CN103061363B - Device for monitoring soil plug lifting height of prestressed pipe pile in hydrostatic process - Google Patents
Device for monitoring soil plug lifting height of prestressed pipe pile in hydrostatic process Download PDFInfo
- Publication number
- CN103061363B CN103061363B CN201310029660.8A CN201310029660A CN103061363B CN 103061363 B CN103061363 B CN 103061363B CN 201310029660 A CN201310029660 A CN 201310029660A CN 103061363 B CN103061363 B CN 103061363B
- Authority
- CN
- China
- Prior art keywords
- counterweight
- pipe pile
- fixed
- soil plug
- prestressed pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种监测预应力管桩静压过程土塞上升高度的装置,包括测度仪表、固定圆盘、多圈电位器、同步轮、同步带、第一配重和第二配重,所述固定圆盘上设置有固定足,所述多圈电位器固定在所述固定圆盘上,所述同步轮镶嵌在所述多圈电位器上,所述同步带缠绕在所述同步轮上,所述第一配重和第二配重分别设置在所述同步带的两端,所述第一配重的重量大于第二配重的重量,所述测度仪表连接所述多圈电位器。本发明的监测预应力管桩静压过程土塞上升高度的装置,能实时精确地监测预应力管桩静压过程中土塞高度的变化过程,结构简单,设计巧妙,制作成本低,数据可靠性高。
The invention discloses a device for monitoring the rising height of a soil plug during the static pressure process of a prestressed pipe pile, which includes a measuring instrument, a fixed disc, a multi-turn potentiometer, a synchronous wheel, a synchronous belt, a first counterweight and a second counterweight, The fixed disc is provided with a fixed foot, the multi-turn potentiometer is fixed on the fixed disc, the synchronous wheel is inlaid on the multi-turn potentiometer, and the synchronous belt is wound on the synchronous wheel Above, the first counterweight and the second counterweight are respectively arranged at both ends of the synchronous belt, the weight of the first counterweight is greater than the weight of the second counterweight, and the measuring instrument is connected to the multi-turn potential device. The device for monitoring the rising height of the soil plug during the static pressure process of the prestressed pipe pile of the present invention can accurately monitor the change process of the height of the soil plug during the static pressure process of the prestressed pipe pile in real time, and has a simple structure, ingenious design, low manufacturing cost and reliable data high sex.
Description
技术领域 technical field
本发明涉及一种监测预应力管桩静压过程土塞上升高度的装置。 The invention relates to a device for monitoring the rising height of a soil plug during the static pressure process of a prestressed pipe pile.
背景技术 Background technique
有技术中,没有能监测打桩静压过程中管桩空腔内土塞上升高度的装置,工程上的一般做法是打桩结束后用皮尺量测一下土塞最终上升高度。土塞上升高度的实时监测,能搞清楚打桩过程中土塞上升的全过程,能弄清楚管桩在打入不同类别土层时土塞高度的增长状况,能更清楚管桩承载力的构成,对管桩承载力的设计进行验证和修正。 In the prior art, there is no device capable of monitoring the rising height of the soil plug in the pile cavity during the pile driving static pressure process. The general practice in engineering is to measure the final rising height of the soil plug with a tape measure after the piling is completed. The real-time monitoring of the rising height of the soil plug can clarify the whole process of the rising of the soil plug during the piling process, the growth of the soil plug height when the pipe pile is driven into different types of soil layers, and the composition of the bearing capacity of the pipe pile. , to verify and revise the design of the pile bearing capacity.
因此,需要一种监测预应力管桩静压过程土塞上升高度的装置以解决上述问题。 Therefore, a device for monitoring the rising height of the soil plug during the static pressure process of the prestressed pipe pile is needed to solve the above problems.
发明内容 Contents of the invention
发明目的:本发明针对现有技术中的预应力管桩静压过程桩内土塞上升高度监测装置的缺陷,提供一种简单方便的监测预应力管桩静压过程土塞上升高度的装置。 Purpose of the invention: The present invention provides a simple and convenient device for monitoring the rising height of the soil plug during the static pressure process of prestressed pipe piles, aiming at the defects of the prior art monitoring device for the rising height of the soil plug during the static pressure process of the prestressed pipe pile.
技术方案:为解决上述技术问题,本发明的监测预应力管桩静压过程土塞上升高度的装置采用如下技术方案: Technical solution: In order to solve the above technical problems, the device for monitoring the rising height of the soil plug during the static pressure process of the prestressed pipe pile of the present invention adopts the following technical solution:
一种监测预应力管桩静压过程土塞上升高度的装置,包括测度仪表、固定圆盘、多圈电位器、同步轮、同步带、第一配重和第二配重,所述固定圆盘上设置有固定足,所述多圈电位器固定在所述固定圆盘上,所述同步轮镶嵌在所述多圈电位器上,所述同步带缠绕在所述同步轮上,所述第一配重和第二配重分别设置在所述同步带的两端,所述第一配重的重量大于第二配重的重量,所述测度仪表连接所述多圈电位器。 A device for monitoring the rising height of the soil plug during the static pressure process of prestressed pipe piles, including a measuring instrument, a fixed disc, a multi-turn potentiometer, a synchronous wheel, a synchronous belt, a first counterweight and a second counterweight, the fixed disc The disk is provided with a fixed foot, the multi-turn potentiometer is fixed on the fixed disk, the synchronous wheel is embedded on the multi-turn potentiometer, the synchronous belt is wound on the synchronous wheel, the The first counterweight and the second counterweight are respectively arranged at both ends of the synchronous belt, the weight of the first counterweight is greater than the weight of the second counterweight, and the measuring instrument is connected to the multi-turn potentiometer.
优选的,所述固定圆盘上设置有三个或四个固定足,所述固定足沿所述固定圆盘的圆周均匀设置,所述固定足垂直所述固定圆盘设置。固定足用于固定圆盘与管桩端头,固定效果较好。 Preferably, three or four fixed feet are arranged on the fixed disk, the fixed feet are evenly arranged along the circumference of the fixed disk, and the fixed feet are arranged vertically to the fixed disk. The fixing foot is used for fixing the disc and the end of the pipe pile, and the fixing effect is better.
优选的,所述固定足为圆柱形。 Preferably, the fixing feet are cylindrical.
优选的,所述固定足的长度为5±0.1cm,直径8±1mm。 Preferably, the fixed foot has a length of 5±0.1cm and a diameter of 8±1mm.
优选的,所述固定圆盘的直径等于所述预应力管桩的外直径。固定圆盘与预应力管桩的外直径相同,可以方便将固定圆盘固定于管桩端头。 Preferably, the diameter of the fixed disc is equal to the outer diameter of the prestressed pipe pile. The outer diameter of the fixed disk is the same as that of the prestressed pipe pile, so that the fixed disk can be conveniently fixed on the end of the pipe pile.
优选的,所述同步轮上设置有卡槽,所述同步带镶嵌在所述卡槽内。同步带不容易滑出。 Preferably, a slot is provided on the synchronous wheel, and the synchronous belt is embedded in the slot. The timing belt is not easy to slip out.
优选的,所述同步轮设置在所述固定圆盘的中部。方便将第一配重和第二配重放入管桩空腔内。 Preferably, the synchronous wheel is arranged in the middle of the fixed disc. It is convenient to put the first counterweight and the second counterweight into the cavity of the pipe pile.
发明原理:管桩施工前,将装有测试装置的圆盘卡在桩头,同步带及配重等放入管桩空腔内,由于自重平衡,同步带一端的大配重落在地面,小配重悬在空中。随着管桩空腔内土塞的升高,相对于管桩大配重上升、小配重下降,多圈电位器进行同步旋转,配重的直线运动转换成了同步轮和多圈电位器的旋转运动,管桩内土塞的高度变化实时转换成多圈电位器阻值的变化。通过导线传输电压信号给测度仪表,根据标定系数建立土塞高度变化和多圈电位器输出电压的关系,达到实时监测土塞高度的目的。。 Invention principle: Before the construction of the pipe pile, the disc equipped with the test device is clamped on the pile head, and the timing belt and counterweight are placed in the cavity of the pipe pile. Due to the balance of self-weight, the large counterweight at one end of the timing belt falls to the ground. Small counterweights hang in the air. With the rise of the soil plug in the pipe pile cavity, the large counterweight rises and the small counterweight falls relative to the pipe pile, the multi-turn potentiometer rotates synchronously, and the linear motion of the counterweight is converted into a synchronous wheel and a multi-turn potentiometer The rotational movement of the pipe pile, the height change of the soil plug in the pipe pile is converted into the change of the resistance value of the multi-turn potentiometer in real time. The voltage signal is transmitted to the measuring instrument through the wire, and the relationship between the height change of the soil plug and the output voltage of the multi-turn potentiometer is established according to the calibration coefficient, so as to achieve the purpose of real-time monitoring of the height of the soil plug. .
有益效果:本发明的监测预应力管桩静压过程土塞上升高度的装置,能实时精确地监测预应力管桩静压过程中土塞高度的变化过程。本发明原理简单巧妙、制作成本低、数据可靠性高。工程应用效果良好,具有广泛的推广应用前景。 Beneficial effects: The device for monitoring the rising height of the soil plug during the static pressure process of the prestressed pipe pile of the present invention can accurately monitor the change process of the height of the soil plug during the static pressure process of the prestressed pipe pile in real time. The principle of the invention is simple and ingenious, the production cost is low, and the data reliability is high. The engineering application effect is good, and it has a wide prospect of popularization and application.
附图说明 Description of drawings
图1为本发明的监测预应力管桩静压过程土塞上升高度的装置的立体图; Fig. 1 is the perspective view of the device of the monitoring prestressed pipe pile static pressure process soil plug rising height of the present invention;
图2为本发明的监测预应力管桩静压过程土塞上升高度的装置的主视图; Fig. 2 is the front view of the device for monitoring the rising height of the soil plug during the static pressure process of the prestressed pipe pile of the present invention;
图3为本发明的监测预应力管桩静压过程土塞上升高度的装置的俯视图。 Fig. 3 is a top view of the device for monitoring the rising height of the soil plug during the static pressure process of the prestressed pipe pile according to the present invention.
具体实施方式 Detailed ways
下面结合附图和具体实施例,进一步阐明本发明,应理解这些实施例仅用于说明本发明而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等价形式的修改均落于本申请所附权利要求所限定的范围。 Below in conjunction with accompanying drawing and specific embodiment, further illustrate the present invention, should be understood that these embodiments are only for illustrating the present invention and are not intended to limit the scope of the present invention, after having read the present invention, those skilled in the art will understand various aspects of the present invention Modifications in equivalent forms all fall within the scope defined by the appended claims of this application.
请参阅图1、图2和图3所示,本发明的监测预应力管桩静压过程土塞上升高度的装置,包括测度仪表、固定圆盘1、多圈电位器2、同步轮3、同步带4、第一配重5和第二配重6。其中,固定圆盘1的直径等于预应力管桩的直径,固定圆盘1上设置有三个固定足11。其中,固定足11的数目也可以为四个。固定足11为圆柱形。固定足11的长度为5±0.1cm,直径8±1mm。固定足11沿固定圆盘1的圆周均匀设置,固定足11垂直固定圆盘1设置,用于固定圆盘1与管桩端头。多圈电位器2固定在固定圆盘1上,同步轮3镶嵌在多圈电位器2上,同步轮3和多圈电位器2保持旋转同步。同步带4缠绕在同步轮3上,其中,同步轮3上设置有卡槽,同步带4镶嵌在卡槽内,同步带4镶嵌在同步轮3的卡槽内,并与同步轮3等速旋转。第一配重5的重量大于第二配重6的重量,第一配重5和第二配重6分别设置在同步带4的两端。测度仪表连接多圈电位器2。 Please refer to Fig. 1, Fig. 2 and shown in Fig. 3, the device for monitoring the rising height of the soil plug in the static pressure process of the prestressed pipe pile of the present invention includes a measuring instrument, a fixed disc 1, a multi-turn potentiometer 2, a synchronous wheel 3, Timing belt 4, first counterweight 5 and second counterweight 6. Wherein, the diameter of the fixed disk 1 is equal to the diameter of the prestressed pipe pile, and three fixed feet 11 are arranged on the fixed disk 1 . Wherein, the number of fixed feet 11 can also be four. The fixed foot 11 is cylindrical. The fixed foot 11 has a length of 5±0.1cm and a diameter of 8±1mm. The fixed feet 11 are evenly arranged along the circumference of the fixed disk 1, and the fixed feet 11 are arranged vertically to the fixed disk 1 for fixing the disk 1 and the end of the pipe pile. The multi-turn potentiometer 2 is fixed on the fixed disk 1, the synchronous wheel 3 is embedded on the multi-turn potentiometer 2, and the synchronous wheel 3 and the multi-turn potentiometer 2 keep rotating synchronously. The synchronous belt 4 is wound on the synchronous wheel 3, wherein the synchronous wheel 3 is provided with a card slot, the synchronous belt 4 is embedded in the card slot, the synchronous belt 4 is embedded in the card slot of the synchronous wheel 3, and is at the same speed as the synchronous wheel 3 rotate. The weight of the first counterweight 5 is greater than the weight of the second counterweight 6 , and the first counterweight 5 and the second counterweight 6 are respectively arranged at both ends of the synchronous belt 4 . The measuring instrument is connected with the multi-turn potentiometer 2.
管桩施工前,将装有测试装置的固定圆盘1卡在桩头,同步带4、第一配重5和第二配重6等放入管桩空腔内,由于自重平衡,同步带4一端的大配重落在地面,小配重悬在空中。随着管桩空腔内土塞的升高,相对于管桩大配重上升、小配重下降,多圈电位器2进行同步旋转,配重的直线运动转换成了同步轮3和多圈电位器2的旋转运动,管桩内土塞的高度变化实时转换成多圈电位器2阻值的变化。通过导线传输电压信号给测度仪表,根据标定系数建立土塞高度变化和多圈电位器2输出电压的关系,达到实时监测土塞高度的目的。 Before the construction of the pipe pile, the fixed disc 1 equipped with the test device is stuck on the pile head, and the timing belt 4, the first counterweight 5 and the second counterweight 6 are put into the cavity of the pipe pile. Due to the balance of self-weight, the timing belt 4 The large counterweight at one end falls to the ground, and the small counterweight hangs in the air. With the rise of the soil plug in the pipe pile cavity, the large counterweight of the pipe pile rises and the small counterweight falls, the multi-turn potentiometer 2 rotates synchronously, and the linear motion of the counterweight is converted into synchronous wheel 3 and multi-turn The rotary motion of the potentiometer 2 and the height change of the soil plug in the pipe pile are converted into the change of the resistance value of the multi-turn potentiometer 2 in real time. The voltage signal is transmitted to the measuring instrument through the wire, and the relationship between the change of the soil plug height and the output voltage of the multi-turn potentiometer 2 is established according to the calibration coefficient, so as to achieve the purpose of real-time monitoring of the soil plug height.
本发明的监测预应力管桩静压过程土塞上升高度的装置,能实时精确地监测预应力管桩静压过程中土塞高度的变化过程,预应力管桩静压过程桩内土塞上升高度是计算管桩承载力需要的参数。本发明原理简单巧妙、制作成本低、数据可靠性高。工程应用效果良好,具有广泛的推广应用前景。 The device for monitoring the rising height of the soil plug during the static pressure process of the prestressed pipe pile of the present invention can accurately monitor the change process of the soil plug height during the static pressure process of the prestressed pipe pile in real time, and the rise of the soil plug in the pile during the static pressure process of the prestressed pipe pile Height is a parameter needed to calculate the bearing capacity of pipe piles. The principle of the invention is simple and ingenious, the production cost is low, and the data reliability is high. The engineering application effect is good, and it has a wide prospect of popularization and application.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310029660.8A CN103061363B (en) | 2013-01-28 | 2013-01-28 | Device for monitoring soil plug lifting height of prestressed pipe pile in hydrostatic process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310029660.8A CN103061363B (en) | 2013-01-28 | 2013-01-28 | Device for monitoring soil plug lifting height of prestressed pipe pile in hydrostatic process |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103061363A CN103061363A (en) | 2013-04-24 |
| CN103061363B true CN103061363B (en) | 2014-12-31 |
Family
ID=48104229
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310029660.8A Expired - Fee Related CN103061363B (en) | 2013-01-28 | 2013-01-28 | Device for monitoring soil plug lifting height of prestressed pipe pile in hydrostatic process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN103061363B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103953074B (en) * | 2014-04-28 | 2016-04-20 | 青岛理工大学 | Open tubular pile hammering injection simulation experiment device and experiment method |
| CN106836317B (en) * | 2017-02-24 | 2018-07-03 | 同济大学 | A kind of pile sinking model test apparatus for considering soil plug effect and its application |
| CN107794956B (en) * | 2017-10-31 | 2023-02-28 | 中国地质大学(武汉) | Detachable field soil plug height dynamic measurement device and method |
| CN107894438A (en) * | 2017-11-01 | 2018-04-10 | 中国计量大学 | Remote control liquid fuel smoke point Auto-Test System |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4535415A (en) * | 1976-07-06 | 1985-08-13 | Hird Edwin A | Measurement conversion and visual display instrument |
| CN1149125A (en) * | 1995-04-28 | 1997-05-07 | 索尼株式会社 | depth sensor |
| CN201047751Y (en) * | 2007-04-06 | 2008-04-16 | 胡敬礼 | Novel straight-line resistor type displacement sensor |
| CN201387314Y (en) * | 2009-04-24 | 2010-01-20 | 成都利尼科医学技术发展有限公司 | Height measurement device for treatment couch |
| CN202352211U (en) * | 2011-12-19 | 2012-07-25 | 北京医模科技有限公司 | Device for detecting cardio-pulmonary resuscitation pressure depth |
| CN202519712U (en) * | 2012-03-02 | 2012-11-07 | 中国石油大学(华东) | Depth tester for soil piston of sea platform infiltrated type steel pipe pile |
-
2013
- 2013-01-28 CN CN201310029660.8A patent/CN103061363B/en not_active Expired - Fee Related
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4535415A (en) * | 1976-07-06 | 1985-08-13 | Hird Edwin A | Measurement conversion and visual display instrument |
| CN1149125A (en) * | 1995-04-28 | 1997-05-07 | 索尼株式会社 | depth sensor |
| CN201047751Y (en) * | 2007-04-06 | 2008-04-16 | 胡敬礼 | Novel straight-line resistor type displacement sensor |
| CN201387314Y (en) * | 2009-04-24 | 2010-01-20 | 成都利尼科医学技术发展有限公司 | Height measurement device for treatment couch |
| CN202352211U (en) * | 2011-12-19 | 2012-07-25 | 北京医模科技有限公司 | Device for detecting cardio-pulmonary resuscitation pressure depth |
| CN202519712U (en) * | 2012-03-02 | 2012-11-07 | 中国石油大学(华东) | Depth tester for soil piston of sea platform infiltrated type steel pipe pile |
Also Published As
| Publication number | Publication date |
|---|---|
| CN103061363A (en) | 2013-04-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103061363B (en) | Device for monitoring soil plug lifting height of prestressed pipe pile in hydrostatic process | |
| CN105424910B (en) | Device for measuring layered settlement of soil mass | |
| CN103047920B (en) | A kind of limit, hole distance mearuring equipment | |
| CN101694397B (en) | Method and device for automatically measuring ascending/descending one-way movement of water level | |
| CN204988191U (en) | Adopt parallel laser projection method to measure portable equipment of cigarette length and diameter | |
| CN204373646U (en) | A kind of roller can manual type sliding inclinometer | |
| CN206917386U (en) | A kind of anemometer tower for being moved easily and fixing | |
| CN207894928U (en) | Measure the detector of soil temperature and humidity | |
| CN107036937B (en) | A device and method for measuring the apparent viscosity of liquefied sand | |
| CN205138700U (en) | Measure device of rivers to pile foundation surge pressure | |
| CN103162904A (en) | Three-line pendulum | |
| CN210048303U (en) | Natural vertical steel wire utilizing bearing rotating force | |
| CN202562916U (en) | Plug-in soil moisture and gas determinator | |
| CN106918416A (en) | Motor cogging torque measurement apparatus | |
| CN206920285U (en) | Sand apparent viscosity measurement apparatus after one kind liquefaction | |
| CN204694322U (en) | A kind of simple and easy deep phreatic water level measuring arrangement | |
| CN212158566U (en) | Tunnel vault settlement measuring suspension ruler | |
| CN102346032A (en) | Inclined plane gradient measuring instrument | |
| CN103927914A (en) | Moment disc with moment arm ruler | |
| CN107607235B (en) | Permanent magnet motor tooth's socket torque measuring device | |
| CN209347040U (en) | Wound measurement devices | |
| CN203642844U (en) | Rock core geologic body measuring apparatus | |
| CN206787735U (en) | Ice core borehole temperature measuring equipment | |
| CN206683559U (en) | Major axis roundness measuring device | |
| CN203672444U (en) | Deep well dynamic and static level detector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C53 | Correction of patent for invention or patent application | ||
| CB03 | Change of inventor or designer information |
Inventor after: Lu Xiaocen Inventor after: Li Guowei Inventor after: Fu Qiusheng Inventor after: Cao Yong Inventor after: Zhan Siwen Inventor before: Lu Xiaocen Inventor before: Li Guowei Inventor before: Fu Qiusheng Inventor before: Su Gaoyu Inventor before: Zhan Siwen |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LU XIAOCEN LI GUOWEI FU QIUSHENG SU GAOYU ZHAN SIWEN TO: LU XIAOCEN LI GUOWEI FU QIUSHENG CAO YONG ZHAN SIWEN |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141231 Termination date: 20170128 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |