[go: up one dir, main page]

CN102797458B - Three-dimensional simulation device for edge-bottom water reservoir - Google Patents

Three-dimensional simulation device for edge-bottom water reservoir Download PDF

Info

Publication number
CN102797458B
CN102797458B CN201210187362.7A CN201210187362A CN102797458B CN 102797458 B CN102797458 B CN 102797458B CN 201210187362 A CN201210187362 A CN 201210187362A CN 102797458 B CN102797458 B CN 102797458B
Authority
CN
China
Prior art keywords
water
accommodating cavity
gland
simulation device
edge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210187362.7A
Other languages
Chinese (zh)
Other versions
CN102797458A (en
Inventor
程林松
赵伦
刘佳
范子菲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
China University of Petroleum Beijing
Original Assignee
Petrochina Co Ltd
China University of Petroleum Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd, China University of Petroleum Beijing filed Critical Petrochina Co Ltd
Priority to CN201210187362.7A priority Critical patent/CN102797458B/en
Publication of CN102797458A publication Critical patent/CN102797458A/en
Application granted granted Critical
Publication of CN102797458B publication Critical patent/CN102797458B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明为一种用于边底水油藏的三维模拟装置,该装置包括一本体和一设置于本体侧面的可拆卸活动侧壁;本体内设有容置腔,本体顶部设有压盖,压盖下部设有活塞;压盖上设有多个与容置腔导通的放气孔;容置腔四周侧壁内设有可密封设置隔板的环槽;本体各壁面及压盖上设有多个孔状功能测量点,功能测量点与容置腔控制导通;容置腔内充满粒状多孔介质;容置腔内的粒状多孔介质中设有多个用于模拟井筒的管柱。该装置能对不同油藏厚度、不同地层倾角、不同驱替方式、不同井网井型开发的边底水油藏进行物理模拟实验,从而研究该油气藏的油水渗流机理,进行不同开发方式效果评价。

The present invention is a three-dimensional simulation device for oil reservoirs with edge and bottom water. The device includes a body and a detachable movable side wall arranged on the side of the body; The lower part of the gland is provided with a piston; the gland is provided with a plurality of vent holes connected with the accommodation cavity; the side walls around the accommodation chamber are provided with annular grooves that can be sealed to install partitions; the walls of the body and the gland are provided with There are a plurality of hole-shaped functional measurement points, and the functional measurement points are connected to the accommodation cavity under control; the accommodation cavity is filled with granular porous media; the granular porous medium in the accommodation cavity is provided with a plurality of pipe strings for simulating the wellbore. The device can conduct physical simulation experiments on edge-bottom water reservoirs developed with different reservoir thicknesses, different formation dip angles, different displacement methods, and different well patterns and well types, so as to study the oil-water seepage mechanism of the oil and gas reservoirs and carry out the effects of different development methods. evaluate.

Description

用于边底水油藏的三维模拟装置Three-dimensional simulation device for edge and bottom water reservoirs

技术领域technical field

本发明是关于一种用于多相流体流动规律研究的实验装置,尤其涉及一种用于模拟不同地层倾角、不同水体类型、多井型联合开发的边底水油藏的三维模拟装置。The invention relates to an experimental device for studying the flow law of multiphase fluids, in particular to a three-dimensional simulation device for simulating edge-bottom water reservoirs with different formation dip angles, different water body types, and multi-well type joint development.

背景技术Background technique

三维油藏物理模拟技术能较真实的反映地下流体运动规律而在石油工业中广泛应用,目前国内外针对底水油藏开发的物理模拟实验较多,但是现有的二维实验装置未考虑到与油田的相似性;现有的三维实验装置未考虑到观察底水脊进规律,并且不能测量实验装置内部流体运动规律。The three-dimensional reservoir physical simulation technology can reflect the movement of underground fluid more realistically and is widely used in the petroleum industry. At present, there are many physical simulation experiments for the development of bottom water reservoirs at home and abroad, but the existing two-dimensional experimental devices do not take into account Similarity to the oil field; the existing three-dimensional experimental device does not take into account the observation of the law of bottom water ridges, and cannot measure the law of fluid movement inside the experimental device.

由此,本发明人凭借多年从事相关行业的经验与实践,提出一种用于边底水油藏的三维模拟装置,以克服现有技术的缺陷。Therefore, relying on years of experience and practice in related industries, the inventor proposes a three-dimensional simulation device for edge-bottom water reservoirs to overcome the defects of the prior art.

发明内容Contents of the invention

本发明的目的在于提供一种用于边底水油藏的三维模拟装置,以模拟不同井网以及不同井型开发下的边底水油藏,通过该装置可研究高压条件下,不同地层倾角的边底水油藏中油水渗流机理,同时进行底水油藏不同开发方式效果评价。The purpose of the present invention is to provide a three-dimensional simulation device for edge-bottom water reservoirs to simulate edge-bottom water reservoirs developed under different well patterns and different well types. Through this device, different formation dip angles can be studied under high pressure conditions. The mechanism of oil-water seepage in edge-bottom water reservoirs is analyzed, and the effects of different development methods for bottom-water reservoirs are evaluated at the same time.

本发明的目的是这样实现的,一种用于边底水油藏的三维模拟装置,该模拟装置由一立方体容器构成;该立方体容器包括一本体和一设置于本体顶部的压盖,本体内设有容置腔,压盖下部设有与容置腔开口形状相同的活塞,所述压盖上设有多个放气孔,所述放气孔贯穿活塞与容置腔导通;所述本体的一侧壁为能拆卸的活动侧壁,环绕所述本体四周侧壁的内壁面至少设有一环槽,所述环槽与本体的底面平行设置,所述环槽内可拆卸地密封嵌设隔板;本体的侧壁或压盖上设有多个孔状功能测量点,所述功能测量点与容置腔控制导通;所述容置腔内充满粒状多孔介质,所述活塞由容置腔开口处伸入容置腔内并压设于粒状多孔介质上;所述容置腔内的粒状多孔介质中设有多个用于模拟井筒的管柱;所述容置腔内部底面及侧壁上设有导流槽,立方体容器的底面和侧壁上设有与导流槽导通的注水孔。The object of the present invention is achieved in this way, a kind of three-dimensional simulation device for edge and bottom water reservoir, this simulation device is made of a cube container; This cube container includes a body and a gland that is arranged on the top of the body, inside the body There is an accommodation chamber, the lower part of the gland is provided with a piston with the same shape as the opening of the accommodation chamber, and the gland is provided with a plurality of vent holes, and the vent holes pass through the piston and conduct with the accommodation chamber; The side wall is a detachable movable side wall. At least one annular groove is provided on the inner wall surface surrounding the side walls of the body. The annular groove is arranged parallel to the bottom surface of the body. plate; the side wall or gland of the main body is provided with a plurality of hole-shaped functional measurement points, and the functional measurement points are connected with the accommodation cavity; the accommodating cavity is filled with granular porous media, and the piston is contained The cavity opening protrudes into the accommodation cavity and is pressed on the granular porous medium; the granular porous medium in the accommodation cavity is provided with a plurality of pipe strings for simulating the wellbore; the inner bottom surface and side of the accommodation cavity A diversion groove is arranged on the wall, and a water injection hole connected with the diversion groove is arranged on the bottom surface and the side wall of the cube container.

在本发明的一较佳实施方式中,所述本体侧壁上的导流槽是设置在所述环槽的上方或下方。In a preferred embodiment of the present invention, the guide groove on the side wall of the body is arranged above or below the annular groove.

在本发明的一较佳实施方式中,所述容置腔内部底面上设有一钢板,所述本体底面上的导流槽是设置在钢板的上表面,所述钢板上设有与导流槽和注水孔导通的透孔。In a preferred embodiment of the present invention, a steel plate is provided on the inner bottom surface of the accommodating cavity, and the diversion groove on the bottom surface of the body is arranged on the upper surface of the steel plate, and the diversion groove is provided on the steel plate. A through hole connected to the water injection hole.

在本发明的一较佳实施方式中,所述导流槽为多条环形沟槽。In a preferred embodiment of the present invention, the guide groove is a plurality of annular grooves.

在本发明的一较佳实施方式中,所述立方体容器设置在三维旋转装置上。In a preferred embodiment of the present invention, the cubic container is arranged on a three-dimensional rotating device.

在本发明的一较佳实施方式中,所述粒状多孔介质为石英砂或玻璃珠。In a preferred embodiment of the present invention, the granular porous medium is quartz sand or glass beads.

在本发明的一较佳实施方式中,所述注水孔由管体顺序连接于一开关阀、一液体流量仪和一第一驱替泵。In a preferred embodiment of the present invention, the water injection hole is sequentially connected to a switch valve, a liquid flow meter and a first displacement pump through a pipe body.

在本发明的一较佳实施方式中,一模拟井筒连接一功能测量点,并由管体顺序连接于一开关阀和第二驱替泵。In a preferred embodiment of the present invention, a simulated wellbore is connected to a functional measurement point, and is sequentially connected to a switching valve and a second displacement pump through a pipe body.

在本发明的一较佳实施方式中,一压力测量装置连接于一功能测量点;一饱和度测量装置连接于另一功能测量点;所述压力测量装置和饱和度测量装置与电脑连接。In a preferred embodiment of the present invention, a pressure measuring device is connected to a functional measuring point; a saturation measuring device is connected to another functional measuring point; the pressure measuring device and the saturation measuring device are connected to a computer.

在本发明的一较佳实施方式中,另一模拟井筒连接于又一功能测量点,并由管体顺序连接于另一开关阀、一回压阀、一油水计量装置。In a preferred embodiment of the present invention, another simulated wellbore is connected to another functional measurement point, and is sequentially connected to another on-off valve, a back pressure valve, and an oil-water metering device through a pipe body.

由上所述,本发明用于边底水油藏的三维模拟装置,能对不同地层倾角、不同水体类型的边底水油藏进行高压物理模拟实验,模拟不同井型以及不同井网开发方式下的边底水油藏,可监测并记录模型内的油水运动规律以及模型的压力分布规律,从而研究底水油藏中油水渗流机理,进行底水油藏不同开发方式效果评价。From the above, the three-dimensional simulation device for edge-bottom water reservoirs of the present invention can perform high-pressure physical simulation experiments on edge-bottom water reservoirs with different formation dip angles and different water body types, and simulate different well types and different well pattern development methods For edge and bottom water reservoirs, it can monitor and record the oil-water movement law in the model and the pressure distribution law of the model, so as to study the oil-water seepage mechanism in bottom water reservoirs and evaluate the effects of different development methods for bottom water reservoirs.

附图说明Description of drawings

以下附图仅旨在于对本发明做示意性说明和解释,并不限定本发明的范围。其中:The following drawings are only intended to illustrate and explain the present invention schematically, and do not limit the scope of the present invention. in:

图1:为本发明用于边底水油藏的三维模拟装置的结构示意图。Fig. 1: It is the schematic structural diagram of the three-dimensional simulation device used in the edge-bottom water reservoir according to the present invention.

图2:为本发明用于边底水油藏的三维模拟装置的侧面结构示意图。Fig. 2: It is a schematic diagram of the side structure of the three-dimensional simulation device used in the edge-bottom water reservoir according to the present invention.

图3:为本发明用于边底水油藏的三维模拟装置的导流槽结构示意图。Fig. 3: It is a schematic diagram of the diversion tank structure of the three-dimensional simulation device used in the edge-bottom water reservoir according to the present invention.

图4:为利用本发明物理模拟装置进行底水油藏开采实验的条件准备流程图。Fig. 4: A flow chart for preparing the conditions of the bottom water reservoir exploitation experiment using the physical simulation device of the present invention.

图5:为利用本发明物理模拟装置进行底水油藏开采实验的流程图。Fig. 5: is the flow chart of using the physical simulation device of the present invention to carry out the exploitation experiment of the bottom water reservoir.

图6:为利用本发明物理模拟装置进行边水油藏开采实验的条件准备流程图。Fig. 6: A flow chart for preparing the conditions for using the physical simulation device of the present invention to carry out the exploitation experiment of the edge water reservoir.

图7:为利用本发明物理模拟装置进行边水油藏开采实验的流程图。Fig. 7: is the flow chart of using the physical simulation device of the present invention to carry out the exploitation experiment of the edge water reservoir.

具体实施方式detailed description

为了对本发明的技术特征、目的和效果有更加清楚的理解,现对照附图说明本发明的具体实施方式。In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation manners of the present invention will now be described with reference to the accompanying drawings.

如图1~图7所示,本发明提出一种用于边底水油藏的三维模拟装置100,该模拟装置100由一立方体容器构成,该容器具有一定的承压能力,所述立方体容器设置在三维旋转装置25上;该立方体容器包括一本体1和一设置于本体顶部的压盖2,本体内设有容置腔11,压盖2下部设有与容置腔11开口形状相同的活塞6,所述压盖2上设有多个放气孔7,所述放气孔7贯穿活塞6与容置腔11导通;所述本体1的一侧壁为能拆卸的活动侧壁3,环绕所述本体1四周侧壁的内壁面至少设有一环槽9,所述环槽9与本体1的底面平行设置,所述环槽9内可拆卸地密封嵌设隔板10;本体1的侧壁或压盖2上设有多个孔状功能测量点4,所述功能测量点4与容置腔11控制导通;所述容置腔11内充满粒状多孔介质24,所述粒状多孔介质24为石英砂或玻璃珠;所述活塞6由容置腔11开口处伸入容置腔内并压设于粒状多孔介质24上;所述容置腔11内的粒状多孔介质24中设有多个用于模拟井筒的管柱21;所述容置腔内部底面及侧壁上设有导流槽12,所述导流槽12为多条环形沟槽;立方体容器的底面和侧壁上设有与导流槽12导通的注水孔8。As shown in Figures 1 to 7, the present invention proposes a three-dimensional simulation device 100 for edge-bottom water reservoirs, the simulation device 100 is composed of a cubic container, the container has a certain pressure bearing capacity, the cubic container It is arranged on the three-dimensional rotating device 25; the cubic container includes a body 1 and a gland 2 arranged on the top of the body, the body is provided with an accommodation chamber 11, and the lower part of the gland 2 is provided with the same shape as the opening of the accommodation chamber 11. The piston 6, the gland 2 is provided with a plurality of vent holes 7, the vent holes 7 pass through the piston 6 and conduct with the accommodating chamber 11; the side wall of the body 1 is a removable movable side wall 3, At least one annular groove 9 is provided on the inner wall surface around the side walls around the body 1, the annular groove 9 is arranged parallel to the bottom surface of the body 1, and a separator 10 is detachably sealed and embedded in the annular groove 9; The side wall or the gland 2 is provided with a plurality of hole-shaped functional measurement points 4, and the functional measurement points 4 are controlled to conduct with the accommodation cavity 11; the accommodation cavity 11 is filled with granular porous media 24, and the granular porous medium 24 The medium 24 is quartz sand or glass beads; the piston 6 extends into the accommodation cavity from the opening of the accommodation cavity 11 and is pressed on the granular porous medium 24; the granular porous medium 24 in the accommodation cavity 11 is set There are a plurality of pipe strings 21 for simulating a wellbore; diversion grooves 12 are provided on the inner bottom surface and side walls of the accommodating cavity, and the diversion grooves 12 are multiple annular grooves; the bottom surface and side walls of the cubic container A water injection hole 8 communicating with the diversion groove 12 is provided on the top.

如图1所示,在本实施方式中,所述本体侧壁上的导流槽12是设置在所述环槽9的上方或下方,即:导流槽12不与环槽9产生交叉,以免发生干涉。As shown in FIG. 1, in this embodiment, the diversion groove 12 on the side wall of the body is arranged above or below the annular groove 9, that is, the diversion groove 12 does not intersect with the annular groove 9, so as not to interfere.

在本实施方式中,如图3所示,所述容置腔11内部底面上设有一钢板26,所述本体底面上的导流槽12是设置在钢板26的上表面,所述钢板26上设有与导流槽12和注水孔8导通的透孔261。In this embodiment, as shown in FIG. 3 , a steel plate 26 is provided on the inner bottom surface of the accommodating cavity 11 , and the diversion groove 12 on the bottom surface of the body is provided on the upper surface of the steel plate 26 . A through hole 261 communicating with the diversion groove 12 and the water injection hole 8 is provided.

由上所述,本发明用于边底水油藏的三维模拟装置,能对不同地层倾角、不同水体类型的边底水油藏进行物理模拟实验,模拟不同井型以及不同井网开发方式下的边底水油藏,可监测并记录模型内的油水运动规律以及模型的压力分布规律,从而研究底水油藏中油水渗流机理,进行底水油藏不同开发方式效果评价。From the above, the three-dimensional simulation device for edge-bottom water reservoirs of the present invention can perform physical simulation experiments on edge-bottom water reservoirs with different formation dip angles and different water body types, and simulate different well types and different well pattern development methods. It can monitor and record the oil-water movement law in the model and the pressure distribution law of the model, so as to study the oil-water seepage mechanism in the bottom water reservoir and evaluate the effect of different development methods of the bottom water reservoir.

实施例1Example 1

当本物理模拟装置用于进行底水油藏开采实验时。When the physical simulation device is used for a bottom water oil reservoir exploitation experiment.

如图4所示,在本实施例中,所述本体的底面注水孔8由管体顺序连接于一开关阀17、一液体流量仪18和一第一驱替泵16。As shown in FIG. 4 , in this embodiment, the bottom water injection hole 8 of the body is sequentially connected to an on-off valve 17 , a liquid flow meter 18 and a first displacement pump 16 through a pipe.

一管柱21(用于模拟注入井)连接压盖上的一功能测量点4,并由管体顺序连接于一开关阀17、中间容器19和第二驱替泵23。A pipe string 21 (for simulating an injection well) is connected to a functional measuring point 4 on the gland, and is sequentially connected to a switch valve 17 , an intermediate container 19 and a second displacement pump 23 through the pipe body.

一压力测量装置13连接于侧壁上的一功能测量点4;一饱和度测量装置14连接于侧壁上的另一功能测量点4;所述压力测量装置13和饱和度测量装置14与电脑15连接。A pressure measuring device 13 is connected to a functional measuring point 4 on the side wall; a saturation measuring device 14 is connected to another functional measuring point 4 on the side wall; the pressure measuring device 13 and the saturation measuring device 14 are connected with the computer 15 connections.

所述放气孔7通过一开关阀17与一放气管路连接。The air release hole 7 is connected with an air release pipeline through an on-off valve 17 .

如图5所示,另一管柱21(用于模拟生产井)连接于压盖上的另一功能测量点4,并由管体顺序连接于另一开关阀17、一回压阀20、一油水计量装置22。As shown in Figure 5, another pipe string 21 (for simulating production well) is connected to another functional measuring point 4 on the gland, and is connected to another on-off valve 17, a back pressure valve 20, An oil-water metering device 22.

本发明用于底水油藏的物理模拟装置的具体使用过程如下:The concrete use process of the physical simulation device that the present invention is used for bottom water reservoir is as follows:

1)填砂:1) Sand filling:

将物理模拟装置100设置在三维旋转装置25上,所述三维旋转装置25为现有结构,旋转该物理模拟装置100,将物理模拟装置100的活动侧壁3朝上放置,将可活动侧壁3取下,旋转螺栓5,使得活塞6与压盖2受力向装置100外侧移动;通过管线连接立方体容器底部注水孔8,管线另一端与一开关阀17连接,用于模拟底水供给;在压盖2上的放气孔7处也设有开关阀17,用于控制装置内压力;通过管线连接功能测量点4与压力测量装置13,用于监测物理模拟装置100内部的压力变化规律;将饱和度测量装置14的探针通过另一功能测量点4插入物理模拟装置100内,饱和度测量装置14用于监测物理模拟装置100内流体运动规律;将管壁上钻有孔眼的管柱21插入相应的功能测量点4内,模拟生产井或注入井,并在管柱上装上开关阀17,用于开关井;往物理模拟装置100的容置腔11内填满一定量的粒状多孔介质24,根据实验要求压实充填该介质;盖上可活动侧壁3;旋转螺栓5使得活塞6和压盖2受力朝容置腔11方向移动,进一步压实粒状多孔介质24。The physical simulation device 100 is arranged on the three-dimensional rotation device 25, and the three-dimensional rotation device 25 is an existing structure, the physical simulation device 100 is rotated, the movable side wall 3 of the physical simulation device 100 is placed upwards, and the movable side wall 3. Remove and rotate the bolt 5, so that the piston 6 and the gland 2 are forced to move to the outside of the device 100; connect the water injection hole 8 at the bottom of the cubic container through a pipeline, and connect the other end of the pipeline to a switch valve 17 for simulating bottom water supply; An on-off valve 17 is also provided at the vent hole 7 on the gland 2 to control the internal pressure of the device; the functional measurement point 4 and the pressure measurement device 13 are connected through a pipeline to monitor the pressure variation law inside the physical simulation device 100; The probe of the saturation measurement device 14 is inserted into the physical simulation device 100 through another functional measurement point 4, and the saturation measurement device 14 is used to monitor the fluid movement law in the physical simulation device 100; 21 is inserted into the corresponding functional measurement point 4 to simulate the production well or injection well, and the on-off valve 17 is installed on the pipe string for opening and closing the well; a certain amount of granular porous The medium 24 is compacted and filled according to the experimental requirements; the movable side wall 3 is covered; the bolt 5 is rotated so that the piston 6 and the gland 2 are forced to move toward the accommodating cavity 11, and the granular porous medium 24 is further compacted.

2)实验准备阶段:2) Experiment preparation stage:

打开放气孔7处的开关阀17,保持容置腔11与大气接通;利用管线将注水孔8处开关阀17与液体流量仪18出口端连接,其入口端与第一驱替泵16出口端连接,第一驱替泵16入口端连接实验用水。打开注水孔8处开关阀17,打开第一驱替泵16,设定驱替压力,使得第一驱替泵16保持恒定压力将实验用水注入到容置腔11内,直到底水厚度达到实验要求,按顺序关闭第一驱替泵16和注水孔8处的开关阀17。Open the on-off valve 17 at the vent hole 7 to keep the accommodating chamber 11 connected to the atmosphere; use the pipeline to connect the on-off valve 17 at the water injection hole 8 to the outlet of the liquid flow meter 18, and its inlet to the outlet of the first displacement pump 16 The inlet port of the first displacement pump 16 is connected with experimental water. Open the on-off valve 17 at the water injection hole 8, open the first displacement pump 16, set the displacement pressure so that the first displacement pump 16 maintains a constant pressure and inject the experimental water into the accommodating chamber 11 until the thickness of the bottom water reaches the experimental pressure. Requirement, close the switch valve 17 at the first displacement pump 16 and the water injection hole 8 in order.

保持放气孔7处的开关阀17处于打开状态,通过管线连接一管柱21(用于模拟注入井)处开关阀17与中间容器19出口端,中间容器19入口端与第二驱替泵23相连;打开该管柱21处的开关阀17,通过第二驱替泵23以一定注入速度向物理模拟装置100内注入饱和模拟油,直到放气孔7处均见油,关闭放气孔7处开关阀17,继续注入一定量的模拟油,直到容置腔11内压力达到实验要求,并记录此时容置腔11内的平均压力,关闭该注入井处开关阀17,并断开该注入井21与中间容器19的连接。Keep the on-off valve 17 at the bleed hole 7 in an open state, connect the on-off valve 17 at the pipe string 21 (for simulating the injection well) to the outlet of the intermediate container 19, and the inlet of the intermediate container 19 to the second displacement pump 23 through pipelines connected; open the switch valve 17 at the pipe string 21, inject saturated simulated oil into the physical simulation device 100 at a certain injection rate through the second displacement pump 23, until oil is seen in the 7 vent holes, and close the switch at the 7 vent holes Valve 17, continue to inject a certain amount of simulated oil until the pressure in the accommodation chamber 11 reaches the experimental requirements, and record the average pressure in the accommodation chamber 11 at this time, close the on-off valve 17 at the injection well, and disconnect the injection well 21 is connected with the intermediate container 19.

打开与注水孔8相连的第一驱替泵16,设定第一驱替泵16的驱替压力等于容置腔11内的平均压力,打开注水孔8处的开关阀17,记录液体流量仪18上的数据,直到通过液体流量为零时,此时容置腔11与第一驱替泵16间达到压力平衡,实验条件准备完毕。Open the first displacement pump 16 connected to the water injection hole 8, set the displacement pressure of the first displacement pump 16 to be equal to the average pressure in the accommodation chamber 11, open the switch valve 17 at the water injection hole 8, record the liquid flow meter 18 until the liquid flow rate is zero, at this time the pressure balance between the accommodation chamber 11 and the first displacement pump 16 is reached, and the experimental conditions are ready.

3)生产模拟:3) Production simulation:

保持与注水孔8相连的第一驱替泵16为打开状态;将回压阀20入口端与生产井的井眼管线相连,回压阀20出口端连接油水计量装置22;实验时,打开井眼管线处开关阀17,设定回压阀20入口端压力,则可模拟生产井采油的开发过程。记录油水计量装置22上的读数,可测量生产井生产出的油量和水量,记录液体流量仪18上的读数,可测量底水油藏的水侵量,通过饱和度测量装置14可观察底水脊进规律。Keep the first displacement pump 16 connected to the water injection hole 8 in an open state; connect the inlet end of the back pressure valve 20 to the wellbore pipeline of the production well, and connect the outlet end of the back pressure valve 20 to the oil-water metering device 22; during the experiment, open the well By switching the valve 17 at the eye pipeline and setting the pressure at the inlet of the back pressure valve 20, the development process of production wells can be simulated. Record the readings on the oil-water metering device 22 to measure the amount of oil and water produced by the production well, and record the readings on the liquid flow meter 18 to measure the water intrusion of the bottom water reservoir. The law of water ridge advance.

本发明用于边底水油藏的三维模拟装置,能对不同地层倾角、不同水体类型的边底水油藏进行物理模拟实验,模拟不同井型以及不同井网开发方式下的边底水油藏,可监测并记录模型内的油水运动规律以及模型的压力分布规律,从而研究底水油藏中油水渗流机理,进行底水油藏不同开发方式效果评价。The three-dimensional simulation device for edge-bottom water reservoirs of the present invention can perform physical simulation experiments on edge-bottom water reservoirs with different formation dip angles and different water body types, and simulate edge-bottom water oil reservoirs under different well types and different well pattern development modes It can monitor and record the oil-water movement law in the model and the pressure distribution law of the model, so as to study the oil-water seepage mechanism in the bottom water reservoir and evaluate the effect of different development methods of the bottom water reservoir.

实施例2Example 2

该实施例是利用该物理模拟装置进行边水油藏开采实验模拟。This embodiment is to use the physical simulation device to carry out the experimental simulation of edge water oil reservoir exploitation.

本实施例与实施例1的结构及原理基本相同,其区别在于,如图2所示,在本实施例中,所述本体四周侧壁上设置的环槽9中,密封嵌设有隔板10,隔板10将容置腔11分隔为上、下两个密封空间(使容置腔的厚度可变)。如图6、图7所示,在本实施例中,所述开关阀17、一液体流量仪18和一第一驱替泵16是由管体顺序连接于本体的侧壁注水孔8上,且该注水孔8位于环槽9的上方。The structure and principle of this embodiment are basically the same as those of Embodiment 1, the difference being that, as shown in Figure 2, in this embodiment, in the ring groove 9 provided on the side walls around the body, a partition is sealed and embedded 10. The partition plate 10 divides the accommodating cavity 11 into two sealed spaces (upper and lower) (making the thickness of the accommodating cavity variable). As shown in Figure 6 and Figure 7, in this embodiment, the switch valve 17, a liquid flow meter 18 and a first displacement pump 16 are sequentially connected to the side wall water injection hole 8 of the body by the pipe body, And the water injection hole 8 is located above the ring groove 9 .

本发明用于边水油藏的物理模拟装置的具体使用过程如下:The concrete use process of the physical simulation device that the present invention is used for edge water reservoir is as follows:

1)填砂:1) Sand filling:

将物理模拟装置100设置在三维旋转装置25上,所述三维旋转装置25为现有结构,旋转该物理模拟装置100,将物理模拟装置100的可活动侧壁3朝上放置,并将可活动侧壁3取下,旋转螺栓5,使得活塞6与压盖2受力向装置100外侧移动;将隔板10沿容置腔11四周壁面上的环槽9插入,利用管线连接侧壁上的注水孔8,并在该管线处设有开关阀17;在压盖2上的放气孔7处也设有开关阀17,用于控制装置内压力;通过管线连接功能测量点4与压力测量装置13,用于监测物理模拟装置100内部的压力变化规律;将饱和度测量装置14的探针通过另一功能测量点4插入物理模拟装置100内,饱和度测量装置14用于监测物理模拟装置100内流体运动规律;将管壁上钻有孔眼的管柱21插入相应的功能测量点4内,用于模拟生产井,并在管柱上装上开关阀17,用于开关井;往隔板10与压盖2之间的容置腔11的上密封空间111内填满一定量的粒状多孔介质24,根据实验要求压实充填该介质;盖上可活动侧壁3;旋转螺栓5使得活塞6和压盖2受力朝容置腔11方向移动,进一步压实粒状多孔介质24;利用三维旋转装置25,将物理模拟装置100的压盖2朝上放置;并利用旋转装置25,将模型旋转一定角度,模拟地层倾角。The physical simulation device 100 is arranged on the three-dimensional rotating device 25, the three-dimensional rotating device 25 is an existing structure, the physical simulation device 100 is rotated, the movable side wall 3 of the physical simulation device 100 is placed upwards, and the movable The side wall 3 is removed, and the bolt 5 is rotated so that the piston 6 and the gland 2 are forced to move to the outside of the device 100; the partition plate 10 is inserted along the ring groove 9 on the wall surface around the accommodating chamber 11, and the pipeline is used to connect the Water injection hole 8, and on-off valve 17 is provided at this pipeline; On-off valve 17 is also provided on vent hole 7 on gland 2, is used for controlling the pressure in the device; Connect function measuring point 4 and pressure measuring device through pipeline 13. It is used to monitor the pressure change law inside the physical simulation device 100; the probe of the saturation measurement device 14 is inserted into the physical simulation device 100 through another functional measurement point 4, and the saturation measurement device 14 is used to monitor the physical simulation device 100 The internal fluid movement law; the pipe string 21 with holes drilled on the pipe wall is inserted into the corresponding functional measurement point 4, which is used to simulate the production well, and the switch valve 17 is installed on the pipe string for the switch well; to the partition 10 A certain amount of granular porous medium 24 is filled in the upper sealing space 111 of the accommodation chamber 11 between the gland 2, and the medium is compacted and filled according to the experimental requirements; the movable side wall 3 is placed on the cover; the bolt 5 is rotated so that the piston 6 and the gland 2 is forced to move toward the accommodation cavity 11, further compacting the granular porous medium 24; using the three-dimensional rotating device 25, the gland 2 of the physical simulation device 100 is placed upward; and using the rotating device 25, the model is rotated A certain angle to simulate the formation dip.

2)实验准备阶段:2) Experiment preparation stage:

打开放气孔7处的开关阀17,保持容置腔11与大气接通;利用管线将侧壁上注水孔8处开关阀17与液体流量仪18出口端连接,其入口端与第一驱替泵16出口端连接,第一驱替泵16入口端连接实验用水。打开侧壁上注水孔8处开关阀17,打开第一驱替泵16,设定驱替压力,使得第一驱替泵16保持恒定压力将实验用水注入到容置腔11内,直到边水厚度达到实验要求,按顺序关闭第一驱替泵16和注水孔8处的开关阀17。Open the on-off valve 17 at the vent hole 7 to keep the accommodating cavity 11 connected to the atmosphere; use the pipeline to connect the on-off valve 17 at the water injection hole 8 on the side wall to the outlet of the liquid flow meter 18, and its inlet to the first displacement The outlet of the pump 16 is connected, and the inlet of the first displacement pump 16 is connected with experimental water. Open the switch valve 17 at the water injection hole 8 on the side wall, turn on the first displacement pump 16, set the displacement pressure so that the first displacement pump 16 maintains a constant pressure, and inject the experimental water into the accommodating chamber 11 until the edge water When the thickness meets the experimental requirements, the first displacement pump 16 and the on-off valve 17 at the water injection hole 8 are closed in sequence.

保持放气孔7处的开关阀17处于打开状态,通过管线连接管柱21处开关阀17与中间容器19出口端,中间容器19入口端与第二驱替泵23相连;打开该管柱21处的开关阀17,通过第二驱替泵23以一定注入速度向物理模拟装置100内注入饱和模拟油,直到放气孔7处均见油,关闭放气孔7处开关阀17,继续注入一定量的模拟油,直到容置腔11内压力达到实验要求,并记录此时容置腔11内的平均压力关闭该管柱21处开关阀17,并断开该管柱21与中间容器19的连接。Keep the on-off valve 17 at the bleed hole 7 in an open state, connect the on-off valve 17 at the pipe string 21 to the outlet end of the intermediate container 19 through the pipeline, and the inlet end of the intermediate container 19 is connected to the second displacement pump 23; open the pipe string 21 Inject saturated simulated oil into the physical simulation device 100 at a certain injection rate through the second displacement pump 23 until oil is seen in the vent hole 7, close the switch valve 17 in the vent hole 7, and continue to inject a certain amount of Simulate oil until the pressure in the accommodation chamber 11 reaches the experimental requirements, and record the average pressure in the accommodation chamber 11 at this time, close the on-off valve 17 at the pipe string 21, and disconnect the pipe string 21 from the intermediate container 19.

打开与侧壁上注水孔8相连的第一驱替泵16,设定第一驱替泵16的驱替压力等于容置腔11内的平均压力,打开侧壁上注水孔8处的开关阀17,记录液体流量仪18上的数据,直到通过液体流量为零时,此时容置腔11与第一驱替泵16间达到压力平衡,实验条件准备完毕。Open the first displacement pump 16 connected to the water injection hole 8 on the side wall, set the displacement pressure of the first displacement pump 16 to be equal to the average pressure in the accommodation chamber 11, and open the switch valve at the water injection hole 8 on the side wall 17. Record the data on the liquid flow meter 18 until the passing liquid flow rate is zero, at this time the pressure balance between the accommodation chamber 11 and the first displacement pump 16 is reached, and the experimental conditions are ready.

3)生产模拟:3) Production simulation:

保持与侧壁上注水孔8相连的第一驱替泵16为打开状态;将回压阀20入口端与管柱21的井眼管线相连,回压阀20出口端连接油水计量装置22;实验时,打开井眼管线处开关阀17,并设定回压阀20入口端压力,则可模拟边水油藏内采油井21采油的开发过程。记录油水计量装置22上的读数,可测量采油井21生产出的油量与水量,记录液体流量仪18上的读数,可测量边水油藏的水侵量,通过饱和度测量装置14可观察底水脊进规律。Keep the first displacement pump 16 connected to the water injection hole 8 on the side wall in an open state; connect the inlet end of the back pressure valve 20 to the wellbore pipeline of the pipe string 21, and connect the outlet end of the back pressure valve 20 to the oil-water metering device 22; experiment When opening the on-off valve 17 at the wellbore pipeline and setting the pressure at the inlet port of the back pressure valve 20, the development process of oil production by the oil production well 21 in the edge water reservoir can be simulated. Record the readings on the oil-water metering device 22 to measure the amount of oil and water produced by the oil production well 21, and record the readings on the liquid flow meter 18 to measure the water intrusion of the edge water reservoir, which can be observed through the saturation measuring device 14 Bottom water ridge advance law.

本实施例的其它有益效果与实施例1相同,在此不再赘述。Other beneficial effects of this embodiment are the same as those of Embodiment 1, and will not be repeated here.

以上所述仅为本发明示意性的具体实施方式,并非用以限定本发明的范围。任何本领域的技术人员,在不脱离本发明的构思和原则的前提下所作出的等同变化与修改,均应属于本发明保护的范围。The above descriptions are only illustrative specific implementations of the present invention, and are not intended to limit the scope of the present invention. Any equivalent changes and modifications made by those skilled in the art without departing from the concepts and principles of the present invention shall fall within the protection scope of the present invention.

Claims (6)

1. for a three-dimensional simulation device for bottom and edge water, it is characterized in that: this analogue means is made up of a cubic container; This cubic container comprises the gland that a body and is arranged at bodies top, accommodating cavity is provided with in body, gland bottom is provided with the piston identical with accommodating cavity opening shape, and described gland is provided with multiple air vent, and described air vent runs through piston and accommodating cavity conducting; One sidewall of described body is the movable side wall that can dismantle, and the internal face around described body surrounding sidewall is at least provided with an annular groove, and the bottom surface of described annular groove and body be arranged in parallel, and in described annular groove, removably sealing is embedded dividing plate; The sidewall of body or gland are provided with multiple poroid functional measurement point, and described functional measurement point and accommodating cavity control conducting; Be full of granular porous medium in described accommodating cavity, described piston to be stretched in accommodating cavity by accommodating cavity opening part and is installed with on granular porous medium; Multiple tubing string for simulation wellbore hole is provided with in granular porous medium in described accommodating cavity; Described accommodating cavity inner bottom surface and sidewall are provided with guiding gutter, and the bottom surface of cubic container and sidewall are provided with the water injection hole with guiding gutter conducting; Guiding gutter on described body sidewall is arranged on above or below described annular groove; Described accommodating cavity inner bottom surface is provided with a steel plate, and the guiding gutter on described body bottom surface is the upper surface being arranged on steel plate, and described steel plate is provided with the open-work with guiding gutter and water injection hole conducting; Described guiding gutter is many ring-shaped grooves; Described cubic container is arranged on three-dimensional rotation device.
2., as claimed in claim 1 for the three-dimensional simulation device of bottom and edge water, it is characterized in that: described granular porous medium is quartz sand or bead.
3., as claimed in claim 1 for the three-dimensional simulation device of bottom and edge water, it is characterized in that: described water injection hole is linked in sequence in a switch valve, a liquid flow instrument and one first displacement pump by body.
4., as claimed in claim 1 for the three-dimensional simulation device of bottom and edge water, it is characterized in that: a simulation wellbore hole connects a functional measurement point, and be linked in sequence in a switch valve and the second displacement pump by body.
5., as claimed in claim 1 for the three-dimensional simulation device of bottom and edge water, it is characterized in that: a device for pressure measurement is connected to a functional measurement point; One saturation measuring device is connected to another functional measurement point; Described device for pressure measurement is connected with computer with saturation measuring device.
6., as claimed in claim 1 for the three-dimensional simulation device of bottom and edge water, it is characterized in that: another simulation wellbore hole is connected to another functional measurement point, and be linked in sequence in another switch valve, a back-pressure valve, an oil-water metering device by body.
CN201210187362.7A 2012-06-07 2012-06-07 Three-dimensional simulation device for edge-bottom water reservoir Active CN102797458B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210187362.7A CN102797458B (en) 2012-06-07 2012-06-07 Three-dimensional simulation device for edge-bottom water reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210187362.7A CN102797458B (en) 2012-06-07 2012-06-07 Three-dimensional simulation device for edge-bottom water reservoir

Publications (2)

Publication Number Publication Date
CN102797458A CN102797458A (en) 2012-11-28
CN102797458B true CN102797458B (en) 2016-01-20

Family

ID=47196737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210187362.7A Active CN102797458B (en) 2012-06-07 2012-06-07 Three-dimensional simulation device for edge-bottom water reservoir

Country Status (1)

Country Link
CN (1) CN102797458B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104254B (en) * 2013-01-24 2015-05-20 西南石油大学 Multifunctional oil reservoir simulation experiment device and experiment method thereof
CN103967460B (en) * 2014-05-26 2018-01-30 中国石油大学(华东) A kind of oil reservoir side water water enchroachment (invasion) visual Simulation device for considering well pattern and influenceing
CN105298487B (en) * 2015-12-02 2018-06-12 中国矿业大学 Gas-liquid two-phase seepage flow Jamin effect simulation experiment method in a kind of coal seam reservoirs
CN105464651A (en) * 2015-12-02 2016-04-06 中国矿业大学 Simulation experiment system of gas-liquid two-phase seepage Jamin effect in coal reservoir
CN105604545B (en) * 2015-12-17 2019-05-07 中国石油天然气股份有限公司 Experimental device and method for simulating gas reservoir water invasion
CN108612524A (en) * 2016-12-12 2018-10-02 中国石油天然气股份有限公司 Three-dimensional visible bottom water reservoir physical simulation device
CN107288630A (en) * 2017-07-28 2017-10-24 中国地质调查局油气资源调查中心 A kind of gas hydrates develop the control system of analogue experiment installation
CN108661626B (en) * 2018-08-02 2023-11-21 西南石油大学 High-temperature high-pressure well wall water invasion simulation experiment device
CN109519156B (en) * 2018-11-01 2020-10-02 中海石油(中国)有限公司上海分公司 A seepage experiment method for water-flooding profile model in edge-water sandstone gas reservoirs
CN110107288B (en) * 2019-05-17 2020-07-14 重庆科技学院 Full-contact edge-bottom water reservoir development simulation system and method
CN111101936B (en) * 2019-12-30 2023-06-30 中国地质大学(武汉) An experimental device for simulating bottom water driven oil production in collapsed accumulation reservoirs
CN111119806B (en) * 2019-12-30 2021-03-19 中国地质大学(武汉) Method for simulating bottom water-driven oil extraction of collapsed and piled reservoir body
CN111119876B (en) * 2019-12-30 2021-05-28 中国地质大学(武汉) An experimental device for simulating the edge and bottom water-driven oil recovery of collapsed accumulation reservoirs
CN113389544B (en) * 2021-07-09 2022-10-04 中国石油大学(华东) A visualization model for water intrusion simulation experiments in edge-water reservoirs
CN114810034A (en) * 2022-03-02 2022-07-29 中国石油大学(北京) Fishbone well injection-production experimental device
CN114542035A (en) * 2022-03-28 2022-05-27 中国石油大学(华东) A visual simulation device and method for injection and production of well pattern in high-dip edge-water oil reservoirs

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007142554A2 (en) * 2006-06-06 2007-12-13 Obshchestvo S Ogranichennoy Otvetstvennostyu Glo-Bel Nefteservis Device for testing crude oil and gas
CN101561362A (en) * 2009-05-13 2009-10-21 中国石油大学(北京) Three-dimensional experimental device for simulating lithologic reservoir forming
CN201437724U (en) * 2009-06-22 2010-04-14 中国石油天然气股份有限公司 Three-dimensional high-temperature high-pressure oil-gas migration physical simulation device
CN101866145A (en) * 2010-06-04 2010-10-20 海安县石油科研仪器有限公司 Intelligent well simulation experiment device
CN202202850U (en) * 2011-08-06 2012-04-25 中国石油化工股份有限公司 Multi-medium oil displacement physical simulation experiment device
CN202202851U (en) * 2011-08-06 2012-04-25 中国石油化工股份有限公司 Oil displacement physical simulation experiment device
CN102434151A (en) * 2011-12-19 2012-05-02 中国海洋石油总公司 Bottom-water coning dynamic simulation experiment device in bottom-water oil reservoir development and simulation system
CN102434145A (en) * 2011-08-10 2012-05-02 中国石油天然气股份有限公司 Horizontal well experiment system with adjustable angle horizontal well section

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007142554A2 (en) * 2006-06-06 2007-12-13 Obshchestvo S Ogranichennoy Otvetstvennostyu Glo-Bel Nefteservis Device for testing crude oil and gas
CN101561362A (en) * 2009-05-13 2009-10-21 中国石油大学(北京) Three-dimensional experimental device for simulating lithologic reservoir forming
CN201437724U (en) * 2009-06-22 2010-04-14 中国石油天然气股份有限公司 Three-dimensional high-temperature high-pressure oil-gas migration physical simulation device
CN101866145A (en) * 2010-06-04 2010-10-20 海安县石油科研仪器有限公司 Intelligent well simulation experiment device
CN202202850U (en) * 2011-08-06 2012-04-25 中国石油化工股份有限公司 Multi-medium oil displacement physical simulation experiment device
CN202202851U (en) * 2011-08-06 2012-04-25 中国石油化工股份有限公司 Oil displacement physical simulation experiment device
CN102434145A (en) * 2011-08-10 2012-05-02 中国石油天然气股份有限公司 Horizontal well experiment system with adjustable angle horizontal well section
CN102434151A (en) * 2011-12-19 2012-05-02 中国海洋石油总公司 Bottom-water coning dynamic simulation experiment device in bottom-water oil reservoir development and simulation system

Also Published As

Publication number Publication date
CN102797458A (en) 2012-11-28

Similar Documents

Publication Publication Date Title
CN102797458B (en) Three-dimensional simulation device for edge-bottom water reservoir
CN102590456B (en) Device and method for simulating volume fracturing of horizontal well on shale reservoir stratum
CN202718673U (en) Visual physical simulation device for bottom water reservoir
CN105178926B (en) Fractured-cavernous carbonate reservoir physical model, displacement simulation experimental provision and system
CN106324226B (en) Monitor seepage action of ground water, sedimentation perfusion one laboratory testing rig and method
CN103352695B (en) Visualization physical simulation device with consideration of interlamination fluid channeling
CN105156102B (en) Bottom water reservoir water energy three-dimensional physical simulation device and method
CN104500013B (en) Multi-functional heat extraction by steam injection three-dimensional physical simulation experimental provision
CN105178927B (en) A kind of displacement simulation experimental provision and system
CN102720479B (en) Physical simulation device for gas-cap oil reservoir
CN103104254B (en) Multifunctional oil reservoir simulation experiment device and experiment method thereof
CN102587894B (en) Horizontal well seepage experimental device
CN102720476A (en) O-shaped well physical simulation experiment device
CN106761498A (en) A kind of experimental provision and method for carrying out multi-phase separation to gas hydrates drilling fluid
CN205063944U (en) Three -dimensional physical simulation device of bottom water oil reservoir water energy
CN106501493A (en) A kind of displacement test heterogeneous body self-constant temperature sandpack column and loading method
CN102434151A (en) Bottom-water coning dynamic simulation experiment device in bottom-water oil reservoir development and simulation system
CN104005742B (en) A kind of method for testing lab simulation Heterogeneous reservoir difference water filling and device
CN201935852U (en) Selective water plugging simulation device system of oil well
CN106401577A (en) Visual testing device and method for simulating bottom water coning of bottom water gas reservoir gas well
CN206132761U (en) Monitoring groundwater seepage flow, subside fill integrative indoor test device
CN103993877B (en) Radial well pressure break testing arrangement
CN204327057U (en) Multi-functional heat extraction by steam injection three-dimensional physical simulation experimental facilities
CN209780859U (en) A productivity simulation model for fractured horizontal wells in low-permeability glutenite reservoirs
CN107575209A (en) A kind of large-scale visual virtual design experimental provision of fracture and vug carbonate reservoir and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant