CN102987632A - Climbing shoes for installing lightweight steel constructions and using method thereof - Google Patents
Climbing shoes for installing lightweight steel constructions and using method thereof Download PDFInfo
- Publication number
- CN102987632A CN102987632A CN2011102688987A CN201110268898A CN102987632A CN 102987632 A CN102987632 A CN 102987632A CN 2011102688987 A CN2011102688987 A CN 2011102688987A CN 201110268898 A CN201110268898 A CN 201110268898A CN 102987632 A CN102987632 A CN 102987632A
- Authority
- CN
- China
- Prior art keywords
- sole
- shoes
- ascending
- prong
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000009194 climbing Effects 0.000 title abstract 8
- 229910000831 Steel Inorganic materials 0.000 title abstract 7
- 239000010959 steel Substances 0.000 title abstract 7
- 238000010276 construction Methods 0.000 title abstract 5
- 238000000034 method Methods 0.000 title abstract 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 5
- 229910052742 iron Inorganic materials 0.000 abstract 2
Landscapes
- Ladders (AREA)
Abstract
A pair of climbing shoes for installing lightweight steel constructions is used for climbing H-shaped steel columns and comprises shoe bottom plates (1), instep fixing rings (2), U-shaped forks (4) and shoelace buckling rings (5). The pair of climbing shoes for installing the lightweight steel constructions is characterized in that the shoe bottom plates (1) are made of steel plates; the instep fixing rings (2) are iron half rings, and two ends of the iron half rings are fixedly welded onto two sides of the middles of the shoe bottom plates (1); the U-shaped forks (4) are steel plates with lengths of 60-70mm, widths of 40mm and thicknesses of 10-14mm, the lengths of fork openings are 50mm, and the sides of the U-shaped forks (4) are welded to the shoe tops of the shoe bottom plates (1); and the shoelace buckling rings (5) are pairs of small iron rings which are respectively welded on two sides of the shoes, and shoelaces are tied on the shoelace buckling rings (5). The climbing shoes for installing the lightweight steel constructions and a using method of the climbing shoes have the advantages that climbing operators can flexibly climb by means of the climbing shoes, working efficiency is greatly improved, economic input is less, and engineering construction cost is reduced.
Description
Technical field
The present invention relates to a kind of shoes, specifically, is to make the people climb neatly ascending shoes and the using method that lightweight steel construction is installed that be used for of steel column on a kind of flange plate that is clamped in steel column with shoes.
Background technology
Lightweight steel construction has from heavy and light, and the construction period is short, strong adaptability, and specious, cost is low, the characteristics such as easy care.From generation nineteen ninety, lightweight steel construction has entered fast comprehensively development and application period in China, is widely used in industrial premises, supermarket, the warehouse construction.
Lightweight steel construction adopts factory process, field erected mode substantially, the raising of Installation Technology, optimize be guarantee that steel building is efficient, the basis of high-quality, safety.During Lightweight metal plant was installed, upwards the work high above the ground of climbing was many.According to traditional approach, the general method that hangs vertical ladder at steel column that adopts.But, along with the generally application of large span factory building, adopt this kind method the situation of expense high (vertical ladder is set in a large number) or efficient low (processing a small amount of cat ladder repeats to have bad luck) just to occur.
Therefore the method that hangs vertical ladder during known lightweight steel construction is installed exists above-mentioned all inconvenience and problem.
Summary of the invention
Purpose of the present invention is to propose a kind ofly can climb flexibly operation, safe and reliable be used for the ascending shoes that lightweight steel construction is installed.
Another object of the present invention is to propose a kind ofly can climb flexibly operation, safe and reliable be used for the ascending shoes using method that lightweight steel construction is installed.
For achieving the above object, technical solution of the present invention is:
A kind of ascending shoes for the lightweight steel construction installation is used for climbing " H " steel column, comprises sole, the instep retainer ring, and U-shaped fork and shoestring clasp is characterized in that:
Described sole (1) is made by steel plate;
Described instep retainer ring is an iron semi-ring, and iron semi-ring two ends are welded in the both sides, middle part of sole admittedly;
Described U-shaped fork is long a 60~70mm, wide 40mm, and the steel plate of thick 10~14mm, prong length is 50mm, described U-shaped fork is welded on the footwear top of sole with side;
Described shoestring clasp is that one pair of little iron hoop is welded on respectively the both sides at shoes, and is that shoestring is arranged.
The ascending shoes of installing for lightweight steel construction of the present invention can also be further achieved by the following technical measures.
Aforesaid method, the steel plate of wherein said sole is checkered steel plate.
Aforesaid method, the steel plate thickness of wherein said sole are 5~8mm.
Aforesaid method, the prong of wherein said U-shaped fork admittedly welds with the footwear top of sole to the right and is connected, to be used for operator's left foot; The prong of U-shaped fork admittedly welds with the footwear top of sole left and is connected, to be used for operator's right crus of diaphragm.
Aforesaid method, the large 1mm of prong Width steel column flange plate of wherein said U-shaped fork.
Aforesaid method, the arch place, middle part of wherein said sole dig two with sole lengthwise parallel elongated slot in the same way, to alleviate the weight of ascending shoes.
A kind of ascending shoes using method for the lightweight steel construction installation is characterized in that may further comprise the steps:
The prong that a, the operator that ascends a height put in described U-shaped fork with left foot welds the instep retainer ring of the ascending shoes that is connected to the right admittedly with the footwear top of sole;
B, the operator that ascends a height weld the ascending shoes instep retainer ring that is connected with the footwear top of sole left admittedly with the prong that right crus of diaphragm puts in described U-shaped fork;
C, the operator left and right sides pin of ascending a height use respectively the shoestring of described shoestring clasp with oneself pin and ascending shoes tighten;
The prong that d, the operator that ascends a height pitch with the U-shaped of the ascending shoes on the pin of the left and right sides respectively inserts the steel column flange plate of erectting and climbs upper steel column, and with the hand steered steel column of holding, then left and right sides pin is alternately climbed, and uses both hands and feet and climbs up object height simultaneously; During climbing downwards, vice versa.
After adopting technique scheme, ascending shoes and using method of installing for lightweight steel construction of the present invention has the following advantages:
1, saves the steel of processing vertical ladder, also saved the machinery that on-the-spot vertical ladder is had bad luck use;
2, the construction workman utilizes it can climb neatly operation, has improved widely operating efficiency;
3, economic input is few, reduces Construction Cost.
Description of drawings
Fig. 1 is the ascending shoes structural representation of the embodiment of the invention;
Fig. 2 is the schematic diagram that the sole of the embodiment of the invention is welded to connect the instep retainer ring.
Among the figure: 1 sole, 2 instep retainer rings, 3 butt welds, 4 " U " shape fork, 5 shoestring clasps.
The specific embodiment
Below in conjunction with embodiment and accompanying drawing thereof the present invention is illustrated further.
Embodiment 1
Now see also Fig. 1, Fig. 1 is the ascending shoes structural representation of the embodiment of the invention, and Fig. 2 is the schematic diagram that the sole of the embodiment of the invention is welded to connect the instep retainer ring.As shown in the figure, described sole 1 is made by the checkered steel plate that 6 ㎜ are thick, and checkered steel plate can play anti-skidding effect;
Described instep retainer ring 2 is the rectangle semi-ring that a usefulness 12mm round steel is made, and rectangle semi-ring two ends are welded in the both sides, middle part of sole 1 admittedly;
Described U-shaped fork 4 is a long 60mm, wide 40mm, and the steel plate of thick 12mm, prong length is 50mm, described U-shaped is pitched 4 and is welded on the footwear top of sole 4, its butt weld 3 with side;
Described shoestring clasp 5 is that one pair of little iron hoop of making of the 12mm round steel is welded on respectively the both sides at shoes, and is that shoestring is arranged that available shoestring is strapped in ascending shoes on operator's the ankle.
The prong of described U-shaped fork 4 admittedly welds with the footwear top of sole 1 with side to the right and is connected, to be used for operator's left foot; The prong of U-shaped fork 4 admittedly welds with the footwear top of sole 1 with side left and is connected, to be used for operator's right crus of diaphragm.
The large 1mm of prong Width steel column flange plate of described U-shaped fork 4.
The arch place, middle part of described sole 1 dig two with sole lengthwise parallel elongated slot in the same way, to alleviate the weight of ascending shoes.
Embodiment 2
A kind of ascending shoes using method for the lightweight steel construction installation is used for climbing " H " steel column, it is characterized in that may further comprise the steps:
The prong that a, the operator that ascends a height put in described U-shaped fork 4 with left foot welds the instep retainer ring 2 of the ascending shoes that is connected to the right admittedly with the footwear top of sole 1;
B, the operator that ascends a height weld the ascending shoes instep retainer ring 2 that is connected with the footwear top of sole 1 left admittedly with the prong that right crus of diaphragm puts in described U-shaped fork 4;
C, the operator left and right sides pin of ascending a height use respectively the shoestring of described shoestring clasp 5 with oneself pin and ascending shoes tighten;
D, the operator that ascends a height use respectively the prong of the U-shaped fork 4 of the ascending shoes on the pin of the left and right sides to insert the steel column flange plate of erectting and climb upward steel column, and with the hand steered steel column of holding, then left and right sides pin is alternately climbed, and uses both hands and feet and climbs up object height simultaneously; During climbing downwards, vice versa.
In building-site construction, in order to ensure safety, prevent accidental falling, also should safety be set at steel column and slip rope, the operator that ascends a height uses up and down unidirectional catching device during operation.
In the Baosteel wheel project of Yantai, the long 240m of main building, wide 54m divide two to stride, totally 31 lines.Mainly comprise 117 of steel columns, 31 groups of roof girders, AB are striden and are provided with 1 electronic twin beam overhead crane (5t) in the interior 12-31 line, and BC strides interior logical line and is provided with 1 electronic twin beam overhead crane (10t).
According to former arrangement and method for construction, owing to be the lightweight steel construction system, the steel column top vertically only is provided with tie-rod, can't walk between post and post.Therefore, need at A, B, C three row 12 vertical ladders to be set altogether, cat ladder uses Φ 12mm round steel to make, and uses altogether 2 tons of steel; In construction work, utilize driving to have bad luck use.
Adopt ascending shoes and the using method for the lightweight steel construction installation of the present invention, saved the steel of making cat ladder; Improved operating efficiency, the duration is saved artificial 80,10 machine-teams of 25 tons of truck cranes than plan 20 days in advance; Just greatly improve operating efficiency with seldom economic input, successfully finished the Steel Structure Installation task.
Above embodiment is only for explanation the present invention, but not limitation of the present invention, person skilled in the relevant technique in the situation that does not break away from the spirit and scope of the present invention, can also make various conversion or variation.Therefore, all technical schemes that are equal to also should belong to category of the present invention, should be limited by each claim.
Claims (7)
1. one kind is used for the ascending shoes that lightweight steel construction is installed, and is used for climbing " H " steel column, comprises sole (1), instep retainer ring (2), and U-shaped fork (4) and shoestring clasp (5) is characterized in that:
Described sole (1) is made by steel plate;
Described instep retainer ring (2) is an iron semi-ring, and iron semi-ring two ends are welded in the both sides, middle part of sole (1) admittedly;
Described U-shaped fork (4) is long a 60~70mm, wide 40mm, and the steel plate of thick 10~14mm, prong length is 50mm, described U-shaped fork (4) is welded on the footwear top of sole (1) with side;
Described shoestring clasp (5) is that one pair of little iron hoop is welded on respectively the both sides at shoes, and is that shoestring is arranged.
2. the ascending shoes for the lightweight steel construction installation as claimed in claim 1 is characterized in that the steel plate of described sole (1) is checkered steel plate.
3. the ascending shoes for the lightweight steel construction installation as claimed in claim 1 is characterized in that the steel plate thickness of described sole (1) is 5~8mm.
4. the ascending shoes for the lightweight steel construction installation as claimed in claim 1 is characterized in that, the prong of described U-shaped fork (4) admittedly welds with the footwear top of sole (1) with side to the right and is connected, with the left foot for the operator that ascends a height; The prong of U-shaped fork (4) admittedly welds with the footwear top of sole (1) with side left and is connected, with the right crus of diaphragm for the operator that ascends a height.
5. the ascending shoes for the lightweight steel construction installation as claimed in claim 1 is characterized in that, the large 1mm of prong Width steel column flange plate of described U-shaped fork (4).
6. the ascending shoes of installing for lightweight steel construction as claimed in claim 1 is characterized in that, the arch place, middle part of described sole (1) dig two with sole lengthwise parallel elongated slot in the same way, to alleviate the weight of ascending shoes.
7. one kind is used for the ascending shoes using method that lightweight steel construction is installed, and it is characterized in that may further comprise the steps:
A, the operator that ascends a height put in described U-shaped with left foot and pitch the prong of (4) welds the ascending shoes that is connected to the right admittedly with the footwear top of sole (1) instep retainer ring (2);
B, the operator that ascends a height weld the ascending shoes instep retainer ring (2) that is connected with the footwear top of sole (1) left admittedly with the prong that right crus of diaphragm puts in described U-shaped fork (4);
C, the operator left and right sides pin of ascending a height use respectively the shoestring of described shoestring clasp (5) with oneself pin and ascending shoes tighten;
D, the operator that ascends a height pitch respectively the upper steel column of steel column flange plate climbing of the prong insertion setting of (4) with the U-shaped of the ascending shoes on the pin of the left and right sides, with the hand steered steel column of holding, then left and right sides pin is alternately climbed, and uses both hands and feet and climbs up object height simultaneously; During climbing downwards, vice versa.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102688987A CN102987632A (en) | 2011-09-13 | 2011-09-13 | Climbing shoes for installing lightweight steel constructions and using method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102688987A CN102987632A (en) | 2011-09-13 | 2011-09-13 | Climbing shoes for installing lightweight steel constructions and using method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102987632A true CN102987632A (en) | 2013-03-27 |
Family
ID=47917110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102688987A Pending CN102987632A (en) | 2011-09-13 | 2011-09-13 | Climbing shoes for installing lightweight steel constructions and using method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102987632A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104188237A (en) * | 2014-07-25 | 2014-12-10 | 河南新亚钢构工程有限公司 | Profile steel climbing shoes |
CN108056523A (en) * | 2018-01-11 | 2018-05-22 | 李利民 | One kind walks wall footwear and walks wall method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2624026A1 (en) * | 1987-12-08 | 1989-06-09 | Bresch Andre | Device making it possible to climb a mast |
CN2560392Y (en) * | 2002-06-16 | 2003-07-16 | 曹凤林 | Clibming climbers for steel structure building |
CN200973946Y (en) * | 2006-11-18 | 2007-11-14 | 曹俊晖 | Device having safety bell for climbing rob |
CN201312590Y (en) * | 2008-12-25 | 2009-09-23 | 大连金广建设集团有限公司 | Device for climbing steel structures in construction works |
CN201571545U (en) * | 2009-12-22 | 2010-09-08 | 中冶京唐建设有限公司 | Structural frame ascending operation shoes |
CN201823245U (en) * | 2010-06-13 | 2011-05-11 | 中国化学工程第十四建设有限公司 | Climbing steel overshoe |
CN201906419U (en) * | 2010-12-24 | 2011-07-27 | 中国化学工程第十一建设有限公司 | Special iron shoe tool for climbing H-shaped steel column |
-
2011
- 2011-09-13 CN CN2011102688987A patent/CN102987632A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2624026A1 (en) * | 1987-12-08 | 1989-06-09 | Bresch Andre | Device making it possible to climb a mast |
CN2560392Y (en) * | 2002-06-16 | 2003-07-16 | 曹凤林 | Clibming climbers for steel structure building |
CN200973946Y (en) * | 2006-11-18 | 2007-11-14 | 曹俊晖 | Device having safety bell for climbing rob |
CN201312590Y (en) * | 2008-12-25 | 2009-09-23 | 大连金广建设集团有限公司 | Device for climbing steel structures in construction works |
CN201571545U (en) * | 2009-12-22 | 2010-09-08 | 中冶京唐建设有限公司 | Structural frame ascending operation shoes |
CN201823245U (en) * | 2010-06-13 | 2011-05-11 | 中国化学工程第十四建设有限公司 | Climbing steel overshoe |
CN201906419U (en) * | 2010-12-24 | 2011-07-27 | 中国化学工程第十一建设有限公司 | Special iron shoe tool for climbing H-shaped steel column |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104188237A (en) * | 2014-07-25 | 2014-12-10 | 河南新亚钢构工程有限公司 | Profile steel climbing shoes |
CN108056523A (en) * | 2018-01-11 | 2018-05-22 | 李利民 | One kind walks wall footwear and walks wall method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205977243U (en) | A platform truck for tunnel water proofing board is laid and reinforcement | |
CN205557339U (en) | From climbing formula pier stud template elevating gear | |
CN108547225A (en) | A kind of assembly moving type security construction of prevention work job platform and construction method and application | |
CN209523118U (en) | A kind of moving type security hanging basket for drainpipe installation below bridge | |
CN102987632A (en) | Climbing shoes for installing lightweight steel constructions and using method thereof | |
KR101339284B1 (en) | Safety ladder for concrete mold | |
CN210886963U (en) | Simple and easy integral T roof beam hogging moment construction platform | |
CN105133501A (en) | Method for constructing high pier through integrated lifting bracket | |
CN214658685U (en) | Combined anti-skidding climbing frame for constructional engineering | |
CN103866699A (en) | Rail-free type walking hanging basket | |
CN212561215U (en) | Back cage platform channel device | |
CN201823245U (en) | Climbing steel overshoe | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN203867198U (en) | Slip equipment for high-rise steel structure transfer layer truss | |
CN105484483A (en) | Construction method for bottom decoration construction platform of steel truss ceiling | |
CN216304427U (en) | Road and bridge construction is with safe construction platform | |
CN215564748U (en) | Pavement for roof structure of swimming pool | |
CN211499700U (en) | Construction protection handling frame | |
CN202705932U (en) | T-beam reinforced hanger frame structure | |
CN206815190U (en) | Carry the bridge square pier construction formwork of corbel type support safety fence operation platform | |
CN206616460U (en) | A kind of adhesion type bridge maintenance nacelle device | |
CN104627787A (en) | Basement roof support-free elevator installation method | |
CN104912339A (en) | Long-distance multi-span welding H-section steel roof beam installation method | |
CN203768820U (en) | Walking hanging basket without rail | |
CN215052253U (en) | Bridge concatenation bar planting is punched, is chiseled with portable platform truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130327 |