the second operating system, determine the first battery powered object, thereby only the application number in the second operating system is not 0 o'clock, the first battery just is the second power electronic equipment, also namely share to the second electronic equipment, even be that the application number of the 0 and second operating system is not 0 o'clock at the application number of the first operating system, the first battery only provides electric power for the second electronic equipment, thereby so that sharing of the first battery is more reasonable.
The embodiment that shares method with the application's battery is corresponding, and the application also provides the embodiment of battery sharing means.
Referring to Fig. 6, be the first example structure synoptic diagram of the application's battery sharing means, wherein,
The first judging unit 610 is used for judging that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
Gain of parameter unit 620 is used for obtaining a parameter information when described judged result represents that described connecting interface connects described second electronic equipment;
Standard information obtains unit 630, is used for obtaining a pre-stored standard information, and described standard information is used for determining the strategy that electric power is provided of described the first battery;
Preferably, described the second electronic equipment comprises the second hardware system and the second battery, and described the second battery provides electric power for described the second hardware system;
Preferably, as shown in Figure 6, this device can also comprise:
Electric weight acquiring unit 660 for the electric weight that obtains the second battery, judges that whether the electric weight of the second battery is less than default power threshold;
At this moment, supply control unit 650 also is used for: the electric weight that the electric weight acquiring unit is judged the second battery is carried out the step that described the first battery of described control charges to described the second battery during less than default power threshold.
Preferably, in the first electronic equipment, can move the first operating system based on the first hardware system; In the second electronic equipment, can move the second operating system based on the second hardware system;
At this moment, under different parameter informations and standard information, the implementation structure of described processing unit 640 is described in detail by Fig. 7~10.
Fig. 7 is the first implementation structure synoptic diagram of processing unit 640, wherein,
Described parameter information can comprise: the application of the application of the first operating system and the second operating system;
Described standard information can comprise: each uses corresponding importance information;
At this moment, processing unit 640 can comprise:
First determines subelement 710, is used for determining according to described standard information the importance information of each application of the first operating system, and, determine the importance information of each application of the second operating system according to described standard information;
Second determines subelement 720, be used for determining according to the importance information of each application of the first operating system the importance information of the first operating system, and, determine the importance information of the second operating system according to the importance information of each application of the second operating system;
Relatively subelement 730 is used for relatively other height of significance level of two operating systems;
First produces subelement 740, is used for producing the result of indication the first strategy when the importance information of the first operating system is higher than the importance information of the second operating system; When the importance information of the importance information of the first operating system and the second operating system is identical, produce the result of indication the second strategy; When the importance information of the first operating system is lower than the importance information of the second operating system, produce the result of indication the 3rd strategy.
When processing unit 640 is realized by structure shown in Figure 7, first produces subelement 740 according to other height of significance level of two operating systems, produce the result of indication Different Strategies, thereby supply control unit 650 is determined the first battery powered object accordingly, the preferential power supply that guarantees the operating system that importance information is high in two operating systems is so that sharing of the first battery is more reasonable.
Fig. 8 is the second implementation structure synoptic diagram of processing unit 640, wherein,
Described parameter information can comprise: the application of the second operating system;
Described standard information can comprise: use corresponding importance information;
As shown in Figure 8, processing unit 640 comprises:
The 3rd determines subelement 810, is used for the importance information of each application of definite the second operating system;
The first judgment sub-unit 820 is used for judging whether described application exists importance information to be higher than the application of the first level threshold;
Second produces subelement 830, when existing importance information to be higher than the application of the first level threshold for described application, produces the result of indication the 3rd strategy;
The second judgment sub-unit 840 when not existing importance information to be higher than the application of the first level threshold for described application, judges whether there is the application that is higher than the second level threshold value in the described application; The first level threshold is greater than the second level threshold value;
The 3rd produces subelement 850, is used for existing when being higher than the application of second level threshold value, produces the result of indication the second strategy; When not having the application that is higher than the second level threshold value, produce the result of indication the first strategy.
When processing unit 640 is realized by structure shown in Figure 8, according to the importance information of each application in the second operating system and the relation between the first level threshold and the second level threshold value, produce the result of indication Different Strategies, thereby supply control unit 650 is determined the first battery powered object accordingly, when the importance of only using at the second operating system was higher than the second level threshold value, the first battery was the first electronic equipment and the second power electronic equipment; And then when the importance of the second operating system application was higher than the first level threshold, the first battery only was the second power electronic equipment, thereby so that sharing of the first battery is more reasonable.
Fig. 9 is the third implementation structure synoptic diagram of processing unit 640, wherein,
Described parameter information can comprise: the information whether whether the first operating system receive the result of this task to information and first operating system of the second operating system allocating task;
Described standard information can comprise: the processing result information whether whether the first operating system receive this task to information and first operating system of the second operating system allocating task and the corresponding relation between the strategy;
As shown in Figure 9, processing unit 640 can comprise:
The 3rd judgment sub-unit 910 is used for judging that whether the first operating system is to the second operating system allocating task;
The 4th produces subelement 920, when being used for the first operating system not to the second operating system allocating task, produces the result of indication the first strategy;
The 4th judgment sub-unit 930 when being used for the first operating system to the second operating system allocating task, judges whether the first operating system receives the result of this task;
The 5th produces subelement 940, when receiving the result of this task for the first operating system, produces the result of indication the first strategy; When the first operating system does not receive the result of this task, produce the result of indication the second strategy.
Preferably, described parameter information can also comprise: the electric weight of the second battery;
Described standard information specifically can comprise: the information of the result whether whether electric weight of the second battery, the first operating system receive this task to information and first operating system of the second operating system allocating task and the corresponding relation between the strategy;
At this moment, as shown in Figure 9, processing unit 640 also comprises:
The 5th judgment sub-unit 950 when being used for the first operating system and not receiving the result of this task to the second operating system allocating task and the first operating system, judges that whether the electric weight of the second battery is less than default power threshold;
The 5th produces subelement 940 specifically is used for: the electric weight of the second battery is carried out the step that the result of the second strategy is indicated in described generation during less than default power threshold; When the electric weight of the second battery is not less than default power threshold, produce the result of indication the first strategy.
When processing unit 640 is realized by structure shown in Figure 9, the information that whether whether receives the result of this task to information and first operating system of the second operating system allocating task according to the first operating system, produce the result of indication Different Strategies, thereby supply control unit 650 is determined the first battery powered object accordingly, only in the first operating system to the second operating system allocating task and when not receiving the result of task, the first battery just is the second power electronic equipment, also namely share to the second electronic equipment, thereby so that sharing of the first battery is more reasonable.
Figure 10 is the 4th kind of implementation structure synoptic diagram of processing unit 640, wherein,
Described parameter information can comprise: the application number of the first operating system and the application number of the second operating system;
Described standard information can comprise: the corresponding relation between the application number of the first operating system and the application number of the second operating system and the strategy;
As shown in figure 10, processing unit 640 can comprise:
The 6th judgment sub-unit 1010 is used for judging whether the application number of the first operating system is 0, and, judge whether the application number of the second operating system is 0;
The 6th produces subelement 1020, and the application number that is used for the first operating system is not that the application number of 0, the second operating system is 0 o'clock, produces the result of indication the first strategy; The application number of the first operating system is not that the application number of 0, the second operating system is not 0 o'clock, produces the result of indication the second strategy; The application number of the first operating system is that the application number of 0, the second operating system is not 0 o'clock, produces the result of indication the 3rd strategy.
When processing unit 640 is realized by structure shown in Figure 10, whether be 0 according to the application number of the first operating system and the application number of the second operating system, produce the result of indication Different Strategies, thereby supply control unit 650 is determined the first battery powered object accordingly, only the application number in the second operating system is not 0 o'clock, the first battery just is the second power electronic equipment, also namely share to the second electronic equipment, even be that the application number of the 0 and second operating system is not 0 o'clock at the application number of the first operating system, the first battery only provides electric power for the second electronic equipment, thereby so that sharing of the first battery is more reasonable.
The technology that those skilled in the art can be well understood in the embodiment of the invention can realize by the mode that software adds essential general hardware platform.Based on such understanding, the part that technical scheme in the embodiment of the invention contributes to prior art in essence in other words can embody with the form of software product, this computer software product can be stored in the storage medium, such as ROM/RAM, magnetic disc, CD etc., comprise that some instructions are with so that a computer equipment (can be personal computer, server, the perhaps network equipment etc.) carry out the described method of some part of each embodiment of the present invention or embodiment.
Each embodiment in this instructions all adopts the mode of going forward one by one to describe, and identical similar part is mutually referring to getting final product between each embodiment, and each embodiment stresses is difference with other embodiment.Especially, for system embodiment because its basic simlarity is in embodiment of the method, thus describe fairly simple, relevant part gets final product referring to the part explanation of embodiment of the method.
Above-described embodiment of the present invention does not consist of the restriction to protection domain of the present invention.Any modification of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., all should be included within protection scope of the present invention.
Claims (16)
1. the method that battery is shared is characterized in that described method is applied in one first electronic equipment, described the first electronic equipment has the first hardware system, the first battery and a connecting interface, wherein, described the first battery provides electric power for described the first hardware system, and described method comprises:
Judge that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
When described judged result represents that described connecting interface connects described second electronic equipment, obtain a parameter information;
Obtain a pre-stored standard information, described standard information is used for determining the strategy that electric power is provided of described the first battery;
Described parameter information and described standard information are processed, produced a result;
When described result is designated as the first strategy, controls described the first battery and keep described the first power electronic equipment;
When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously;
When described result is designated as the 3rd strategy, control described the first battery to described the second power electronic equipment.
2. method according to claim 1 is characterized in that, described the second electronic equipment comprises the second hardware system and the second battery, and described the second battery provides electric power for described the second hardware system;
Described the first battery comprises described the second power electronic equipment:
Control described the first battery and provide electric power for described the second hardware system, control simultaneously described the first battery described the second battery is charged;
Perhaps, control described the first battery and provide electric power for described the second hardware system;
Perhaps, controlling described the first battery charges to described the second battery.
3. method according to claim 2 is characterized in that, also comprises:
Obtain the electric weight of the second battery, judge that whether the electric weight of the second battery is less than default power threshold;
The electric weight of judging the second battery is carried out the step that described the first battery of described control charges to described the second battery during less than default power threshold.
4. according to claim 1 to 3 each described methods, it is characterized in that operation has the first operating system based on the first hardware system in the first electronic equipment; Operation has the second operating system based on the second hardware system in the second electronic equipment;
Described parameter information comprises: the application of the application of the first operating system and the second operating system;
Described standard information comprises: each uses corresponding importance information;
Described parameter information and described standard information are processed, are produced a result and comprise:
Determine the importance information of each application of the first operating system according to described standard information, and, determine the importance information of each application of the second operating system according to described standard information;
Determine the importance information of the first operating system according to the importance information of each application of the first operating system, and, determine the importance information of the second operating system according to the importance information of each application of the second operating system;
Other height of significance level that compares two operating systems;
When the importance information of the first operating system is higher than the importance information of the second operating system, produce the result of indication the first strategy;
When the importance information of the importance information of the first operating system and the second operating system is identical, produce the result of indication the second strategy;
When the importance information of the first operating system is lower than the importance information of the second operating system, produce the result of indication the 3rd strategy.
5. according to claim 1 to 3 each described methods, it is characterized in that operation has the first operating system based on the first hardware system in the first electronic equipment; Operation has the second operating system based on the second hardware system in the second electronic equipment;
Described parameter information comprises: the application of the second operating system;
Described standard information comprises: use corresponding importance information;
Described described parameter information and described standard information are processed, are produced a result and comprise:
Determine the importance information of each application of the second operating system;
Judge whether exist importance information to be higher than the application of the first level threshold in the described application;
When existing importance information to be higher than the application of the first level threshold in the described application, produce the result of indication the 3rd strategy;
When not existing importance information to be higher than the application of the first level threshold in the described application, judge whether there is the application that is higher than the second level threshold value in the described application; The first level threshold is greater than the second level threshold value;
Exist when being higher than the application of second level threshold value, produce the result of indication the second strategy;
When not having the application that is higher than the second level threshold value, produce the result of indication the first strategy.
6. according to claim 1 to 3 each described methods, it is characterized in that operation has the first operating system based on the first hardware system in the first electronic equipment; Operation has the second operating system based on the second hardware system in the second electronic equipment;
Described parameter information comprises: the information whether whether the first operating system receive the result of this task to information and first operating system of the second operating system allocating task;
Described standard information comprises: the processing result information whether whether the first operating system receive this task to information and first operating system of the second operating system allocating task and the corresponding relation between the strategy;
Described described parameter information and described standard information are processed, are produced a result and comprise:
Judge that whether the first operating system is to the second operating system allocating task;
The first operating system produces the result of indication the first strategy during not to the second operating system allocating task;
The first operating system judges whether the first operating system receives the result of this task during to the second operating system allocating task;
When the first operating system receives the result of this task, produce the result of indication the first strategy;
When the first operating system does not receive the result of this task, produce the result of indication the second strategy.
7. method according to claim 6 is characterized in that, described parameter information also comprises: the electric weight of the second battery;
Described standard information specifically comprises: the information of the result whether whether electric weight of the second battery, the first operating system receive this task to information and first operating system of the second operating system allocating task and the corresponding relation between the strategy;
Described described parameter information and described standard information are processed, are produced a result and also comprise:
When the first operating system does not receive the result of this task to the second operating system allocating task and the first operating system, judge that whether the electric weight of the second battery is less than default power threshold;
The electric weight of the second battery is carried out the step that the result of the second strategy is indicated in described generation during less than default power threshold;
When the electric weight of the second battery is not less than default power threshold, produce the result of indication the first strategy.
8. according to claim 1 to 3 each described methods, it is characterized in that operation has the first operating system based on the first hardware system in the first electronic equipment; Operation has the second operating system based on the second hardware system in the second electronic equipment;
Described parameter information comprises: the application number of the first operating system and the application number of the second operating system;
Described standard information comprises: the corresponding relation between the application number of the first operating system and the application number of the second operating system and the strategy;
Described described parameter information and described standard information are processed, are produced a result and comprise:
Whether the application number of judging the first operating system is 0, and, judge whether the application number of the second operating system is 0;
The application number of the first operating system is not that the application number of 0, the second operating system is 0 o'clock, produces the result of indication the first strategy;
The application number of the first operating system is not that the application number of 0, the second operating system is not 0 o'clock, produces the result of indication the second strategy;
The application number of the first operating system is that the application number of 0, the second operating system is not 0 o'clock, produces the result of indication the 3rd strategy.
9. the device that battery is shared is characterized in that described application of installation is in one first electronic equipment, described the first electronic equipment has the first hardware system, the first battery and a connecting interface, wherein, described the first battery provides electric power for described the first hardware system, and described device comprises:
The first judging unit is used for judging that whether described connecting interface is connected with the second electronic equipment, produces a judged result;
The gain of parameter unit is used for obtaining a parameter information when described judged result represents that described connecting interface connects described second electronic equipment;
Standard information obtains the unit, is used for obtaining a pre-stored standard information, and described standard information is used for determining the strategy that electric power is provided of described the first battery;
Processing unit is used for described parameter information and described standard information are processed, and produces a result;
Supply control unit is used for when described result is designated as the first strategy, controls described the first battery and keeps described the first power electronic equipment; When described result is designated as the second strategy, control described the first battery and keep described the first power electronic equipment, described the first battery is to described the second power electronic equipment simultaneously; When described result is designated as the 3rd strategy, control described the first battery to described the second power electronic equipment.
10. device according to claim 9 is characterized in that, described the second electronic equipment comprises the second hardware system and the second battery, and described the second battery provides electric power for described the second hardware system;
Supply control unit realizes that in the following manner described the first battery is to described the second power electronic equipment:
Control described the first battery and provide electric power for described the second hardware system, control simultaneously described the first battery described the second battery is charged;
Perhaps, control described the first battery and provide electric power for described the second hardware system;
Perhaps, controlling described the first battery charges to described the second battery.
11. device according to claim 10 is characterized in that, also comprises:
The electric weight acquiring unit for the electric weight that obtains the second battery, judges that whether the electric weight of the second battery is less than default power threshold;
The second judging unit, electric weight that be used for to judge the second battery are during less than default power threshold, and supply control unit is carried out the step that described the first battery of described control charges to described the second battery.
12. to 11 each described devices, it is characterized in that according to claim 9 operation has the first operating system based on the first hardware system in the first electronic equipment; Operation has the second operating system based on the second hardware system in the second electronic equipment;
Described parameter information comprises: the application of the application of the first operating system and the second operating system;
Described standard information comprises: each uses corresponding importance information;
Processing unit comprises:
First determines subelement, is used for determining according to described standard information the importance information of each application of the first operating system, and, determine the importance information of each application of the second operating system according to described standard information;
Second determines subelement, be used for determining according to the importance information of each application of the first operating system the importance information of the first operating system, and, determine the importance information of the second operating system according to the importance information of each application of the second operating system;
Relatively subelement is used for relatively other height of significance level of two operating systems;
First produces subelement, is used for producing the result of indication the first strategy when the importance information of the first operating system is higher than the importance information of the second operating system; When the importance information of the importance information of the first operating system and the second operating system is identical, produce the result of indication the second strategy; When the importance information of the first operating system is lower than the importance information of the second operating system, produce the result of indication the 3rd strategy.
13. to 11 each described devices, it is characterized in that according to claim 9 operation has the first operating system based on the first hardware system in the first electronic equipment; Operation has the second operating system based on the second hardware system in the second electronic equipment;
Described parameter information comprises: the application of the second operating system;
Described standard information comprises: use corresponding importance information;
Processing unit comprises:
The 3rd determines subelement, is used for the importance information of each application of definite the second operating system;
The first judgment sub-unit is used for judging whether described application exists importance information to be higher than the application of the first level threshold;
Second produces subelement, when existing importance information to be higher than the application of the first level threshold for described application, produces the result of indication the 3rd strategy;
The second judgment sub-unit when not existing importance information to be higher than the application of the first level threshold for described application, judges whether there is the application that is higher than the second level threshold value in the described application; The first level threshold is greater than the second level threshold value;
The 3rd produces subelement, is used for existing when being higher than the application of second level threshold value, produces the result of indication the second strategy; When not having the application that is higher than the second level threshold value, produce the result of indication the first strategy.
14. to 11 each described devices, it is characterized in that according to claim 9 operation has the first operating system based on the first hardware system in the first electronic equipment; Operation has the second operating system based on the second hardware system in the second electronic equipment;
Described parameter information comprises: the information whether whether the first operating system receive the result of this task to information and first operating system of the second operating system allocating task;
Described standard information comprises: the processing result information whether whether the first operating system receive this task to information and first operating system of the second operating system allocating task and the corresponding relation between the strategy;
Processing unit comprises:
The 3rd judgment sub-unit is used for judging that whether the first operating system is to the second operating system allocating task;
The 4th produces subelement, when being used for the first operating system not to the second operating system allocating task, produces the result of indication the first strategy;
The 4th judgment sub-unit when being used for the first operating system to the second operating system allocating task, judges whether the first operating system receives the result of this task;
The 5th produces subelement, when receiving the result of this task for the first operating system, produces the result of indication the first strategy; When the first operating system does not receive the result of this task, produce the result of indication the second strategy.
15. device according to claim 14 is characterized in that, described parameter information also comprises: the electric weight of the second battery;
Described standard information specifically comprises: the information of the result whether whether electric weight of the second battery, the first operating system receive this task to information and first operating system of the second operating system allocating task and the corresponding relation between the strategy;
Processing unit also comprises:
The 5th judgment sub-unit when being used for the first operating system and not receiving the result of this task to the second operating system allocating task and the first operating system, judges that whether the electric weight of the second battery is less than default power threshold;
The 5th produces subelement specifically is used for: the electric weight of the second battery is carried out the step that the result of the second strategy is indicated in described generation during less than default power threshold; When the electric weight of the second battery is not less than default power threshold, produce the result of indication the first strategy.
16. to 11 each described devices, it is characterized in that according to claim 9 operation has the first operating system based on the first hardware system in the first electronic equipment; Operation has the second operating system based on the second hardware system in the second electronic equipment;
Described parameter information comprises: the application number of the first operating system and the application number of the second operating system;
Described standard information comprises: the corresponding relation between the application number of the first operating system and the application number of the second operating system and the strategy;
Processing unit comprises:
The 6th judgment sub-unit is used for judging whether the application number of the first operating system is 0, and, judge whether the application number of the second operating system is 0;
The 6th produces subelement, and the application number that is used for the first operating system is not that the application number of 0, the second operating system is 0 o'clock, produces the result of indication the first strategy; The application number of the first operating system is not that the application number of 0, the second operating system is not 0 o'clock, produces the result of indication the second strategy; The application number of the first operating system is that the application number of 0, the second operating system is not 0 o'clock, produces the result of indication the 3rd strategy.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110326138.7A CN103064490B (en) | 2011-10-24 | 2011-10-24 | A kind of battery shares method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110326138.7A CN103064490B (en) | 2011-10-24 | 2011-10-24 | A kind of battery shares method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103064490A true CN103064490A (en) | 2013-04-24 |
CN103064490B CN103064490B (en) | 2015-11-25 |
Family
ID=48107146
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110326138.7A Active CN103064490B (en) | 2011-10-24 | 2011-10-24 | A kind of battery shares method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103064490B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104135053A (en) * | 2014-08-06 | 2014-11-05 | 中国联合网络通信集团有限公司 | Electric quantity sharing method and device |
CN104407883A (en) * | 2014-10-28 | 2015-03-11 | 联想(北京)有限公司 | Control method and electronic equipment |
CN107204077A (en) * | 2017-06-08 | 2017-09-26 | 郭宜萍 | A kind of business model for being used to share moving automobile battery |
US10505381B2 (en) | 2014-05-21 | 2019-12-10 | Huawei Technologies Co., Ltd. | Electric energy dispatch method and apparatus, and power management method and apparatus |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4918596A (en) * | 1985-07-01 | 1990-04-17 | Akira Nakano | Hierarchical information processing system |
TW495704B (en) * | 1999-12-28 | 2002-07-21 | Optrom Inc | Storage medium having electronic circuit and information managing method and information processing system using the same medium |
JP2008033504A (en) * | 2006-07-27 | 2008-02-14 | Nippon Hoso Kyokai <Nhk> | Processing load ordering device, processing load order receiving device, processing result distribution device, processing result output device, and processing load ordering order receiving system |
CN102055039A (en) * | 2009-11-04 | 2011-05-11 | 富士通株式会社 | Electronic device and power source control device |
-
2011
- 2011-10-24 CN CN201110326138.7A patent/CN103064490B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4918596A (en) * | 1985-07-01 | 1990-04-17 | Akira Nakano | Hierarchical information processing system |
TW495704B (en) * | 1999-12-28 | 2002-07-21 | Optrom Inc | Storage medium having electronic circuit and information managing method and information processing system using the same medium |
JP2008033504A (en) * | 2006-07-27 | 2008-02-14 | Nippon Hoso Kyokai <Nhk> | Processing load ordering device, processing load order receiving device, processing result distribution device, processing result output device, and processing load ordering order receiving system |
CN102055039A (en) * | 2009-11-04 | 2011-05-11 | 富士通株式会社 | Electronic device and power source control device |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10505381B2 (en) | 2014-05-21 | 2019-12-10 | Huawei Technologies Co., Ltd. | Electric energy dispatch method and apparatus, and power management method and apparatus |
CN104135053A (en) * | 2014-08-06 | 2014-11-05 | 中国联合网络通信集团有限公司 | Electric quantity sharing method and device |
CN104407883A (en) * | 2014-10-28 | 2015-03-11 | 联想(北京)有限公司 | Control method and electronic equipment |
CN104407883B (en) * | 2014-10-28 | 2017-12-29 | 联想(北京)有限公司 | A kind of control method and electronic equipment |
CN107204077A (en) * | 2017-06-08 | 2017-09-26 | 郭宜萍 | A kind of business model for being used to share moving automobile battery |
CN107204077B (en) * | 2017-06-08 | 2020-02-04 | 郭宜萍 | Method for sharing mobile automobile battery |
Also Published As
Publication number | Publication date |
---|---|
CN103064490B (en) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11368039B2 (en) | Battery charging method and electronic device | |
US11398741B2 (en) | Charging device and a charging method thereof | |
CN105379363B (en) | System and method for managing the electric current in portable computing device | |
CN104540176B (en) | Wireless network access method, device and terminal | |
CN106775871A (en) | Firmware upgrade method and equipment | |
CN104426188A (en) | Wireless charging method, wireless charging system, wireless charging device and wearable device | |
CN103887571A (en) | Charging mode switching method and charging mode switching device | |
CN103064490B (en) | A kind of battery shares method and device | |
KR20130083116A (en) | Recharging control system and method for battery of electronic device | |
WO2018072443A1 (en) | Charging method, apparatus, and data storage medium | |
CN103247832B (en) | Charging method and electronic device | |
CN103428373A (en) | Achieving method and device of user-defined package | |
CN105577573B (en) | Information processing method and electronic equipment | |
KR20130108903A (en) | Power sharing apparatus and system using power sharing program installed in mobile terminal | |
CN103986824A (en) | Data display method and system of electronic equipment | |
CN104902568A (en) | Wireless network resource sharing method and electronic equipment | |
CN114389258B (en) | Optimization method and device for load bearing of radiation power supply line | |
CN105828421A (en) | Terminal and terminal power saving method | |
CN208673332U (en) | A kind of Android system core control panel of band LTE communication function | |
CN115823670A (en) | Control method and control device of solar air conditioner and solar air conditioner | |
CN110601383B (en) | Laser charging method and related equipment | |
CN211046508U (en) | Charging device capable of charging in multiple modes | |
CN112954760A (en) | Connection method and device of Bluetooth equipment and electronic equipment | |
CN111786430B (en) | Method and device for controlling charging of battery for oil exploration | |
CN105188113A (en) | Information processing method and wireless access device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |