[go: up one dir, main page]

CN102710009A - Design method for supplying power to core data center - Google Patents

Design method for supplying power to core data center Download PDF

Info

Publication number
CN102710009A
CN102710009A CN2012101492254A CN201210149225A CN102710009A CN 102710009 A CN102710009 A CN 102710009A CN 2012101492254 A CN2012101492254 A CN 2012101492254A CN 201210149225 A CN201210149225 A CN 201210149225A CN 102710009 A CN102710009 A CN 102710009A
Authority
CN
China
Prior art keywords
power
power supply
terminal equipment
input
redundancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101492254A
Other languages
Chinese (zh)
Other versions
CN102710009B (en
Inventor
吴安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Inspur Cloud Computing Co ltd
Original Assignee
Inspur Electronic Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inspur Electronic Information Industry Co Ltd filed Critical Inspur Electronic Information Industry Co Ltd
Priority to CN201210149225.4A priority Critical patent/CN102710009B/en
Publication of CN102710009A publication Critical patent/CN102710009A/en
Application granted granted Critical
Publication of CN102710009B publication Critical patent/CN102710009B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

本发明提供一种核心数据中心供电的设计方法,该方法是在核心数据中心,从电网到终端设备的供电采用全冗余方式,保证设备不间断运行;终端设备中AC-DC电源采用双交流输入电源,实现设备交流冗余;终端设备中AC-DC电源采用支持并联均流的电源模块,实现电源模块直流输出冗余;终端设备中AC-DC电源,采用两台电源并联组合为一台电源的方式实现交流冗余,组合后的电源并联实现直流输出冗余,在数据中心中,实现了电网到终端设备供电的全冗余设计,保证设备不间断运行;在终端设备处,采用电源组合的方式,实现双交流输入和直流冗余,提高了可靠性,同时简单实用,成本低,方便扩容。

Figure 201210149225

The invention provides a design method for the power supply of the core data center. In the method, in the core data center, the power supply from the power grid to the terminal equipment adopts a fully redundant mode to ensure the uninterrupted operation of the equipment; the AC-DC power supply in the terminal equipment adopts dual AC Input power to realize equipment AC redundancy; the AC-DC power supply in the terminal equipment adopts a power module that supports parallel current sharing to realize the DC output redundancy of the power module; the AC-DC power supply in the terminal equipment uses two power supplies connected in parallel to form one The power supply method realizes AC redundancy, and the combined power supplies are connected in parallel to realize DC output redundancy. In the data center, the full redundancy design of the power supply from the power grid to the terminal equipment is realized to ensure the uninterrupted operation of the equipment; at the terminal equipment, the power supply is adopted The way of combination realizes dual AC input and DC redundancy, improves reliability, is simple and practical, low cost, and convenient for capacity expansion.

Figure 201210149225

Description

A kind of method for designing of core data center feed
Technical field
The present invention relates to the data center field, be specifically related to a kind of method for designing of core data center feed.
Background technology
In areas of information technology; Current user is rapid to the demand growth of magnanimity type data message; To data center reliable and stable operation require increasingly high; The core data center should have under 365*24 hour all weather conditions, incessantly data is carried out the ability of high speed acquisition, high speed processing, high speed storing and high-speed transfer.The core cell that electric power system runs without interruption as data center must guarantee stable reliably and with long-term operation.
To above problem, the present invention proposes a kind of method for designing of core data center feed, from the electrical network to the power terminal equipment, adopts the full redundancy design, guarantees that electric power system runs without interruption.
Summary of the invention
The method for designing that the purpose of this invention is to provide a kind of core data center feed.
The objective of the invention is to realize by following mode that at the core data center, the full redundancy mode is adopted in the power supply from the electrical network to the terminal equipment, the equipment of assurance runs without interruption; The AC-DC power supply adopts two alternating current input power supplyings in the terminal equipment, and realization equipment exchanges redundant; The AC-DC power supply adopts the power module of supporting parallel current-sharing in the terminal equipment, realizes power module direct current port redundancy; AC-DC power supply in the terminal equipment, the mode that adopts two power supply parallel connections to be combined as a power supply are realized exchanging redundant, and the power supply parallel connection after the combination realizes the direct current port redundancy, and concrete design procedure is following:
Electric power system comprises A and B duplex feeding; The power supply of A road converts three-phase electricity from electrical network A power taking into by transformer, offers terminal equipment AC-DC power supply master ac input end after the AC distribution part converts three-phase electricity into single-phase alternating current; The power supply of B road is from electrical network B power taking; Convert three-phase electricity into after automatic change-over is exported by transformer, diesel engine generator is supplied power in support and is connected with automatic change-over, and the output three-phase electricity passes to UPS through AC distribution; Battery is that UPS provides the reserve power supply; UPS output offers terminal equipment AC-DC power supply backup ac input end after AC distribution converts single-phase alternating current into, terminal equipment AC-DC power supply is the input of double cross stream, supports the power module of output-parallel;
During operate as normal, the A road provides electric power as primary input, and the B road is in the Hot Spare state as the backup input, if electrical network A breaks down; Terminal equipment AC-DC power supply switches to backup and exchanges input service, and B provides electric power by electrical network, and is normal if electrical network A recovers; Terminal equipment AC-DC power supply automaticallyes switch back to lead and exchanges input service, has electrical network A that electric power is provided, if between electrical network A age at failure; Electrical network B also breaks down, and automatic change-over can automatically switch to by the diesel engine generator power supply, but because the diesel engine generator startup needs about 10 minutes delay; This moment, battery was that UPS provides the energy, and UPS is that terminal equipment provides electric power, after diesel engine generator starts; Be that UPS provides the energy by diesel engine generator just, UPS is that terminal equipment provides electric power, and terminal equipment AC-DC power supply is except that the input of double cross stream simultaneously; The direct current output-parallel, the N+1 Redundancy Design is when a power supply breaks down therein; Assurance equipment normally moves, and through the multiple duplication Redundancy Design, guarantees the stable reliably and with long-term operation of core data center feed system.
The invention has the beneficial effects as follows: in data center, from the electrical network to the power terminal equipment, adopt the full redundancy mode, the equipment of assurance runs without interruption; The AC-DC power supply adopts two alternating current input power supplyings in the terminal equipment, and realization equipment exchanges redundant; The AC-DC power supply adopts the power module of supporting parallel current-sharing in the terminal equipment, realizes power module direct current port redundancy; AC-DC power supply in the terminal equipment, the mode that adopts two power supply parallel connections to be combined as a power supply are realized exchanging redundant, and the power supply parallel connection after the combination realizes the direct current port redundancy, and simple and practical, cost is low, makes things convenient for dilatation.In data center, realized the full redundancy design of electrical network to power terminal equipment, the equipment of assurance runs without interruption; At the terminal equipment place, adopt the mode of power supply combination, realize that input of double cross stream and direct current are redundant, improved reliability, simultaneously simple and practical, cost is low, makes things convenient for dilatation.
Description of drawings
Fig. 1 is the structural representation of core data center feed system;
Fig. 2 is the design frame chart of red frame of broken lines part in the accompanying drawing 1.
Embodiment
Explanation at length below with reference to Figure of description method of the present invention being done.
With reference to the accompanying drawings, content of the present invention with instantiation its implementation and the course of work is described.
As shown in Figure 1, electric power system comprises A and B duplex feeding, and the A road supplies power from electrical network A power taking, converts three-phase electricity into by transformer, offers terminal equipment AC-DC power supply master ac input end after the AC distribution part converts three-phase electricity into single-phase alternating current.The power supply of B road is from electrical network B power taking; Convert three-phase electricity into after automatic change-over output by transformer; Diesel engine generator is supplied power in support and is connected with automatic change-over; The output three-phase electricity passes to UPS through AC distribution, and battery is that UPS provides the reserve power supply, and UPS output offers terminal equipment AC-DC power supply backup ac input end after AC distribution converts single-phase alternating current into.Terminal equipment AC-DC power supply is the input of double cross stream, supports the power module (seeing accompanying drawing 2 in detail) of output-parallel.
During operate as normal, the A road provides electric power as primary input, and the B road is in the Hot Spare state as the backup input.If electrical network A breaks down, terminal equipment AC-DC power supply switches to backup and exchanges input service, and B provides electric power by electrical network.If it is normal that electrical network A recovers, terminal equipment AC-DC power supply automaticallyes switch back to lead and exchanges input service, has electrical network A that electric power is provided.If between electrical network A age at failure; Electrical network B also breaks down, and automatic change-over can automatically switch to by the diesel engine generator power supply, but because the diesel engine generator startup needs a period of time (about 10 minutes); This moment, battery was that UPS provides the energy, and UPS is that terminal equipment provides electric power.After diesel engine generator starts, be that UPS provides the energy just by diesel engine generator, UPS is that terminal equipment provides electric power.Simultaneously terminal equipment AC-DC power supply is except that the input of double cross stream, the direct current output-parallel, and the N+1 Redundancy Design, when a power supply broke down therein, assurance equipment normally moved.Through multiple duplication Redundancy Design as above, guaranteed the stable reliably and with long-term operation of core data center feed system.
Accompanying drawing 2 is the interior partial detailed designs block diagram of frame of broken lines in the accompanying drawing 1, i.e. terminal equipment AC-DC power unit detailed design block diagram.Every AC-DC power supply inside comprises two AC-DC power supplys, and these two power supply inputs connect different alternating currents respectively, and output-parallel is redundant, uses as two alternating current input power supplyings.Two-way exchanges and is input as active and standby design, and main road exchanges just often, main road work, and another road Hot Spare, when main road was unusual, the work of backup road realized seamless switching.
Power supply AC-DC (A) comprises two power supply AC-DC (A-1) and AC-DC (A-2), and two power supplys exchange and are input as active and standby design, and AC-DC (A-1) is a main power source, and input is connected with single phase alternating current (A.C.) A, and AC-DC (A-2) is a backup battery, and input is connected with single phase alternating current (A.C.) B.Two power supply output-parallels use as a power supply AC-DC (A).The same AC-DC of power supply AC-DC (B) design configurations (A).Relatively control unit exchanges single phase alternating current (A.C.) A and backs up the state that exchanges single phase alternating current (A.C.) B and control the work of each power supply, the active and standby switching of item through detecting main road.Power supply AC-DC (A) and power supply AC-DC (B) output-parallel are realized power supply N+1 Redundancy Design.
Single phase alternating current (A.C.) A just often compares control unit and receives detection signal, controls AC-DC (A-1) and AC-DC (B-1) work then, turn-offs AC-DC (A-2) and AC-DC (B-3), and single phase alternating current (A.C.) B is in heat and is equipped with state.When single phase alternating current (A.C.) A broke down, relatively control unit was received detection signal, controlled AC-DC (A-2) and AC-DC (B-3) work then, realized uninterrupted power supply.After single phase alternating current (A.C.) A recovered normally, relatively control unit can turn-off AC-DC (A-2) and AC-DC (B-3), and control AC-DC (A-1) and AC-DC (B-1) resume work.Adopt the mode of power supply combination, realize that input of double cross stream and direct current are redundant, improved reliability, simultaneously simple and practical, cost is low, makes things convenient for dilatation
Except that the described technical characterictic of specification, be the known technology of those skilled in the art.

Claims (1)

1.一种核心数据中心供电的设计方法,其特征在于在核心数据中心,从电网到终端设备的供电采用全冗余方式,保证设备不间断运行;终端设备中AC-DC电源采用双交流输入电源,实现设备交流冗余;终端设备中AC-DC电源采用支持并联均流的电源模块,实现电源模块直流输出冗余;终端设备中AC-DC电源,采用两台电源并联组合为一台电源的方式实现交流冗余,组合后的电源并联实现直流输出冗余,具体设计步骤如下: 1. A design method for power supply of a core data center, characterized in that in the core data center, the power supply from the power grid to the terminal equipment adopts a fully redundant mode to ensure uninterrupted operation of the equipment; the AC-DC power supply in the terminal equipment adopts dual AC input The power supply realizes the AC redundancy of the equipment; the AC-DC power supply in the terminal equipment adopts a power module that supports parallel current sharing to realize the DC output redundancy of the power module; the AC-DC power supply in the terminal equipment uses two power supplies connected in parallel to form a power supply The AC redundancy is realized by means of the combined power supply, and the DC output redundancy is realized by connecting the combined power supplies in parallel. The specific design steps are as follows: 供电系统包括A和B两路供电,A路供电从电网A取电,由变压器转换为三相电,交流配电部分将三相电转换为单相交流电后提供给终端设备AC-DC电源主交流输入端,B路供电从电网B取电,由变压器转换为三相电后经自动转换开关输出,柴油发电机作为后备供电与自动转换开关连接,输出三相电经交流配电传递给UPS,电池为UPS提供后备供电,UPS输出经交流配电转换为单相交流电后提供给终端设备AC-DC电源备份交流输入端,终端设备AC-DC电源为双交流输入,支持输出并联的电源模块; The power supply system includes A and B two-way power supply. The A-way power supply takes power from the grid A and is converted into three-phase power by the transformer. The AC power distribution part converts the three-phase power into single-phase AC power and supplies it to the terminal equipment AC-DC power supply master At the AC input terminal, the B-circuit power supply takes power from the power grid B, which is converted into three-phase power by the transformer and then output through the automatic transfer switch. The diesel generator is connected to the automatic transfer switch as a backup power supply, and the output three-phase power is transmitted to the UPS through AC power distribution. , the battery provides backup power for the UPS, and the UPS output is converted into a single-phase AC power by AC power distribution and then provided to the terminal equipment AC-DC power backup AC input terminal, the terminal equipment AC-DC power supply is dual AC input, and supports parallel output power modules ; 正常工作时,A路作为主输入提供电力,B路作为备份输入处于热备份状态,如果电网A出现故障,终端设备AC-DC电源切换到备份交流输入工作,由电网B提供电力,如果电网A恢复正常,终端设备AC-DC电源自动切换回主交流输入工作,有电网A提供电力,如果在电网A故障期间,电网B也出现故障,自动转换开关会自动切换到由柴油发电机供电,但是由于柴油发电机启动需要约10分钟的延迟,此时电池为UPS提供能源,UPS为终端设备提供电力,当柴油发电机启动后,就由柴油发电机为UPS提供能源,UPS为终端设备提供电力,同时终端设备AC-DC电源除双交流输入外,直流输出并联,N+1冗余设计,在其中一台电源出现故障时,保证设备正常运行,通过多重备份冗余设计,保证核心数据中心供电系统长期可靠稳定的运行。 During normal operation, circuit A is used as the main input to provide power, and circuit B is used as the backup input in the hot backup state. If the grid A fails, the AC-DC power supply of the terminal equipment will switch to the backup AC input to work, and the grid B will provide power. If the grid A When it returns to normal, the AC-DC power supply of the terminal equipment will automatically switch back to the main AC input, and power grid A will provide power. If grid B also fails during grid A failure, the automatic transfer switch will automatically switch to diesel generator power supply, but Since the diesel generator needs a delay of about 10 minutes to start, the battery provides energy for the UPS at this time, and the UPS provides power for the terminal equipment. When the diesel generator starts, the diesel generator provides energy for the UPS, and the UPS provides power for the terminal equipment At the same time, in addition to the dual AC input, the AC-DC power supply of the terminal equipment is connected in parallel with the DC output. The N+1 redundancy design ensures the normal operation of the equipment when one of the power supplies fails. The multiple backup redundancy design ensures that the core data center The long-term reliable and stable operation of the power supply system.
CN201210149225.4A 2012-05-15 2012-05-15 Design method for supplying power to core data center Active CN102710009B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210149225.4A CN102710009B (en) 2012-05-15 2012-05-15 Design method for supplying power to core data center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210149225.4A CN102710009B (en) 2012-05-15 2012-05-15 Design method for supplying power to core data center

Publications (2)

Publication Number Publication Date
CN102710009A true CN102710009A (en) 2012-10-03
CN102710009B CN102710009B (en) 2015-05-06

Family

ID=46902622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210149225.4A Active CN102710009B (en) 2012-05-15 2012-05-15 Design method for supplying power to core data center

Country Status (1)

Country Link
CN (1) CN102710009B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103023131A (en) * 2012-11-14 2013-04-03 北京百度网讯科技有限公司 Direct-current power supply system of data center
CN103117591A (en) * 2013-01-29 2013-05-22 浪潮电子信息产业股份有限公司 A data center power supply system
CN104242428A (en) * 2013-06-07 2014-12-24 中兴通讯股份有限公司 Power supply method for information communication technology equipment and device thereof
CN104393666A (en) * 2014-11-26 2015-03-04 中国联合网络通信集团有限公司 Power supply system for data center
CN104682552A (en) * 2015-03-13 2015-06-03 北京百度网讯科技有限公司 System and method for supplying power to data center
CN106953370A (en) * 2017-04-11 2017-07-14 许继电气股份有限公司 A power supply system for electronic equipment in a power system
CN107800133A (en) * 2017-11-28 2018-03-13 郑州云海信息技术有限公司 A kind of data center's method of supplying power to and structure
CN109656347A (en) * 2018-12-12 2019-04-19 浪潮(北京)电子信息产业有限公司 Method, apparatus, equipment and the storage medium of server system power management
CN110944430A (en) * 2019-07-02 2020-03-31 台达电子企业管理(上海)有限公司 Power supply circuit
CN111641258A (en) * 2020-06-11 2020-09-08 深圳爱易瑞科技有限公司 Power supply for 5G communication base station

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5881215A (en) * 1996-12-13 1999-03-09 Lsi Logic Corporation Apparatus and methods for providing robust powering
US20080030078A1 (en) * 2006-06-01 2008-02-07 Exaflop Llc Data Center Uninterruptible Power Distribution Architecture
CN101707389A (en) * 2009-11-17 2010-05-12 北京唐智科技发展有限公司 Redundant fault-tolerant system and fault-tolerant regulating and controlling method of UPS power supply system in IDC machine room
CN101895146A (en) * 2010-07-30 2010-11-24 浪潮电子信息产业股份有限公司 Method for realizing redundancy of alternating current power supply
CN201766404U (en) * 2010-08-23 2011-03-16 上海市电力公司超高压输变电公司 A kind of DC power supply instead of UPS power supply
CN102104263A (en) * 2009-12-17 2011-06-22 台达电子工业股份有限公司 High-voltage direct-current uninterruptible power supply system with multiple input power supplies

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5881215A (en) * 1996-12-13 1999-03-09 Lsi Logic Corporation Apparatus and methods for providing robust powering
US20080030078A1 (en) * 2006-06-01 2008-02-07 Exaflop Llc Data Center Uninterruptible Power Distribution Architecture
CN101707389A (en) * 2009-11-17 2010-05-12 北京唐智科技发展有限公司 Redundant fault-tolerant system and fault-tolerant regulating and controlling method of UPS power supply system in IDC machine room
CN102104263A (en) * 2009-12-17 2011-06-22 台达电子工业股份有限公司 High-voltage direct-current uninterruptible power supply system with multiple input power supplies
CN101895146A (en) * 2010-07-30 2010-11-24 浪潮电子信息产业股份有限公司 Method for realizing redundancy of alternating current power supply
CN201766404U (en) * 2010-08-23 2011-03-16 上海市电力公司超高压输变电公司 A kind of DC power supply instead of UPS power supply

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
丁豪: "数据中心高可靠性供电方案研究", 《土木建筑学术文库》 *
王其英: "UPS冗余并联与双总线连接供电方案(二)", 《电源技术应用》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103023131A (en) * 2012-11-14 2013-04-03 北京百度网讯科技有限公司 Direct-current power supply system of data center
CN103023131B (en) * 2012-11-14 2016-04-20 北京百度网讯科技有限公司 A kind of data center DC power-supply system
CN103117591A (en) * 2013-01-29 2013-05-22 浪潮电子信息产业股份有限公司 A data center power supply system
CN104242428B (en) * 2013-06-07 2018-08-10 南京中兴软件有限责任公司 A kind of method of supplying power to and device for Information Technology Equipment
CN104242428A (en) * 2013-06-07 2014-12-24 中兴通讯股份有限公司 Power supply method for information communication technology equipment and device thereof
CN104393666A (en) * 2014-11-26 2015-03-04 中国联合网络通信集团有限公司 Power supply system for data center
CN104682552B (en) * 2015-03-13 2018-10-16 北京百度网讯科技有限公司 System and method for powering for data center
CN104682552A (en) * 2015-03-13 2015-06-03 北京百度网讯科技有限公司 System and method for supplying power to data center
CN106953370A (en) * 2017-04-11 2017-07-14 许继电气股份有限公司 A power supply system for electronic equipment in a power system
CN107800133A (en) * 2017-11-28 2018-03-13 郑州云海信息技术有限公司 A kind of data center's method of supplying power to and structure
CN109656347A (en) * 2018-12-12 2019-04-19 浪潮(北京)电子信息产业有限公司 Method, apparatus, equipment and the storage medium of server system power management
CN110944430A (en) * 2019-07-02 2020-03-31 台达电子企业管理(上海)有限公司 Power supply circuit
CN110944430B (en) * 2019-07-02 2021-09-17 台达电子企业管理(上海)有限公司 Power supply circuit
CN111641258A (en) * 2020-06-11 2020-09-08 深圳爱易瑞科技有限公司 Power supply for 5G communication base station
CN111641258B (en) * 2020-06-11 2021-05-25 湖南大井电源技术有限公司 Power supply for 5G communication base station

Also Published As

Publication number Publication date
CN102710009B (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN102710009A (en) Design method for supplying power to core data center
CN103023131B (en) A kind of data center DC power-supply system
TW200849770A (en) Backup power system
CN105515167A (en) Uninterruptible power supply UPS device and power supply method thereof
CN102790418A (en) Modular UPS and multi-charger parallel logic control method
CN202424295U (en) Inverter power supply and power supply system applying same
CN104901410A (en) UPS circuit
KR20160107302A (en) Energy storage system and method for increasing the efficiency of an energy storage system
CN103296738A (en) Dual standby saving type direct current power supply system
CN202513656U (en) Modularized UPS system connected in parallel
CN102738887B (en) System for intelligently allocating power supply from renewable energy power and grid power
CN203674797U (en) Station power microgrid main wiring system
CN101710728A (en) Method and device for supplying power to chassis equipment of communication machine room
CN105305493B (en) A kind of light for interconnected operation stores up independent micro-capacitance sensor topology
TW201407332A (en) Uninterruptible power system and method of operating the same
CN103840548B (en) A kind of transformer substation system with micro-grid system
CN103683462A (en) Server cabinet
CN203301212U (en) Dual standby saving type DC power supply system
CN104967211B (en) A kind of electric car electric charging station emergency power supply system and method
CN118249432A (en) Energy storage black start system and balancing method for active and passive balancing between clusters
CN103208854A (en) Multi-energy multi-mode uninterruptible power supply (UPS) based on controller area network (CAN) bus
CN203205969U (en) Multi-energy and multi-mode uninterruptible power supply based on CAN bus
CN216959346U (en) Alternating current-direct current microgrid router system for comprehensive energy station
CN216625311U (en) Distributed wind and light energy storage management system
CN112186877B (en) Energy storage online seamless switching power supply device based on emergency power supply vehicle and control method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180813

Address after: 250101 S06 tower, 1036, Chao Lu Road, hi tech Zone, Ji'nan, Shandong.

Patentee after: SHANDONG LANGCHAO YUNTOU INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 250014 1036 Shun Ya Road, hi tech Zone, Ji'nan, Shandong.

Patentee before: INSPUR ELECTRONIC INFORMATION INDUSTRY Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 250100 No. 1036 Tidal Road, Jinan High-tech Zone, Shandong Province, S01 Building, Tidal Science Park

Patentee after: Inspur cloud Information Technology Co.,Ltd.

Address before: 250101 S06 tower, 1036, Chao Lu Road, hi tech Zone, Ji'nan, Shandong.

Patentee before: SHANDONG LANGCHAO YUNTOU INFORMATION TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221114

Address after: Room 1602, Floor 16, High tech Zone Management Committee Building, No. 177, Gaoxin 6th Road, Rizhao, Shandong 276800

Patentee after: Rizhao Inspur Cloud Computing Co.,Ltd.

Address before: 250100 No. 1036 Tidal Road, Jinan High-tech Zone, Shandong Province, S01 Building, Tidal Science Park

Patentee before: Inspur cloud Information Technology Co.,Ltd.