[go: up one dir, main page]

CN102966094B - Method for constructing concrete pile through rotary excavating and pressure irrigation - Google Patents

Method for constructing concrete pile through rotary excavating and pressure irrigation Download PDF

Info

Publication number
CN102966094B
CN102966094B CN201210542726.9A CN201210542726A CN102966094B CN 102966094 B CN102966094 B CN 102966094B CN 201210542726 A CN201210542726 A CN 201210542726A CN 102966094 B CN102966094 B CN 102966094B
Authority
CN
China
Prior art keywords
drilling rod
pile
rotary excavating
concrete
digging machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210542726.9A
Other languages
Chinese (zh)
Other versions
CN102966094A (en
Inventor
马春根
曹开伟
欧阳洲球
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Huanqiu Geotechnical Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210542726.9A priority Critical patent/CN102966094B/en
Publication of CN102966094A publication Critical patent/CN102966094A/en
Application granted granted Critical
Publication of CN102966094B publication Critical patent/CN102966094B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a method for constructing a concrete pile through rotary excavating and pressure irrigation, which is characterized by comprising the following steps: employing a rotary excavating driller for construction, lifting a rotary excavating drilling bucket after drilling a pile hole with a preset depth, and placing a multi-functional slag removing barrel at the bottom of the pile hole for slag removal; after slag removal at the bottom of the pile hole is complete, rotating the multi-functional slag removing barrel for half a circle so that a concrete output valve at the bottom of the multi-functional slag removing barrel is open, and lifting a rotary excavating drilling rod slowly while pressure-irrigating concrete in the pile hole by a concrete convey pipe arranged in the rotary excavating drilling rod and performing synchronous self-expansion along with the rotary excavating drilling rod; and lifting a reinforcement cage and inserting the reinforcement cage into the pile through dead weight of the reinforcement cage and a vibrator. By the adoption the invention, drilling and slag removal of the pile foundation, irrigation and pile forming are integrated, overcoming the disadvantage that for rotary excavating and pressure irrigation of a pile in the prior art, a plurality of complicate and hard-to-control measures need to be taken for preventing settlement overproof, effectively controlling the project quality of a pile rotary excavating machine, greatly improving construction speed and benefits, and filling up an empty filed in the pile industry in China.

Description

One is revolved and is dug guncreting pile construction method
Technical field
The present invention relates to a kind of Spiral digging machine construction method, be specifically related to one and revolve and dig guncreting pile construction method.
Background technology
Current domestic Spiral digging machine generally can only be holed, can not guncreting, after Spiral digging machine boring, drilling rod must be proposed, and put into reinforcing cage, otherwise just cannot concrete perfusion.Revolve and dig the multinomial complexity that castinplace pile takes in order to prevent sediment from exceeding standard and don't hold manageable measure, and the scarfing cinder time that need to be longer, engineering cost increased, so existing Spiral digging machine drilling rod has seriously restricted the development of pile foundation industry.
The multi-functional residue-removing cylinder (CN201220456767.1) of applicant invention, it is provided with the steel pipe with hollow duct for fluid concrete in former residue-removing cylinder inside, it is connected with drilling rod, there is concrete outlet valve in residue-removing cylinder bottom design simultaneously, in the time that drilling rod clockwise rotates, concrete outlet is closed automatically, residue-removing cylinder carries out scarfing cinder operation by shoveling native plate, and in the time that drilling rod rotates counterclockwise, concrete outlet is automatically opened and carried out concrete pressure filling operation.Effectively having solved residue-removing cylinder can only scarfing cinder, technical barrier that can not concrete perfusion.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of speed of application is fast, workmanship is high one and revolves and dig guncreting pile construction method.
For solving above technical problem, technical scheme of the present invention is: one is revolved and dug guncreting pile construction method, it is characterized in that comprising the following steps:
The 1st step: adopt rotary drilling rig construction, be drilled into a predetermined stake hole depth, then propose rotary drilling digger, change multi-functional residue-removing cylinder and put into a bottom, hole and carry out scarfing cinder construction;
The 2nd step: after bottom, stake hole sediment cleans out, reversion half-turn is opened the concrete output valve of multi-functional residue-removing cylinder bottom, slowly mention on one side rotary drill rod, in stake hole, press concrete perfusion by synchronize the elephant trunk of self extending activity in rotary drill rod with Spiral digging machine drilling rod on one side;
The 3rd step: hang in reinforcing cage, utilize reinforcing cage deadweight and vibrator that reinforcing cage is inserted in stake.
Described Spiral digging machine drilling rod can self extending by different-diameter drilling rod be socketed and form from inside to outside, wherein the drilling rod of diameter minimum is connected with Spiral digging machine gooseneck portion pulley by rotatable parts and wire rope, the drilling rod top movable of described diameter minimum is connected with synchronizes the elephant trunk of self extending activity with drilling rod, bottom is provided with the square joint being connected with rotary drilling digger.
Described elephant trunk is socketed and forms from inside to outside by the pipeline of different-diameter, wherein the elephant trunk top of diameter minimum is fixed on Spiral digging machine gooseneck portion, and wherein the elephant trunk of diameter maximum bottom is provided with the rotatable parts that are connected with the drilling rod top movable of diameter minimum.
In described square joint, be provided with band hollow duct.
Each pipe joint road outer setting finite place piece of described elephant trunk, bottom is provided with the block piece matching with locating part.
Described locating part is arranged on the place apart from block piece 20~40cm.
Between described locating part and block piece, be provided with the seal that prevents that concrete from flowing backwards.
The width of described locating part and block piece is the semidiameter between each pipe joint road.
The present invention has rewritten rotary drilling rig, can only hole can not guncreting fall behind historical, realize the boring of pile foundation, scarfing cinder, perfusion, pile institutional operation, guarantee the sedimentation quality of Spiral digging machine, effectively control the workmanship of rotary pile-digging machine, the multinomial safeguard procedures that former rotary drilling rig is taked in order to prevent sediment from exceeding standard are deducted, speed of application and benefit are significantly improved, solved technical code for building pile foundation JGJ 94-2008 " in adopt after rotary drilling rig pore-forming concrete perfusion again described in 6.3.25 chapters and sections, the multinomial unmanageable technical barrier that can cause, fill up a blank of China's pile foundation industry.
Brief description of the drawings
Fig. 1 is construction sequence figure of the present invention;
Fig. 2 is Spiral digging machine drilling rod schematic diagram of the present invention.
1, Spiral digging machine gooseneck portion, 2, wire rope, 3, drilling rod, 4, the drilling rod of diameter minimum, 5, elephant trunk, 6, seal, 7, the elephant trunk of diameter minimum, 8, the elephant trunk of diameter maximum, 9, square joint, 10, hollow duct, 11, locating part, 12, block piece, 13, rotatable parts.
Detailed description of the invention
One is revolved and is dug guncreting pile construction method, it is characterized in that comprising the following steps:
The 1st step: adopt rotary drilling rig construction, be drilled into a predetermined stake hole depth, then propose rotary drilling digger, change multi-functional residue-removing cylinder and put into a bottom, hole and carry out scarfing cinder construction;
The 2nd step: after bottom, stake hole sediment cleans out, reversion half-turn is opened the concrete output valve of multi-functional residue-removing cylinder bottom, slowly mention on one side rotary drill rod, in stake hole, press concrete perfusion by synchronize the elephant trunk of self extending activity in rotary drill rod with Spiral digging machine drilling rod on one side;
The 3rd step: hang in reinforcing cage, utilize reinforcing cage deadweight and vibrator that reinforcing cage is inserted in stake.
As shown in Figure 1, detailed construction step of the present invention is as follows:
Smooth location → stake position setting-out → mounting equipment → Spiral digging machine is in place → drilling to completion stop creeping into → pulling down rotary drilling digger → change is multi-functional please slag cylinder → cleaning dregs (repeatedly scarfing cinder) → be rotated counterclockwise drilling machine drilling rod (half-turn) → close scarfing cinder nozzle, automatically unlatching concrete valve → mention drilling rod (30cm) → one side to promote drilling rod, on one side with concrete ground pump via concrete conveying pipe to the built-in automatic telescopic elephant trunk pump pressure Superfluid state concrete → proposition drilling rod → insertion reinforcing cage → pile → pile crown processing → stake top safeguard measure of Spiral digging machine drilling rod.
As shown in Figure 2, described Spiral digging machine drilling rod can self extending by different-diameter drilling rod 3 be socketed and form from inside to outside, wherein the drilling rod 4 of diameter minimum is connected with Spiral digging machine gooseneck portion 1 by wire rope 2, drilling rod 4 top movable of described diameter minimum are connected with synchronizes the elephant trunk 5 of self extending activity with drilling rod 3, bottom is provided with the square joint with hollow duct 10 9 being connected with rotary drilling digger;
Described elephant trunk 5 is socketed and forms from inside to outside by different-diameter pipeline, wherein elephant trunk 7 tops of diameter minimum are fixed in Spiral digging machine gooseneck portion 1, extend above rig column with elbow, external concrete conveyance steel pipe, then receive on concrete ground pump with rubber hose and steel pipe connecting, wherein elephant trunk 8 bottoms of diameter maximum are provided with the rotatable parts 13 that are connected with drilling rod 4 top movable of diameter minimum;
Each pipe joint road outer setting finite place piece 11 of described elephant trunk 5, bottom is provided with the block piece 12 matching with locating part 11;
Between described locating part 11 and block piece 12, distance is 30cm, and between locating part 11 and block piece 12, is provided with the seal 6 that prevents that concrete from flowing backwards;
The width of described each pipe joint road upper limit part 11 and block piece 12 is, the radius of lower pipe joint road and this section pipeline poor.
The geological formations in the most of provinces of central China such as this method is applicable to banket, mud, silt, clay, sandy soil, cobble, middle weathering and gentle breeze, city, has made huge contribution by the fast development for pile foundation industry.
The above, be only preferably detailed description of the invention of the present invention, but protection domain of the present invention is not limited to this, is equal to replacement or changes, within all should being encompassed in protection scope of the present invention according to technical scheme of the present invention and inventive concept thereof.

Claims (2)

1. revolve and dig a guncreting pile construction method, it is characterized in that comprising the following steps:
The 1st step: adopt rotary drilling rig construction, be drilled into a predetermined stake hole depth, then propose rotary drilling digger, change multi-functional residue-removing cylinder and put into a bottom, hole and carry out scarfing cinder construction;
The 2nd step: after bottom, stake hole sediment cleans out, reversion half-turn is opened the concrete output valve of multi-functional residue-removing cylinder bottom, slowly mention on one side Spiral digging machine drilling rod, in stake hole, press concrete perfusion by synchronize the elephant trunk of self extending activity in Spiral digging machine drilling rod with Spiral digging machine drilling rod on one side;
The 3rd step: hang in reinforcing cage, utilize reinforcing cage deadweight and vibrator that reinforcing cage is inserted in stake;
Described multi-functional residue-removing cylinder, comprise cylindrical shell, described cylindrical shell top is provided with the link being connected with Spiral digging machine drilling rod, bottom is provided with and the body concentric fan-shaped base plate of cylinder, in described cylindrical shell, be provided with the steel pipe with hollow duct, described steel pipe lower end is fixedly connected on fan-shaped base plate, and described fan-shaped base plate bottom is provided with can be around the receipts soil plate of steel pipe rotary, and described steel pipe bottom is provided with valve;
Described Spiral digging machine drilling rod can self extending by different-diameter drilling rod (3) be socketed from inside to outside formation, wherein the drilling rod of diameter minimum (4) is connected with Spiral digging machine gooseneck portion (1) pulley by rotatable parts (13) and wire rope (2), drilling rod (4) top movable of described diameter minimum is connected with synchronizes the elephant trunk (5) of self extending activity with drilling rod (3), bottom is provided with the square joint (9) being connected with rotary drilling digger;
Described elephant trunk (5) is socketed and forms from inside to outside by the pipeline of different-diameter, wherein the elephant trunk of diameter minimum (7) top is fixed on Spiral digging machine gooseneck portion (1), and wherein the elephant trunk of diameter maximum (8) bottom is provided with the rotatable parts (13) that are connected with drilling rod (4) top movable of diameter minimum.
2. construction method according to claim 1, is characterized in that: on described fan-shaped base plate, be provided with block;
On the edge of the native plate of described receipts, be provided with the shovel soil plate under being tilted to; Described valve is made up of two semilune baffle plates; On described semilune baffle plate, be provided with groove; Described baffle plate one end is fixed on steel pipe bottom by bearing pin, and the other end passes groove by bearing pin and is limited on the native plate of receipts; Described fan-shaped base plate is connected by hinge with cylinder body bottom.
3 .construction method according to claim 1, is characterized in that: in described square joint (9), be provided with band hollow duct (10).
4 .construction method according to claim 1, is characterized in that: each pipe joint road outer setting finite place piece (11) of described elephant trunk (5), bottom is provided with the block piece (12) matching with locating part (11).
5 .construction method according to claim 4, is characterized in that: described locating part (11) is arranged on apart from block piece (12) 20~40cm places.
6 .construction method according to claim 4, is characterized in that: between described locating part (11) and block piece (12), be provided with the seal (6) that prevents that concrete from flowing backwards.
7 .construction method according to claim 4, is characterized in that: the width of described locating part (11) and block piece (12) is the semidiameter between each pipe joint road.
CN201210542726.9A 2012-12-15 2012-12-15 Method for constructing concrete pile through rotary excavating and pressure irrigation Active CN102966094B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210542726.9A CN102966094B (en) 2012-12-15 2012-12-15 Method for constructing concrete pile through rotary excavating and pressure irrigation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210542726.9A CN102966094B (en) 2012-12-15 2012-12-15 Method for constructing concrete pile through rotary excavating and pressure irrigation

Publications (2)

Publication Number Publication Date
CN102966094A CN102966094A (en) 2013-03-13
CN102966094B true CN102966094B (en) 2014-08-27

Family

ID=47796507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210542726.9A Active CN102966094B (en) 2012-12-15 2012-12-15 Method for constructing concrete pile through rotary excavating and pressure irrigation

Country Status (1)

Country Link
CN (1) CN102966094B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243740B (en) * 2013-05-20 2015-02-04 马春根 Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN104153352B (en) * 2014-07-31 2017-02-15 广西科技大学 Karst geology rotary-drilling bored concrete pile hole forming process
CN104631437B (en) * 2014-12-19 2016-05-04 国家电网公司 KV Electric Transmissions application rotary drilling rig carries out the method for digging hole pile foundation pore-forming
CN106930276B (en) * 2017-04-11 2018-11-06 广州智弘建筑物检测与鉴定技术有限公司 The construction method of the deep hole blasting of rotary digging bored concrete pile and conduit rotary digging removing obstacles
CN109555125B (en) * 2019-01-24 2024-02-27 张家口众益岩土工程有限公司 Submersible concrete pouring sealing telescopic pipe
CN113235608A (en) * 2021-04-30 2021-08-10 杭州市市政工程集团有限公司 Enclosure structure for closely penetrating low-clearance bridge and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5099696A (en) * 1988-12-29 1992-03-31 Takechi Engineering Co., Ltd. Methods of determining capability and quality of foundation piles and of designing foundation piles, apparatus for measuring ground characteristics, method of making hole for foundation pile such as cast-in-situ pile and apparatus therefor
CN1831250A (en) * 2005-03-07 2006-09-13 徐州工程机械科技股份有限公司徐工研究院 Construction technology of dry soil taking hole forming method of rotary digging drilling machine
CN100523389C (en) * 2007-06-08 2009-08-05 中铁十八局集团有限公司 Ballastless track steel reinforced concrete pile-net construction method
CN101566043A (en) * 2009-05-19 2009-10-28 李征 Cast-in-situ cylinder pile rotary drilling rig and piling method thereof
CN102605771B (en) * 2012-04-01 2014-07-30 贺德新 Construction method for drilling cast-in-place concrete pipe pile and drilling tool for concrete pipe pile
CN102758430B (en) * 2012-07-31 2014-07-23 中建五局第三建设有限公司 Large-diameter rotary digging pile construction process for ultra-deep throwing and filling unconsolidated soil body

Also Published As

Publication number Publication date
CN102966094A (en) 2013-03-13

Similar Documents

Publication Publication Date Title
CN102966094B (en) Method for constructing concrete pile through rotary excavating and pressure irrigation
CN101638891B (en) Construction method of all casing precessing isolation pile
CN105649012B (en) Upper-soft lower-hard ground subway station building enclosure drilled pile construction method
JP6144542B2 (en) Nakabori excavator
CN205743796U (en) A kind of churning driven cartridge type scouring bit
CN102286984A (en) Water-stop curtain and construction method thereof
CN103603342A (en) Construction method of ultra-long bored concrete pile with large-diameter casing combination
CN102605772A (en) Construction method for revolving digging cast-in-place pile
CN102425372A (en) Vibration Drilling Drilling Rig
CN104805831A (en) Pore-forming method of hard rock foundation pile with large diameter
CN109653682A (en) Bore the adjustable drill bit of diameter and hole digging machine
CN202194149U (en) Waterproof curtain
CN114108649A (en) Foundation pit reinforcing construction method for mucky soil layer
CN102535490A (en) Method for dewatering foundation pit by using bored cast-in-place pile
CN110424896A (en) A kind of hole stake drilling construction method and device suitable for high backfill Karst Geological Landscape
CN103243740A (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN202926230U (en) A rotary drilling rig drill rod provided with a self-extension concrete conveying pipe
CN206800416U (en) One kind is easy to the permanent branch protecting assembly of the vertical rock mass steel-pipe pile of reassembling type
CN104264679B (en) Construction method of large-caliber underwater cast-in-place pile for power transmission tower foundation
CN104074184B (en) Pile base post-grouted expanded-base bored pile
CN106930274B (en) A construction method of a full-sleeve rotary bored cast-in-place pile with a fixed steel cage position
CN209798792U (en) open cut foundation pit deep silt layer vacuum dewatering system
CN207229106U (en) The shaft sinking device to break ground for shaft sinking construction machinery broken rock
CN111425664A (en) Large-diameter concrete pipeline jacking pipe construction method
CN107386963A (en) A kind of rotary digging bored concrete pile meets big particle diameter cobble drilling construction method and embraces stone bucket and bores

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161128

Address after: 333000 Jiangxi Province, Jingdezhen City Changjiang district fish Li Industrial Park, No. fifteenth

Patentee after: Jiangxi Huanqiu geotechnical Technology Co., Ltd.

Address before: 333000 Jiangxi Province, Jingdezhen city Zhushan District pear garden in Shangri-La 27

Patentee before: Ma Chungen