CN102748007A - Well testing analytical method and device - Google Patents
Well testing analytical method and device Download PDFInfo
- Publication number
- CN102748007A CN102748007A CN201210260155XA CN201210260155A CN102748007A CN 102748007 A CN102748007 A CN 102748007A CN 201210260155X A CN201210260155X A CN 201210260155XA CN 201210260155 A CN201210260155 A CN 201210260155A CN 102748007 A CN102748007 A CN 102748007A
- Authority
- CN
- China
- Prior art keywords
- oil
- flooding
- pressure
- well
- phase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000004458 analytical method Methods 0.000 title claims abstract description 131
- 238000012360 testing method Methods 0.000 title claims abstract description 130
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 187
- 229920000642 polymer Polymers 0.000 claims abstract description 183
- 239000003129 oil well Substances 0.000 claims abstract description 93
- 239000012530 fluid Substances 0.000 claims abstract description 67
- 238000000034 method Methods 0.000 claims description 29
- 230000015572 biosynthetic process Effects 0.000 claims description 23
- 230000035699 permeability Effects 0.000 claims description 20
- 238000004364 calculation method Methods 0.000 claims description 19
- 230000008569 process Effects 0.000 claims description 17
- 238000012544 monitoring process Methods 0.000 claims description 10
- 238000004519 manufacturing process Methods 0.000 abstract description 23
- 239000003921 oil Substances 0.000 description 100
- 238000010586 diagram Methods 0.000 description 28
- 239000000243 solution Substances 0.000 description 13
- 238000005259 measurement Methods 0.000 description 9
- 238000003860 storage Methods 0.000 description 6
- 238000011161 development Methods 0.000 description 5
- 230000018109 developmental process Effects 0.000 description 5
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 238000002474 experimental method Methods 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 239000011435 rock Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007903 penetration ability Effects 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 230000005514 two-phase flow Effects 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
本发明提供了一种试井分析方法,包括:测量油井及所述油井中各相流体的基本参数;依据所述油井及所述油井中各相流体的基本参数,进行水驱的试井分析,获取水驱时油藏的基本信息;选取水驱时多相流中的单相油;利用所述油藏的基本信息进行压力拟合,获取所述单相油的拟黏度;结合所述拟黏度进行聚合物驱的试井分析,获取聚合物驱时油藏的基本信息;依据所述聚合物驱时油藏的基本信息,对聚合物驱时的油藏信息进行监控。本发明提供的试井分析方法可进行基于聚合物驱进行试井分析,并通过分析得到的聚合物驱时油藏的基本信息实现对油井进行监控。相应地,本发明还提供了一种试井分析装置,以实现在实际生产中的应用。
The invention provides a well test analysis method, comprising: measuring the basic parameters of the oil well and the fluids of each phase in the oil well; performing well test analysis of water flooding according to the basic parameters of the oil well and the fluids of each phase in the oil well , obtain the basic information of the reservoir during water flooding; select the single-phase oil in the multiphase flow during water flooding; use the basic information of the reservoir to perform pressure fitting to obtain the pseudo-viscosity of the single-phase oil; combine the The well test analysis of polymer flooding is carried out to obtain the basic information of the reservoir during polymer flooding, and the reservoir information during polymer flooding is monitored according to the basic information of the reservoir during polymer flooding. The well test analysis method provided by the invention can perform well test analysis based on polymer flooding, and monitor oil wells by analyzing the obtained basic information of oil reservoirs during polymer flooding. Correspondingly, the present invention also provides a well testing analysis device to realize the application in actual production.
Description
技术领域 technical field
本申请涉及油藏开发技术领域,特别涉及一种试井分析方法及装置。The application relates to the technical field of reservoir development, in particular to a well testing analysis method and device.
背景技术 Background technique
在石油开采过程中,开采人员需要对选定的油井进行勘测以确定油井是否位于油藏中。目前,开发人员常采用的方法为试井分析,其是认识油藏、进行油藏评价和石油生产动态监测的重要动态分析手段。During oil extraction, operators need to survey selected oil wells to determine whether the oil wells are located in the oil reservoir. At present, the method often used by developers is well test analysis, which is an important dynamic analysis method for understanding reservoirs, evaluating reservoirs and monitoring oil production dynamics.
上述试井分析可以将实测结果和计算结果进行对比,最终获取油藏的基本信息,如井储常数、井筒表皮和渗透率。开采人员可以进一步对油藏的基本信息进行分析,以确定井底附近或两井之间的导压系数及岩石特性参数;推算平均地层压力和井的产出能力;判断井的特性参数、井筒体积以及井筒污染程度;发现油层的边界类型;估算油藏内的原油储量,为油藏开采和维护提供依据。The above-mentioned well test analysis can compare the measured results with the calculated results, and finally obtain the basic information of the reservoir, such as well storage constant, wellbore skin and permeability. Production personnel can further analyze the basic information of the reservoir to determine the pressure conductivity coefficient and rock characteristic parameters near the bottom of the well or between two wells; calculate the average formation pressure and the production capacity of the well; judge the characteristic parameters of the well, the wellbore Volume and wellbore pollution degree; Boundary types of oil layers discovered; Estimation of crude oil reserves in oil reservoirs to provide basis for oil reservoir development and maintenance.
然而,目前试井分析普遍为基于水驱的试井分析,而我国多个油田使用聚合物驱来提高采收率,因此,急需一种基于聚合物驱的试井分析。However, the current well testing analysis is generally based on water flooding, and many oilfields in my country use polymer flooding to enhance oil recovery. Therefore, a well testing analysis based on polymer flooding is urgently needed.
发明内容 Contents of the invention
本申请所要解决的技术问题是提供一种试井分析方法,该试井分析方法可以基于聚合物驱进行试井分析,获取聚合物驱时的油藏基本信息,以便对油藏进行监控。The technical problem to be solved in this application is to provide a well testing analysis method, which can conduct well testing analysis based on polymer flooding, and obtain basic information of oil reservoirs during polymer flooding, so as to monitor the oil reservoirs.
为了解决上述问题,本申请公开了一种试井分析方法,包括:In order to solve the above problems, the application discloses a well testing analysis method, comprising:
测量油井及所述油井中各相流体的基本参数;Measuring the basic parameters of the oil well and the fluids of each phase in said oil well;
依据所述油井及所述油井中各相流体的基本参数,进行水驱的试井分析,获取水驱时油藏的基本信息;According to the basic parameters of the oil well and the fluids of each phase in the oil well, the well test analysis of water flooding is carried out to obtain the basic information of the oil reservoir during water flooding;
选取水驱时多相流中的单相油;Select single-phase oil in multi-phase flow during water flooding;
利用所述油藏的基本信息进行压力拟合,获取所述单相油的拟黏度;Using the basic information of the reservoir to perform pressure fitting to obtain the pseudo-viscosity of the single-phase oil;
结合所述拟黏度进行聚合物驱的试井分析,获取聚合物驱时油藏的基本信息;Combined with the pseudo-viscosity, the well test analysis of polymer flooding is carried out to obtain the basic information of the reservoir during polymer flooding;
依据所述聚合物驱时油藏的基本信息,对聚合物驱时的油藏信息进行监控。According to the basic information of the reservoir during polymer flooding, the reservoir information during polymer flooding is monitored.
优选地,所述依据所述油井及所述油井中各相流体的基本参数,进行水驱的试井分析,获取水驱时油藏基本信息包括:Preferably, according to the basic parameters of the oil well and the fluids of each phase in the oil well, the well test analysis of water flooding is carried out, and the basic information of the reservoir during water flooding is obtained includes:
测量水驱时的井底实际压力数据;Measure the actual bottom hole pressure data during water flooding;
选取地质模型、井筒类型和油藏边界,获取水驱时油藏的预设基本信息;Select the geological model, wellbore type and reservoir boundary to obtain the preset basic information of the reservoir during water flooding;
根据油井及所述油井中各相流体的基本参数、地质模型、井筒类型、油藏边界以及油藏的预设基本信息,利用黑油模型计算获取水驱时的井底流压;According to the oil well and the basic parameters of each phase fluid in the oil well, the geological model, the wellbore type, the reservoir boundary and the preset basic information of the oil reservoir, the black oil model is used to calculate and obtain the bottom hole flow pressure during water flooding;
将水驱时的实际压力数据和计算获取的水驱时的井底流压进行拟合,获取水驱时油藏的基本信息。The actual pressure data during water flooding and the calculated bottom hole flowing pressure during water flooding are fitted to obtain the basic information of the reservoir during water flooding.
优选地,所述将水驱时的实际压力数据和计算获取的水驱时的井底流压进行拟合,获取水驱时油藏的基本信息包括:Preferably, the actual pressure data during water flooding is fitted with the calculated bottomhole flow pressure during water flooding, and the basic information of the reservoir during water flooding is obtained includes:
获取水驱时的实际的压力差和压力导数,并绘制所述压力差和压力导数的双对数图;Obtain the actual pressure difference and pressure derivative during water flooding, and draw the log-logarithmic graph of the pressure difference and pressure derivative;
获取水驱时的计算的压力差和压力导数,并绘制所述压力差和压力导数的双对数图;Obtaining the calculated pressure differential and pressure derivative during waterflooding, and plotting a log-log graph of said pressure differential and pressure derivative;
将水驱时的实际的压力差和压力导数的双对数图与水驱时的计算的压力差和压力导数的双对数图进行拟合,若拟合精度在预设精度范围内,获取的水驱时的油藏基本信息为所需的油藏基本信息;若拟合精度不在预定精度范围内,修改水驱时油藏的预设基本信息,进行水驱的试井分析,直到拟合精度在预设精度范围内。Fit the actual pressure difference and the log-log graph of the pressure derivative during water flooding with the calculated pressure difference and the log-log graph of the pressure derivative during water flooding. If the fitting accuracy is within the preset accuracy range, get The basic information of the reservoir at the time of water flooding is the required basic information of the reservoir; if the fitting accuracy is not within the predetermined accuracy range, modify the preset basic information of the reservoir at the time of water flooding, and carry out well test analysis of water flooding until the proposed The combined accuracy is within the preset accuracy range.
优选地,所述利用所述油藏的基本信息进行压力拟合,获取所述单相油的拟黏度包括:Preferably, performing pressure fitting using the basic information of the reservoir, and obtaining the pseudo-viscosity of the single-phase oil include:
根据水驱时油藏的基本信息,更改单相油的黏度,进行试井分析,获取单相流体的拟黏度。According to the basic information of the reservoir during water flooding, the viscosity of the single-phase oil is changed, and well test analysis is performed to obtain the pseudo-viscosity of the single-phase fluid.
优选地,所述结合所述拟黏度进行聚合物驱的试井分析,获取聚合物驱时油藏的基本信息包括:Preferably, the well test analysis of polymer flooding is carried out in combination with the pseudo-viscosity, and the basic information of the reservoir during polymer flooding is obtained including:
选取黑油模型中油水两相模型,其中水相为聚合物溶液,水相黏度为聚合物溶液的黏度,油相为单相油,油相黏度为拟黏度,水相和油相的基本参数为聚合物溶液和单相油的基本参数;Select the oil-water two-phase model in the black oil model, in which the water phase is the polymer solution, the viscosity of the water phase is the viscosity of the polymer solution, the oil phase is single-phase oil, the oil phase viscosity is the pseudo viscosity, and the basic parameters of the water phase and the oil phase is the basic parameter of polymer solution and single-phase oil;
测量聚合物驱时的实际压力数据;Measure the actual pressure data during polymer flooding;
选取地质模型、井筒类型和油藏边界,获取聚合物驱时油藏的预设基本信息;Select the geological model, wellbore type and reservoir boundary to obtain the preset basic information of the reservoir during polymer flooding;
根据所述的油井基本参数和所述水相和油相流体的基本参数、地质模型、井筒类型、油藏边界和聚合物驱时油藏的预设基本信息,利用黑油模型计算获取聚合物驱时的井底流压;According to the basic parameters of the oil well and the basic parameters of the water phase and oil phase fluid, geological model, wellbore type, reservoir boundary and preset basic information of the reservoir during polymer flooding, the black oil model is used to calculate and obtain the polymer Bottom hole pressure during flooding;
将聚合物驱时的实际压力数据和计算获取的聚合物驱时的井底流压进行拟合,获取聚合物驱时油藏的基本信息。The actual pressure data during polymer flooding and the calculated bottom hole flowing pressure during polymer flooding are fitted to obtain the basic information of the reservoir during polymer flooding.
优选地,所述将聚合物驱时的实际压力数据和计算获取的聚合物驱时的井底流压进行拟合,获取聚合物驱时油藏的基本信息包括:Preferably, the actual pressure data during polymer flooding and the calculated bottom hole flow pressure during polymer flooding are fitted, and the basic information of the reservoir during polymer flooding includes:
获取聚合物驱时的实际的压力差和压力导数,并绘制所述压力差和压力导数的双对数图;Obtain the actual pressure difference and pressure derivative during polymer flooding, and draw the double-logarithmic graph of the pressure difference and pressure derivative;
获取聚合物驱时的计算的压力差和压力导数,并绘制所述压力差和压力导数的双对数图;Obtaining the calculated pressure difference and pressure derivative during polymer flooding, and plotting a log-log graph of said pressure difference and pressure derivative;
将聚合物驱时的实际的压力差和压力导数的双对数图与聚合物驱时的计算的压力差和压力导数的双对数图进行拟合,若拟合精度在预设精度范围内,获取的聚合物驱时的油藏基本信息为所需的油藏基本信息;若拟合精度不在预定精度范围内,修改聚合物驱时油藏的预设基本信息,进行聚合物驱的试井分析,直到拟合精度在预设精度范围内。Fit the actual pressure difference and the log-log graph of the pressure derivative during polymer flooding with the calculated pressure difference and the log-log graph of the pressure derivative during polymer flooding, if the fitting accuracy is within the preset accuracy range , the basic reservoir information obtained during polymer flooding is the required basic reservoir information; if the fitting accuracy is not within the predetermined accuracy range, modify the preset basic information of the reservoir during polymer flooding, and carry out the polymer flooding test. Wells are analyzed until the fitting accuracy is within the preset accuracy range.
优选地,所述油井及所述油井中各相流体的基本参数包括:井、各相流体的黏度、体积系数、压缩系数、流体密度、地层厚度、孔隙度和地层绝对渗透率。Preferably, the basic parameters of the oil well and each phase fluid in the oil well include: viscosity, volume coefficient, compressibility coefficient, fluid density, formation thickness, porosity and formation absolute permeability of the well and each phase fluid.
优选地,所述油藏的基本信息包括:井储常数、井筒表皮、渗透率、初始压力和原始地层压力。Preferably, the basic information of the reservoir includes: well storage constant, wellbore skin, permeability, initial pressure and original formation pressure.
本申请还公开了一种试井分析装置,包括:The application also discloses a well testing analysis device, comprising:
基本参数测量单元,用于测量油井及所述油井中各相流体的基本参数;The basic parameter measuring unit is used for measuring the basic parameters of the oil well and the fluids of each phase in the oil well;
水驱的试井分析单元,用于依据所述油井及所述油井中各相流体的基本参数,进行水驱的试井分析,获取水驱时油藏的基本信息;The well test analysis unit of water flooding is used to perform well test analysis of water flooding according to the basic parameters of the oil well and the fluids of each phase in the oil well, and obtain the basic information of the oil reservoir during water flooding;
拟单相流获取单元,用于选取水驱时多相流体中的单相油;Pseudo-single-phase flow acquisition unit, used to select single-phase oil in multi-phase fluid during water flooding;
拟黏度获取单元,用于利用所述油藏的基本信息进行压力拟合,得出所述单相油的拟黏度;A pseudo-viscosity acquisition unit, configured to use the basic information of the reservoir to perform pressure fitting to obtain the pseudo-viscosity of the single-phase oil;
聚合物驱的试井分析单元,用于结合所述拟黏度进行聚合物驱的试井分析,获取聚合物驱时油藏的基本信息;The well test analysis unit of polymer flooding is used to perform the well test analysis of polymer flooding in combination with the pseudo-viscosity to obtain the basic information of the reservoir during polymer flooding;
监控单元,用于依据所述聚合物驱时油藏的基本信息,对所述油井进行监控。The monitoring unit is used to monitor the oil well according to the basic information of the oil reservoir during the polymer flooding.
优选地,水驱的试井分析单元包括:Preferably, the well test analysis unit for water flooding includes:
第一测量单元,用于测量水驱时实际压力数据;The first measuring unit is used for measuring actual pressure data during water flooding;
第一选取单元,用于选取水驱时的地质模型、井筒类型和油藏边界,获取水驱时油藏的预设基本信息;The first selection unit is used to select the geological model, wellbore type and reservoir boundary during water flooding, and obtain the preset basic information of the reservoir during water flooding;
第一计算单元,用于根据油井及所述油井中各相流体的基本参数、地质模型、井筒类型、油藏边界以及油藏的预设基本信息,利用黑油模型计算获取水驱时的井底流压;The first calculation unit is used to calculate and obtain the well during water flooding by using the black oil model according to the basic parameters of the oil well and the various phase fluids in the oil well, the geological model, the wellbore type, the reservoir boundary and the preset basic information of the reservoir underflow pressure;
第一压力拟合单元,将水驱时的实际压力数据和计算获取的水驱时的井底流压进行拟合,获取水驱时油藏的基本信息。The first pressure fitting unit fits the actual pressure data during water flooding and the calculated bottomhole flowing pressure during water flooding to obtain basic information of the reservoir during water flooding.
优选地,第一压力拟合单元包括:Preferably, the first pressure fitting unit includes:
第一对数图绘制单元,用于分别获取水驱时实际的和计算的压力差与压力导数,并对压力差和压力导数进行双对数图的绘制;The first logarithmic diagram drawing unit is used to respectively obtain the actual and calculated pressure difference and pressure derivative during water flooding, and draw a double-logarithmic diagram of the pressure difference and pressure derivative;
第一对数图拟合单元,用于将水驱时的实际的压力差和压力导数的双对数图与水驱时的计算的压力差和压力导数的双对数图进行拟合;The first logarithmic map fitting unit is used to fit the actual pressure difference and the double logarithmic map of the pressure derivative during water flooding to the calculated pressure difference and the double logarithmic map of the pressure derivative during water flooding;
第一拟合精度判断单元,用于判断拟合精度是否在预设精度范围内,若拟合精度在预设精度范围内,获取的水驱时的油藏基本信息为所需的油藏基本信息;若拟合精度不在预定精度范围内,修改水驱时油藏的预设基本信息,进行水驱的试井分析,直到拟合精度在预设精度范围内。The first fitting accuracy judging unit is used to judge whether the fitting accuracy is within the preset accuracy range. If the fitting accuracy is within the preset accuracy range, the obtained basic reservoir information during water flooding is the required basic reservoir information. information; if the fitting accuracy is not within the preset accuracy range, modify the preset basic information of the reservoir during water flooding, and perform water flooding well test analysis until the fitting accuracy is within the preset accuracy range.
优选地,聚合物驱试井分析单元包括:Preferably, the polymer flooding well test analysis unit includes:
第二测量单元,用于测量聚合物驱时井底的实际压力数据;The second measurement unit is used to measure the actual pressure data at the bottom of the well during polymer flooding;
第二选取单元,用于选取聚合物驱时的地质模型、井筒类型和油藏边界,获取聚合物驱时油藏的预设基本信息;The second selection unit is used to select the geological model, wellbore type and reservoir boundary during polymer flooding, and obtain the preset basic information of the reservoir during polymer flooding;
第二计算单元,用于根据油井及所述油相与水相流体的基本参数、地质模型、井筒类型、油藏边界以及油藏的预设基本信息,利用黑油模型计算获取聚合物驱时井底流压;The second calculation unit is used to use the black oil model to calculate and obtain the polymer flooding time according to the basic parameters of the oil well and the oil phase and water phase fluid, geological model, wellbore type, reservoir boundary and preset basic information of the reservoir bottom hole pressure;
第二压力拟合单元,用于将聚合物驱时的实际压力数据和计算获取的聚合物驱时的井底流压进行拟合,获取聚合物驱时油藏的基本信息。The second pressure fitting unit is used to fit the actual pressure data during polymer flooding and the calculated bottom hole flow pressure during polymer flooding to obtain basic information of the reservoir during polymer flooding.
优选地,第二压力拟合单元包括:Preferably, the second pressure fitting unit includes:
第二对数图绘制单元,用于分别获取聚合物驱时实际的和计算的压力差与压力导数,并对压力差和压力导数进行双对数图的绘制;The second logarithmic diagram drawing unit is used to respectively obtain the actual and calculated pressure difference and pressure derivative during polymer flooding, and draw a double-logarithmic diagram of the pressure difference and pressure derivative;
第二对数图拟合单元,用于将聚合物驱时的实际的压力差和压力导数的双对数图与聚合物驱时的计算的压力差和压力导数的双对数图进行拟合;The second logarithmic map fitting unit is used to fit the actual pressure difference and the double logarithmic map of the pressure derivative during polymer flooding to the calculated double logarithmic map of the pressure difference and pressure derivative during polymer flooding ;
第二拟合精度判断单元,用于判断拟合精度是否在预设精度范围内,若拟合精度在预设精度范围内,获取的聚合物驱时的油藏基本信息为所需的油藏基本信息;若拟合精度不在预定精度范围内,修改聚合物驱时油藏的预设基本信息,进行聚合物驱的试井分析,直到拟合精度在预设精度范围内。The second fitting accuracy judging unit is used to judge whether the fitting accuracy is within the preset accuracy range, if the fitting accuracy is within the preset accuracy range, the acquired basic information of the reservoir during polymer flooding is the required reservoir Basic information; if the fitting accuracy is not within the preset accuracy range, modify the preset basic information of the reservoir during polymer flooding, and perform polymer flooding well test analysis until the fitting accuracy is within the preset accuracy range.
优选地,还包括:Preferably, it also includes:
油井产量测量单元,用于测量水驱及聚合物驱时油井在不同时间段的产量;Oil well production measurement unit, used to measure the production of oil wells in different time periods during water flooding and polymer flooding;
油藏流动段划分单元,用于在水驱的试井分析和聚合物驱的试井分析时,根据所述油井在不同时间段的产量,将油藏划分为多个流动段,对不同流动段依次进行水驱的试井分析和聚合物驱的试井分析。Reservoir flow section division unit is used to divide the reservoir into multiple flow sections according to the production of the oil wells in different time periods during the well test analysis of water flooding and polymer flooding. The well test analysis of water flooding and the well test analysis of polymer flooding are carried out in sequence.
优选地,所述油井及所述油井中各相流体的基本参数包括:井、各相流体的黏度、体积系数、压缩系数、流体密度、地层厚度、孔隙度和地层绝对渗透率。Preferably, the basic parameters of the oil well and each phase fluid in the oil well include: viscosity, volume coefficient, compressibility coefficient, fluid density, formation thickness, porosity and formation absolute permeability of the well and each phase fluid.
优选地,所述油藏的基本信息包括:井储常数、井筒表皮、渗透率、初始压力和原始地层压力。Preferably, the basic information of the reservoir includes: well storage constant, wellbore skin, permeability, initial pressure and original formation pressure.
与现有技术相比,本申请包括以下优点:Compared with the prior art, the present application includes the following advantages:
在本申请中,首先测量油井及油井中各相流体的基本参数,其次获取水驱时油藏的基本信息以及单相流体的拟黏度,再结合所述拟黏度进行聚合物驱的试井分析,获取聚合物驱时油藏的基本信息,依据所述聚合物驱时油藏的基本信息,对所述油井进行监控。因此,本申请可以基于聚合物驱进行试井分析,并可以依据聚合物驱时油藏的基本信息,对所述油井进行监控。In this application, the oil well and the basic parameters of each phase fluid in the oil well are measured first, and then the basic information of the reservoir during water flooding and the pseudo-viscosity of the single-phase fluid are obtained, and then combined with the pseudo-viscosity to conduct well test analysis of polymer flooding The basic information of the oil reservoir during polymer flooding is obtained, and the oil well is monitored according to the basic information of the oil reservoir during polymer flooding. Therefore, the present application can conduct well test analysis based on polymer flooding, and can monitor the oil well according to the basic information of the oil reservoir during polymer flooding.
当然,实施本申请的任一产品并不一定需要同时达到以上所述的所有优点。Of course, implementing any product of the present application does not necessarily need to achieve all the above-mentioned advantages at the same time.
附图说明 Description of drawings
为了更清楚地说明本申请实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present application. For those skilled in the art, other drawings can also be obtained based on these drawings without any creative effort.
图1是本申请提供的一种试井分析方法的流程图;Fig. 1 is a flow chart of a well testing analysis method provided by the application;
图2是本申请提供的一种试井分析方法的一个子流程图;Fig. 2 is a subflow chart of a kind of well test analysis method provided by the present application;
图3是本申请提供的一种试井分析方法的另一个子流程图;Fig. 3 is another subflow chart of a kind of well test analysis method provided by the present application;
图4是本申请提供的一种试井分析方法的再一个子流程图;Fig. 4 is another subflow chart of a kind of well test analysis method provided by the present application;
图5是本申请提供的一种试井分析方法的再一个子流程图;Fig. 5 is another subflow chart of a kind of well test analysis method provided by the present application;
图6是本申请提供的油田开发实例图;Fig. 6 is an example diagram of oilfield development provided by the present application;
图7是本申请提供的聚合物驱时地层渗透率分布图;Fig. 7 is the distribution diagram of formation permeability during polymer flooding provided by the present application;
图8是本申请提供的水驱的试井分析时的压力拟合图;Fig. 8 is the pressure fitting diagram during the well test analysis of water flooding provided by the present application;
图9是本申请提供的聚合物驱的试井分析时的压力拟合图;Fig. 9 is the pressure fitting diagram during the well test analysis of the polymer flooding provided by the present application;
图10是本申请提供的一种试井分析装置的结构示意图;Fig. 10 is a schematic structural view of a well testing analysis device provided by the present application;
图11是本申请提供的试井分析装置中水驱试井分析单元的结构示意图;Fig. 11 is a schematic structural view of the water drive well test analysis unit in the well test analysis device provided by the present application;
图12是本申请提供的试井分析装置中水驱试井分析单元中压力拟合单元的结构示意图;Fig. 12 is a schematic structural diagram of the pressure fitting unit in the water drive well test analysis unit of the well test analysis device provided by the present application;
图13是本申请提供的试井分析装置中聚合物驱试井分析单元的结构示意图;Fig. 13 is a structural schematic diagram of the polymer flooding well test analysis unit in the well test analysis device provided by the present application;
图14是本申请提供的试井分析装置中聚合物驱试井分析单元中压力拟合单元的结构示意图;Fig. 14 is a schematic structural diagram of the pressure fitting unit in the polymer flooding well test analysis unit of the well test analysis device provided by the present application;
图15是本申请提供的一种试井分析装置的另一种结构示意图。Fig. 15 is another structural schematic diagram of a well testing analysis device provided by the present application.
具体实施方式 Detailed ways
下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the application with reference to the drawings in the embodiments of the application. Apparently, the described embodiments are only some of the embodiments of the application, not all of them. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of this application.
请参见图1,其示出了本申请一种试井分析方法的流程图,可以包括以下步骤:Referring to Fig. 1, it shows the flow chart of a kind of well test analysis method of the present application, can comprise the following steps:
步骤11:测量油井及所述油井中各相流体的基本参数。Step 11: Measure the basic parameters of the oil well and the fluids of each phase in the oil well.
本实施例可以通过油田实验测量油井、和油井中各相流体的基本参数。其中,各相流体可以包括水相、油相和气相。基本参数可以包括井、各相流体的黏度、体积系数、压缩系数、流体密度、地层厚度、孔隙度和地层绝对渗透率(以下简称为“渗透率”)。In this embodiment, the oil well and the basic parameters of each phase fluid in the oil well can be measured through oilfield experiments. Wherein, each phase fluid may include water phase, oil phase and gas phase. The basic parameters may include the viscosity, volume coefficient, compressibility coefficient, fluid density, formation thickness, porosity and formation absolute permeability (hereinafter referred to as "permeability") of the well and each phase fluid.
在这里需要指出,在进行水驱或者聚合物驱的试井分析之前要对油藏划分流动段,有利于提高试井分析的准确性。It should be pointed out here that before the well test analysis of water flooding or polymer flooding, it is necessary to divide the flow section of the reservoir, which is conducive to improving the accuracy of well test analysis.
其中,流动段划分可以包括:测量水驱时的油井在不同时间段的产量,根据所述油井在不同时间段的产量将油藏划分为多个流动段,在所划分的多个流动段上可依次进行水驱的试井分析;Wherein, the division of the flow section may include: measuring the production of the oil well in different time periods during water flooding, dividing the reservoir into multiple flow sections according to the production of the oil well in different time periods, Well test analysis of water flooding can be carried out sequentially;
测量聚合物驱时的油井在不同时间段的产量,根据所述油井在不同时间段的产量将油藏划分为多个流动段,在所划分的多个流动段上可依次进行聚合物驱的试井分析。Measure the production of oil wells in different time periods during polymer flooding, divide the reservoir into multiple flow sections according to the production of the oil wells in different time periods, and perform polymer flooding in sequence on the divided multiple flow sections Well test analysis.
步骤12:依据所述油井及所述油井中各相流体的基本参数,进行水驱的试井分析,获取水驱时油藏的基本信息。Step 12: According to the basic parameters of the oil well and the fluids of each phase in the oil well, conduct well test analysis of water flooding, and obtain basic information of the oil reservoir during water flooding.
在本实施例中,可以利用黑油模型进行水驱的试井分析,并依据试井分析的结果获取水驱时油藏的基本信息。所述油藏的基本信息包括:井储常数、井筒表皮、渗透率、初始压力和原始地层压力。In this embodiment, the well test analysis of water flooding can be performed using the black oil model, and the basic information of the reservoir during water flooding can be obtained according to the results of the well test analysis. The basic information of the reservoir includes: well storage constant, wellbore skin, permeability, initial pressure and original formation pressure.
其中黑油模型的具体表达式如下:The specific expression of the black oil model is as follows:
油组分:Oil composition:
水组分:Water component:
气组分:Gas composition:
其中,in,
So+Sw+Sg=1 (4)S o +S w +S g =1 (4)
pcow=po-pw=f(Sw,Sg) (5)p cow =p o -p w =f(S w ,S g ) (5)
pcgo=pg-po=f(Sw,Sg) (6)p cgo =p g -p o =f(S w ,S g ) (6)
公式中油组分、水组分和气组分可以分别为油相、水相和气相,o、w、g为油、水、气相的下标;K为地层绝对渗透率;Kro、Krw、Krg分别为油相、水相、气相的相对渗透率;B为地层体积系数;μ为黏度;γ为相对密度;p为压力;Z为垂向坐标;Rs为溶解油气比;qsc为组分产量或流量。In the formula, the oil component, water component and gas component can be oil phase, water phase and gas phase respectively, o, w, g are the subscripts of oil, water and gas phase; K is the absolute permeability of the formation; K ro , K rw , K rg are relative permeability of oil phase, water phase and gas phase respectively; B is formation volume coefficient; μ is viscosity; γ is relative density; p is pressure; Z is vertical coordinate; R s is ratio of dissolved oil and gas ; is the component yield or flow.
公式(1)-(3)中Kro、Krw、Krg、pcow、pcgo为饱和度的函数。其中:In formulas (1)-(3), K ro , K rw , K rg , pcow , and pcgo are functions of saturation. in:
Krw=Krw(Sw)K rw =K rw (S w )
Krg=Krg(Sg)K rg =K rg (S g )
Kro=Kro(So)=Kro(Sw,Sg)K ro =K ro (S o )=K ro (S w ,S g )
pcow=f(Sw)p cow =f(S w )
pcgo=f(Sg)p cgo =f(S g )
Krw、Krg、pcow、pcgo均可由油水和油气两相流动实验数据取得,Kro需要应用Stone等公式计算。K rw , K rg , pcow , and pcgo can all be obtained from the experimental data of oil-water and oil-gas two-phase flow, and K ro needs to be calculated using formulas such as Stone.
Bo、Bw、Bg为各相流体的体积系数;μo、μw、μg为各相流体的黏度;γo、γw、γg为各相流体的相对密度。在三相状态即油相饱和状态下,各相流体的相对密度、体积系数、黏度都是压力P的函数,如:B o , B w , B g are the volume coefficients of the fluids of each phase; μ o , μ w , μ g are the viscosities of the fluids of each phase; γ o , γ w , γ g are the relative densities of the fluids of each phase. In the three-phase state, that is, the oil phase saturation state, the relative density, volume coefficient, and viscosity of each phase fluid are all functions of the pressure P, such as:
Bo=f(p)B o =f(p)
Rs=f(p)R s =f(p)
μo=f(p)μ o =f(p)
在油相未饱和的状态下,油藏中只有油水两种相态时,各相流体的相对密度、体积系数、粘度是泡点压力pb和压力p的函数,如:In the unsaturated state of the oil phase, when there are only two phases of oil and water in the reservoir, the relative density, volume coefficient, and viscosity of each phase fluid are functions of the bubble point pressure p b and the pressure p, such as:
Bo=f(p,pb)B o =f(p,p b )
ρo=f(p,pb)ρ o =f(p,p b )
μo=f(p,pb)μ o =f(p,p b )
如果岩石孔隙体积随压力有显著变化,则有:If the rock pore volume changes significantly with pressure, then:
φ=φref[1+Cr(p-pref)]φ=φ ref [1+C r (pp ref )]
式中Cr为岩石压缩系数;φ为孔隙度;φref为参考压力pref下的孔隙度。where C r is the rock compressibility coefficient; φ is the porosity; φ ref is the porosity at the reference pressure pre ref .
在利用黑油模型进行水驱的试井分析时需要根据油藏的实际情况选择黑油模型中的多相流体模型,如可选择油水两相模型及选择油气水三相模型,在本实施例中选择油水气三相模型。When using the black oil model for water flooding well test analysis, it is necessary to select the multiphase fluid model in the black oil model according to the actual situation of the reservoir. For example, the oil-water two-phase model and the oil-gas-water three-phase model can be selected. In this embodiment Choose the oil-water-gas three-phase model.
在本实施例中,上述将油井及所述油井中各相流体的基本参数代入黑油模型中,获取水驱时油藏的基本信息的具体过程请参阅图2所示,可以包括以下步骤:In this embodiment, the above-mentioned substituting the basic parameters of the oil well and the fluids of each phase in the oil well into the black oil model, and the specific process of obtaining the basic information of the reservoir during water flooding, please refer to Figure 2, and may include the following steps:
步骤201:测量水驱时的井底实际压力数据。Step 201: Measure the actual bottomhole pressure data during water flooding.
步骤202:选取地质模型、井筒类型和油藏边界,获取水驱时油藏的预设基本信息。Step 202: Select the geological model, wellbore type and reservoir boundary to obtain preset basic information of the reservoir during water flooding.
在进行水驱的试井分析时要选取适用于水驱的试井分析时的地质模型、井筒类型和油藏边界,并根据油藏开采经验获取水驱时油藏基本信息的预设参数值。In the well test analysis of water drive, it is necessary to select the geological model, wellbore type and reservoir boundary suitable for the test analysis of water drive, and obtain the preset parameter values of the basic information of the reservoir in water drive according to the reservoir production experience .
其中,在进行试井分析时要根据在油藏开采过程中对油藏的认识及不同的施工方案,对不同的油藏选取相应的地质模型、井筒类型和油藏边界。Among them, in the well test analysis, it is necessary to select the corresponding geological model, wellbore type and reservoir boundary for different reservoirs according to the understanding of the reservoir and different construction schemes in the process of reservoir exploitation.
步骤203:根据油井及所述油井中各相流体的基本参数、地质模型、井筒类型、油藏边界以及油藏的预设基本信息,利用黑油模型计算获取水驱时的井底流压。Step 203: According to the oil well and the basic parameters of each phase fluid in the oil well, the geological model, the wellbore type, the reservoir boundary and the preset basic information of the reservoir, use the black oil model to calculate and obtain the bottom hole flow pressure during water flooding.
步骤204:将水驱时的实际压力数据和计算获取的水驱时的井底流压进行拟合,获取水驱时油藏的基本信息。Step 204: Fitting the actual pressure data during water flooding and the calculated bottomhole flowing pressure during water flooding to obtain basic information of the reservoir during water flooding.
在本实施例中,压力拟合的过程请参阅图3所示,可以包括以下步骤:In this embodiment, the process of pressure fitting is shown in Figure 3, and may include the following steps:
步骤301:获取水驱时的实际的压力差和压力导数,并绘制所述压力差和压力导数的双对数图。Step 301: Obtain the actual pressure difference and pressure derivative during water flooding, and draw a logarithmic graph of the pressure difference and pressure derivative.
步骤302:获取水驱时的计算的压力差和压力导数,并绘制所述压力差和压力导数的双对数图。Step 302: Obtain the calculated pressure difference and pressure derivative during water flooding, and draw a logarithmic graph of the pressure difference and pressure derivative.
其中,计算压力差和压力导数的公式如下所示,Among them, the formulas for calculating the pressure difference and pressure derivative are as follows,
设(T0,P0)(T1,P1),…,(Tn ,Pn)为不同时间下的压力,则压力差为:Δp1=P1-P0,…,Δpn=Pn-P0 Let (T 0 , P 0 ) (T 1 , P 1 ),…, (T n , P n ) be the pressure at different times, then the pressure difference is: Δp 1 =P 1 -P 0 ,…,Δp n =P n -P 0
压力导数为:dp1=(P1-P0)/(T1-T0)*T1,…,dpn=(Pn-Pn-1)/(Tn-Tn-1)*Tn-1 The pressure derivative is: dp 1 = (P 1 -P 0 )/(T 1 -T 0 )*T 1 ,…,dp n = (P n -P n-1 )/(T n -T n-1 ) *T n-1
其中,双对数图的绘制是以压力降落图版上坐标尺寸为基础的。Among them, the drawing of the double-log graph is based on the coordinate size on the pressure drop chart.
步骤303:将水驱时的实际的压力差和压力导数的双对数图与水驱时的计算的压力差和压力导数的双对数图进行拟合。Step 303: Fitting the actual pressure difference and the log-log graph of the pressure derivative during the water flooding with the calculated pressure difference and the log-log graph of the pressure derivative during the water flooding.
步骤304:判断拟合精度是否在预设的精度范围内,若是,转到步骤305;若否转到步骤306。Step 304: Determine whether the fitting accuracy is within the preset accuracy range, if yes, go to step 305; if not, go to step 306.
其中,预设的精度范围可以依据应用场景下油藏的情况设置不同的精度范围,对此不加以限制。Among them, the preset accuracy range can be set to different accuracy ranges according to the conditions of the reservoir in the application scenario, and there is no limitation on this.
步骤305:获取水驱时的油藏基本信息为所需的油藏基本信息。Step 305: Obtaining the basic information of the reservoir during water flooding is the required basic information of the reservoir.
步骤306:修改油藏的预设基本信息,进行水驱的试井分析,直到拟合精度在预设精度范围内。Step 306: modify the preset basic information of the reservoir, and perform water flooding well test analysis until the fitting accuracy is within the preset accuracy range.
其中,在不满足精度时,通过观察实测曲线与计算曲线的差异,根据渗流方程的流动规律,及不同预设参数变化对计算曲线形态影响的规律,选择需要调整的参数进行修改。例如计算曲线与实测曲线的“张口”大小不一样,就可通过调整井筒污染参数来进行压力拟合。Among them, when the accuracy is not satisfied, by observing the difference between the measured curve and the calculated curve, according to the flow law of the seepage equation and the influence of different preset parameters on the shape of the calculated curve, select the parameters that need to be adjusted for modification. For example, the "opening" of the calculated curve and the measured curve is different, and the pressure fitting can be performed by adjusting the wellbore pollution parameters.
修改油藏的预设基本信息具体可以通过修改油藏基本信息中的具体参数值,将修改后的油藏基本信息作为油藏的预设基本信息,再次依据油井及所述油井中各相流体的基本参数、地质模型、井筒类型、油藏边界以及油藏的预设基本信息进行水驱的试井分析。水驱的试井分析的具体过程请参阅图2来进行拟合。To modify the preset basic information of the reservoir, the specific parameter values in the basic information of the reservoir can be modified, and the modified basic information of the reservoir can be used as the preset basic information of the reservoir. The basic parameters, geological model, wellbore type, reservoir boundary and preset basic information of the reservoir are used for well test analysis of water flooding. For the specific process of well test analysis of water drive, please refer to Figure 2 for fitting.
步骤13:选取水驱时多相流体中的单相油。Step 13: Select the single-phase oil in the multi-phase fluid during water flooding.
其中,选取井底的多相流体中的单相油之后,单相油为拟单相。选取黑油模型中的单相油模型进行试井分析其计算模型如下,Wherein, after selecting the single-phase oil in the multi-phase fluid at the bottom of the well, the single-phase oil is a pseudo-single phase. The single-phase oil model in the black oil model is selected for well test analysis. The calculation model is as follows:
其中拟单相的体积系数、压缩系数计算公式如下:The volume coefficient and compressibility coefficient calculation formula of pseudo-single phase are as follows:
拟单相体积系数=油相饱和度*油相体积系数+水相饱和度*水相体积系数;拟单相压缩系数=油相饱和度*油相压缩系数+水相饱和度*水相压缩系数。Pseudo-single-phase volume coefficient = oil phase saturation * oil phase volume coefficient + water phase saturation * water phase volume coefficient; pseudo-single-phase compression coefficient = oil phase saturation * oil phase compression coefficient + water phase saturation * water phase compression coefficient.
拟单相的参数数值均可由油藏实验及计算方式获取。The parameter values of the pseudo-single phase can be obtained by reservoir experiments and calculation methods.
其中,在进行试井分析时要根据所选择的井底多相流体来制定井的生产制度,如选择单向油时井的生产制度定为定油的产量生产,选择水相时井的生产制度定为定水的产量生产,选择油水两相时井的生产制度定为定油水的产量生产。Among them, in the well test analysis, the production system of the well should be formulated according to the selected multi-phase fluid at the bottom of the well. The production system is defined as constant water production, and the production system of the well when oil-water two-phase is selected is defined as constant oil-water production.
步骤14:利用所述油藏的基本信息进行压力拟合,获取所述单相油的拟黏度。Step 14: Using the basic information of the reservoir to perform pressure fitting to obtain the pseudo-viscosity of the single-phase oil.
具体为:获取单相油模型下的计算的压力差和压力导数,并绘制所述压力差和压力导数的双对数图。压力差和压力导数的计算公式为:Specifically: obtaining the calculated pressure difference and pressure derivative under the single-phase oil model, and drawing a double-logarithmic graph of the pressure difference and pressure derivative. The formulas for calculating the pressure difference and pressure derivative are:
设(T0,P0)(T1,P1),…,(Tn ,Pn)为不同时间下的压力,则压力差为:Δp1=P1-P0,…,Δpn=Pn-P0 Let (T 0 , P 0 ) (T 1 , P 1 ),…, (T n , P n ) be the pressure at different times, then the pressure difference is: Δp 1 =P 1 -P 0 ,…,Δp n =P n -P 0
压力导数为:dp1=(P1-P0)/(T1-T0)*T1,…,dpn=(Pn-Pn-1)/(Tn-Tn-1)*Tn-1 The pressure derivative is: dp 1 = (P 1 -P 0 )/(T 1 -T 0 )*T 1 ,…,dp n = (P n -P n-1 )/(T n -T n-1 ) *T n-1
将单相油模型下的计算的压力差和压力导数的双对数图与水驱时的计算的压力差和压力导数的双对数图进行拟合。判断拟合精度是否在预设的精度范围内,若是,单相油的黏度为所需的拟黏度,若不在预设精度范围,更改单相油的黏度,进行单相油模型下的计算的压力差和压力导数的双对数图与水驱时的计算的压力差和压力导数的双对数图的拟合,直到拟合精度在预设范围内。The log-log plots of the calculated pressure differences and pressure derivatives under the single-phase oil model were fitted to those for the water flood. Determine whether the fitting accuracy is within the preset accuracy range. If so, the viscosity of the single-phase oil is the required pseudo-viscosity. If it is not within the preset accuracy range, change the viscosity of the single-phase oil and perform calculations under the single-phase oil model. The log-log graph of the pressure difference and pressure derivative is fitted with the calculated pressure difference and log-log graph of the pressure derivative during water flooding until the fitting accuracy is within the preset range.
其中,预设的精度范围可以依据应用场景下油藏的情况设置不同的精度范围,对此不加以限制。Among them, the preset accuracy range can be set to different accuracy ranges according to the conditions of the reservoir in the application scenario, and there is no limitation on this.
步骤15:结合所述拟黏度进行聚合物驱的试井分析,获取聚合物驱时油藏的基本信息。Step 15: Combined with the pseudo-viscosity, the well test analysis of polymer flooding is carried out to obtain the basic information of the reservoir during polymer flooding.
聚合物驱的试井分析可以利用黑油模型进行,聚合物驱的试井分析具体过程请参阅图4所示,可以包括以下步骤:The well test analysis of polymer flooding can be carried out using the black oil model. The specific process of well test analysis of polymer flooding is shown in Figure 4, which can include the following steps:
步骤401:选取黑油模型中的油水两相模型作为聚合物驱的试井分析的计算模型。Step 401: Select the oil-water two-phase model in the black oil model as a calculation model for well test analysis of polymer flooding.
其中,油相为单相油,油相黏度为拟黏度,水相为聚合物溶液,水相黏度为聚合物溶液的黏度,油相和水相的基本参数分别为单相油和聚合物溶液的基本参数。Among them, the oil phase is a single-phase oil, the viscosity of the oil phase is the pseudoviscosity, the water phase is the polymer solution, the viscosity of the water phase is the viscosity of the polymer solution, and the basic parameters of the oil phase and the water phase are the single-phase oil and the polymer solution respectively basic parameters.
其中,油相和水相的基本参数可以通过油藏实验及计算方式获取。Among them, the basic parameters of oil phase and water phase can be obtained through reservoir experiments and calculation methods.
步骤402:测量聚合物驱时的实际压力数据。Step 402: Measure actual pressure data during polymer flooding.
步骤403:选取地质模型、井筒类型和油藏边界,获取聚合物驱时油藏的预设基本信息。Step 403: Select the geological model, wellbore type and reservoir boundary to obtain the preset basic information of the reservoir during polymer flooding.
在进行聚合物驱的试井分析时要选取适用于聚合物驱的试井分析时的地质模型、井筒类型和油藏边界,并根据油田开采经验获取聚合物驱时油藏基本信息的预设参数值。In the well test analysis of polymer flooding, it is necessary to select the geological model, wellbore type and reservoir boundary suitable for the well test analysis of polymer flooding, and obtain the preset of the basic information of the polymer flooding reservoir according to the oil field production experience parameter value.
步骤404:根据所述测量的油井基本参数及油相与水相流体的基本参数、地质模型、井筒类型、油藏边界和聚合物驱时油藏的预设基本信息,利用黑油模型计算获取聚合物驱时的井底流压。Step 404: According to the measured basic parameters of the oil well and the basic parameters of oil phase and water phase fluid, geological model, wellbore type, reservoir boundary and preset basic information of the reservoir during polymer flooding, use the black oil model to calculate and obtain Bottomhole flowing pressure during polymer flooding.
步骤405:将聚合物驱时的实际压力数据和计算获取的聚合物驱时的井底流压进行拟合,获取聚合物驱时油藏的基本信息。Step 405: Fitting the actual pressure data during polymer flooding and the calculated bottom hole flowing pressure during polymer flooding to obtain basic information of the reservoir during polymer flooding.
在本实施例中,压力拟合的过程请参阅图5所示,可以包括以下步骤:In this embodiment, the process of pressure fitting is shown in Figure 5, and may include the following steps:
步骤501:获取聚合物驱时的实际的压力差和压力导数,并绘制所述压力差和压力导数的双对数图。Step 501: Obtain the actual pressure difference and pressure derivative during polymer flooding, and draw a logarithmic graph of the pressure difference and pressure derivative.
步骤502:获取聚合物驱时的计算的压力差和压力导数,并绘制所述压力差和压力导数的双对数图。Step 502: Obtain the calculated pressure difference and pressure derivative during polymer flooding, and draw a logarithmic graph of the pressure difference and pressure derivative.
其中,双对数图的绘制是以压力降落图版上坐标尺寸为基准的。Among them, the drawing of the double-log graph is based on the coordinate size on the pressure drop chart.
步骤503:将聚合物驱时的实际中的压力差和压力导数的双对数图与聚合物驱时的计算的压力差和压力导数的双对数图进行拟合。Step 503: Fitting the actual pressure difference and the double-logarithmic diagram of the pressure derivative during the polymer flooding with the calculated pressure difference and the double-logarithmic diagram of the pressure derivative during the polymer flooding.
步骤504:判断拟合精度是否在预设的精度范围内,若是,转到步骤505;若否转到步骤506。Step 504: Determine whether the fitting accuracy is within the preset accuracy range, if yes, go to step 505; if not, go to step 506.
步骤505:获取的聚合物驱时的油藏基本信息为所需的油藏基本信息。Step 505: The acquired basic reservoir information during polymer flooding is the required basic reservoir information.
步骤506:修改聚合物驱时油藏的预设基本信息,进行聚合物驱的试井分析,直到拟合精度在预设精度范围内。Step 506: Modify the preset basic information of the reservoir during polymer flooding, and perform well test analysis of polymer flooding until the fitting accuracy is within the preset accuracy range.
其中,修改预设的油藏基本信息具体可以可通过修改油藏基本信息中的具体参数值,将修改后的油藏基本信息作为油藏的预设基本信息,再次依据油井及所述油井中各相流体的基本参数、地质模型、井筒类型、油藏边界以及油藏的预设基本信息进行聚合物驱的试井分析。聚合物驱的试井分析的具体过程请参阅图4来进行拟合。Among them, the modification of the preset basic information of the oil reservoir can specifically be carried out by modifying the specific parameter values in the basic information of the oil reservoir, using the modified basic information of the oil reservoir as the preset basic information of the oil reservoir, and again according to the oil well and the value in the oil well. The basic parameters of each phase fluid, geological model, wellbore type, reservoir boundary and preset basic information of the reservoir are used for well test analysis of polymer flooding. For the specific process of well test analysis of polymer flooding, please refer to Fig. 4 for fitting.
步骤16:依据所述聚合物驱时油藏的基本信息,对油井进行监控。Step 16: Monitoring the oil well according to the basic information of the reservoir during polymer flooding.
请参阅图6,其示出了本申请依据聚合物驱时油藏的基本信息对油井进行监控的实例,在某个油藏区域中,中间一口生产井,周围四口为注入井。在水驱时向注入井注入水,在聚合物驱时向注入井注入聚合物溶液,在生产井中采取油藏。Please refer to Figure 6, which shows an example of the application monitoring oil wells based on the basic information of the reservoir during polymer flooding. In a certain reservoir area, there is one production well in the middle and four injection wells around it. Water is injected into the injection well during water flooding, polymer solution is injected into the injection well during polymer flooding, and oil reservoirs are recovered in the production well.
使用现有技术的试井分析方法进行聚合物驱的试井分析时,获取的油藏基本信息中:井筒表皮为-0.23,井储常数为0.7(m3/MPa),地层渗透率平均为800mD。其中油相黏度为8.9mPa.s,水相黏度为0.6mPa.s。When the well testing analysis method of the prior art is used for the well testing analysis of polymer flooding, the obtained basic information of the reservoir: the wellbore skin is -0.23, the well storage constant is 0.7 (m 3 /MPa), and the average formation permeability is 800mD. Among them, the oil phase viscosity is 8.9mPa.s, and the water phase viscosity is 0.6mPa.s.
采用本申请提供的试井分析方法进行聚合物驱试井分析,获取的油藏基本信息中:井筒表皮为5,井储常数为0.8(m3/MPa),地层渗透率分布如图7所示,其中聚合物溶液的黏度为12mPa.s。The well test analysis method provided by this application was used for polymer flooding well test analysis. Among the obtained basic information of the reservoir: the wellbore skin is 5, the well storage constant is 0.8 (m 3 /MPa), and the formation permeability distribution is shown in Figure 7 shows that the viscosity of the polymer solution is 12mPa.s.
选取多相流体中的单相油之后,通过压力拟合,得到的拟黏度为2.9mPa.s。After selecting the single-phase oil in the multi-phase fluid, the pseudo-viscosity obtained by pressure fitting is 2.9 mPa.s.
其中,水驱的试井分析时的压力拟合图如图8所示,聚合物驱时压力拟合情形如图9所示。Among them, the pressure fitting diagram of water flooding well test analysis is shown in Fig. 8, and the pressure fitting situation of polymer flooding is shown in Fig. 9.
图8与图9的上部分曲线图为实测压力降落及其导数与计算压力降落及其导数的拟合图;下部分曲线图为实测压力与计算压力的拟合图。The upper part of the graphs in Fig. 8 and Fig. 9 is the fitting graph of the measured pressure drop and its derivative and the calculated pressure drop and its derivative; the lower part of the graph is the fitting graph of the measured pressure and the calculated pressure.
显然采用本申请提供的试井分析方法进行聚合物驱的试井分析时,降低了地层渗透率很明显降低了,并且井的表皮由负变为正,符合油田开发动态。其中,油田动态是油田开发过程中所表现出来的特征,井筒表皮越大变大,流动越困难,渗透率代表聚合物溶液在地层的渗透能力,聚合物会导致污染,所以聚合物溶液流动越困难,渗透率越低越好。Obviously, when the well test analysis method provided by this application is used for polymer flooding well test analysis, the formation permeability is obviously reduced, and the well skin changes from negative to positive, which is in line with the oilfield development dynamics. Among them, the oilfield dynamics are the characteristics shown in the oilfield development process. The larger the wellbore skin becomes, the more difficult the flow is. The permeability represents the penetration ability of the polymer solution in the formation. The polymer will cause pollution, so the more the polymer solution flows Difficult, the lower the permeability the better.
由此可见,采用现有试井分析方法进行聚合物驱试井分析,得到的井筒表皮往往是一个绝对数很大的负值,不符合油田动态,是错误的。It can be seen that the wellbore skin obtained by using the existing well test analysis method for polymer flooding well test analysis is often a negative value with a large absolute number, which does not conform to the oilfield dynamics and is wrong.
应用上述技术方案,首先测量油井及油井中各相流体的基本参数,其次获取水驱时油藏的基本信息以及单相流体的拟黏度,再结合所述拟黏度进行聚合物驱的试井分析,获取聚合物驱时油藏的基本信息,依据所述聚合物驱时油藏的基本信息,对所述油井进行监控。因此,本申请可以基于聚合物驱进行试井分析,并可以依据聚合物驱时油藏的基本信息,对所述油井进行监控。Applying the above technical scheme, first measure the basic parameters of the oil well and each phase fluid in the oil well, secondly obtain the basic information of the reservoir during water flooding and the pseudo-viscosity of the single-phase fluid, and then conduct the well test analysis of polymer flooding in combination with the pseudo-viscosity The basic information of the oil reservoir during polymer flooding is obtained, and the oil well is monitored according to the basic information of the oil reservoir during polymer flooding. Therefore, the present application can conduct well test analysis based on polymer flooding, and can monitor the oil well according to the basic information of the oil reservoir during polymer flooding.
与上述方法相对应,本申请还提供了一种试井分析装置,用以保证上述方法在实际中的实现及应用。请参见图10,其示出了本申请的一种试井分析装置的一种结构示意图,可以包括以下结构单元:基本参数测量单元101、水驱的试井分析单元102、拟单相流获取单元103、拟黏度获取单元104、聚合物驱的试井分析单元105和监控单元106。其中,Corresponding to the above method, the present application also provides a well test analysis device to ensure the realization and application of the above method in practice. Please refer to Fig. 10, which shows a schematic structural diagram of a well test analysis device of the present application, which may include the following structural units: basic
基本参数测量单元101,用于测量油井及所述油井中各相流体的基本参数。The basic
水驱的试井分析单元102,用于依据所述油井及所述油井中各相流体的基本参数,进行水驱的试井分析,获取水驱时油藏的基本信息。其具体结构请参见图11,水驱的试井分析单元102包括:第一测量单元201,第一选取单元202,第一计算单元203和第一压力拟合单元204,其中,The water flooding well test analysis unit 102 is used for performing water flooding well test analysis according to the basic parameters of the oil well and the fluids of each phase in the oil well, and obtaining the basic information of the oil reservoir during water flooding. Please refer to FIG. 11 for its specific structure. The well test analysis unit 102 of water flooding includes: a
第一测量单元201,用于测量水驱时的井底实际压力数据。The
第一选取单元202,用于选取水驱时的地质模型、井筒类型和油藏边界,获取水驱时油藏的预设基本信息。The
第一计算单元203,用于根据油井及所述油井中各相流体的基本参数、地质模型、井筒类型、油藏边界以及油藏的预设基本信息,利用黑油模型计算获取水驱时的井底流压。The
第一压力拟合单元204,用于将水驱时的实际压力数据和计算获取的水驱时的井底流压进行拟合,获取水驱时油藏的基本信息。其具体结构参见图12,第一压力拟合单元204包括:第一对数图绘制单元301,第一对数图拟合单元302和第一拟合精度判断单元303。其中,The first
第一对数图绘制单元301,用于分别获取水驱时实际的和计算的压力差与压力导数,并对压力差和压力导数进行双对数图的绘制。The first logarithmic
第一对数图拟合单元302,用于将水驱时的实际的压力差和压力导数的双对数图与水驱时的计算的压力差和压力导数的双对数图进行拟合。The first logarithmic diagram
第一拟合精度判断单元303,用于判断拟合精度是否在预设精度范围内,若拟合精度在预设精度范围内,获取的水驱时的油藏基本信息为所需的油藏基本信息;若拟合精度不在预定精度范围内,修改水驱时油藏的预设基本信息,进行水驱的试井分析,直到拟合精度在预设精度范围内。The first fitting
拟单相流获取单元103,用于选取水驱时多相流体中的单相油。。The pseudo-single-phase flow acquisition unit 103 is used to select single-phase oil in the multi-phase fluid during water flooding. .
拟黏度获取单元104,用于利用所述油藏的基本信息进行压力拟合,获取所述单相油的拟黏度。The pseudo-viscosity acquisition unit 104 is configured to use the basic information of the reservoir to perform pressure fitting to obtain the pseudo-viscosity of the single-phase oil.
聚合物驱的试井分析单元105,用于结合所述拟黏度进行聚合物驱的试井分析,获取聚合物驱时油藏的基本信息。其具体结构请参见图13,聚合物驱的试井分析单元105包括:第二测量单元401,第二选取单元402,第二计算单元403和第二压力拟合单元404。其中,The polymer flooding well test analysis unit 105 is used to perform polymer flooding well test analysis in combination with the pseudo-viscosity to obtain basic information of the reservoir during polymer flooding. Please refer to FIG. 13 for its specific structure. The well test analysis unit 105 of polymer flooding includes: a
第二测量单元401,用于测量聚合物驱时井底的实际压力数据。The
第二选取单402,用于选取聚合物驱时的地质模型、井筒类型和油藏边界,选取黑油模型中的油水两相模型,获取聚合物驱时油藏的预设基本信息。The
第二计算单元403,用于根据油井及所述油相与水相流体的基本参数、地质模型、井筒类型、油藏边界以及油藏的预设基本信息,利用黑油模型计算获取聚合物驱时的井底流压。The
第二压力拟合单404,用于将聚合物驱时的实际压力数据和计算获取的聚合物驱时的井底流压进行拟合,获取聚合物驱时油藏的基本信息。其具体结构请参见图14,第二压力拟合单元404包括:第二对数图绘制单元501,第二对数图拟合单502和第二拟合精度判断单元503,其中,The second
第二对数图绘制单元501,用于分别获取聚合物驱时实际的和计算的压力差与压力导数,并对压力差和压力导数进行双对数图的绘制。The second logarithmic
第二对数图拟合单元502,用于将聚合物驱时的实际的压力差和压力导数的双对数图与聚合物驱时的计算的压力差和压力导数的双对数图进行拟合。The second logarithmic diagram
第二拟合精度判断单元503用于判断拟合精度是否在预设精度范围内,若拟合精度在预设精度范围内,获取的聚合物驱时的油藏基本信息为所需的油藏基本信息;若拟合精度不在预定精度范围内,修改聚合物驱时油藏的预设基本信息,进行聚合物驱的试井分析,直到拟合精度在预设精度范围内。The second fitting
监控单元106,用于依据所述聚合物驱时油藏的基本信息,对所述油井进行监控。The monitoring unit 106 is configured to monitor the oil well according to the basic information of the reservoir during polymer flooding.
在本实施例中,在进行水驱或者聚合物驱的试井分析之前要对油藏划分流动段,有利于提高试井分析的准确性,请参见图15,其示出了本申请的一种试井分析装置的另一种结构示意图,在图10基础上,还可以包括:油井产量测量单元107和油藏流动段划分单元108。其中,In this embodiment, before the well test analysis of water flooding or polymer flooding, it is necessary to divide the flow section of the reservoir, which is beneficial to improve the accuracy of the well test analysis. Please refer to Figure 15, which shows a Another schematic diagram of the structure of the well testing analysis device, based on FIG. in,
油井产量测量单元107,用于测量水驱及聚合物驱时油井在不同时间段的产量。The oil well production measurement unit 107 is used to measure the production of the oil well in different time periods during water flooding and polymer flooding.
油藏流动段划分单元108,用于在水驱的试井分析和聚合物驱的试井分析时,根据所述油井在不同时间段的产量,将油藏划分为多个流动段,对不同流动段依次进行水驱的试井分析和聚合物驱的试井分析。Reservoir flow section division unit 108 is used to divide the reservoir into multiple flow sections according to the production of the oil wells in different time periods during the well test analysis of water flooding and polymer flooding. In the flow section, the well test analysis of water flooding and the well test analysis of polymer flooding are carried out sequentially.
以上实施例介绍了在水驱试井分析的基础上,通过选取水驱时多相流体中的单相油作为拟单相,并通过修改单相油参数中的黏度进行压力拟合,得到拟单相的拟黏度,选取黑油模型中的油水两相模型,其中将单相油作为油相,聚合物溶液作为水相,进行聚合物驱的试井分析,从而获得了聚合物驱时的油藏信息,有利于对油藏的监控。The above examples introduce that on the basis of water flooding well test analysis, the single-phase oil in the multiphase fluid during water flooding is selected as the pseudo-single phase, and the pressure fitting is performed by modifying the viscosity in the parameters of the single-phase oil to obtain the pseudo-single phase. For the single-phase pseudo-viscosity, the oil-water two-phase model in the black oil model is selected, in which the single-phase oil is used as the oil phase, and the polymer solution is used as the water phase. Reservoir information is beneficial to the monitoring of the reservoir.
以上对本申请所提供的一种试井分析方法及装置进行了详细介绍,本文中应用了具体个例对本申请的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本申请的方法及其核心思想;同时,对于本领域的一般技术人员,依据本申请的思想,在具体实施方式及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本申请的限制。A kind of well test analysis method and device provided by the application have been introduced in detail above. The principle and implementation of the application have been explained by using specific examples in this paper. The description of the above examples is only used to help understand the application. method and its core idea; at the same time, for those of ordinary skill in the art, according to the idea of this application, there will be changes in the specific implementation and application scope. Application Restrictions.
Claims (16)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210260155.XA CN102748007B (en) | 2012-07-25 | 2012-07-25 | Well testing analytical method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210260155.XA CN102748007B (en) | 2012-07-25 | 2012-07-25 | Well testing analytical method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102748007A true CN102748007A (en) | 2012-10-24 |
CN102748007B CN102748007B (en) | 2015-01-07 |
Family
ID=47028461
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210260155.XA Expired - Fee Related CN102748007B (en) | 2012-07-25 | 2012-07-25 | Well testing analytical method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102748007B (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105352851A (en) * | 2015-12-07 | 2016-02-24 | 中国石油化工股份有限公司 | Method for recognizing type of fluid flowing into well |
CN106198543A (en) * | 2016-07-04 | 2016-12-07 | 中国科学技术大学 | A kind of experimental provision verifying dynamic negative-pressure perforation tunnel cleaning degree |
CN107130955A (en) * | 2016-02-26 | 2017-09-05 | 中国石油化工股份有限公司 | The determination method and Reservoir Body natural energy method for determination of amount of flowing bottomhole pressure (FBHP) |
CN109441415A (en) * | 2018-12-19 | 2019-03-08 | 克拉玛依新科澳石油天然气技术股份有限公司 | The Well Test Data Analysis Method of Polymer Flooding Reservoirs testing well based on disturbance from offset wells |
CN110486008A (en) * | 2019-09-02 | 2019-11-22 | 合肥鼎盛锦业科技有限公司 | A kind of parameter interpretation method and system of Radial Compound Reservoir |
CN110578503A (en) * | 2019-09-20 | 2019-12-17 | 合肥鼎盛锦业科技有限公司 | Method and system for determining initial water saturation of oil reservoir in polymer flooding numerical well testing |
CN110924913A (en) * | 2018-09-18 | 2020-03-27 | 中国石油天然气股份有限公司 | Method and device for acquiring foam flooding formation pressure |
CN110991641A (en) * | 2019-12-17 | 2020-04-10 | 合肥鼎盛锦业科技有限公司 | Oil reservoir type analysis method and device and electronic equipment |
CN112343566A (en) * | 2019-08-08 | 2021-02-09 | 中国石油天然气股份有限公司 | Method and device for determining bottom hole flowing pressure of injection polymer well |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1995696A (en) * | 2006-12-21 | 2007-07-11 | 大庆油田有限责任公司 | Polymer flooding whole-process division method and comprehensive adjustment method |
CN102041995A (en) * | 2010-12-02 | 2011-05-04 | 中国海洋石油总公司 | System for monitoring complicated oil deposit flooding conditions |
US20110246161A1 (en) * | 2009-10-01 | 2011-10-06 | Kirsty Morton | Method for integrated inversion determination of rock and fluid properties of earth formations |
-
2012
- 2012-07-25 CN CN201210260155.XA patent/CN102748007B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1995696A (en) * | 2006-12-21 | 2007-07-11 | 大庆油田有限责任公司 | Polymer flooding whole-process division method and comprehensive adjustment method |
US20110246161A1 (en) * | 2009-10-01 | 2011-10-06 | Kirsty Morton | Method for integrated inversion determination of rock and fluid properties of earth formations |
CN102041995A (en) * | 2010-12-02 | 2011-05-04 | 中国海洋石油总公司 | System for monitoring complicated oil deposit flooding conditions |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105352851A (en) * | 2015-12-07 | 2016-02-24 | 中国石油化工股份有限公司 | Method for recognizing type of fluid flowing into well |
CN105352851B (en) * | 2015-12-07 | 2017-11-10 | 中国石油化工股份有限公司 | A kind of recognition methods of entry well fluid type |
CN107130955A (en) * | 2016-02-26 | 2017-09-05 | 中国石油化工股份有限公司 | The determination method and Reservoir Body natural energy method for determination of amount of flowing bottomhole pressure (FBHP) |
CN107130955B (en) * | 2016-02-26 | 2020-12-11 | 中国石油化工股份有限公司 | Method for determining bottom hole flowing pressure and method for determining natural energy of reservoir |
CN106198543A (en) * | 2016-07-04 | 2016-12-07 | 中国科学技术大学 | A kind of experimental provision verifying dynamic negative-pressure perforation tunnel cleaning degree |
CN106198543B (en) * | 2016-07-04 | 2018-08-21 | 中国科学技术大学 | A kind of experimental provision of verification dynamic negative-pressure perforation tunnel cleaning degree |
CN110924913A (en) * | 2018-09-18 | 2020-03-27 | 中国石油天然气股份有限公司 | Method and device for acquiring foam flooding formation pressure |
CN110924913B (en) * | 2018-09-18 | 2021-09-28 | 中国石油天然气股份有限公司 | Method and device for acquiring foam flooding formation pressure |
CN109441415A (en) * | 2018-12-19 | 2019-03-08 | 克拉玛依新科澳石油天然气技术股份有限公司 | The Well Test Data Analysis Method of Polymer Flooding Reservoirs testing well based on disturbance from offset wells |
CN109441415B (en) * | 2018-12-19 | 2021-03-30 | 中国石油天然气股份有限公司 | Well testing interpretation method of polymer flooding oil reservoir test well based on adjacent well interference |
CN112343566A (en) * | 2019-08-08 | 2021-02-09 | 中国石油天然气股份有限公司 | Method and device for determining bottom hole flowing pressure of injection polymer well |
CN112343566B (en) * | 2019-08-08 | 2022-12-02 | 中国石油天然气股份有限公司 | Method and device for determining bottom hole flowing pressure of injection polymer well |
CN110486008A (en) * | 2019-09-02 | 2019-11-22 | 合肥鼎盛锦业科技有限公司 | A kind of parameter interpretation method and system of Radial Compound Reservoir |
CN110486008B (en) * | 2019-09-02 | 2023-11-03 | 合肥鼎盛锦业科技有限公司 | Parameter interpretation method and system for radial composite oil reservoir |
CN110578503A (en) * | 2019-09-20 | 2019-12-17 | 合肥鼎盛锦业科技有限公司 | Method and system for determining initial water saturation of oil reservoir in polymer flooding numerical well testing |
CN110991641A (en) * | 2019-12-17 | 2020-04-10 | 合肥鼎盛锦业科技有限公司 | Oil reservoir type analysis method and device and electronic equipment |
CN110991641B (en) * | 2019-12-17 | 2024-03-05 | 合肥鼎盛锦业科技有限公司 | Oil reservoir type analysis method and device and electronic equipment |
Also Published As
Publication number | Publication date |
---|---|
CN102748007B (en) | 2015-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102748007B (en) | Well testing analytical method and device | |
CN107701180B (en) | Original oil reservoir water saturation calculation method based on closed coring | |
Mirzaei-Paiaman et al. | A further verification of FZI* and PSRTI: Newly developed petrophysical rock typing indices | |
US10845322B2 (en) | Method and apparatus for measuring capillary pressure and foam transport in porous media | |
US10167719B2 (en) | Methods and systems for evaluation of rock permeability, porosity, and fluid composition | |
CN103527185B (en) | Horizontal well physical simulation experiment device and its experimental technique | |
US10392922B2 (en) | Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests | |
US10094202B2 (en) | Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions | |
CN105822298B (en) | The acquisition methods of shale gas-bearing formation absolute open flow (AOF) based on index number of producing gas | |
Akram et al. | A model to predict wireline formation tester sample contamination | |
CN108133086A (en) | Water Fractured Gas Wells fracture half-length's inversion method is produced in a kind of stress sensitive reservoir | |
CN203769767U (en) | Horizontal-well physical simulation experiment device | |
CN104389592B (en) | Oil loss evaluation experiment test method for water flooded layer of bottom water condensate gas reservoir with oil rim | |
CN107237626B (en) | Method for determining volume of karst cave encountered by well drilling | |
Daungkaew et al. | Frequently asked Questions in the Interval Pressure Transient Test (IPTT) and what is Next with Deep Transient Test (DTT) | |
CN110095584A (en) | A kind of reservoir oil water saturation bearing calibration | |
Parra et al. | Application of the producer-based capacitance resistance model to undersaturated oil reservoirs in primary recovery | |
CN102073772A (en) | MDT pressure value test simulation method | |
CN103675945B (en) | Method and equipment for measuring saturation of hole type reservoir | |
CN205297569U (en) | Device for determining saturation index of tight sandstone | |
Sarkar et al. | Adverse Effects of Poor Mudcake Quality: A Supercharging and Fluid Sampling Study | |
CN100523431C (en) | Method for simulating oil-water two-phase cable formation testing | |
Ayan et al. | The effects of multiphase flow on the interpretation of pressure buildup tests | |
CN115146548A (en) | Method, device, equipment and storage medium for determining oil-water interface of fracture-cavity oil reservoir | |
Khairy et al. | Application of Successful New Downhole Fluid Sampling Technique in Ultra Low Permeability Reservoir in Abu Dhabi Onshore |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150107 Termination date: 20210725 |