Underground continuous wall for preventing streaming around wall bottom and construction method thereof Download PDF

Info

Publication number
CN102758448A
CN102758448A CN2011101109328A CN201110110932A CN102758448A CN 102758448 A CN102758448 A CN 102758448A CN 2011101109328 A CN2011101109328 A CN 2011101109328A CN 201110110932 A CN201110110932 A CN 201110110932A CN 102758448 A CN102758448 A CN 102758448A
Authority
CN
China
Prior art keywords
wall
continuous
diaphragm
construction
wall body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101109328A
Other languages
Chinese (zh)
Inventor
蒋学文
洪三金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG PROV FOUNDATION ENGINEERING Co
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CN2011101109328A priority Critical patent/CN102758448A/en
Publication of CN102758448A publication Critical patent/CN102758448A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses an underground continuous wall for preventing streaming around a wall bottom. The underground continuous wall comprises a continuous wall body, wherein a continuous cemented soil consolidation body is formed in a permeable layer below the wall bottom of the continuous wall. Compared with the prior art, the underground continuous wall has the advantages that: the cemented soil consolidation body is formed in the permeable layer at the bottom of the continuous wall body, so that the underground continuous wall has a good waterstop effect and can effectively prevent underground water from streaming around. In addition, the invention provides a construction process for the continuous wall.

Description

Anti-diaphragm wall and the job practices thereof of streaming at the bottom of-kind of the wall
Technical field
The invention belongs to concrete stake (wall) technical field that space enclosing structure is used, particularly-kind of wall at the bottom of the anti-diaphragm wall that streams.
Background technology
Diaphragm wall is as a kind of space enclosing structure, and its construction technology is very ripe, in the underground support engineering, is used widely.But under the formation condition of, rich groundwater big in disappearance below the substrate impervious layer and scar height fluctuations, intercepting water at the bottom of the continuous wall (anti-streaming) effect will be difficult to guarantee; As in the South China; Karst is extremely grown, and the grey scar discrepancy in elevation changes greatly, and often only covers layer of sand or thin layer impervious layer more than the scar; If want to intercept water fully at the bottom of the continuous wall, go at the bottom of the wall then that the rock degree of depth is big, pore-forming card hammer is frequent, verticality is difficult to control, cost height, quality can't guarantee.So, select a kind ofly can satisfy pattern foundation pit supporting structure, go into rock, easy construction less, can solve the technology of streaming at the bottom of the wall again, be the problem that vast geotechnical engineering technician is studying always.
Summary of the invention
The technical problem that the present invention will solve provides-kind of wall at the bottom of the anti-diaphragm wall that streams.
Another technical problem to be solved by this invention provides a kind of job practices of above-mentioned diaphragm wall.
The technical solution adopted for the present invention to solve the technical problems is:
Prevent at the bottom of-kind of the wall streaming diaphragm wall, comprise the diaphragm wall body of wall, be formed with continuous cement-soil induration at the bottom of the wall of said diaphragm wall body of wall in the following pervious layer.
Compared with prior art, the invention has the beneficial effects as follows: owing in the pervious layer of continuous body of wall bottom, have the cement-soil induration, have good stagnant water effect, can prevent effectively that underground water from streaming.
Prevent at the bottom of the above-mentioned wall of the present invention streaming the construction of continuous concrete wall method, may further comprise the steps:
1), in the continuous wall body construction process in reinforced mesh pre-buried pipe;
2), concreting;
3), in pipe following drilling rod, drill pervious layer to impervious layer or rock stratum at the bottom of the wall;
4), carry out churning, pendulum spray or slip casting operation, pervious layer use slurry consolidation, at the continuous cement-soil induration of diaphragm wall bottom to formation between impervious layer or the rock stratum.
The present invention prevents streaming the construction of continuous concrete wall method at the bottom of a kind of above-mentioned wall also is provided, and may further comprise the steps:
1), concreting is built completion continuous wall body construction;
2), drill the diaphragm wall body of wall with drilling machine;
3), through step 2) hole of being bored carries out churning, pendulum spray or slip casting operation to the wall bottom, diaphragm wall body of wall bottom pervious layer use slurry consolidation, at the continuous cement-soil induration of diaphragm wall body of wall bottom to formation between impervious layer or the rock stratum.
Above-mentioned two method technologies provided by the present invention are simple, can effectively shorten the integral construction duration, than reaching more than 40% directly into the rock construction saving construction period at the bottom of the continuous wall, save construction costs.The risk towards rock disturbance solution cavity, the risk of having avoided blocking the hammer bury drills have been avoided simultaneously.In sum, method of the present invention has simply, practical, cost is low, anti-ly stream good effectiveness and advantage, be fit to apply.
Description of drawings
Below in conjunction with accompanying drawing the present invention is described further:
Fig. 1 is the anti-continuous underground wall structure elevational schematic view of streaming at the bottom of the wall of the present invention;
Fig. 2 is the anti-continuous underground wall structure floor map of streaming at the bottom of the wall of the present invention.
The specific embodiment
See figures.1.and.2, prevent at the bottom of of the present invention-kind of wall streaming diaphragm wall, comprise diaphragm wall body of wall 1, be formed with continuous cement-soil induration 3 at the bottom of the wall of said diaphragm wall body of wall 1 in the following pervious layer.Owing in the pervious layer of continuous body of wall 1 bottom, have cement-soil induration 3, have good stagnant water effect, can prevent effectively that underground water from streaming.
Prevent at the bottom of a kind of above-mentioned wall of the present invention streaming the construction of continuous concrete wall method, may further comprise the steps:
1), in diaphragm wall body of wall 1 work progress in reinforced mesh pre-buried pipe 2;
2), concreting;
3), in pipe 2 following drilling rod, drill pervious layer to impervious layer or rock stratum 4 at the bottom of the wall;
4), carry out churning, pendulum spray or slip casting operation, pervious layer use slurry consolidation, at the continuous cement-soil induration 3 of diaphragm wall bottom to formation between impervious layer or the rock stratum 4.
The present invention prevents streaming the construction of continuous concrete wall method at the bottom of a kind of above-mentioned wall also is provided, and may further comprise the steps:
1), concreting is built the construction of completion diaphragm wall body of wall 1;
2), drill diaphragm wall body of wall 1 with drilling machine;
3), through step 2) hole of being bored carries out churning, pendulum spray or slip casting operation to the wall bottom, pervious layer at the bottom of the diaphragm wall body of wall wall use slurry consolidation, the continuous cement-soil induration of formation between diaphragm wall body of wall 1 bottom to impervious layer or rock stratum 4.
Above-mentioned two method technologies are simple, can effectively shorten the integral construction duration, than reaching more than 40% directly into the rock construction saving construction period at the bottom of the continuous wall, save construction costs.The risk towards rock disturbance solution cavity, the risk of having avoided blocking the hammer bury drills have been avoided simultaneously.In sum, method of the present invention has simply, practical, cost is low, anti-ly stream good effectiveness and advantage, be fit to apply.
Certainly; The invention is not limited to above-mentioned embodiment; Those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite of spirit of the present invention, modification that these are equal to or replacement all are included in the application's claim institute restricted portion.

Claims (3)

1.-and anti-ly at the bottom of kind of the wall stream diaphragm wall, comprise diaphragm wall body of wall (1), it is characterized in that: be formed with continuous cement-soil induration (2) at the bottom of the wall of said diaphragm wall body of wall (1) in the following pervious layer.
2. prevent streaming the construction of continuous concrete wall method at the bottom of the described wall of claim 1, may further comprise the steps:
1), in the continuous wall body construction process in reinforced mesh pre-buried pipe;
2), concreting;
3), in pipe following drilling rod, drill pervious layer to impervious layer or rock stratum at the bottom of the wall;
4), carry out churning, pendulum spray or slip casting operation, pervious layer use slurry consolidation, at the continuous cement-soil induration of diaphragm wall bottom to formation between impervious layer or the rock stratum.
3. prevent streaming the construction of continuous concrete wall method at the bottom of the described wall of claim 1, may further comprise the steps:
1), concreting is built completion continuous wall body construction;
2), drill the diaphragm wall body of wall with drilling machine;
3), through step 2) hole of being bored carries out churning, pendulum spray or slip casting operation to the wall bottom, diaphragm wall body of wall bottom pervious layer use slurry consolidation, at the continuous cement-soil induration of diaphragm wall body of wall bottom to formation between impervious layer or the rock stratum.
CN2011101109328A 2011-04-29 2011-04-29 Underground continuous wall for preventing streaming around wall bottom and construction method thereof Pending CN102758448A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101109328A CN102758448A (en) 2011-04-29 2011-04-29 Underground continuous wall for preventing streaming around wall bottom and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101109328A CN102758448A (en) 2011-04-29 2011-04-29 Underground continuous wall for preventing streaming around wall bottom and construction method thereof

Publications (1)

Publication Number Publication Date
CN102758448A true CN102758448A (en) 2012-10-31

Family

ID=47053081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101109328A Pending CN102758448A (en) 2011-04-29 2011-04-29 Underground continuous wall for preventing streaming around wall bottom and construction method thereof

Country Status (1)

Country Link
CN (1) CN102758448A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411557A (en) * 2020-09-21 2021-02-26 广东华隧建设集团股份有限公司 Underground continuous wall and micro-disturbance omnibearing jet grouting pile combined water stopping method
CN113699976A (en) * 2021-08-05 2021-11-26 上海申通地铁集团有限公司 Steel reinforcement cage and construction method of underground continuous wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285678A (en) * 2003-03-20 2004-10-14 Fujita Corp Method and structure for suppressing buoyancy of structure
CN101215834A (en) * 2007-12-31 2008-07-09 浙江省一建建设集团有限公司 Construction Method of Outrigger Type Diaphragm Wall
CN101435198A (en) * 2008-12-23 2009-05-20 中铁二院工程集团有限责任公司 Deep pit support reinforcing anti-seepage water stop composite structure
CN101793024A (en) * 2010-03-31 2010-08-04 中交二航局第三工程有限公司 Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285678A (en) * 2003-03-20 2004-10-14 Fujita Corp Method and structure for suppressing buoyancy of structure
CN101215834A (en) * 2007-12-31 2008-07-09 浙江省一建建设集团有限公司 Construction Method of Outrigger Type Diaphragm Wall
CN101435198A (en) * 2008-12-23 2009-05-20 中铁二院工程集团有限责任公司 Deep pit support reinforcing anti-seepage water stop composite structure
CN101793024A (en) * 2010-03-31 2010-08-04 中交二航局第三工程有限公司 Construction method for multi-head small-diameter deep mixing and high-pressure jet combined anti-seepage wall of foundation pit

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蒋学文: "广州地铁大坦沙站围护结构优化设计与施工", 《广东土木与建筑》, no. 10, 31 October 2005 (2005-10-31) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411557A (en) * 2020-09-21 2021-02-26 广东华隧建设集团股份有限公司 Underground continuous wall and micro-disturbance omnibearing jet grouting pile combined water stopping method
CN113699976A (en) * 2021-08-05 2021-11-26 上海申通地铁集团有限公司 Steel reinforcement cage and construction method of underground continuous wall

Similar Documents

Publication Publication Date Title
CN103215960B (en) Grouting method for high polymer vertical support system
CN103147442B (en) Ultra-deep foundation pit press-grouting pile and prestressed anchor combined supporting construction method
CN102162255B (en) Method for reinforcing existing pile foundation in collapsed loess area by slip casting
CN104631438B (en) Long auger guncreting uplift pile construction method
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN107513995A (en) A kind of bridge struction pile post grouting construction method
CN103437348A (en) Construction device and method of pile peripheral cemented soil cast-in-place stiffness core pile
CN106948340B (en) Construction method of artificial digging pile structure protected by high polymer grouting
CN107386274A (en) Wear the compound isolation pile and its reinforced construction method of bridge pier in tunnel side
CN104499479A (en) Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN105649092A (en) Slope supporting method for crumbly strata
CN107653889A (en) A kind of shaped steel pressure is poured water the construction method of soil curtain support pile
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN203462463U (en) Construction device of pile-peripheral cemented-soil cast-in-situ stiffening core pile
CN105386610A (en) Protective construction method for natural-foundation ancient architectures at top of asymmetric deep foundation pit
CN103243740A (en) Construction method of rotary excavating and long spiral combination bored concrete pressure grouting secant pile continuous wall
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN106677161A (en) Treatment method for soft soil foundation of existing shield rectangular tunnel
CN106703836A (en) Treatment method of the bedding soft soil of existing circular shield tunnel
CN102758448A (en) Underground continuous wall for preventing streaming around wall bottom and construction method thereof
CN105297797A (en) Hoop support form for in-situ protection of existing building in underground space development
CN103790173B (en) The device and method of lime-soil compaction pile and CFG rigid pile Combined Treatment collapsible loess
CN102767177A (en) Construction method for cast-in-place concrete pile of soft soil foundation with stone layer
CN203129143U (en) Static pressure jet flow piling wall forming equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121031