CN102704690B - Tensioning tool for inhaul cable connection piece of cable-net curtain wall - Google Patents
Tensioning tool for inhaul cable connection piece of cable-net curtain wall Download PDFInfo
- Publication number
- CN102704690B CN102704690B CN201210174290.2A CN201210174290A CN102704690B CN 102704690 B CN102704690 B CN 102704690B CN 201210174290 A CN201210174290 A CN 201210174290A CN 102704690 B CN102704690 B CN 102704690B
- Authority
- CN
- China
- Prior art keywords
- steel
- hoop
- jack
- steel loop
- perforation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Curtains And Furnishings For Windows Or Doors (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开一种索网幕墙拉索连接件的张拉工装,包括两根需连接的拉索及其连接端部,还包括两个压制套,一连接扣,两个钢环箍,两根牵引钢绞线,两根固定螺杆及复数螺母,两个千斤顶,所述拉索的连接端部分别套设于所述压制套内部且与压制套互相紧固,所述连接扣设于两根拉索的连接端部之间,在压制套远离拉索连接端部的另一端分别装设有上述钢环箍,且拉索分别穿设于钢环箍内,每个钢环箍穿设拉索处的两边分别穿设有所述牵引钢绞线及所述固定螺杆,每根牵引钢绞线一端与其中一钢环箍互相固定,另一端则穿设所述千斤顶,固定螺杆配合所述螺母作张拉时的临时固定。
The invention discloses a tensioning tool for cable-net curtain wall cable connectors, which includes two cables to be connected and their connecting ends, and also includes two pressing sleeves, a connecting buckle, two steel hoops, two Traction steel strands, two fixed screws and multiple nuts, two jacks, the connecting ends of the cables are respectively sleeved inside the pressing sleeves and are fastened to each other with the pressing sleeves, the connecting buckles are set on two Between the connection ends of the cables, the above-mentioned steel hoops are respectively installed at the other end of the pressing sleeve away from the connection ends of the cables, and the cables are respectively threaded in the steel hoops, and each steel hoop is threaded through a pull The two sides of the rope are respectively threaded with the traction steel strand and the fixed screw, one end of each traction steel strand is fixed to one of the steel hoops, the other end is threaded with the jack, and the fixed screw cooperates with the Temporary fixation when the nut is tensioned.
Description
技术领域 technical field
本发明涉及一种张拉工装,特别地,涉及一种用于复杂空间三向曲面幕墙的拉索连接件的张拉工装。The invention relates to a tensioning tool, in particular to a tensioning tool for a cable connector of a three-way curved curtain wall in a complex space.
背景技术 Background technique
在工程中,经常需要对空间不规则曲面的拉索接头位置进行连接,特别是对于这种复杂空间三向曲面幕墙中,无支撑点、无固定端,且拉索接头悬置在空中的情况,对拉索连接造成很大的困扰,需要解决一系列技术问题,有必要提出一种新的索网幕墙拉索连接件结构及相应的张拉工装。In engineering, it is often necessary to connect the position of the cable joints on the space irregular curved surface, especially for the complex space three-way curved curtain wall, there is no support point, no fixed end, and the cable joints are suspended in the air , causing great trouble to the cable connection, a series of technical problems need to be solved, it is necessary to propose a new structure of the cable mesh curtain wall cable connector and the corresponding tensioning tooling.
发明内容 Contents of the invention
本发明的主要目的是提供一种用于索网幕墙拉索连接件的张拉工装。The main purpose of the present invention is to provide a tensioning tool for the cable connector of the cable net curtain wall.
本发明的索网幕墙拉索连接件的张拉工装,包括两根需连接的拉索及其连接端部,还包括两个压制套,一连接扣,两个钢环箍,两根牵引钢绞线,两个千斤顶,其中The tensioning tool of the cable net curtain wall cable connector of the present invention includes two cables to be connected and their connecting ends, and also includes two pressing sleeves, a connecting buckle, two steel hoops, and two traction steel stranded wire, two jacks, of which
所述拉索的连接端部分别套设于所述压制套内部且与压制套互相紧固,压制套包括用于互相连接的第一端和远离第一端的第二端,所述连接扣设于所述两个压制套的第一端之间,在压制套的第二端分别装设有上述钢环箍,且第二端紧抵上述钢环箍,上述拉索分别穿设于钢环箍内,每个钢环箍穿设拉索处的两边分别穿设有所述牵引钢绞线,每根牵引钢绞线一端与其中一钢环箍互相固定,另一端则穿设与另一钢环箍紧抵的所述千斤顶。The connecting ends of the pull cables are respectively sleeved inside the pressing sleeve and are fastened to each other with the pressing sleeve. The pressing sleeve includes a first end for mutual connection and a second end away from the first end. The connecting buckle Located between the first ends of the two pressing sleeves, the above-mentioned steel hoops are respectively installed on the second ends of the pressing sleeves, and the second ends are pressed against the above-mentioned steel hoops, and the above-mentioned pull cables are respectively installed on the steel hoops. In the hoops, the two sides of each steel hoop are threaded with the traction steel strands respectively. One end of each traction steel strand is fixed to one of the steel hoops, and the other end is threaded to the other. A steel hoop abuts against said jack.
较佳地,所述每个钢环箍穿设拉索处的两边进一步各穿设有一固定螺杆,千斤顶每完成一次张拉行程,即由所述固定螺杆配合相应螺母进行临时固定直至最终实现连接。Preferably, each steel hoop is further pierced with a fixing screw on both sides of the place where the cable is passed through. Every time the jack completes a tensioning stroke, the fixing screw cooperates with the corresponding nut for temporary fixation until the connection is finally realized. .
钢环箍的一种结构为包括一箍索竖板,一卡箍侧封板,及一活动侧封板,其中箍索竖板包括两块平行且在顶部相连接的竖钢板,其顶部通过一顶面钢板相连,两块竖钢板的底部为自由端,两块竖钢板的间隔为大于不锈钢拉索的直径,在两块竖钢板的一侧面设有一侧封板,该侧封板从侧面连接所述两块竖钢板,且该侧封板分别设有呈上下设置第一穿孔及第二穿孔,卡箍侧封板为一块与上述箍索竖板中竖钢板高度相同的钢板,其上下端部分别设有两块平行底板,卡箍侧封板的钢板中间设有一缺口,其宽度大于不锈钢拉索的直径,在该缺口的两边各分设有呈上下设置的一对第三穿孔及第四穿孔,所述的活动侧封板上设有第五穿孔及第六穿孔。A structure of the steel hoop includes a hoop riser, a hoop side seal, and a movable side seal, wherein the hoop riser includes two parallel vertical steel plates connected at the top, and the top passes through A top steel plate is connected, the bottom of the two vertical steel plates is a free end, the distance between the two vertical steel plates is greater than the diameter of the stainless steel cable, a side sealing plate is provided on one side of the two vertical steel plates, and the side sealing plate is connected from the side The two vertical steel plates are connected, and the side sealing plates are respectively provided with a first perforation and a second perforation arranged up and down, and the clamp side sealing plate is a steel plate with the same height as the vertical steel plate in the above-mentioned hoop vertical plate. There are two parallel bottom plates at the ends, and a gap is set in the middle of the steel plate of the clamp side sealing plate, the width of which is larger than the diameter of the stainless steel cable, and a pair of third perforations and a third hole set up and down are respectively arranged on both sides of the gap. Four perforations, the fifth and sixth perforations are arranged on the movable side sealing plate.
较佳地,两个千斤顶设置于同一端钢环箍上,通过计算机平台操作控制,两个千斤顶同步张拉。Preferably, the two jacks are set on the steel hoop at the same end, controlled by the computer platform, and the two jacks are tensioned synchronously.
较佳地,千斤顶每完成一次张拉行程,即由所述固定螺杆配合相应螺母进行临时固定直至最终实现连接。Preferably, each time the jack completes a stretching stroke, the fixing screw rod cooperates with the corresponding nut for temporary fixing until the connection is finally realized.
较佳地,连接扣为一设有内螺纹的螺杆,压制套套设拉索连接端部的一端设有对应的外螺纹。Preferably, the connecting buckle is a screw rod provided with an internal thread, and one end of the pressing sleeve sleeved on the connecting end of the cable is provided with a corresponding external thread.
较佳地,千斤顶前端设有一撑腿抵紧钢环箍。Preferably, a support leg is provided at the front end of the jack against the steel hoop.
较佳地,钢环箍材质为Q345B,板厚20mm。Preferably, the material of the steel hoop is Q345B, and the plate thickness is 20mm.
较佳地,千斤顶采用YCQ20型前卡千斤顶,最大张拉力221KN,张拉行程150mm。Preferably, the jack adopts a YCQ20 type front clamping jack with a maximum tension force of 221KN and a tension stroke of 150mm.
较佳地,牵引钢绞线3采用Φ18预应力钢绞线。Preferably, the traction steel strand 3 adopts Φ18 prestressed steel strand.
本发明的有益效果是:能保证这种空间不规则曲面的拉索接头位置在无支撑点、无固定端,且拉索接头悬置在空中的连接件实现顺利对接,并张拉成形后拉索幕墙的整体形状符合设计要求,确保施工质量。The beneficial effect of the present invention is: it can ensure that the position of the cable joint on the space irregular curved surface has no support point and no fixed end, and the connecting parts suspended in the air by the cable joint can realize smooth butt joint, and pull it after stretching and forming. The overall shape of the cable curtain wall meets the design requirements to ensure the construction quality.
附图说明 Description of drawings
图1为本发明一实施例的索网幕墙拉索连接件的张拉工装示意图。Fig. 1 is a schematic diagram of a tensioning tool for a cable-net curtain wall cable connector according to an embodiment of the present invention.
图2为本发明钢环箍结构的组装示意图;Fig. 2 is the assembly schematic diagram of steel hoop structure of the present invention;
图3为本发明钢环箍的箍索竖板结构示意图;Fig. 3 is the hoop cable riser structure schematic diagram of steel hoop of the present invention;
图4为本发明钢环箍的卡箍侧封板结构示意图;Fig. 4 is the structural schematic diagram of the clamp side sealing plate of the steel hoop of the present invention;
图5为本发明钢环箍的活动侧封板结构示意图。Fig. 5 is a structural schematic diagram of the movable side sealing plate of the steel hoop of the present invention.
具体实施方式Detailed ways
以下参照附图详细描述本发明索网幕墙拉索连接件张拉工装的结构。The structure of the tensioning tool of the cable net curtain wall cable connector of the present invention will be described in detail below with reference to the accompanying drawings.
参阅图1所示,该拉索连接件张拉工装包括两个钢环箍1,两个千斤顶2,两根牵引钢绞线3,两根临时固定螺杆5及与之相配合的两个螺帽6,两个压制套7,一连接扣8,两根不锈钢拉索9,填充浇锌部10。Referring to Fig. 1, the cable connector tensioning tooling includes two steel hoops 1, two jacks 2, two traction steel strands 3, two temporary fixing screws 5 and two matching screws. Cap 6, two pressing sleeves 7, a connecting buckle 8, two stainless steel cables 9, filling the galvanized part 10.
两根不锈钢拉索9的连接端部各套覆一压制套7,压制套7包括用于互相连接的第一端和远离第一端的第二端,所述连接扣8设于所述两个压制套7的第一端之间,在连接时分别与设于不锈钢拉索9的连接端部之间的连接扣8相连,下面以一根不锈钢拉索9的端部结构作说明,压制套7设于且包覆不锈钢拉索9的端部,即不锈钢拉索9的端部套设于压制套7内部,压制套7沿不锈钢拉索9远离端部方向延伸其内径逐渐减小至与不锈钢拉索9的直径相应。在压制套7包覆不锈钢拉索9的部分,压制套7与不锈钢拉索9之间存在间隙,为进一步固定不锈钢拉索9,在此间隙部分浇锌填充形成所述的浇锌部10,这样压制套7便良好地紧固不锈钢拉索9的端部。The connecting ends of the two stainless steel cables 9 are respectively covered with a pressing sleeve 7, and the pressing sleeve 7 includes a first end for mutual connection and a second end away from the first end, and the connecting buckle 8 is located on the two ends. Between the first ends of the two pressing sleeves 7, they are respectively connected to the connection buckles 8 provided between the connecting ends of the stainless steel cables 9 when connecting. The end structure of a stainless steel cable 9 is used for illustration below. The sleeve 7 is located on and covers the end of the stainless steel cable 9, that is, the end of the stainless steel cable 9 is sleeved inside the pressing sleeve 7, and the inner diameter of the pressing sleeve 7 is gradually reduced to Corresponding to the diameter of stainless steel stay cable 9. In the part where the pressing sleeve 7 covers the stainless steel cable 9, there is a gap between the pressing sleeve 7 and the stainless steel cable 9. In order to further fix the stainless steel cable 9, the gap is filled with zinc to form the zinc pouring part 10. The pressing sleeve 7 just fastens the end of the stainless steel cable 9 well like this.
配合图2~5所示,在压制套7的第二端装设有上述钢环箍1,不锈钢拉索9穿设于钢环箍1中,钢环箍1包括箍索竖板1-1,卡箍侧封板1-2,及活动侧封板1-3,其中箍索竖板1-1包括两块平行且在顶部相连接的竖钢板10,其顶部通过一顶面钢板11相连,两块竖钢板10的底部为自由端,以便不锈钢拉索9的穿设,两块竖钢板10的间隔为略大于不锈钢拉索9的直径,在两块竖钢板10的一侧面设有一侧封板12,该侧封板12从侧面连接所述两块竖钢板10,且该侧封板12分别设有呈上下设置第一穿孔13及第二穿孔14。卡箍侧封板1-2为一块与上述箍索竖板1-1中竖钢板10的高度相同的钢板20,钢板20上下端部分别设有两块平行底板22,钢板20中间设有一缺口21,其宽度略大于不锈钢拉索9的直径,在该缺口21的两边各分设有呈上下设置的一对第三穿孔23及第四穿孔24,所述的活动侧封板1-3为一钢板30,其上设有第五穿孔32及第六穿孔33。As shown in Figures 2-5, the above-mentioned steel hoop 1 is installed on the second end of the pressing sleeve 7, and the stainless steel cable 9 is passed through the steel hoop 1, and the steel hoop 1 includes a hoop riser 1-1 , the hoop side seal plate 1-2, and the movable side seal plate 1-3, wherein the hoop vertical plate 1-1 includes two parallel vertical steel plates 10 connected at the top, and the top is connected by a top steel plate 11 , the bottoms of the two vertical steel plates 10 are free ends for the penetration of the stainless steel cables 9, the interval between the two vertical steel plates 10 is slightly larger than the diameter of the stainless steel cable 9, and one side of the two vertical steel plates 10 is provided with a side A sealing plate 12, the side sealing plate 12 is connected to the two vertical steel plates 10 from the side, and the side sealing plate 12 is respectively provided with a first perforation 13 and a second perforation 14 arranged up and down. The hoop side sealing plate 1-2 is a steel plate 20 with the same height as the vertical steel plate 10 in the above-mentioned hoop vertical plate 1-1. 21. Its width is slightly larger than the diameter of the stainless steel cable 9. A pair of third perforations 23 and a fourth perforation 24 arranged up and down are respectively arranged on both sides of the gap 21. The movable side sealing plate 1-3 is a The steel plate 30 is provided with a fifth through hole 32 and a sixth through hole 33 .
安装时先把箍索竖板1-1拆入不锈钢拉索9,即不锈钢拉索9相对箍索竖板1-1从底部进入穿设于两块竖钢板10之间,其中箍索竖板1-1未安装侧封板12的一侧靠近压制套7的一端部,再把卡箍侧封板1-2从箍索竖板1-1侧面卡入箍索竖板1-1与压制套7之间,即不锈钢拉索9相对钢板20从侧面进入钢板20的缺口21,一平行底板22与箍索竖板1-1的顶面钢板11贴合,另一平行底板22与两块竖钢板底部自由端相贴合。When installing, first remove the hoop vertical plate 1-1 into the stainless steel cable 9, that is, the stainless steel cable 9 enters from the bottom relative to the hoop vertical plate 1-1 and penetrates between two vertical steel plates 10, wherein the hoop vertical plate 1-1 The side where the side sealing plate 12 is not installed is close to one end of the pressing sleeve 7, and then the clamp side sealing plate 1-2 is clamped into the hoop vertical plate 1-1 from the side of the hoop vertical plate 1-1 and pressed Between the sleeves 7, that is, the stainless steel cable 9 enters the gap 21 of the steel plate 20 from the side relative to the steel plate 20, and a parallel bottom plate 22 fits with the top steel plate 11 of the hoop vertical plate 1-1, and the other parallel bottom plate 22 and the two The free ends at the bottom of the vertical steel plates are fitted together.
钢板20的缺口21一侧的第三穿孔23及第四穿孔24与箍索竖板1-1的侧封板12上的第一穿孔13及第二穿孔14呈直线对应,即第三穿孔23与第一穿孔13大致处于一条直线上,第四穿孔24与第二穿孔14大致处于一条直线上。The third perforation 23 and the fourth perforation 24 on the side of the notch 21 of the steel plate 20 correspond to the first perforation 13 and the second perforation 14 on the side sealing plate 12 of the hoop riser 1-1 in a straight line, that is, the third perforation 23 The first through hole 13 is substantially on a straight line, and the fourth through hole 24 is substantially on a straight line with the second through hole 14 .
对需要连接的另一条不锈钢拉索9也作如上设置,即套设压制套7,安装钢环箍1的箍索竖板1-1及卡箍侧封板1-2。两条需连接的不锈钢拉索9之间设有一连接扣8,在对接成功时予以固定。Another stainless steel cable 9 that needs to be connected is also set as above, that is, the pressing sleeve 7 is sleeved, and the hoop vertical plate 1-1 and the hoop side sealing plate 1-2 of the steel hoop 1 are installed. A connection buckle 8 is arranged between the two stainless steel cables 9 to be connected, and is fixed when the docking is successful.
然后将牵引钢绞线3分别穿入两个相对的钢环箍1的第一穿孔13及第三穿孔23,牵引钢绞线3的一端与其中一钢环箍1相对固定,另一端穿设一千斤顶2,抵紧于该端钢环箍1上。Then the traction steel strand 3 is respectively penetrated into the first perforation 13 and the third perforation 23 of two opposite steel hoops 1, one end of the traction steel strand 3 is relatively fixed with one of the steel hoops 1, and the other end is passed through A jack 2 is pressed against the steel hoop 1 at this end.
一固定螺杆5分别穿入两个相对的钢环箍1的第二穿孔14及第四穿孔24,配合一螺母6与两个钢环箍1之间进行临时固定。A fixing screw 5 penetrates into the second through hole 14 and the fourth through hole 24 of the two opposite steel hoops 1 respectively, cooperates with a nut 6 to temporarily fix between the two steel hoops 1 .
然后安装活动侧封板1-3于钢环箍1相对于卡箍侧封板1-2的相对侧面上,即与上述侧封板12位于同一面上,卡箍侧封板1-2上钢板20的缺口21另一侧的第三穿孔23与第四穿孔24与活动侧封板上的第五穿孔32及第六穿孔33呈直线对应,即装设好活动侧封板1-3后,第三穿孔23与第五穿孔32大致在一条直线上,第四穿孔24与第六穿孔33大致在一条直线上。Then install the movable side sealing plate 1-3 on the opposite side of the steel hoop 1 relative to the clamp side sealing plate 1-2, that is, on the same surface as the above-mentioned side sealing plate 12, on the clamp side sealing plate 1-2 The third perforation 23 and the fourth perforation 24 on the other side of the notch 21 of the steel plate 20 correspond to the fifth perforation 32 and the sixth perforation 33 on the movable side sealing plate in a straight line, that is, after installing the movable side sealing plate 1-3 , the third through hole 23 and the fifth through hole 32 are substantially on a straight line, and the fourth through hole 24 and the sixth through hole 33 are substantially on a straight line.
同上所述将另一牵引钢绞线3分别穿入两个相对的钢环箍1的第三穿孔23及第五穿孔32,牵引钢绞线3的一端与其中一钢环箍1相对固定,另一端穿设另一千斤顶2,抵紧于该端钢环箍1上。As above, another traction steel strand 3 is respectively inserted into the third perforation 23 and the fifth perforation 32 of two opposite steel hoops 1, and one end of the traction steel strand 3 is relatively fixed to one of the steel hoops 1, The other end is pierced with another jack 2, which is tight against the steel hoop 1 at this end.
另一固定螺杆5分别穿入两个相对的钢环箍1的第四穿孔24及第六穿孔33,配合一螺母6与两个钢环箍1之间进行临时固定。Another fixing screw 5 penetrates into the fourth through hole 24 and the sixth through hole 33 of the two opposite steel hoops 1 respectively, and cooperates with a nut 6 to temporarily fix between the two steel hoops 1 .
这样,即钢环箍1穿设不锈钢拉索9处的两边分别穿设牵引钢绞线3及固定螺杆5,并于牵引钢绞线3上穿设有两个千斤顶抵紧该端钢环箍1。In this way, the steel hoop 1 is threaded with a traction steel strand 3 and a fixed screw 5 on both sides of the stainless steel cable 9 respectively, and two jacks are provided on the traction steel strand 3 to press against the end steel hoop 1.
这样,当千斤顶2开始牵引行程时,抵紧于千斤顶2的钢环箍1在千斤顶2的牵引下,迫使相应端的压制套7靠近另一端压制套7,即两端的压制套7相互靠近,在两端压制套7中间设有所述连接扣8,当压制套7靠近至一定程度时,即分别与连接扣8连接上,实现不锈钢拉索9的连接。In this way, when the jack 2 starts to pull the stroke, the steel hoop 1 that is tight against the jack 2 is pulled by the jack 2 to force the pressing sleeve 7 at the corresponding end to be close to the pressing sleeve 7 at the other end, that is, the pressing sleeves 7 at both ends are close to each other. The connecting buckles 8 are arranged in the middle of the pressing sleeves 7 at both ends, and when the pressing sleeves 7 are close to a certain degree, they are respectively connected with the connecting buckles 8 to realize the connection of the stainless steel cables 9 .
从不锈钢拉索9的连接过程来看,只要钢环箍1穿设不锈钢拉索9的两边分别穿设牵引钢绞线3及固定螺杆5,不锈钢拉索9的两边各有千斤顶用于张拉即可,对于牵线纲绞线3及固定螺杆5的位置并不作限制,对于钢环箍1的结构也不作限制,以上只是本发明的一较佳实施例的安装方式。From the perspective of the connection process of the stainless steel cable 9, as long as the steel hoop 1 is passed through the two sides of the stainless steel cable 9, the traction steel strand 3 and the fixed screw 5 are respectively threaded, and the two sides of the stainless steel cable 9 are respectively provided with jacks for tensioning. That is, there is no restriction on the positions of the stranded wire 3 and the fixing screw 5, and no restriction on the structure of the steel hoop 1. The above is only the installation method of a preferred embodiment of the present invention.
较佳地,两个千斤顶2设置于同一端钢环箍1上,通过计算机平台操作控制,两个千斤顶2同步张拉。Preferably, the two jacks 2 are set on the steel hoop 1 at the same end, and the two jacks 2 are tensioned synchronously through the operation and control of the computer platform.
较佳地,千斤顶2每完成一次张拉行程,即由固定螺杆5配合螺帽6进行临时固定,以防压制套7回缩,直至最终实现连接。Preferably, each time the jack 2 completes a stretching stroke, it is temporarily fixed by the fixing screw 5 and the nut 6 to prevent the compression sleeve 7 from retracting until the connection is finally realized.
较佳地,连接扣8为一设有内螺纹的螺杆,压制套套设拉索连接端部的一端设有对应的外螺纹,当压制套7在千斤顶2的作用下,最终共同进入连接扣8,此时旋转连接扣8,与两边压制套7的内外螺纹配合而紧固。Preferably, the connecting buckle 8 is a screw rod provided with an internal thread, and one end of the connecting end of the cable is provided with a corresponding external thread when the pressing sleeve 7 is under the action of the jack 2, and finally enters the connecting buckle 8 together. , this moment, rotate the connecting buckle 8, cooperate with the internal and external threads of both sides pressing sleeve 7 and fasten.
较佳地,千斤顶2前端设有一撑腿4抵紧钢环箍1。Preferably, the front end of the jack 2 is provided with a support leg 4 against the steel hoop 1 .
较佳地,钢环箍1材质为Q345B,板厚20mm。Preferably, the material of the steel hoop 1 is Q345B, and the plate thickness is 20mm.
较佳地,千斤顶2采用YCQ20型前卡千斤顶,最大张拉力221KN,张拉行程150mm。Preferably, the jack 2 adopts a YCQ20 type front clamping jack with a maximum tension force of 221KN and a tension stroke of 150mm.
较佳地,牵引钢绞线3采用Φ18预应力钢绞线。Preferably, the traction steel strand 3 adopts Φ18 prestressed steel strand.
虽然本发明的索网幕墙拉索连接件张拉工装已参照当前的具体实例进行了描述,但是本技术领域的技术人员应该认识到,以上的实例仅是用来说明本发明,在没有脱离本发明精神的情况下还可作出各种等效的变化和修改都将落在本发明的权利要求书的范围内。Although the cable net curtain wall cable connector tensioning tool of the present invention has been described with reference to the current specific examples, those skilled in the art should recognize that the above examples are only used to illustrate the present invention, without departing from the present invention. Various equivalent changes and modifications can also be made under the spirit of the invention, all of which will fall within the scope of the claims of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210174290.2A CN102704690B (en) | 2012-05-30 | 2012-05-30 | Tensioning tool for inhaul cable connection piece of cable-net curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210174290.2A CN102704690B (en) | 2012-05-30 | 2012-05-30 | Tensioning tool for inhaul cable connection piece of cable-net curtain wall |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102704690A CN102704690A (en) | 2012-10-03 |
CN102704690B true CN102704690B (en) | 2014-10-15 |
Family
ID=46897719
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210174290.2A Expired - Fee Related CN102704690B (en) | 2012-05-30 | 2012-05-30 | Tensioning tool for inhaul cable connection piece of cable-net curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102704690B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103498589A (en) * | 2013-08-20 | 2014-01-08 | 青岛中天斯壮科技有限公司 | Striding type flexible pull rod hydraulic tensioning device |
CN109137763B (en) * | 2018-10-29 | 2023-12-01 | 招商局重庆交通科研设计院有限公司 | Cable cutting device and cable dismantling construction method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201679149U (en) * | 2010-01-21 | 2010-12-22 | 武汉二航路桥特种工程有限责任公司 | Device for middle connection and tension of steel stands |
CN102296829A (en) * | 2011-06-03 | 2011-12-28 | 中国建筑第八工程局有限公司 | Method for constructing three-dimensional cable net curtain wall and node connection member used in same |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10131493A (en) * | 1996-10-28 | 1998-05-19 | Tokyo Seiko Co Ltd | How to connect tendons |
-
2012
- 2012-05-30 CN CN201210174290.2A patent/CN102704690B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201679149U (en) * | 2010-01-21 | 2010-12-22 | 武汉二航路桥特种工程有限责任公司 | Device for middle connection and tension of steel stands |
CN102296829A (en) * | 2011-06-03 | 2011-12-28 | 中国建筑第八工程局有限公司 | Method for constructing three-dimensional cable net curtain wall and node connection member used in same |
Non-Patent Citations (2)
Title |
---|
东莞篮球中心大型双曲面单索玻璃幕墙施工技术;杨文军,万利民,嵇康东,蔡庆军,章亮;《施工技术》;20120131;第41卷(第357期);参见第21页左栏"3拉索加工及下料"部分内容,第22页左栏最后1行至第23页左栏第15行,图3、图6、图7 * |
杨文军,万利民,嵇康东,蔡庆军,章亮.东莞篮球中心大型双曲面单索玻璃幕墙施工技术.《施工技术》.2012,第41卷(第357期),参见第21页左栏"3拉索加工及下料"部分内容,第22页左栏最后1行至第23页左栏第15行,图3、图6、图7. |
Also Published As
Publication number | Publication date |
---|---|
CN102704690A (en) | 2012-10-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100757883B1 (en) | Twisted mesh fence | |
CN102704690B (en) | Tensioning tool for inhaul cable connection piece of cable-net curtain wall | |
CN206904368U (en) | A kind of rectangular air duct bilaterally earthquake-resisting support device | |
KR20120095763A (en) | The structure of the ceiling frame | |
CN106012834B (en) | A kind of spatial warping curve abnormal shape antisymmetry steel king-tower inner support and tensioning system | |
CN202215040U (en) | Telescopic adjustable temporary wire drawing device for transmission line pole/tower | |
CN108316633B (en) | Daylighting roof operation platform and construction method | |
CN204079226U (en) | A kind of movable beam string hanging apparatus that can increase rigidity when tubular truss lifts | |
CN203977869U (en) | A kind of falsework structure | |
KR101472980B1 (en) | Weight clamping type Gondola Hanger for Building facade maintenance | |
CN205248755U (en) | Self -adaptation cable mount | |
CN113279560B (en) | Scaffold board fixing clamp | |
CN205382605U (en) | Floor tectonic structure | |
CN206158162U (en) | High -efficient integrative template | |
CN205061378U (en) | A device for hoisting cable end of a thread | |
KR100757890B1 (en) | Twisted mesh fence | |
CN103726575B (en) | A kind of prefabricated balcony slab and balcony support and connection structure | |
CN205992710U (en) | A kind of cable arrange-line pay off rack | |
CN203188601U (en) | Anti-upwarp clamp for scaffold board | |
CN203296268U (en) | Cross-shaped lap joint buckle | |
CN201261961Y (en) | Tent and grab apparatus | |
CN212968972U (en) | A gallows for crane span structure installation | |
KR101339610B1 (en) | Roof truss of large structure | |
CN203654471U (en) | Connecting structure between assembly type prefabricated balcony slab and balcony support | |
CN214462561U (en) | Beam formwork fastening device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20141015 |
|
CF01 | Termination of patent right due to non-payment of annual fee |