CN102795554A - 固定式塔吊整体迁移机构及迁移方法 - Google Patents
固定式塔吊整体迁移机构及迁移方法 Download PDFInfo
- Publication number
- CN102795554A CN102795554A CN2012102829284A CN201210282928A CN102795554A CN 102795554 A CN102795554 A CN 102795554A CN 2012102829284 A CN2012102829284 A CN 2012102829284A CN 201210282928 A CN201210282928 A CN 201210282928A CN 102795554 A CN102795554 A CN 102795554A
- Authority
- CN
- China
- Prior art keywords
- slideway
- tower crane
- jack
- vertical jack
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title abstract description 14
- 230000007246 mechanism Effects 0.000 title abstract description 5
- 229910000831 Steel Inorganic materials 0.000 abstract description 26
- 239000010959 steel Substances 0.000 abstract description 26
- 230000005012 migration Effects 0.000 abstract description 12
- 238000013508 migration Methods 0.000 abstract description 12
- 241001669679 Eleotris Species 0.000 abstract description 8
- 238000010276 construction Methods 0.000 abstract description 7
- 238000011068 loading method Methods 0.000 abstract description 4
- 239000004567 concrete Substances 0.000 abstract description 3
- 239000011440 grout Substances 0.000 abstract 1
- 238000005096 rolling process Methods 0.000 abstract 1
- 238000013519 translation Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000007723 transport mechanism Effects 0.000 description 2
- LFQSCWFLJHTTHZ-UHFFFAOYSA-N Ethanol Chemical compound CCO LFQSCWFLJHTTHZ-UHFFFAOYSA-N 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000009424 underpinning Methods 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
一种固定式塔吊整体迁移机构,包括托换梁、竖向千斤顶、水平千斤顶、道木、钢板滑道,托换梁作滑道基础,滑道基础上面设置由两层钢板之间夹有滚轴构成的钢板滑道,钢板滑道上面设有竖向千斤顶,水平千斤顶通过道木靠在一侧,用于移动塔吊。通过本机构首先确定迁移后的位置,然后将原基础位置、新基础位置、滑道基础及行进路线的土挖出;施工滑道基础,并在滑道基础上面安装好钢板滑道;布置水平、竖向千斤顶;给水平、竖向千斤顶加荷,滑到新基础位置;用经纬仪观测塔吊的垂直度,并用竖向千斤顶调整,达到要求后,用短型钢替换竖向千斤顶,把竖向千斤顶撤出;用细石混凝土或灌浆料将基础底部灌满,然后回填土。本发明缩短因迁移引起的工期,成本低廉,能大大降低安全风险。
Description
技术领域
本发明涉及建筑运输机械,尤其是涉及一种固定式塔吊托换整体迁移机构及迁移方法。
背景技术
固定式塔吊是目前建筑业使用最多的垂直运输机械,由于各种原因需要将正在作业的塔吊短距离迁移到新位置的事时有发生。目前常用的方法就是新建一个基础,再将固定式塔吊拆卸后到新地点重新组立。这种方法比较传统,工艺成熟容易掌握。但产生的成本高,另外由于需要拆卸吊车,重新做基础,需要较长时间,影响工期。
发明内容
本发明的目的是提供一种固定式塔吊托换整体迁移机构及迁移方法,以节省工期,降低建造成本,降低安全风险。
为实现上述目的,本发明提供一种固定式塔吊整体迁移机构,其特征在于:包括托换梁、竖向千斤顶、水平千斤顶、道木、钢板滑道,托换梁作滑道基础,滑道基础上面设置由两层钢板之间夹有滚轴构成的钢板滑道,钢板滑道上面设有竖向千斤顶,水平千斤顶通过道木靠在一侧,用于移动塔吊。
一种固定式塔吊整体迁移方法,其特征在于包括下列步骤:
1、首先确定迁移后的位置,然后将原基础位置、新基础位置、滑道基础及行进路线的土挖出;
2、施工滑道基础,并在滑道基础上面安装好钢板滑道;
3、布置水平、竖向千斤顶;
4、给水平、竖向千斤顶加荷,滑到新基础位置;
5、用经纬仪观测塔吊的垂直度,并用竖向千斤顶调整,达到要求后,用短型钢替换竖向千斤顶,把竖向千斤顶撤出;
6、用细石混凝土或灌浆料将基础底部灌满,然后回填土。
本发明优点如下:
1、在整个塔吊迁移的过程中,塔吊都能正常工作,不影响正常施工,能大大缩短因迁移引起的工期。
2、本发明在实施过程中不需要大型的水平和垂直运输机械,不需要另作基础,成本低廉,仅是常规方法成本的10%左右。
3、本发明在实施中绝大部分是地面作业,不存在高空作业,能大大降低安全风险。
附图说明
图1是塔吊平移施工示意图;
图2是塔吊平移正立面图;
图3是塔吊平移侧立面图;
图4是塔吊平移平面图。
具体实施方式
参照图1、2、3、4,原塔吊基础1,托换梁2作滑道基础、竖向千斤顶3、水平千斤顶4、钢板5、滚轴6,滑道基础上面设置由两层钢板之间夹有滚轴构成的钢板滑道,钢板滑道上面设有竖向千斤顶,水平千斤顶通过道木7靠在基础一侧,用于移动塔吊。
本发明平移施工具体步骤如下:
1、首先确定迁移后的位置,然后将原基础位置8、新基础位置9和滑道基础及行进路线的土挖出;
2、施工拖换梁2作滑道基础,并在滑道基础上面依次安装好钢板5、滚轴6、钢板5组合成的钢板滑道;
3、将竖向千斤顶布置好,并开始对基础1同步加荷,当满负荷后,开始布置道木7及水平千斤顶4,并使水平千斤顶4受力;
4、通过水平千斤顶4对基础1加荷,随着塔吊的平稳前移,不断地倒换钢板滑道及道木7,直到塔吊滑到新基础位置;
5、塔吊到达新基础位置后,用经纬仪观测塔吊的垂直度,并用竖向千斤顶3调整,达到要求后,用短型钢替换竖向千斤顶,把竖向千斤顶撤出;
6、用细石混凝土或灌浆料将基础底部灌满,然后回填土。
本发明采用了两条临时托换梁做滑道基础,辅助两条滚动式的钢板滑道,使固定式塔吊平稳的从原位置迁移到新位置后,找正、注浆后回填土,完成全部迁移过程。
试验例1
在吉林市30万吨/年燃料乙醇自备电站施工现场,由于立塔吊时位置未测量准。使用之后发现影响其他单位吊车的回转,大约需要迁移3m左右。由于工期特别紧,现场场地又比较狭小,大型吊车、板车难以进入,因此采用了本发明的方法成功的将塔吊迁移了3.5m,在整个过程中塔吊均正常工作。
迁移的塔吊是QTZ5011型,高 25m,自重加配重61 t。托换基础为两条1000mmx600mm(高)钢筋混凝土基础,滑道采用两层10mm钢板夹Φ25 mm圆钢200mm,竖向采用每侧4个30t千斤顶均匀布置,水平采用两个100t千斤顶千斤顶后背了两层道木。
挖土和前期基础施工用了一星期,正式迁移用了两天时间到预计位置,找正后支模板浇注了C30大流动混凝土,然后回填。塔吊以后正常使用到工程结束。
试验例2
在通钢施工现场,因塔吊基础施工时有一半基础下部是回填土,当时未发现,后塔吊发生倾斜,找正几次仍倾斜,因此采用本发明将基础平移2.5m。方法和上例相同,迁移后塔吊未再发生倾斜,正常使用到工程结束。
Claims (2)
1.一种固定式塔吊整体迁移机构,其特征在于:包括托换梁、竖向千斤顶、水平千斤顶、道木、钢板滑道,托换梁作滑道基础,滑道基础上面设置由两层钢板之间夹有滚轴构成的钢板滑道,钢板滑道上面设有竖向千斤顶,水平千斤顶通过道木靠在一侧,用于移动塔吊。
2.利用权利要求1所述的固定式塔吊整体迁移机构对固定式塔吊整体迁移的方法,其特征在于包括下列步骤:
(1)首先确定迁移后的位置,然后将原基础位置、新基础位置、滑道基础及行进路线的土挖出;
(2)施工滑道基础,并在滑道基础上面安装好钢板滑道;
(3)布置水平、竖向千斤顶;
(4)给水平、竖向千斤顶加荷,滑到新基础位置;
(5)用经纬仪观测塔吊的垂直度,并用竖向千斤顶调整,达到要求后,用短型钢替换竖向千斤顶,把竖向千斤顶撤出;
(6)用细石混凝土或灌浆料将基础底部灌满,然后回填土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102829284A CN102795554A (zh) | 2012-08-10 | 2012-08-10 | 固定式塔吊整体迁移机构及迁移方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102829284A CN102795554A (zh) | 2012-08-10 | 2012-08-10 | 固定式塔吊整体迁移机构及迁移方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102795554A true CN102795554A (zh) | 2012-11-28 |
Family
ID=47194902
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102829284A Pending CN102795554A (zh) | 2012-08-10 | 2012-08-10 | 固定式塔吊整体迁移机构及迁移方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102795554A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115321304A (zh) * | 2022-07-12 | 2022-11-11 | 中建一局集团第五建筑有限公司 | 一种设置在车库顶板的施工升降机免回顶方法 |
CN115432603A (zh) * | 2022-10-17 | 2022-12-06 | 徐州建机工程机械有限公司 | 一种无轨式移动塔机底架装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1089008A (zh) * | 1993-10-09 | 1994-07-06 | 阮蔚文 | 建筑物搬迁方法 |
JPH09144050A (ja) * | 1995-11-24 | 1997-06-03 | Mitsui Constr Co Ltd | 構造物の上方押圧方法 |
CN1262366A (zh) * | 1999-01-27 | 2000-08-09 | 高亚平 | 小型建筑物的移位方法 |
EP0788572B1 (de) * | 1995-08-17 | 2001-07-11 | Roland Beck | Verfahren zum unterfangen von bauwerken |
CN2674002Y (zh) * | 2003-10-27 | 2005-01-26 | 高建华 | 小型建筑物移动装置 |
CN101429820A (zh) * | 2007-11-07 | 2009-05-13 | 上海天演建筑物移位工程有限公司 | 建筑物整体移位方法 |
CN202831000U (zh) * | 2012-08-10 | 2013-03-27 | 中油吉林化建工程有限公司 | 固定式塔吊整体迁移机构 |
-
2012
- 2012-08-10 CN CN2012102829284A patent/CN102795554A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1089008A (zh) * | 1993-10-09 | 1994-07-06 | 阮蔚文 | 建筑物搬迁方法 |
EP0788572B1 (de) * | 1995-08-17 | 2001-07-11 | Roland Beck | Verfahren zum unterfangen von bauwerken |
JPH09144050A (ja) * | 1995-11-24 | 1997-06-03 | Mitsui Constr Co Ltd | 構造物の上方押圧方法 |
CN1262366A (zh) * | 1999-01-27 | 2000-08-09 | 高亚平 | 小型建筑物的移位方法 |
CN2674002Y (zh) * | 2003-10-27 | 2005-01-26 | 高建华 | 小型建筑物移动装置 |
CN101429820A (zh) * | 2007-11-07 | 2009-05-13 | 上海天演建筑物移位工程有限公司 | 建筑物整体移位方法 |
CN202831000U (zh) * | 2012-08-10 | 2013-03-27 | 中油吉林化建工程有限公司 | 固定式塔吊整体迁移机构 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115321304A (zh) * | 2022-07-12 | 2022-11-11 | 中建一局集团第五建筑有限公司 | 一种设置在车库顶板的施工升降机免回顶方法 |
CN115321304B (zh) * | 2022-07-12 | 2023-08-15 | 中建一局集团第五建筑有限公司 | 一种设置在车库顶板的施工升降机免回顶方法 |
CN115432603A (zh) * | 2022-10-17 | 2022-12-06 | 徐州建机工程机械有限公司 | 一种无轨式移动塔机底架装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105133856B (zh) | 一种利用拼装拖车对建筑物进行整体移位的方法 | |
CN109798396B (zh) | 一种复杂地层的长距离大口径混凝土管人工顶进工艺 | |
CN109778721A (zh) | 同步顶升桥梁上下部结构进行桥梁加高改造的方法 | |
CN103981816A (zh) | 立交桥框架墩柱托换施工方法 | |
CN103195085B (zh) | 一种向下加层地下室及其建造方法 | |
CN101725357B (zh) | 地铁隧道下穿段施工方法 | |
CN108265618B (zh) | 一种高架桥柱墩基础地下逆向增层施工方法 | |
CN103628422B (zh) | 一种反力式牵索挂篮预压装置及其实施方法 | |
CN102758441A (zh) | 一种逆作条件下深基坑平台接力出土方法及结构 | |
CN108894258B (zh) | 一种群桩基础桩土荷载分担比的测试方法 | |
CN104389315A (zh) | 固结灌浆钻孔桩墙及其施工方法 | |
CN201635410U (zh) | 承受吊装施工荷载的混凝土结构临时加固装置 | |
CN105953078A (zh) | 高压燃气管道的保护装置及保护方法 | |
CN103306204B (zh) | 一种基座钢锚箱三向式定位装置 | |
CN202831000U (zh) | 固定式塔吊整体迁移机构 | |
CN102733406B (zh) | 大型工业厂房内整体道床铁路施工方法 | |
CN206635599U (zh) | 一种塌方道路的路面抢险支固装置 | |
CN106285040B (zh) | 利用轨道高差实现建筑物移位转向的方法 | |
CN102795554A (zh) | 固定式塔吊整体迁移机构及迁移方法 | |
CN101949215A (zh) | 钢结构支座安装施工方法 | |
CN104631486A (zh) | 狭窄环境下的独立柱基施工方法 | |
CN110725349B (zh) | 用于高铁站雨棚柱的承台更换施工装置和方法 | |
CN203891060U (zh) | 盖挖逆作车站主体结构的永久钢管柱定位系统 | |
CN101476338A (zh) | 微型钢管桩加固沉降基础施工工艺 | |
CN203113515U (zh) | 一种滑模顶升一体化装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20121128 |