CN103031849B - 基坑内布置降水井及降水井柔性封闭的施工方法 - Google Patents
基坑内布置降水井及降水井柔性封闭的施工方法 Download PDFInfo
- Publication number
- CN103031849B CN103031849B CN201210579869.7A CN201210579869A CN103031849B CN 103031849 B CN103031849 B CN 103031849B CN 201210579869 A CN201210579869 A CN 201210579869A CN 103031849 B CN103031849 B CN 103031849B
- Authority
- CN
- China
- Prior art keywords
- dewatering well
- construction
- pit
- dewatering
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 34
- 238000000034 method Methods 0.000 title abstract description 9
- 238000007789 sealing Methods 0.000 claims abstract description 8
- 239000013589 supplement Substances 0.000 claims description 9
- 239000004793 Polystyrene Substances 0.000 claims description 7
- 229920002223 polystyrene Polymers 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 238000004078 waterproofing Methods 0.000 claims description 6
- 238000005266 casting Methods 0.000 claims description 4
- 239000004576 sand Substances 0.000 claims description 4
- 238000009412 basement excavation Methods 0.000 claims description 3
- 239000000463 material Substances 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 239000003643 water by type Substances 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 229910001294 Reinforcing steel Inorganic materials 0.000 abstract 1
- 238000001556 precipitation Methods 0.000 description 9
- 102000001999 Transcription Factor Pit-1 Human genes 0.000 description 4
- 108010040742 Transcription Factor Pit-1 Proteins 0.000 description 4
- 238000005336 cracking Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
本发明属于建筑工程技术领域,特别涉及一种基坑内布置降水井及降水井柔性封闭的施工方法,采取以下步骤:1)在基坑内布置降水井;2)挖缓冲层凹坑;3)混凝土垫层及防水层施工;4)基础筏板施工;5)填实降水井;6)铺设缓冲层;7)补充浇筑混凝土垫层;8)预留防水层及其保护层施工;9)粘贴膨胀型止水橡胶条;10)绑扎连接基础筏板钢筋;11)补充浇筑基础筏板。本发明的有益效果是:采用基坑内降水井柔性封闭施工方法,可有效解决降水井上方负弯矩导致的基础筏板与防水层开裂难题,满足了巨大基坑内设置降水井的施工方法要求,比传统降水方法节约降水费用2/3,可缩短施工周期,并符合高效节能的绿色施工要求。
Description
技术领域
本发明涉及一种基坑内布置降水井及降水井柔性封闭的施工方法,属于建筑工程技术领域。
背景技术
目前,我国住宅小区均设置覆盖建筑红线范围的地下车库,从而使建筑基坑面积数倍扩大,传统的基坑周边布置降水井的做法已无法满足降水要求,因此普遍采用基坑内布置降水井降水的做法。但是降水井壁承载力远高于天然地基,降水井封闭后,由于管井壁对其上部防水层与基础筏板产生负弯矩,往往导致防水层与基础筏板开裂而渗漏,成为一项建筑业全国性技术难题。
发明内容
本发明要解决的技术问题是:提供一种安全可靠,经济合理,可操作性强的基坑内布置降水井及降水井柔性封闭的施工方法,解决了降水井壁产生负弯矩导致的防水层与基础筏板开裂渗漏关键性技术难题,为巨大基坑内布置降水井提供了可靠的技术保障。
本发明为解决其技术问题所采用的技术方案是:所述的基坑内布置降水井及降水井柔性封闭的施工方法,其特征在于采取以下步骤:
1)在基坑内布置降水井;
2)挖缓冲层凹坑:自降水井中心线向四周扩展500㎜~700㎜范围内加深开挖50㎜~100㎜凹坑;
3)混凝土垫层及防水层施工:浇筑混凝土垫层至凹坑边缘,在混凝土垫层上部铺设防水卷材至凹坑边缘;
4)基础筏板施工:自降水井中心线向四周扩展至基础筏板钢筋搭接长度的2~3倍宽度处留设混凝土施工缝,并预留满足相互错开搭接的钢筋;
5)填实降水井:基坑降水完毕后,降水井内采用中砂填实,从凹坑下表面至降水井深度1000㎜~2000㎜的范围内采用C30膨胀混凝土填实;
6)铺设缓冲层:在凹坑内铺设厚度为50㎜~100㎜的挤塑聚苯板;
7)补充浇筑混凝土垫层:在挤塑聚苯板上部补充后浇混凝土垫层;
8)预留防水层及其保护层施工:在后浇混凝土垫层上铺设后补防水卷材,并与防水卷材搭接200mm进行严密粘贴,在防水卷材上和后补防水卷材上浇筑混凝土保护层;
9)粘贴膨胀型止水橡胶条:在混凝土施工缝截面高度中部粘贴膨胀型止水橡胶条;
10)绑扎连接基础筏板钢筋:按照相邻接头中心相互错开1.35倍钢筋搭接长度进行钢筋搭接连接;
11)补充浇筑基础筏板:采用比已浇筑基础筏板高一个强度等级的膨胀混凝土补充后浇基础筏板。
本发明的有益效果是:
采用基坑内降水井柔性封闭施工方法,可有效解决降水井上方负弯矩导致的基础筏板与防水层开裂难题,满足了巨大基坑内设置降水井的施工方法要求,比传统降水方法节约降水费用2/3,可缩短施工周期,并符合高效节能的绿色施工要求。
附图说明
图1是基坑内降水井柔性封闭施工平面布置图。
图2是图1的A-A剖面结构示意图。
图中:1、降水井 2、凹坑 3、混凝土施工缝 4、后浇基础筏板 5、混凝土保护层 6、挤塑聚苯板 7、C30膨胀混凝土 8、中砂 9、混凝土垫层 10、后浇混凝土垫层 11、防水卷材 12、后补防水卷材 13、基础筏板 14、钢筋 15、膨胀型止水橡胶条。
具体实施方式
下面结合附图和实施例对本发明做进一步描述:
如图1和图2所示,本发明所述的基坑内布置降水井及降水井柔性封闭的施工方法,采取以下步骤:
1)根据降水设计位置,在基坑内布置降水井1;
2)挖缓冲层凹坑:开挖至基坑设计底标高后,自降水井1中心线向四周扩展500㎜范围加深开挖50㎜凹坑2;
3)混凝土垫层及防水层施工:浇筑混凝土垫层9至凹坑2边缘,在混凝土垫层9上部铺设防水卷材11至凹坑2边缘;
4)基础筏板施工:自降水井1中心线向四周扩展至基础筏板13钢筋搭接长度的2倍宽度处留设混凝土施工缝3,并预留满足相互错开搭接的钢筋14;
5)填实降水井:基坑降水完毕后,降水井1内采用中砂8填实,从凹坑2下表面至降水井1深度1000㎜的范围内采用C30膨胀混凝土7填实;
6)铺设缓冲层:在凹坑2内铺设厚度为50㎜的挤塑聚苯板6;
7)补充浇筑混凝土垫层:在挤塑聚苯板6上补充后浇混凝土垫层10;
8)预留防水层及其保护层施工:在后浇混凝土垫层10上铺设后补防水卷材12,并与防水卷材11搭接200mm进行严密粘贴,在防水卷材11上和后补防水卷材12上浇筑混凝土保护层5;
9)粘贴膨胀型止水橡胶条:在混凝土施工缝3截面高度中部粘贴膨胀型止水橡胶条15;
10)绑扎连接基础筏板钢筋:按照相邻接头中心相互错开1.35倍钢筋搭接长度进行钢筋14搭接连接,并满足钢筋接头面积率50%的要求;
11)补充浇筑基础筏板:采用比已浇筑基础筏板13高一个强度等级的膨胀混凝土补充后浇基础筏板4。
Claims (1)
1.一种基坑内布置降水井及降水井柔性封闭的施工方法,其特征在于采取以下步骤:
1)在基坑内布置降水井(1);
2)挖缓冲层凹坑:自降水井(1)中心线向四周扩展500㎜~700㎜范围内加深开挖50㎜~100㎜凹坑(2);
3)混凝土垫层及防水层施工:浇筑混凝土垫层(9)至凹坑(2)边缘,在混凝土垫层(9)上部铺设防水卷材(11)至凹坑(2)边缘;
4)基础筏板施工:自降水井(1)中心线向四周扩展至基础筏板(13)钢筋搭接长度的2~3倍宽度处留设混凝土施工缝(3),并预留满足相互错开搭接的钢筋(14);
5)填实降水井:基坑降水完毕后,降水井(1)内采用中砂(8)填实,从凹坑(2)下表面至降水井(1)深度1000㎜~2000㎜的范围内采用C30膨胀混凝土(7)填实;
6)铺设缓冲层:在凹坑(2)内铺设厚度为50㎜~100㎜的挤塑聚苯板(6);
7)补充浇筑混凝土垫层:在挤塑聚苯板(6)上部补充后浇混凝土垫层(10);
8)预留防水层及其保护层施工:在后浇混凝土垫层(10)上铺设后补防水卷材(12),并与防水卷材(11)搭接200mm进行严密粘贴,在防水卷材(11)上和后补防水卷材(12)上浇筑混凝土保护层(5);
9)粘贴膨胀型止水橡胶条:在混凝土施工缝(3)截面高度中部粘贴膨胀型止水橡胶条(15);
10)绑扎连接基础筏板钢筋:按照相邻接头中心相互错开1.35倍钢筋搭接长度进行钢筋(14)搭接连接;
11)补充浇筑基础筏板:采用比已浇筑基础筏板(13)高一个强度等级的膨胀混凝土补充后浇基础筏板(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210579869.7A CN103031849B (zh) | 2012-12-27 | 2012-12-27 | 基坑内布置降水井及降水井柔性封闭的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210579869.7A CN103031849B (zh) | 2012-12-27 | 2012-12-27 | 基坑内布置降水井及降水井柔性封闭的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103031849A CN103031849A (zh) | 2013-04-10 |
CN103031849B true CN103031849B (zh) | 2014-11-26 |
Family
ID=48019208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210579869.7A Expired - Fee Related CN103031849B (zh) | 2012-12-27 | 2012-12-27 | 基坑内布置降水井及降水井柔性封闭的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103031849B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104196045B (zh) * | 2014-08-28 | 2016-08-17 | 青岛海川建设集团有限公司 | 地下车库基坑内深井降水井口封井装置及方法 |
CN110939143A (zh) * | 2019-11-29 | 2020-03-31 | 中国建筑第四工程局有限公司 | 一种简易的核心筒分阶导流排水结构 |
CN112575801A (zh) * | 2020-12-04 | 2021-03-30 | 中冶天工集团有限公司 | 一种封堵降水井的方法 |
CN115324090B (zh) * | 2022-10-13 | 2023-03-17 | 山东金城建设有限公司 | 地下工程坑中坑降水与封井施工方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2162122C2 (ru) * | 1998-06-17 | 2001-01-20 | Уральская государственная академия путей сообщения | Способ понижения уровня грунтовых вод вблизи зданий и сооружений |
CN101761096A (zh) * | 2009-12-14 | 2010-06-30 | 山东万鑫建设有限公司 | 防水底板下设置塔吊基础控裂防渗施工方法 |
-
2012
- 2012-12-27 CN CN201210579869.7A patent/CN103031849B/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2162122C2 (ru) * | 1998-06-17 | 2001-01-20 | Уральская государственная академия путей сообщения | Способ понижения уровня грунтовых вод вблизи зданий и сооружений |
CN101761096A (zh) * | 2009-12-14 | 2010-06-30 | 山东万鑫建设有限公司 | 防水底板下设置塔吊基础控裂防渗施工方法 |
Non-Patent Citations (6)
Title |
---|
中建一局建设发展公司.金融街B7大厦工程深基坑降水与止水施工总结.《工程质量》.2008,(第4期),第9页右栏第1段及左栏废井封井示意图. * |
刘勇等.大孔降水井封井工法.《建筑技术》.2012,第43卷(第12期),第1135页左栏第1段及图1、第1136页第4节及图3. * |
北京城建大厦地下室防水施工;李勇;《中国建筑防水》;20040531(第5期);第26页第4.4节及第27页图2 * |
大孔降水井封井工法;刘勇等;《建筑技术》;20121215;第43卷(第12期);第1135页左栏第1段及图1、第1136页第4节及图3 * |
李勇.北京城建大厦地下室防水施工.《中国建筑防水》.2004,(第5期),第26页第4.4节及第27页图2. * |
金融街B7大厦工程深基坑降水与止水施工总结;中建一局建设发展公司;《工程质量》;20080228(第4期);第9页右栏第1段及左栏废井封井示意图 * |
Also Published As
Publication number | Publication date |
---|---|
CN103031849A (zh) | 2013-04-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109898533B (zh) | 筏板内置式降水结构、降水井的封井结构及封井方法 | |
CN104005419B (zh) | 下沉法施工的箱涵构造及施工方法 | |
CN202689046U (zh) | 封闭式超前止水后浇带 | |
CN206768880U (zh) | 一种用于海边综合管廊的防水结构 | |
CN103410175B (zh) | 一种岩溶富水地质地下结构防水施工渗水控制施工方法 | |
CN103015456B (zh) | 地下混凝土构筑物基础底板中的坑中坑快速支模法 | |
CN209339169U (zh) | 一种基坑内降水井封堵装置 | |
CN203729424U (zh) | 顶管施工改型骑马检查井 | |
CN103161172B (zh) | 电梯井底降水施工方法 | |
CN103031849B (zh) | 基坑内布置降水井及降水井柔性封闭的施工方法 | |
CN102011410A (zh) | 一种预制预应力地下连续墙及其施工方法 | |
CN109578014B (zh) | 一种抗突涌封底结构及施工方法 | |
CN202730786U (zh) | 一种降水井封井防水施工结构 | |
CN104790435A (zh) | 沉降后浇带超前止水抗渗混凝土结构及其施工工艺 | |
CN202416379U (zh) | 一种可提前停止降水的沉降后浇带 | |
CN105484277A (zh) | 一种电梯基坑或集水坑内管井降水施工用构件及施工方法 | |
CN203768925U (zh) | 一种基坑内降水井的封堵装置 | |
CN104846935B (zh) | 高位水池渗漏治理改造方法 | |
CN102409702A (zh) | 一种地下连续墙中埋式橡胶止水带接缝防水施工方法 | |
CN218407467U (zh) | 一种热力暗挖隧道拱墙变形缝防水构造 | |
CN216077128U (zh) | 一种地铁双层全断面冷冻暗挖换乘车站结构 | |
CN202440852U (zh) | 一种地下室后浇带超前止水隔离结构 | |
CN203977451U (zh) | 电力检修井 | |
CN111441367A (zh) | 强透水地层封底混凝土分仓浇筑结构及施工方法 | |
CN113356887B (zh) | 一种带注浆止水连接件的单层井壁及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141126 |