CN102995649A - 逐层分级调平沉井倾斜的方法 - Google Patents
逐层分级调平沉井倾斜的方法 Download PDFInfo
- Publication number
- CN102995649A CN102995649A CN2012105111976A CN201210511197A CN102995649A CN 102995649 A CN102995649 A CN 102995649A CN 2012105111976 A CN2012105111976 A CN 2012105111976A CN 201210511197 A CN201210511197 A CN 201210511197A CN 102995649 A CN102995649 A CN 102995649A
- Authority
- CN
- China
- Prior art keywords
- open caisson
- caisson
- steel structure
- piles
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 54
- 239000010959 steel Substances 0.000 claims abstract description 54
- 239000002689 soil Substances 0.000 claims abstract description 16
- 239000004568 cement Substances 0.000 claims abstract description 7
- 239000002002 slurry Substances 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 claims description 11
- 238000009412 basement excavation Methods 0.000 claims description 4
- 230000009286 beneficial effect Effects 0.000 claims description 4
- 230000003068 static effect Effects 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Abstract
本发明提供了一种逐层分级调平沉井倾斜的方法,它包括以下步骤:在沉井预下沉的地基中形成多个支撑桩孔;向多个支撑桩孔内注入水泥土浆;将多个预制钢结构桩分别插入至多个支撑桩孔中;预制第一段沉井,在第一段沉井的下部刃脚对应于所述多个钢结构桩的部位施工成平面;进行第一段沉井,直至第一段沉井底部落在多个钢结构桩上,调平沉井;拆除第一节钢结构桩,继续挖土、沉井,直至第一段沉井再次落在多个钢结构桩上,调平沉井;待第一段沉井按设计要求下沉预定深度后,在其上面浇筑第二段沉井;将钢结构桩逐节拆除,并在第二段沉井上面继续浇筑预定段数的沉井,直至沉井底端下沉至底部设计标高为止。采用本方法可减少沉井倾斜现象发生。
Description
技术领域
本发明属于土木建筑技术领域,尤其涉及逐层分级调平沉井倾斜的方法。
背景技术
因地质情况的复杂、开挖的不对称、沉井周边的荷载不一样等原因,沉井在下沉过程中,常出现沉井倾斜,且很难纠偏,甚至影响工程的正常进行和产生安全事故。针对沉井下沉发生倾斜的问题,传统的方法是采用不对称开挖、在沉井上部或沉井外侧采用不对称堆载的方法进行纠偏,但都是在沉井发生倾斜以后而被动采取的措施。
本发明人曾针对此问题提出过中国发明专利“防止沉井倾斜的预控方法”(公开日2009年8月12日,公开号为CN101503879A),但此方法所使用的构件比较复杂,需要在井内设置支撑梁及钢牛腿等,而且挖土不便,增加施工成本。
发明内容
本发明要解决的技术问题是:提供一种逐层分级调平沉井倾斜的方法,该方法能使沉井发生倾斜的概率大为减少。
本发明为解决上述技术问题所采取的技术方案为:
逐层分级调平沉井倾斜的方法,其特征在于,它包括以下步骤:
1)在沉井预下沉的地基中形成多个支撑桩孔,所述多个支撑桩孔设置在沉井井壁中心线所形成的圆周投影上;
2)向所述多个支撑桩孔内注入水泥土浆;
3)将多个预制钢结构桩分别插入至所述多个注入有水泥土浆的支撑桩孔中,所述预制钢结构桩是分节用螺栓连接或法兰盘连接而成;
4)预制第一段沉井,在第一段沉井的下部刃脚对应于所述多个钢结构桩并将落在所述多个钢结构桩的部位,施工成平面,以利于沉井能稳定地落在所述多个钢结构桩上;
5)待所述第一段沉井混凝土强度达到设计要求后,开始挖土,进行第一段沉井,直至第一段沉井底部落在所述多个钢结构桩上,调平沉井;
6)沿第一段沉井井壁下方将所述多个钢结构桩部位的土方向下开挖预定深度,同步拆除第一节钢结构桩,继续挖土、沉井,直至第一段沉井再次落在所述多个钢结构桩上,调平沉井;
7)待第一段沉井按设计要求下沉预定深度后,在其上面继续浇筑第二段沉井;
8)不断重复步骤6)和7),将钢结构桩逐节拆除,并在第二段沉井上面继续浇筑预定的N段的沉井,直至沉井底端下沉至底部设计标高为止。
上述方案中,所述多个钢结构桩等间隔均匀设置,每两个相邻的钢结构桩之间的环向间隔距离为3 m ~15m。
上述方案中,所述多个钢结构桩在土硬的部位的间距大于在土软的部位的间距,每两个相邻的钢结构桩之间的环向间隔距离为3 m ~15m。
上述方案中,所述步骤6)中的向下开挖的深度为0.3 m ~3m。
上述方案中,所述步骤1)中形成多个支撑桩孔的方法为钻孔、锤击成孔、振动成孔、或静压成孔。
本发明的有益效果为:由于多个支撑桩孔设置在沉井井壁中心线所形成的圆周投影上;且支撑桩孔内的预制钢结构桩的顶端位于同一标高,每次沉井时沉井均会分别落在顶端位于同一标高的预制钢结构桩上,故每段沉井都通过钢结构桩进行了调平,避免了沉井倾斜的累计。预制钢结构桩埋设在水泥土中,由于水泥土的强度远低于混凝土,便于钢结构桩的拆除;同时各节钢结构桩采用螺栓或法兰盘连接,可使拆除每节钢结构桩时方便快捷,同时拆除后的钢结构桩可以重复使用。而且相对于本发明人之前的专利,本发明的结构更加简单,井内无梁柱结构,井内挖土更加方便快捷、成本更低。
附图说明
图1至图9为本发明实施例提供的逐层分级调平沉井倾斜方法的过程示意图。
具体实施方式
下面结合附图和实施例对本发明作进一步的描述,当然下述实施例不应理解为对本发明的限制。
本实施例提供一种逐层分级调平沉井倾斜的方法,它包括以下步骤:
第一步:
如图1和图2所示,在沉井预下沉的地基4中形成多个支撑桩孔1。该多个支撑桩孔1设置在沉井井壁中心线所形成的圆周投影3上。该多个支撑桩孔1等间隔均匀设置。每两个相邻的支撑桩孔1之间的环向间隔距离为3 m ~15m。可以理解的是,该多个支撑桩孔1也可以以不等间隔方式设置,在土硬的部位的间距大于在土软的部位的间距。在本实施例中,支撑桩孔1的数量为八个,其并不限于本实施例中的八个,可根据沉井的直径和土质情况确定。该支撑桩孔1的成孔方法可以采用成孔设备成孔,如钻孔、锤击成孔、振动成孔、或静压成孔等。
第二步:
向所述多个支撑桩孔1内注入水泥土浆。
第三步:
如图2所示,将多个预制钢结构桩2分别插入至多个注入有水泥土浆的支撑桩孔1中。在本实施例中,如图3所示,预制钢结构桩是分节用法兰盘5连接而成(图3中仅示意了两节),其还可以用螺栓连接。
第四步:
如图4所示,预制第一段沉井6,在第一段沉井6的下部刃脚对应于多个钢结构桩2并将落在多个钢结构桩2的部位,施工成平面7,以利于沉井能稳定地落在多个钢结构桩2上。
第五步:
如图5和图6所示,待第一段沉井混凝土强度达到设计要求后,开始挖土,对第一段沉井6进行沉井,直至第一段沉井6的底部落在八个钢结构桩2上(如图6所示),由于八个钢结构桩2的顶端位于同一标高,故可以调平沉井。
第六步:
如图7和图8所示,沿第一段沉井6井壁下方将多个钢结构桩部位的土方向下开挖预定深度,如0.3 m ~3m,同步拆除用法兰盘连接的第一节钢结构桩2,然后继续挖土、沉井,直至第一段沉井6再次落在钢结构桩2上,调平沉井。
第七步:
如图9所示,待第一段沉井6按设计要求下沉预定深度后,在其上面继续浇筑第二段沉井8。
第八步:
重复第六步和第七步,将钢结构桩逐节拆除,并在第二段沉井上面继续浇筑预定的N段沉井,直至沉井底端下沉至底部设计标高为止。
需要说明的是,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或等同替换,而不脱离本发明技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。
Claims (5)
1.逐层分级调平沉井倾斜的方法,其特征在于,它包括以下步骤:
1)在沉井预下沉的地基中形成多个支撑桩孔,所述多个支撑桩孔设置在沉井井壁中心线所形成的圆周投影上;
2)向所述多个支撑桩孔内注入水泥土浆;
3)将多个预制钢结构桩分别插入至所述多个注入有水泥土浆的支撑桩孔中,所述预制钢结构桩是分节用螺栓连接或法兰盘连接而成;
4)预制第一段沉井,在第一段沉井的下部刃脚对应于所述多个钢结构桩并将落在所述多个钢结构桩的部位,施工成平面,以利于沉井能稳定地落在所述多个钢结构桩上;
5)待所述第一段沉井混凝土强度达到设计要求后,开始挖土,进行第一段沉井,直至第一段沉井底部落在所述多个钢结构桩上,调平沉井;
6)沿第一段沉井井壁下方将所述多个钢结构桩部位的土方向下开挖预定深度,同步拆除第一节钢结构桩,继续挖土、沉井,直至第一段沉井再次落在所述多个钢结构桩上,调平沉井;
7)待第一段沉井按设计要求下沉预定深度后,在其上面继续浇筑第二段沉井;
8)不断重复步骤6)和7),将钢结构桩逐节拆除,并在第二段沉井上面继续浇筑预定的N段的沉井,直至沉井底端下沉至底部设计标高为止。
2.如权利要求1所述的逐层分级调平沉井倾斜的方法,其特征在于,所述多个钢结构桩等间隔均匀设置,每两个相邻的钢结构桩之间的环向间隔距离为3 m ~15m。
3.如权利要求1所述的逐层分级调平沉井倾斜的方法,其特征在于,所述多个钢结构桩在土硬的部位的间距大于在土软的部位的间距,每两个相邻的钢结构桩之间的环向间隔距离为3 m ~15m。
4.如权利要求1所述的逐层分级调平沉井倾斜的方法,其特征在于,所述步骤6)中的向下开挖的深度为0.3 m ~3m。
5.如权利要求1所述的逐层分级调平沉井倾斜的方法,其特征在于,所述步骤1)中形成多个支撑桩孔的方法为钻孔、锤击成孔、振动成孔、或静压成孔。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210511197.6A CN102995649B (zh) | 2012-12-04 | 2012-12-04 | 逐层分级调平沉井倾斜的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210511197.6A CN102995649B (zh) | 2012-12-04 | 2012-12-04 | 逐层分级调平沉井倾斜的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102995649A true CN102995649A (zh) | 2013-03-27 |
CN102995649B CN102995649B (zh) | 2014-11-12 |
Family
ID=47924705
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210511197.6A Expired - Fee Related CN102995649B (zh) | 2012-12-04 | 2012-12-04 | 逐层分级调平沉井倾斜的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102995649B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638648A (zh) * | 2016-12-13 | 2017-05-10 | 叶香竹 | 沉井的纠偏方法 |
CN109680703A (zh) * | 2018-12-26 | 2019-04-26 | 广州市第三市政工程有限公司 | 软土层沉井施工方法 |
CN113026816A (zh) * | 2021-03-24 | 2021-06-25 | 山东建筑大学 | 一种注浆加固土体的托换逆作沉井支护结构及施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1121909A (ja) * | 1997-06-30 | 1999-01-26 | Taisei Corp | 全旋回型ケーソンとその沈設方法 |
CN101503879A (zh) * | 2009-03-10 | 2009-08-12 | 中国第一冶金建设有限责任公司 | 防止沉井倾斜的预控方法 |
CN201292533Y (zh) * | 2008-08-25 | 2009-08-19 | 中铁大桥局股份有限公司 | 复合型套箱围堰 |
CN101509258A (zh) * | 2009-03-10 | 2009-08-19 | 中国第一冶金建设有限责任公司 | 预先控制沉井下沉倾斜的方法 |
CN101608453A (zh) * | 2009-07-06 | 2009-12-23 | 广州市第二市政工程有限公司 | 千斤顶顶升平衡进行沉井纠偏的工艺方法 |
KR101134025B1 (ko) * | 2009-12-22 | 2012-04-05 | 한신공영 주식회사 | 우물통 기초 공법 |
-
2012
- 2012-12-04 CN CN201210511197.6A patent/CN102995649B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1121909A (ja) * | 1997-06-30 | 1999-01-26 | Taisei Corp | 全旋回型ケーソンとその沈設方法 |
CN201292533Y (zh) * | 2008-08-25 | 2009-08-19 | 中铁大桥局股份有限公司 | 复合型套箱围堰 |
CN101503879A (zh) * | 2009-03-10 | 2009-08-12 | 中国第一冶金建设有限责任公司 | 防止沉井倾斜的预控方法 |
CN101509258A (zh) * | 2009-03-10 | 2009-08-19 | 中国第一冶金建设有限责任公司 | 预先控制沉井下沉倾斜的方法 |
CN101608453A (zh) * | 2009-07-06 | 2009-12-23 | 广州市第二市政工程有限公司 | 千斤顶顶升平衡进行沉井纠偏的工艺方法 |
KR101134025B1 (ko) * | 2009-12-22 | 2012-04-05 | 한신공영 주식회사 | 우물통 기초 공법 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638648A (zh) * | 2016-12-13 | 2017-05-10 | 叶香竹 | 沉井的纠偏方法 |
CN106638648B (zh) * | 2016-12-13 | 2018-11-09 | 叶香竹 | 沉井的纠偏方法 |
CN109680703A (zh) * | 2018-12-26 | 2019-04-26 | 广州市第三市政工程有限公司 | 软土层沉井施工方法 |
CN113026816A (zh) * | 2021-03-24 | 2021-06-25 | 山东建筑大学 | 一种注浆加固土体的托换逆作沉井支护结构及施工方法 |
CN113026816B (zh) * | 2021-03-24 | 2023-10-24 | 山东建筑大学 | 一种注浆加固土体的托换逆作沉井支护结构及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102995649B (zh) | 2014-11-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207003499U (zh) | 一种地铁隧道上方基坑开挖的抗浮起装置 | |
JP5243669B1 (ja) | 構造物傾動及び地盤改良の工法 | |
CN102660955B (zh) | 一种基坑边坡支护的快速施工方法 | |
CN105569051A (zh) | 一种砂卵石漂石地质层基坑支护体系及施工方法 | |
CN103422510A (zh) | 钢管框架式围堰结构及施工方法 | |
CN102561721B (zh) | 一种建筑物顶升纠偏方法 | |
CN106812150A (zh) | 一种山区陡坡地段公路桥梁桩基施工方法 | |
CN104264683B (zh) | 三面环绕文保建筑凹字形超深基坑分区支护方法 | |
CN103758132B (zh) | 一种结合放坡的悬臂排桩支护结构的施工工艺 | |
CN102995649B (zh) | 逐层分级调平沉井倾斜的方法 | |
CN104727324B (zh) | 不规则地下室支护施工方法 | |
CN101509258B (zh) | 预先控制沉井下沉倾斜的方法 | |
CN203213131U (zh) | 一种排水下沉与不排水下沉相结合的沉井 | |
CN111335319A (zh) | 高压旋喷桩止水帷幕沉井施工方法 | |
CN104594371A (zh) | 一种已有基础底板的加固结构及其施工方法 | |
CN103132532A (zh) | 一种排桩基坑支护方法 | |
CN105421488A (zh) | 地下复合围护体系中基础底板换撑的施工方法 | |
CN101748735A (zh) | 软土地区减少桩偏斜的基坑开挖方法 | |
CN207004520U (zh) | 一种地铁保护区竖井开挖的稳固结构 | |
CN102995650B (zh) | 逐层分级预控沉井倾斜的方法 | |
CN106013168A (zh) | 一种渣沟结构及其施工方法 | |
CN210946881U (zh) | 锚固式旋喷挡土结构 | |
CN105350547A (zh) | 一种用于护坡桩桩间土支护的方法 | |
CN211285666U (zh) | 一种厚软土层的窄长型沉井及其支撑结构 | |
CN104727206A (zh) | 软弱路基注浆处理施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141112 |