CN102720211B - Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system - Google Patents

Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system Download PDF

Info

Publication number
CN102720211B
CN102720211B CN201210187121.2A CN201210187121A CN102720211B CN 102720211 B CN102720211 B CN 102720211B CN 201210187121 A CN201210187121 A CN 201210187121A CN 102720211 B CN102720211 B CN 102720211B
Authority
CN
China
Prior art keywords
jack
immersed tube
carve
body piece
rectifying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210187121.2A
Other languages
Chinese (zh)
Other versions
CN102720211A (en
Inventor
林鸣
曲俐俐
刘德进
冯海暴
李增军
杨瑞亮
李德钊
苏长玺
陆连洲
付大伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 2 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201210187121.2A priority Critical patent/CN102720211B/en
Publication of CN102720211A publication Critical patent/CN102720211A/en
Application granted granted Critical
Publication of CN102720211B publication Critical patent/CN102720211B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)

Abstract

The invention relates to a wedge type bottom-end deviation fine-rectifying system for an immersed pipe and a rectifying process of the wedge type bottom-end deviation fine-rectifying system. The wedge type bottom-end deviation fine-rectifying system comprises a control system and a mechanical system. The mechanical system comprises a hydraulic pump station, a weight box and a rail. A horizontal positioning mechanism is arranged on the rail and comprises a bottom plate and a horizontal positioning jack. A slide groove and a horizontal transversely-moving jack are mounted on the bottom plate, a jacking deviation rectifying box is disposed in the slide groove, and a perpendicular jacking mechanism is arranged in the jacking deviation rectifying box and comprises a jacking jack, a lower wedge and an upper wedge. One end of the jacking jack is fixed on the jacking deviation rectifying box, the other end of the jacking jack is connected with the lower wedge, and the upper wedge is mounted on the lower wedge and can move upwards perpendicularly along with the lower wedge. The wedge type bottom-end deviation fine-rectifying system is simple in structure, can automatically jack and rectify deviation of the immersed pipe to be mounted by the aid of the jacking jack, the upper wedge, the lower wedge and the horizontal transversely-moving jack, is timesaving and laborsaving and accurate in mounting and is slightly affected by natural conditions such as waves, water flow and wind, and high in stability.

Description

Body formula correction accurate adjustment system and adjusting process thereof are carved in immersed tube bottom
Technical field
The present invention relates to immersed tube tunnel construction technology, specifically, relate to immersed tube correction bottom regulating system and adjusting process thereof in a kind of immersed tube tunnel work progress.
Background technology
Immersed tunnelling method is a kind of construction method in building tunnel, the bottom.Immersed tube tunnel be exactly by several prefabricated section respectively transportation by driving to sea (river surface) scene, and sinking is arranged in the own foundation trench of having dredged one by one, the submerged tunnel of building with the method.At present, in immersed tube tunnel work progress, in order to improve the planarization of trench bottom surfaces, the subaqueous tunnel that the overwhelming majority builds up all adopts the method for leveling up.Wherein, the early stage method of leveling up mostly adopting is a kind of first paving method that first sanding masonry is bed course before Pipe Sinking, it is by hoist engine and the special paving machine of scraping or the steel plough of cable control on operation ship, the guide rail that arrange, that there is regulation absolute altitude and the gradient along trench bottom surfaces both sides, the bedding and padding that put down are back and forth struck off, and this method shortcoming is more; The method that another kind is leveled up is filled out method after being, first by Pipe Sinking on the temporary support in trench bottom, and make to manage the end and form certain space (default hydraulic jack in pipeline section base plate can be pushed up to bearing in the time of location, regulate pipeline section elevation), use subsequently course filling closely knit.In above-mentioned two kinds of methods, the object of processing sinking pipeline section basis is to make trench bottom surfaces smooth, instead of in order to improve the bearing capacity of ground, the groove of excavation under water, its bottom surface is uneven, if do not flattened, after Pipe Sinking, can cause local failure because of ground discontinuity, or ftracture because of differential settlement.
The essential condition that is suitable for immersed tunnelling method construction is: water channel stabilization of river bed and current are not too urgent.When, immersed tube aspect ratio large in the depth of water is large, need obviously to increase jack configuration, conventionally adopt sinking to refute assisted Extraction and feed to the power of hanging oneself to reduce immersed tube to bedding frictional force, refute and assist installation stricter to wave height requirement by sinking, general job wave height requirement≤0.4m.At present, adopt sinking to refute auxiliary case of installing and only have Pusan-huge Ji immersed tube tunnel and Oresund immersed tube tunnel, wherein, Pusan-huge Ji immersed tube tunnel is to operation wave height requirement≤0.4m; In the immersed tube tunnel construction of Oresund, can find out from map, job site surrounding has formed shielding, and sea situation is better.And require while being greater than 0.4m for wave height, owing to being subject to the impact of the natural conditions such as wave, current, wind, while adopting sinking to refute auxiliary installation, the power amplitude of variation of hanging is very large, and larger to control effect is installed, jack thrust is large, control difficulty, and installation accuracy is inaccurate, need the time to adjust, waste time and energy.
Summary of the invention
The present invention is directed to the thrust that existed by the effect of natural conditions such as wave, current, wind when immersed tube in existing immersed tube tunnel work progress is installed large, control difficulty, the problems referred to above such as waste time and energy, provide a kind of immersed tube bottom to carve body formula correction accurate adjustment system and adjusting process thereof, this system is positioned at immersed tube afterbody to be installed bottom while use, there is the function of autonomous rectifying by jack up, the immersed tube correction while being applicable to immersed tube tunnel construction.
Technical scheme of the present invention is: body formula correction accurate adjustment system is carved in a kind of immersed tube bottom, this system comprises control system and mechanical system, mechanical system comprises hydraulic power unit, ballast box and is arranged on the track of ballast box one side, on track, being provided with can Orbiting level locating mechanism, this level locating mechanism comprises installation base plate in orbit and be arranged on the horizontal location jack on base plate, and one end of horizontal location jack is connected with ballast box; Chute and horizontal shifting jack are installed on base plate, are placed with rectifying by jack up case in chute, in this rectifying by jack up case, be provided with vertical lifting body, horizontal shifting jack one end is fixed on base plate, and the other end is connected with rectifying by jack up case; Vertical lifting body comprise pushing tow jack, under carve body piece and on carve body piece, pushing tow jack one end is fixed on rectifying by jack up case, the other end with under carve body piece and be connected, above carve body piece and be arranged on down and carve on body piece, and can with under carve body piece movement vertically move up.
Preferably, under carve body piece upper surface be provided with chute, the soffit of above carving body piece is provided with the slide block corresponding with chute, above carve body piece by slide block can under carve in the chute of body piece and move.
Preferably, be provided with vertical stopper slot on the sidewall of rectifying by jack up case, the both sides of above carving body piece are provided with the spacing block set corresponding with vertical stopper slot.
Preferably, be provided with column on base plate, horizontal shifting jack one end is fixed on column, and the other end is connected with rectifying by jack up case.
Preferably, above carve body piece upper surface and under carve body piece soffit be all set to ramp structure.
Another object of the present invention is to provide a kind of immersed tube bottom correction technique, adopt immersed tube bottom to carve body formula correction accurate adjustment system and rectify a deviation, its correction processing step is:
(1) basis requires: hydraulic power unit and control system that body formula correction accurate adjustment system is carved in immersed tube bottom are all positioned on diving crane ship, this system mechanics system-based need to be than the low 70cm of base bed flattening absolute altitude by immersed tube afterbody rubble basis instrument to be installed, axial length is 5m, it is 56cm that the mechanical system that body formula correction accurate adjustment system is carved in immersed tube bottom enters immersed tube bottom part height, is convenient to mechanical system in place.
(2) axis repetition measurement: after the crimping of immersed tube waterpower completes, open the steel measured hole of sealing up a door and carry out holing through survey.
(3) sinking, in place: immersed tube bottom is carved the mechanical system sinking of body formula correction accurate adjustment system and fixed by suspension bracket, and suspension bracket length 25m can contact with passage abutment wall spacing in the time of sinking translation; When sinking, by being arranged on the distance between measuring instrument in mechanical system is measured and steel is sealed up a door, when apart from 2m place, immersed tube end implantation, and then sling apart from bedding 1m, be adjacent to immersed tube end by being preset in the mechanical system that the wire rope of immersed tube end pulls immersed tube bottom to carve body formula correction accurate adjustment system, and then fall implantation, utilize immersed tube bottom to carve the horizontal location jack pushing tow rectifying by jack up case of mechanical system self of body formula correction accurate adjustment system in place.
(4) immersed tube jacking: by carving body piece 0.4m under pushing tow jack pushing tow, above carve the jacking of body piece and raise 0.1m, carve body piece and immersed tube gap in elimination, make to carve body piece and immersed tube bottom close contact; Pushing tow jack continues to carve body piece to 0.9m under pushing tow, above carves body piece and is raised 0.2m by jacking, and immersed tube is raised by jacking, and now, immersed tube reaches 600t to carving body piece gross pressure, and the frictional force of above carving body piece and immersed tube generation can reach 360t.
(5) immersed tube correction: under carve body piece spacing by pushing tow jack pushing tow after, horizontal shifting jack pushing tow rectifying by jack up case correction immersed tube 100mm, realizes immersed tube correction operation.
(6) Real-Time Monitoring: correction operating period utilizes total powerstation to observe immersed tube tail end correction situation and tail end top lifting height by measured hole.
(7) equipment shifts out: after correction puts in place, locking horizontal shifting jack, pull down and carve body piece by pushing tow jack, making to carve body piece declines, immersed tube decline implantation, completes correction, now, the mechanical system that body formula correction accurate adjustment system is carved in immersed tube bottom exits immersed tube bottom, and the mechanical system of utilizing crane gear that body formula correction accurate adjustment system is carved in immersed tube bottom winches to assigned address.
Preferably, in step (3), when sinking is in place, the rectifying by jack up case state that mediates, before jacking, by horizontal shifting jack, rectifying by jack up case is pushed to one end of correction, keeps horizontal shifting jack correction amount between 10-20cm, can repeat above-mentioned steps.
The invention has the beneficial effects as follows: the present invention carves body formula correction accurate adjustment system architecture advantages of simple, easy to use, adopt horizontal location jack in place, by pushing tow jack, on carve body piece, under carve body piece and horizontal shifting jack and realize immersed tube to be installed rectifying by jack up function, and be provided with control system, whole process completes automatically, time saving and energy saving, and it is convenient to control, installation accuracy is accurate, is subject to the effect of natural conditions such as wave, current, wind little; After correction completes, can directly unload and carve body formula correction accurate adjustment system, stability is high.
Brief description of the drawings
Accompanying drawing 1 is the original state structural representation of specific embodiment of the invention mechanical system sinking time in place.
Status architecture when accompanying drawing 2 is the correction of specific embodiment of the invention mechanical system jacking immersed tube .
Under being specific embodiment of the invention mechanical system, accompanying drawing 3 carves body block structure schematic diagram.
On being specific embodiment of the invention mechanical system, accompanying drawing 4 carves body block structure schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
Body formula correction accurate adjustment system is carved in a kind of immersed tube bottom, this system comprises control system and mechanical system, mechanical system comprises hydraulic power unit, ballast box 1 and is arranged on the track of ballast box 1 one sides, on track, being provided with can Orbiting level locating mechanism, this level locating mechanism comprises and is arranged on base plate in orbit 2 and is arranged on the horizontal location jack 3 on base plate 2, and one end of horizontal location jack 3 is connected with ballast box 1; Chute and horizontal shifting jack 4 are installed on base plate 2, in chute, be placed with rectifying by jack up case 5, in this rectifying by jack up case 5, be provided with vertical lifting body, horizontal shifting jack 4 one end are fixed on the column 12 being arranged on base plate 2, and the other end is connected with rectifying by jack up case 5; Vertical lifting body comprise pushing tow jack 6, under carve body piece 7 and on carve body piece 8, above carve body piece 8 upper surface and under carve body piece 7 soffit be all set to ramp structure.Pushing tow jack 6 one end are fixed on rectifying by jack up case 5, the other end with under carve body piece 7 and be connected, above carve body piece 8 and be arranged on down and carve on body piece 7, and can with under carve body piece 7 movement vertically move up.Under carve body piece 7 upper surface be provided with chute 9, the soffit of above carving body piece 8 is provided with the slide block corresponding with chute 9 10, above carve body piece 8 by slide block 10 can under carve body piece 7 the interior movement of chute 9.On the sidewall of rectifying by jack up case 5, be provided with vertical stopper slot, the both sides of above carving body piece 8 are provided with the spacing block set corresponding with vertical stopper slot 11.
Its correction processing step is as follows:
(1) basis requires: hydraulic power unit and control system that body formula correction accurate adjustment system is carved in immersed tube bottom are all positioned on diving crane ship, this system mechanics system-based need to be by immersed tube afterbody rubble to be installed basis than the low 70cm of base bed flattening absolute altitude, axial length is 5m, it is 56cm that the mechanical system that body formula correction accurate adjustment system is carved in immersed tube bottom enters immersed tube bottom part height, is convenient to mechanical system in place.
(2) axis repetition measurement: after the crimping of immersed tube waterpower completes, open the steel measured hole of sealing up a door and carry out holing through survey.
(3) sinking, in place: immersed tube bottom is carved the mechanical system sinking of body formula correction accurate adjustment system and fixed by suspension bracket, and suspension bracket length 25m can contact with passage abutment wall spacing in the time of sinking translation; When sinking, by being arranged on the distance between measuring instrument in mechanical system is measured and steel is sealed up a door, when apart from 2m place, immersed tube end implantation, and then sling apart from bedding 1m, be adjacent to immersed tube end by being preset in the mechanical system that the wire rope of immersed tube end pulls immersed tube bottom to carve body formula correction accurate adjustment system, and then fall implantation, utilize immersed tube bottom to carve the horizontal location jack pushing tow rectifying by jack up case of mechanical system self of body formula correction accurate adjustment system in place; When sinking is in place, the rectifying by jack up case state that mediates is pushed to rectifying by jack up case by horizontal shifting jack one end of correction before jacking, keeps horizontal shifting jack correction amount between 10-20cm.
(4) immersed tube jacking: by carving body piece 0.4m under pushing tow jack pushing tow, above carve the jacking of body piece and raise 0.1m, carve body piece and immersed tube gap in elimination, make to carve body piece and immersed tube bottom close contact; Pushing tow jack continues to carve body piece to 0.9m under pushing tow, above carves body piece and is raised 0.2m by jacking, and immersed tube is raised by jacking, and now, immersed tube reaches 600t to carving body piece gross pressure, and the frictional force of above carving body piece and immersed tube generation can reach 360t.
(5) immersed tube correction: under carve body piece spacing by pushing tow jack pushing tow after, horizontal shifting jack pushing tow rectifying by jack up case correction immersed tube 100mm, realizes immersed tube correction operation.
(6) Real-Time Monitoring: correction operating period utilizes total powerstation to observe immersed tube tail end correction situation and tail end top lifting height by measured hole.
(7) equipment shifts out: after correction puts in place, locking horizontal shifting jack, pull down and carve body piece by pushing tow jack, making to carve body piece declines, immersed tube decline implantation, completes correction, now, the mechanical system that body formula correction accurate adjustment system is carved in immersed tube bottom exits immersed tube bottom, and the mechanical system of utilizing crane gear that body formula correction accurate adjustment system is carved in immersed tube bottom winches to assigned address.
Above specific embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can modify or be equal to replacement technical scheme of the present invention, and not departing from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of claim scope of the present invention.

Claims (7)

1. body formula correction accurate adjustment system is carved in an immersed tube bottom, it is characterized in that: this system comprises control system and mechanical system, mechanical system comprises hydraulic power unit, ballast box and is arranged on the track of ballast box one side, on track, being provided with can Orbiting level locating mechanism, this level locating mechanism comprises installation base plate in orbit and be arranged on the horizontal location jack on base plate, and one end of horizontal location jack is connected with ballast box; Chute and horizontal shifting jack are installed on base plate, are placed with rectifying by jack up case in chute, in this rectifying by jack up case, be provided with vertical lifting body, horizontal shifting jack one end is fixed on base plate, and the other end is connected with rectifying by jack up case; Vertical lifting body comprise pushing tow jack, under carve body piece and on carve body piece, pushing tow jack one end is fixed on rectifying by jack up case, the other end with under carve body piece and be connected, above carve body piece and be arranged on down and carve on body piece, and can with under carve body piece movement vertically move up.
2. body formula correction accurate adjustment system is carved in immersed tube as claimed in claim 1 bottom, it is characterized in that: under carve body piece upper surface be provided with chute, on carve body piece soffit be provided with the slide block corresponding with chute, above carve body piece by slide block can under carve in the chute of body piece and move.
3. body formula correction accurate adjustment system is carved in immersed tube as claimed in claim 1 bottom, it is characterized in that: on the sidewall of rectifying by jack up case, be provided with vertical stopper slot, the both sides of above carving body piece are provided with the spacing block set corresponding with vertical stopper slot.
4. body formula correction accurate adjustment system is carved in immersed tube as claimed in claim 1 bottom, it is characterized in that: on base plate, be provided with column, horizontal shifting jack one end is fixed on column, and the other end is connected with rectifying by jack up case.
5. body formula correction accurate adjustment system is carved in a described immersed tube bottom, top as any in claim 1 to 4, it is characterized in that: the upper surface of above carving body piece with under carve body piece soffit be all set to ramp structure.
6. an immersed tube bottom correction technique, is characterized in that: adopt immersed tube claimed in claim 1 bottom to carve body formula correction accurate adjustment system and rectify a deviation, its correction processing step is:
(1) basis requires: hydraulic power unit and control system that body formula correction accurate adjustment system is carved in immersed tube bottom are all positioned on diving crane ship, this system mechanics system-based need to be than the low 70cm of base bed flattening absolute altitude by immersed tube afterbody rubble basis instrument to be pacified, axial length is 5m, it is 56cm that the mechanical system that body formula correction accurate adjustment system is carved in immersed tube bottom enters immersed tube bottom part height, is convenient to mechanical system in place;
(2) axis repetition measurement: after the crimping of immersed tube waterpower completes, open the steel measured hole of sealing up a door and carry out holing through survey;
(3) sinking, in place: immersed tube bottom is carved the mechanical system sinking of body formula correction accurate adjustment system and fixed by suspension bracket, and suspension bracket length 25m can contact with passage abutment wall spacing in the time of sinking translation; When sinking, by being arranged on the distance between measuring instrument in mechanical system is measured and steel is sealed up a door, when apart from 2m place, immersed tube end implantation, and then sling apart from bedding 1m, be adjacent to immersed tube end by being preset in the mechanical system that the wire rope of immersed tube end pulls immersed tube bottom to carve body formula correction accurate adjustment system, and then fall implantation, utilize immersed tube bottom to carve the horizontal location jack pushing tow rectifying by jack up case of mechanical system self of body formula correction accurate adjustment system in place;
(4) immersed tube jacking: by carving body piece 0.4m under pushing tow jack pushing tow, above carve the jacking of body piece and raise 0.1m, carve body piece and immersed tube gap in elimination, make to carve body piece and immersed tube bottom close contact; Pushing tow jack continues to carve body piece to 0.8m under pushing tow, above carves body piece and is raised 0.2m by jacking, and immersed tube is raised by jacking, and now, immersed tube reaches 600t to carving body piece gross pressure, and the frictional force of above carving body piece and immersed tube generation can reach 360t;
(5) immersed tube correction: under carve body piece spacing by pushing tow jack pushing tow after, horizontal shifting jack pushing tow rectifying by jack up case correction immersed tube 100mm, realizes immersed tube correction operation;
(6) Real-Time Monitoring: correction operating period utilizes total powerstation to observe immersed tube tail end correction situation and tail end top lifting height by measured hole;
(7) equipment shifts out: after correction puts in place, locking horizontal shifting jack, pull down and carve body piece by pushing tow jack, making to carve body piece declines, immersed tube decline implantation, completes correction, now, the mechanical system that body formula correction accurate adjustment system is carved in immersed tube bottom exits immersed tube bottom, and the mechanical system of utilizing crane gear that body formula correction accurate adjustment system is carved in immersed tube bottom winches to assigned address.
7. immersed tube as claimed in claim 6 bottom correction technique, it is characterized in that: in step (3), when sinking is in place, the rectifying by jack up case state that mediates, before jacking, by horizontal shifting jack, rectifying by jack up case is pushed to one end of correction, keep horizontal shifting jack correction amount between 10-20cm, can repeat above-mentioned steps.
CN201210187121.2A 2012-05-29 2012-05-29 Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system Active CN102720211B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210187121.2A CN102720211B (en) 2012-05-29 2012-05-29 Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210187121.2A CN102720211B (en) 2012-05-29 2012-05-29 Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system

Publications (2)

Publication Number Publication Date
CN102720211A CN102720211A (en) 2012-10-10
CN102720211B true CN102720211B (en) 2014-10-15

Family

ID=46946066

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210187121.2A Active CN102720211B (en) 2012-05-29 2012-05-29 Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system

Country Status (1)

Country Link
CN (1) CN102720211B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105253351A (en) * 2015-10-23 2016-01-20 东莞市锦顺包装机械有限公司 Automatic paperboard packaging machine
CN108660952B (en) * 2018-05-21 2020-07-21 南通路桥工程有限公司 Pushing installation method of prefabricated concrete automobile box
CN108951326A (en) * 2018-06-28 2018-12-07 安徽东方钢结构有限公司 A kind of track girder slope conditioning
CN111395397B (en) * 2020-03-20 2021-11-30 华侨大学 Construction method of bending type immersed tube anti-deformation structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003049441A (en) * 2001-08-03 2003-02-21 Toyo Constr Co Ltd Direction correction device and direction correction method for buried box
CN1696415A (en) * 2004-05-12 2005-11-16 布伊古公共工程公司 Process and apparatus for producing an immersed tunnel on subsea ground
CN101586342A (en) * 2009-06-15 2009-11-25 中交一航局第二工程有限公司 Caisson adopts jack to move horizontally the roof process of jacking
CN202787315U (en) * 2012-05-29 2013-03-13 中交一航局第二工程有限公司 Immersed tube bottom end carving body type rectifying and fine adjusting system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003049441A (en) * 2001-08-03 2003-02-21 Toyo Constr Co Ltd Direction correction device and direction correction method for buried box
CN1696415A (en) * 2004-05-12 2005-11-16 布伊古公共工程公司 Process and apparatus for producing an immersed tunnel on subsea ground
CN101586342A (en) * 2009-06-15 2009-11-25 中交一航局第二工程有限公司 Caisson adopts jack to move horizontally the roof process of jacking
CN202787315U (en) * 2012-05-29 2013-03-13 中交一航局第二工程有限公司 Immersed tube bottom end carving body type rectifying and fine adjusting system

Also Published As

Publication number Publication date
CN102720211A (en) 2012-10-10

Similar Documents

Publication Publication Date Title
CN102691314B (en) Internal deviation correcting fine adjusting system and adjusting technology for immersed tubes
CN102251530B (en) Construction process of double-wall steel cofferdam for construction of pier bearing platform in main river water of Yellow River
CN105240019B (en) A kind of pipe jacking construction method
CN110185044B (en) Foundation pit side wall stress adjustment system for deep unstable stratum
CN102720222B (en) Tail-end deviation rectifying process for immersed pipe
CN102720211B (en) Wedge type bottom-end deviation fine-rectifying system for immersed pipe and rectifying process of wedge type bottom-end deviation fine-rectifying system
CN114232689B (en) Leveling method for immersed tube tunnel full-floating foundation bed
CN110387884A (en) The construction method used for anti-burst of ultra-deep foundation pit
CN114673153A (en) Construction method of super long diameter pile foundation casing structure in complex stratum
CN102704512B (en) Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology
GB2511520A (en) Methods for construction and completion of underwater tunnels
CN101608452B (en) Bottom-connected reinforced concrete sinking well water-jetting sinking construction method
CN103938638A (en) Buoy type deepwater single-wall steel cofferdam construction method
CN102704508B (en) Immersed tube bottom end fork truck type deviation correcting fine adjusting system and regulating process of system
CN103669383B (en) A kind of method of installation and leveling caisson on ground, seabed
CN102979090A (en) Construction method for fixing steel casing on covering-free steep bare rock in deepwater and rapid stream
CN202913431U (en) Immersed tube bottom end jack type deviation-rectifying accurate adjustment system
CN202787315U (en) Immersed tube bottom end carving body type rectifying and fine adjusting system
CN209603143U (en) Floating underwater crushed stone bed continuous leveling vessel
CN102691313B (en) Immersed tube bottom capsule water filling fine adjusting system and adjusting technology
CN110258580B (en) Construction method of foundation pit enclosure structure serving as permanent underground structure
CN220117247U (en) Shallow layer long-term observation and emergency dredging well structure in basement side wall of building structure
CN202913427U (en) Immersed tube bottom end capsule water-filling type accurate adjustment system
CN202787314U (en) Immersed tube bottom end forklift-type rectifying and fine adjusting system
CN203238663U (en) Immersed tube top end three-dimensional fine tuning system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: CCCC FIRST HARBOR ENGINEERING COMPANY LTD.

Effective date: 20121019

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Lin Ming

Inventor after: David Faure

Inventor after: Qu Lili

Inventor after: Liu Dejin

Inventor after: Feng Haibao

Inventor after: Li Zengjun

Inventor after: Yang Ruiliang

Inventor after: Li Dezhao

Inventor after: Su Changxi

Inventor after: Lu Lianzhou

Inventor before: Qu Lili

Inventor before: Liu Dejin

Inventor before: Feng Haibao

Inventor before: Yang Ruiliang

Inventor before: Li Dezhao

Inventor before: Su Changxi

Inventor before: Lu Lianzhou

Inventor before: David Faure

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: QU LILI LIU DEJIN FENG HAIBAO YANG RUILIANG LI DEZHAO SU CHANGXI LU LIANZHOU FU DAWEI TO: LIN MING QU LILI LIU DEJIN FENG HAIBAO LI ZENGJUN YANG RUILIANG LI DEZHAO SU CHANGXI LU LIANZHOU FU DAWEI

TA01 Transfer of patent application right

Effective date of registration: 20121019

Address after: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong

Applicant after: NO.2 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd.

Applicant after: CCCC FIRST HARBOR ENGINEERING CO.,LTD.

Address before: 266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong

Applicant before: NO.2 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CI01 Publication of corrected invention patent application

Correction item: Applicant

Correct: CCCC Second Highway Engineering Co. Ltd.|266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong|CCCC First Harbor Engineering Co., Ltd.

False: CCCC Second Highway Engineering Co. Ltd.|266071 Shandong city of Qingdao province Fuzhou City Road No. 16 building in Hong Kong|ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING CO.,LTD.

Number: 47

Volume: 28

ERR Gazette correction

Free format text: CORRECT: APPLICANT; FROM: THE SECOND ENGINEERING CO. OF CCCC FIRST HARBOR ENGINEERING CO., LTD.:266071 QINGDAO, SHANDONG PROVINCE; CCCC FIRST HARBOR ENGINEERING COMPANY LTD. TO: THE SECOND ENGINEERING CO. OF CCCC FIRST HARBOR ENGINEERING CO., LTD.:266071 QINGDAO, SHANDONG PROVINCE; CCCC FIRST HARBOR ENGINEERING CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant