CN102825192A - Method for forging upper shell of nuclear power equipment with outer bench - Google Patents
Method for forging upper shell of nuclear power equipment with outer bench Download PDFInfo
- Publication number
- CN102825192A CN102825192A CN2011101650963A CN201110165096A CN102825192A CN 102825192 A CN102825192 A CN 102825192A CN 2011101650963 A CN2011101650963 A CN 2011101650963A CN 201110165096 A CN201110165096 A CN 201110165096A CN 102825192 A CN102825192 A CN 102825192A
- Authority
- CN
- China
- Prior art keywords
- forging
- temperature
- upper shell
- nuclear power
- electroslag ingot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005242 forging Methods 0.000 title claims abstract description 89
- 238000000034 method Methods 0.000 title claims abstract description 28
- 239000000463 material Substances 0.000 claims abstract description 15
- 238000005520 cutting process Methods 0.000 claims abstract description 7
- LNSPFAOULBTYBI-UHFFFAOYSA-N [O].C#C Chemical group [O].C#C LNSPFAOULBTYBI-UHFFFAOYSA-N 0.000 claims abstract description 4
- 230000000630 rising effect Effects 0.000 claims description 3
- 238000003754 machining Methods 0.000 abstract description 3
- 239000002184 metal Substances 0.000 abstract description 2
- 239000000203 mixture Substances 0.000 abstract description 2
- 238000009826 distribution Methods 0.000 abstract 1
- 238000000465 moulding Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Forging (AREA)
Abstract
The invention discloses a method for forging an upper shell of nuclear power equipment with an outer bench. The method comprises the following steps of: forging an electroslag ingot into an upper shell with the outer bench by a 16500-ton hydraulic press, wherein material of the electroslag ingot is Grade 3 Class 2 of SA-508 and weight of the electroslag ingot is 300-340 ton; the forging method is as follows in details: step 1, drawing out the electroslag ingot; step 2, carrying out oxygen-acetylene cutting and blanking the electroslag ingot; step 3, upsetting the electroslag ingot; step 4, forging a centre hole; step 5, drawing out and segregating the electroslag ingot; and step 6, carrying out chambering. According to the method disclosed by the invention, temperature in a forging process is strictly controlled to keep the temperature of forging pieces to be 850-1240 DEG C constantly; a forging ratio of the electroslag ingot in each step is guaranteed; the outer bench of the upper shell is forged and formed directly, so that forging allowance and machining allowance are reduced; and in addition, the forged and formed forge pieces are not easily to be cracked, and the forge pieces are uniform in wall thick, dense in material, uniform in composition, reasonable in metal flow line distribution and stable in property.
Description
Technical field
The present invention relates to a kind of forging method, be specifically related to a kind of forging method of the nuclear power generating equipment upper shell with outer step.
Background technology
At present, the nuclear power industry in the whole world has got into the period of a high speed development, and in order to improve energy resource structure, each industrially developed country and developing country are all in the development of actively being devoted to nuclear power.The U.S. will enlarge the important component part of nuclear energy as national energy policy, and present more than 100 nuclear power station in use has considerable part to update; Russia has formulated fairly large nuclear power plan, and existing 5 base groups are in construction; Japanese government plans newly-built 13 nuclear power stations before 2010, builds 7 nuclear power stations after 2011 again; The Asia also has 11 countries to propose respectively to develop nuclear power except that China, Japan and Korea.Before the year two thousand twenty, the whole world needs more than 20 cover nuclear power forging every year at least, and the market prospects of nuclear power forging are boundless.
But because high to the quality requirements of forging in the nuclear power projects, and forge weight is bigger, and the surplus that adopts the method for the straight tube of existing forging to forge is very big, and the weight of steel ingot is also very big, has increased mach surplus simultaneously, has prolonged life cycle of the product.
Summary of the invention
The technical problem that the present invention will solve provides a kind of forging method of the nuclear power generating equipment upper shell with outer step, and directly forging molding goes out the upper shell of the outer step of band.
For solving the problems of the technologies described above, the technical solution of the forging method of the nuclear power generating equipment upper shell of the outer step of band of the present invention is:
Using 16500 tons of hydraulic presses, is the Grade3Class1 among the SA-508 with material, and weight is that 300~340 tons ESR ingot forges the upper shell that becomes the outer step of band, and concrete grammar is divided into following steps:
The first step, pulling; ESR ingot is heated to 1220 ℃, and pulling becomes 5840~6620mm with the length of 3970~4500mm, makes forging ratio reach 1.47; The temperature of forging is remained in 850~1220 ℃ the scope;
Second step, oxygen-acetylene cutting; Cutting length 5420~6200mm, rising head tip cut-off 220mm, bottom end excision 200mm;
The 3rd step, jumping-up; Temperature is heated to 1240 ℃, through jumping-up, the height of 5420~6200mm is become 2460~2820mm, make forging ratio reach 2.2; The temperature of forging is remained in 850~1240 ℃ the scope;
In the 4th step, forge centre bore; Temperature is heated to 1200 ℃,, on forging, forges the center hole of diameter 1650mm, guarantee inside and outside concentric circles through forging centre bore; Forging the temperature that makes forging in the centre bore process remains in 850~1200 ℃ the scope;
The 5th step, the pulling sub-material; Temperature is heated to 1220 ℃, through the pulling sub-material, blank is divided into three steps, the difference in height of adjacent step is controlled at 50~200mm; The temperature of forging is remained in 850~1220 ℃ the scope;
The 6th step, reaming; Temperature is heated to 1200 ℃,,, makes forging ratio reach 1.9 by the completion of forging requirement size through reaming; Three steps replace reaming and two steps to expanding; The temperature of forging is remained in 850~1200 ℃ the scope.
The forging method of the nuclear power generating equipment upper shell of the outer step of band of the present invention, strict control temperature in forging process remains in 850~1240 ℃ the scope forging temperature; And guarantee the forging ratio in each step, directly forging molding goes out the outer step of upper shell, has reduced forging surplus and machining allowance; And the forging behind the forging molding is difficult for cracking, and wall thickness is even, and material is fine and close; Composition is even, and metal streamline distributes rationally, stable performance.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further detailed explanation:
Fig. 1 is the sketch map of 300~340 tons of ESR ingots;
Fig. 2 is the size sketch map through the forging of pulling;
Fig. 3 is the size sketch map through the forging of jumping-up;
Fig. 4 is the size sketch map through the forging of forging centre bore;
Fig. 5 is the size sketch map through the forging of pulling sub-material;
Fig. 6 is the size sketch map through the forging of reaming;
Fig. 7 is the flow chart of the forging method of the nuclear power generating equipment upper shell of step outside the band of the present invention.
The specific embodiment
The forging method of the nuclear power generating equipment upper shell of the outer step of band of the present invention, as shown in Figure 7, use 16500 tons of hydraulic presses; With material is the Grade3Class1 among the SA-508, and weight is 300~340 tons, and diameter is Φ 3500mm, highly is that the ESR ingot of 3970~4500mm forges that to become external diameter be Φ 4770~Φ 5170mm/ Φ 4420~Φ 4820mm; Internal diameter is Φ 3490~Φ 3890mm; Highly be 4180~4580mm, the upper shell of the outer step of band, forging method is divided into following steps:
The first step, pulling; ESR ingot as shown in Figure 1 is heated to 1220 ℃, and pulling becomes 5840~6620mm with the length of 3970~4500mm, and is as shown in Figure 2, makes forging ratio reach 1.47; Reduce to below 850 ℃ like the forging temperature in the pulling process, forging is reheated, the temperature of forging is remained in 850~1220 ℃ the scope;
Second step, oxygen-acetylene cutting; Cutting length 5420~6200mm, rising head tip cut-off 220mm, bottom end excision 200mm guarantees the blank quality;
The 3rd step, jumping-up; Temperature is heated to 1240 ℃, through jumping-up, the height of 5420~6200mm is become 2460~2820mm, as shown in Figure 3, make forging ratio reach 2.2; Reduce to below 850 ℃ like the forging temperature in the upsetting process, forging is reheated, the temperature of forging is remained in 850~1240 ℃ the scope;
In the 4th step, forge centre bore; Temperature is heated to 1200 ℃; Through forging centre bore, on forging, forge the center hole of diameter 1650mm, guarantee inside and outside concentric circles; As shown in Figure 4; Forge in the centre bore process and reduce to below 850 ℃, forging is reheated, the temperature of forging is remained in 850~1200 ℃ the scope like the forging temperature;
The 5th step, the pulling sub-material; Temperature is heated to 1220 ℃,, blank is divided into three steps through the pulling sub-material; Make forging ratio reach 1.2; The difference in height of adjacent step is controlled at 50~200mm, and is as shown in Figure 5, reduces to below 850 ℃ like the forging temperature in the pulling sub-material process; Forging is reheated, the temperature of forging is remained in 850~1220 ℃ the scope;
The 6th step, reaming; Temperature is heated to 1200 ℃, and three steps replace reaming, bellmouth orifice occurs in the middle of avoiding, and finally expand two steps, by the completion of forging requirement size, make forging ratio reach 1.9, and are as shown in Figure 6; Reduce to below 850 ℃ like the forging temperature in the reaming process, forging is reheated, the temperature of forging is remained in 850~1200 ℃ the scope.
Forge by above step, calculate according to the ASME standard, total forging ratio reaches 6.7.
The forging method of the nuclear power generating equipment upper shell of the outer step of band of the present invention, directly forging molding goes out the upper shell of the outer step of band, has reduced forging surplus and machining allowance, has shortened the production cycle of product.
Claims (3)
1. the forging method of the nuclear power generating equipment upper shell of the outer step of a band; It is characterized in that, use 16500 tons of hydraulic presses, is the Grade3Class1 among the SA-508 with material; Weight is that 300~340 tons ESR ingot forges the upper shell that becomes the outer step of band, and concrete grammar is divided into following steps:
The first step, pulling; ESR ingot is heated to 1220 ℃, and pulling becomes 5840~6620mm with the length of 3970~4500mm, makes forging ratio reach 1.47; The temperature of forging is remained in 850~1220 ℃ the scope;
Second step, oxygen-acetylene cutting; Cutting length 5420~6200mm, rising head tip cut-off 220mm, bottom end excision 200mm;
The 3rd step, jumping-up; Temperature is heated to 1240 ℃, through jumping-up, the height of 5420~6200mm is become 2460~2820mm, make forging ratio reach 2.2; The temperature of forging is remained in 850~1240 ℃ the scope;
In the 4th step, forge centre bore; Temperature is heated to 1200 ℃,, on forging, forges the center hole of diameter 1650mm, guarantee inside and outside concentric circles through forging centre bore; Forging the temperature that makes forging in the centre bore process remains in 850~1200 ℃ the scope;
The 5th step, the pulling sub-material; Temperature is heated to 1220 ℃,, blank is divided into three steps through the pulling sub-material; The temperature of forging is remained in 850~1220 ℃ the scope;
The 6th step, reaming; Temperature is heated to 1200 ℃,,, makes forging ratio reach 1.9 by the completion of forging requirement size through reaming; The temperature of forging is remained in 850~1200 ℃ the scope.
2. the forging method of the nuclear power generating equipment upper shell of the outer step of band according to claim 1 is characterized in that: in said the 5th step pulling sub-material, blank is divided into three steps, the difference in height of adjacent step is controlled at 50~200mm.
3. the forging method of the nuclear power generating equipment upper shell of the outer step of band according to claim 1 and 2 is characterized in that: in said the 6th step reaming, three steps replace reaming and two steps to expanding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110165096.3A CN102825192B (en) | 2011-06-17 | 2011-06-17 | The forging method of the nuclear power generating equipment upper shell with outer step |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110165096.3A CN102825192B (en) | 2011-06-17 | 2011-06-17 | The forging method of the nuclear power generating equipment upper shell with outer step |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102825192A true CN102825192A (en) | 2012-12-19 |
CN102825192B CN102825192B (en) | 2015-08-19 |
Family
ID=47328622
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110165096.3A Active CN102825192B (en) | 2011-06-17 | 2011-06-17 | The forging method of the nuclear power generating equipment upper shell with outer step |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102825192B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103143659A (en) * | 2013-03-21 | 2013-06-12 | 通裕重工股份有限公司 | Hollow forging method of nuclear power main pipeline |
CN104338882A (en) * | 2013-08-07 | 2015-02-11 | 上海重型机器厂有限公司 | Forming method of motor enclosure forging of third-generation nuclear power coolant pump |
CN107225208A (en) * | 2017-07-13 | 2017-10-03 | 江阴南工锻造有限公司 | A kind of little gear forging technology |
CN107282837A (en) * | 2017-07-13 | 2017-10-24 | 江阴南工锻造有限公司 | A kind of open socket forging method |
CN112264568A (en) * | 2020-09-30 | 2021-01-26 | 宝鸡石油机械有限责任公司 | Forging method for air bag shell forming die of drilling pump for circulating system of petroleum drilling machine |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5641024A (en) * | 1979-09-13 | 1981-04-17 | Nippon Kokan Raito Steel Kk | Roll for bending |
CN101987343A (en) * | 2009-08-07 | 2011-03-23 | 上海重型机器厂有限公司 | Forging method of conical cylinder body of nuclear power equipment |
CN101987344A (en) * | 2009-08-07 | 2011-03-23 | 上海重型机器厂有限公司 | Method for forging nuclear power equipment pressure vessel large end sealing plate blank |
-
2011
- 2011-06-17 CN CN201110165096.3A patent/CN102825192B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5641024A (en) * | 1979-09-13 | 1981-04-17 | Nippon Kokan Raito Steel Kk | Roll for bending |
CN101987343A (en) * | 2009-08-07 | 2011-03-23 | 上海重型机器厂有限公司 | Forging method of conical cylinder body of nuclear power equipment |
CN101987344A (en) * | 2009-08-07 | 2011-03-23 | 上海重型机器厂有限公司 | Method for forging nuclear power equipment pressure vessel large end sealing plate blank |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103143659A (en) * | 2013-03-21 | 2013-06-12 | 通裕重工股份有限公司 | Hollow forging method of nuclear power main pipeline |
CN104338882A (en) * | 2013-08-07 | 2015-02-11 | 上海重型机器厂有限公司 | Forming method of motor enclosure forging of third-generation nuclear power coolant pump |
CN104338882B (en) * | 2013-08-07 | 2016-08-10 | 上海重型机器厂有限公司 | The forming method of generation Ⅲ nuclear power cooling medium pump motor casing forging |
CN107225208A (en) * | 2017-07-13 | 2017-10-03 | 江阴南工锻造有限公司 | A kind of little gear forging technology |
CN107282837A (en) * | 2017-07-13 | 2017-10-24 | 江阴南工锻造有限公司 | A kind of open socket forging method |
CN107225208B (en) * | 2017-07-13 | 2019-01-29 | 江阴南工锻造有限公司 | A kind of pinion gear forging technology |
CN107282837B (en) * | 2017-07-13 | 2019-01-29 | 江阴南工锻造有限公司 | A kind of open socket forging method |
CN112264568A (en) * | 2020-09-30 | 2021-01-26 | 宝鸡石油机械有限责任公司 | Forging method for air bag shell forming die of drilling pump for circulating system of petroleum drilling machine |
CN112264568B (en) * | 2020-09-30 | 2023-05-12 | 宝鸡石油机械有限责任公司 | Forging method of casing jig of air bag of drilling pump for petroleum drilling machine circulation system |
Also Published As
Publication number | Publication date |
---|---|
CN102825192B (en) | 2015-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101987343B (en) | Forging method of conical cylinder body of nuclear power equipment | |
CN101898224B (en) | Forging method of lower sealing head forge piece of one-mega kilowatt nuclear-power reactor pressure vessel | |
CN102825192A (en) | Method for forging upper shell of nuclear power equipment with outer bench | |
CN105414430A (en) | Profiling forging method of large cylinder forge piece provided with internal and external steps | |
CN102019337B (en) | Rolling method for shaping integral top cover | |
CN102554088A (en) | Forging method for pressure vessel bottom head transition section of second-generation nuclear power station and mould | |
CN102172757B (en) | Hole-reaming forming technology for internal and external specially-shaped surfaces | |
CN102019338B (en) | Punching method for forming integrated top cover | |
CN102825187B (en) | The forging method of generation Ⅲ nuclear power station steam generator ellipsoidal head ring forging | |
CN101987344A (en) | Method for forging nuclear power equipment pressure vessel large end sealing plate blank | |
CN103567341A (en) | Forging method for CAP1400 nuclear power pressure vessel pipe connecting section | |
CN102672083A (en) | Design method for high-temperature alloy ring preforming blank with tapered section | |
CN203018668U (en) | Anti-twisting unloading-free forge piece heat punching integrated die | |
CN102717014B (en) | Method for freely forging casing elevator for petroleum drilling and production | |
CN102189182A (en) | Compound die fixture for blanking of ring forge piece | |
CN204308124U (en) | For the assembling die of motor-car high gear ring blank forging | |
CN103381460A (en) | Method for forging production of oil cylinder with stepped holes by utilizing half moulding bed of riser-free steel ingot | |
CN204912644U (en) | Integrative mould is forged in shaping of scraper blade machine dumbbell round pin | |
CN207288760U (en) | The frock of the ring forging of annular groove is set on outer wall | |
CN104368735B (en) | Frock for heavy mine car hub for vehicle wheel blank forging | |
CN202123361U (en) | Tool for annular forged pieces with L-shaped inside step sections | |
CN202278065U (en) | Taper hole punching forming equipment for black metal forge pieces | |
CN202861110U (en) | High-precise blanking stamping structure | |
CN102581194A (en) | Fixture for ring forging with outer step having L-shaped cross section | |
CN202894175U (en) | Precise forging combined body cold forging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20161216 Address after: 200245 Jiangchuan Road, Shanghai, No. 207, building 1800, No. Patentee after: Shanghai Electric Heavy Forging Co. Ltd. Patentee after: Shanghai Heavy-Machine Factory Co., Ltd. Address before: 200245 Jiangchuan Road, Shanghai, No. 1800, No. Patentee before: Shanghai Heavy-Machine Factory Co., Ltd. |