CN102877646B - 灌芯叠合装配式钢筋混凝土剪力墙结构及其建造方法 - Google Patents
灌芯叠合装配式钢筋混凝土剪力墙结构及其建造方法 Download PDFInfo
- Publication number
- CN102877646B CN102877646B CN201210399425.5A CN201210399425A CN102877646B CN 102877646 B CN102877646 B CN 102877646B CN 201210399425 A CN201210399425 A CN 201210399425A CN 102877646 B CN102877646 B CN 102877646B
- Authority
- CN
- China
- Prior art keywords
- wall
- concrete
- shear wall
- shear
- cast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011150 reinforced concrete Substances 0.000 title claims abstract description 24
- 238000000034 method Methods 0.000 title claims abstract description 13
- 239000004567 concrete Substances 0.000 claims abstract description 61
- 238000010276 construction Methods 0.000 claims abstract description 39
- 238000009826 distribution Methods 0.000 claims description 27
- 238000011065 in-situ storage Methods 0.000 claims description 26
- 229910000831 Steel Inorganic materials 0.000 claims description 25
- 239000010959 steel Substances 0.000 claims description 25
- 230000003014 reinforcing effect Effects 0.000 claims description 19
- 238000009413 insulation Methods 0.000 claims description 18
- 238000010008 shearing Methods 0.000 claims description 17
- 239000011178 precast concrete Substances 0.000 claims description 16
- 238000003466 welding Methods 0.000 claims description 12
- 238000005194 fractionation Methods 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 9
- 239000004744 fabric Substances 0.000 claims description 7
- 230000002787 reinforcement Effects 0.000 claims description 7
- 238000010923 batch production Methods 0.000 claims description 6
- 239000011083 cement mortar Substances 0.000 claims description 5
- 230000009467 reduction Effects 0.000 claims description 3
- 230000008878 coupling Effects 0.000 claims description 2
- 238000010168 coupling process Methods 0.000 claims description 2
- 238000005859 coupling reaction Methods 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 230000006872 improvement Effects 0.000 abstract description 2
- 238000009417 prefabrication Methods 0.000 abstract 1
- 239000010410 layer Substances 0.000 description 15
- 238000010586 diagram Methods 0.000 description 13
- 238000009415 formwork Methods 0.000 description 8
- 238000009435 building construction Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000000926 separation method Methods 0.000 description 4
- 239000005439 thermosphere Substances 0.000 description 4
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000000945 filler Substances 0.000 description 2
- 238000004260 weight control Methods 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009422 external insulation Methods 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 239000012774 insulation material Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210399425.5A CN102877646B (zh) | 2012-10-19 | 2012-10-19 | 灌芯叠合装配式钢筋混凝土剪力墙结构及其建造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210399425.5A CN102877646B (zh) | 2012-10-19 | 2012-10-19 | 灌芯叠合装配式钢筋混凝土剪力墙结构及其建造方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102877646A CN102877646A (zh) | 2013-01-16 |
CN102877646B true CN102877646B (zh) | 2014-12-17 |
Family
ID=47479144
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210399425.5A Active CN102877646B (zh) | 2012-10-19 | 2012-10-19 | 灌芯叠合装配式钢筋混凝土剪力墙结构及其建造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102877646B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105133735B (zh) * | 2015-08-31 | 2017-09-01 | 西安建筑科技大学 | 一种预制混凝土剪力墙与楼板接缝处灌浆的封堵方法 |
CN105178604A (zh) * | 2015-09-30 | 2015-12-23 | 长沙远大住宅工业集团有限公司 | 一种装配式叠合楼板施工方法 |
CN106295889A (zh) * | 2016-08-12 | 2017-01-04 | 北京市住宅建筑设计研究院有限公司 | 湿法连接预制混凝土构件拆分方法 |
CN107254933A (zh) * | 2017-07-17 | 2017-10-17 | 广东省建科建筑设计院有限公司 | 高层装配式单排通孔预制剪力墙及其装配结构和施工方法 |
CN110359593B (zh) * | 2019-06-27 | 2021-02-26 | 中建科技贵州有限公司 | 一种装配式预制外剪力墙 |
CN110866304B (zh) * | 2019-12-25 | 2024-02-02 | 中铁建设集团有限公司 | 一种基于钢筋模板一体化直墙构件模型的创建方法 |
CN111764547B (zh) * | 2020-06-11 | 2021-05-11 | 河海大学 | 一种预制装配式剪力墙结构及其制作方法 |
CN114892840B (zh) * | 2022-04-08 | 2023-11-24 | 吉林建筑大学 | 一种带有模网的预制装配式混凝土剪力墙及施工方法 |
CN116638619B (zh) * | 2023-07-19 | 2023-09-29 | 河北盛通桁架楼承板科技有限公司 | 一种免拆式钢筋桁架楼承板的预制组装生产线 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2170662A1 (en) * | 1995-04-17 | 1996-10-18 | Robert J. Menchetti | Wall structure and method of securing framing members to wallboards with an adhesive |
CA2471807A1 (en) * | 2004-03-16 | 2005-09-16 | Lease Crutcher Lewis | Method of constructing a concrete shear core multistory building |
CA2595136A1 (en) * | 2006-07-28 | 2008-01-28 | Paul Brienen | Coupling beam and method of use in building construction |
CN101818527A (zh) * | 2010-06-04 | 2010-09-01 | 北京万科企业有限公司 | 装配整体式剪力墙结构体系及其施工方法 |
CN102003009A (zh) * | 2010-10-26 | 2011-04-06 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN102061743A (zh) * | 2010-11-26 | 2011-05-18 | 清华大学建筑设计研究院 | 免拆除预制钢筋砼模板的框架-剪力墙结构建筑及建造方法 |
CN102409783A (zh) * | 2011-11-28 | 2012-04-11 | 北京工业大学 | 底部双重叠合型钢混凝土边框内藏钢板剪力墙及作法 |
-
2012
- 2012-10-19 CN CN201210399425.5A patent/CN102877646B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2170662A1 (en) * | 1995-04-17 | 1996-10-18 | Robert J. Menchetti | Wall structure and method of securing framing members to wallboards with an adhesive |
CA2471807A1 (en) * | 2004-03-16 | 2005-09-16 | Lease Crutcher Lewis | Method of constructing a concrete shear core multistory building |
CA2595136A1 (en) * | 2006-07-28 | 2008-01-28 | Paul Brienen | Coupling beam and method of use in building construction |
CN101818527A (zh) * | 2010-06-04 | 2010-09-01 | 北京万科企业有限公司 | 装配整体式剪力墙结构体系及其施工方法 |
CN102003009A (zh) * | 2010-10-26 | 2011-04-06 | 吴方伯 | 一种钢筋混凝土空心楼板及施工方法 |
CN102061743A (zh) * | 2010-11-26 | 2011-05-18 | 清华大学建筑设计研究院 | 免拆除预制钢筋砼模板的框架-剪力墙结构建筑及建造方法 |
CN102409783A (zh) * | 2011-11-28 | 2012-04-11 | 北京工业大学 | 底部双重叠合型钢混凝土边框内藏钢板剪力墙及作法 |
Also Published As
Publication number | Publication date |
---|---|
CN102877646A (zh) | 2013-01-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102877646B (zh) | 灌芯叠合装配式钢筋混凝土剪力墙结构及其建造方法 | |
CN101260720B (zh) | 一种预制网架夹芯墙板的连接施工方法 | |
US20110011018A1 (en) | Modular construction mold apparatus and method for constructing concrete buildings and structures | |
CN202012136U (zh) | 装配剪力墙结构水平缝u型闭合筋连接构造 | |
CN107859206A (zh) | 预制钢构叠合剪力墙及其施工方法 | |
CN103797197A (zh) | 预铸整体式墙与楼板的建筑结构 | |
CN103924710B (zh) | 低层装配式复合墙体房屋钢板焊接节点结构 | |
CN103982041A (zh) | 框架结构体系的钢筋混凝土预制构件装配式房屋建造方法 | |
WO2012096639A1 (en) | Modular construction mold apparatus and method for constructing concrete buildings and structures | |
CN109083308B (zh) | 一种抗震预制装配式的墙体及其施工方法 | |
CN106381923A (zh) | 一种采用预制板材的多层建筑结构及其建筑方法 | |
WO2018028040A1 (zh) | 一种楼盖梁柱体系的叠合装配整体式地下室 | |
CN107165271A (zh) | 一种装配式异形柱混凝土框架结构 | |
WO2018028041A1 (zh) | 无梁楼盖体系与梁柱体系结合的叠合装配整体式地下室 | |
CN118345949B (zh) | 基于新型全装配式剪力墙的混凝土模块化体系及施工方法 | |
CN111411693A (zh) | 装配浇注一体化剪力墙结构建筑体系 | |
CN110439291A (zh) | 一种适用于低层建筑的装配式生产施工方法 | |
CN216475803U (zh) | 一种应用于剪力墙体体系的新型预制楼板构造 | |
CN110805165A (zh) | 一种装配式排钢管混凝土叠合墙建筑结构 | |
CN214696251U (zh) | 一种蜂窝镂空式格栅管状双钢板混凝土组合剪力墙 | |
CN206090815U (zh) | 预制装配式筒体结构公共建筑 | |
CN220565524U (zh) | 一种大宽度预应力钢筋桁架叠合楼板 | |
CN108978854A (zh) | 一种螺栓连接预制混凝土框架结构 | |
CN217500692U (zh) | 用于复合保温单面叠合墙板的连接节点 | |
KR200178874Y1 (ko) | 조립식 pc콘크리트 벽체판넬 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20130116 Assignee: Fanlin Assembly Building Technology Co., Ltd Assignor: Meng Fanlin Contract record no.: X2020220000007 Denomination of invention: Grouted overlapping assembly type reinforced concrete shear wall structure and method for building grouted overlapping assembly type reinforced concrete shear wall structure Granted publication date: 20141217 License type: Common License Record date: 20200522 Application publication date: 20130116 Assignee: Hebei Xinyan Youjian Assembly Building Technology Co., Ltd Assignor: Meng Fanlin Contract record no.: X2020220000008 Denomination of invention: Grouted overlapping assembly type reinforced concrete shear wall structure and method for building grouted overlapping assembly type reinforced concrete shear wall structure Granted publication date: 20141217 License type: Exclusive License Record date: 20200525 |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210707 Address after: Room 101, unit 0, building b3-2-1, Wanda Plaza, Changchun Auto City, west of Xihu Road, Changchun Auto Development Zone, Jilin Province, 130000 Patentee after: Changchun Jianlin Education Consulting Co.,Ltd. Address before: 130061 Room 405, four building, Star Street, 2577 building street, Changchun, Jilin. Patentee before: Meng Fanlin |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210907 Address after: Room 101, building b3-2-1, group B3, Wanda Plaza, Changchun City, automobile economic and Technological Development Zone, Changchun City, Jilin Province, 130062 Patentee after: Fanlin Assembly Building Technology Co.,Ltd. Address before: Room 101, unit 0, building b3-2-1, Wanda Plaza, Changchun Auto City, west of Xihu Road, Changchun Auto Development Zone, Jilin Province, 130000 Patentee before: Changchun Jianlin Education Consulting Co.,Ltd. |