Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams Download PDFInfo
- Publication number
- CN102704499A CN102704499A CN201210182979XA CN201210182979A CN102704499A CN 102704499 A CN102704499 A CN 102704499A CN 201210182979X A CN201210182979X A CN 201210182979XA CN 201210182979 A CN201210182979 A CN 201210182979A CN 102704499 A CN102704499 A CN 102704499A
- Authority
- CN
- China
- Prior art keywords
- bamboo
- wood
- vertical
- girt strip
- grass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明是一种错台竹木梯格构梁绿色固坡防护方法,其特征是将竹桩与木片结合使用,进行边坡深层与浅层联合防护,利用一种改良土进行培植绿化,竹桩直径为5-11cm,竹桩节节贯通,入土端削尖,竹桩表面刻有注浆孔,注浆孔均匀分布,注浆孔沿长度方向间隔不大于40cm,注浆孔直径不小于1cm,横向肋梁与竖向肋梁采用混凝土或钢筋混凝土材料,进行现浇施工,竹木格构梁为预制拼装结构,采用竹子作为竖向竹肋柱,采用木片交叉方式构成菱形格构,竖向竹肋柱直径为8-11cm,竖向竹肋柱之间采用木片作为横向木支撑,横向木支撑与竖向竹肋柱连接,支撑菱形格构重量,格构内培植改良土,改良土由当地壤土与改良剂组成。
The invention is a green slope protection method for staggered bamboo and wood ladder lattice beams, which is characterized in that bamboo piles and wood chips are used in combination to protect the deep and shallow layers of the slope, and a kind of improved soil is used for cultivation and greening. The diameter of the pile is 5-11cm, the bamboo piles are pierced through, and the end of the soil is sharpened. The surface of the bamboo piles is engraved with grouting holes, and the grouting holes are evenly distributed. 1cm, the horizontal rib beam and vertical rib beam are made of concrete or reinforced concrete materials, and the construction is carried out. The bamboo-wood lattice beam is a prefabricated assembly structure. The diameter of the vertical bamboo rib columns is 8-11cm, and wood chips are used as horizontal wood supports between the vertical bamboo rib columns. Soil consists of local loam with amendments.
Description
技术领域 technical field
本发明是一种边坡生态绿化防护方法,属于土木工程设计施工领域。The invention relates to a slope ecological greening protection method, which belongs to the field of civil engineering design and construction.
背景技术 Background technique
随着国家基础设施的大规模投入,我国高速公路项目、省级公路项目大量开工,公路选线穿越绿化带,形成大量裸露边坡,植被遭到破坏,甚至退化。公路工程边坡防护设计方案,往往多采用水泥混凝土结构,虽然达到了工程防护的目的,但是在生态防护方面表现欠佳,尤其是岩质边坡,生态防护更是一大难题。本发明的目的就是基于环保绿化考虑,采用无污染、生态型防护技术,对岩质边坡、土质边坡进行绿化防护,在尽量短的时间内封闭边坡,促进植被生产,恢复生态环境。With the large-scale investment in national infrastructure, a large number of expressway projects and provincial highway projects have been started in my country. The route selection of the highway crosses the green belt, forming a large number of exposed slopes, and the vegetation is destroyed or even degraded. The slope protection design scheme of highway engineering often adopts cement concrete structure. Although the purpose of engineering protection is achieved, the performance in ecological protection is not good, especially for rocky slopes, and ecological protection is a big problem. The purpose of the present invention is based on the consideration of environmental protection and greening, adopts non-polluting and ecological protection technology, carries out greening protection on rocky slopes and soil slopes, closes the slopes in the shortest possible time, promotes vegetation production, and restores the ecological environment.
发明内容 Contents of the invention
本发明目的是提供一种错台竹木梯格构梁绿色固坡防护方法,用于解决土质边坡或岩质边坡生态绿化防护问题。The purpose of the present invention is to provide a green slope protection method for staggered bamboo and wood ladder lattice beams, which is used to solve the problem of ecological greening protection for soil slopes or rock slopes.
本发明的技术解决方案,一种错台竹木梯格构梁绿色固坡防护方法,其特征是将竹桩(即竹子)作为锚杆,将竹桩与木片结合使用进行边坡生态固坡,利用改良土进行培植绿化,达到边坡深层与浅层联合防护,竹桩直径为5-11cm,竹桩节节贯通,入土端削尖,竹桩表面刻有注浆孔,注浆孔均匀分布,注浆孔沿长度方向间隔不大于40cm,注浆孔直径不小于1cm,横向肋梁与竖向肋梁采用混凝土或钢筋混凝土材料,进行现浇施工,竹木格构梁为预制拼装结构,采用竹子作为竖向竹肋柱,采用木片交叉方式构成菱形格构,竖向竹肋柱直径为8-11cm,竖向竹肋柱之间采用木片作为横向木支撑,横向木支撑与竖向竹肋柱连接,支撑菱形格构重量,格构内培植改良土,改良土由当地壤土与改良剂组成,改良剂包括木本纤维、草本纤维、缓效性肥料,缓效性肥料为氮磷钾的混合材料,氮磷钾质量比例为1∶1∶1,木本纤维、草本纤维、缓效性肥料与壤土按质量比为10∶10∶3∶77进行混合,草籽采用黑麦草、高羊茅和狗牙根按质量比为1∶1∶1进行混合。具体防护技术包括如下步骤:The technical solution of the present invention is a green slope protection method for staggered bamboo and wood ladder lattice beams, which is characterized in that bamboo piles (i.e. bamboo) are used as anchor rods, and bamboo piles and wood chips are used in combination for slope ecological slope consolidation , using improved soil for cultivation and greening to achieve combined protection of the deep and shallow layers of the slope. The diameter of the bamboo pile is 5-11cm. The distribution of the grouting holes along the length direction is not more than 40cm, the diameter of the grouting holes is not less than 1cm, the transverse rib beam and the vertical rib beam are made of concrete or reinforced concrete materials, and the construction is carried out, and the bamboo and wood lattice beam is a prefabricated assembled structure , bamboo is used as the vertical bamboo rib column, and the diamond-shaped lattice structure is formed by crossing wood chips. The diameter of the vertical bamboo rib column is 8-11cm. Bamboo ribs and columns are connected to support the weight of the diamond-shaped lattice structure. Improved soil is cultivated in the lattice structure. The improved soil is composed of local loam and amendments. The amendments include woody fibers, herbal fibers, and slow-acting fertilizers. The slow-acting fertilizers are nitrogen and phosphorus. Potassium mixed material, the mass ratio of nitrogen, phosphorus and potassium is 1:1:1, woody fiber, herbaceous fiber, slow-acting fertilizer and loam are mixed according to the mass ratio of 10:10:3:77, and the grass seeds are ryegrass, Tall fescue and bermudagrass are mixed in a mass ratio of 1:1:1. Specific protection techniques include the following steps:
(1)开挖边坡,刷坡,整理坡面,坡顶与坡脚处设有排水沟,分级边坡设有碎落台与排水沟;(1) Excavate the side slope, brush the slope, and tidy up the slope surface. Drainage ditches are provided at the top and foot of the slope, and broken down platforms and drainage ditches are provided for graded slopes;
(2)放线,开挖横向与竖向肋梁槽,横向与竖向肋梁槽交叉点进行钻孔,钻孔内安置带有注浆孔的竹桩,将尖端放入孔内,竹桩入土深度不小于60cm,坡面露出竹桩部分长度与横向肋梁、竖向肋梁平齐,从竹桩底部开始注浆至坡面;(2) Set out the wires, excavate the horizontal and vertical rib beam grooves, drill holes at the intersection of the horizontal and vertical rib beam grooves, place bamboo piles with grouting holes in the drill holes, put the tips into the holes, and the bamboo piles The depth of the piles should not be less than 60cm, and the length of the exposed bamboo piles on the slope should be equal to the horizontal and vertical rib beams, and the grout should be injected from the bottom of the bamboo piles to the slope;
(3)在肋梁槽内现浇混凝土或钢筋混凝土,并喷水养护至规范要求的强度,竖向肋梁间隔为300cm-400cm,横向肋梁间隔为180cm-240cm;(3) Cast in-situ concrete or reinforced concrete in the rib beam groove, and spray water to maintain the strength required by the specification. The vertical rib beam interval is 300cm-400cm, and the transverse rib beam interval is 180cm-240cm;
(4)将预制拼装好的竹木格构梁安置在横向肋梁与竖向肋梁构成的格子内;(4) Place the prefabricated and assembled bamboo-wood lattice beams in the lattice formed by the horizontal rib beams and the vertical rib beams;
(5)将氮磷钾按质量比例为1∶1∶1进行混合,将木本纤维、草本纤维、缓效性肥料与壤土按质量比为10∶10∶3∶77配置成改良土,将黑麦草、高羊茅和狗牙根按质量比为1∶1∶1配置草籽,将改良土与草籽混合培植到竹木格构梁菱形框架内;(5) Mix nitrogen, phosphorus and potassium in a mass ratio of 1:1:1, and configure woody fiber, herbaceous fiber, slow-acting fertilizer and loam into improved soil in a mass ratio of 10:10:3:77. The ryegrass, tall fescue and bermudagrass are arranged with grass seeds according to the mass ratio of 1:1:1, and the improved soil and grass seeds are mixed and cultivated in the rhombus frame of bamboo and wood lattice beams;
(6)培植混合草籽的改良土,按照从左到右,从上到下进行施工,施工后喷适量水,用无纺布遮盖改良土,待草长出后进行定期修剪。(6) Cultivate the improved soil with mixed grass seeds. Construction is carried out from left to right and from top to bottom. After construction, spray appropriate amount of water, cover the improved soil with non-woven fabric, and trim regularly after the grass grows.
本发明优点:Advantages of the present invention:
施工简单,就地取材,绿色环保,节约能源,满足生态边坡防护的要求。The construction is simple, local materials are used, green and environmental protection, energy saving, and meet the requirements of ecological slope protection.
本发明适用范围:The scope of application of the present invention:
适用于土木工程中遇到的各种深层与浅层土质边坡绿化防护工程。It is suitable for various deep and shallow soil slope greening protection projects encountered in civil engineering.
附图说明: Description of drawings:
图1是竹木格构梁平面布置图。其中有竹桩1、木片2、竖向竹肋柱3、横向肋梁4、竖向肋梁5、横向木支撑6。Figure 1 is a plan layout of bamboo and wood lattice beams. Wherein there are
图2是竹木格构梁平面布置图的A-A剖面图。其中有竹桩1、注浆孔7。Fig. 2 is the A-A sectional view of the floor plan of the bamboo-wood lattice beam. Wherein
图3是竹木格构梁平面布置图的B放大图。其中有木片2、竖向竹肋柱3、横向木支撑6。Fig. 3 is an enlarged view of B of the floor plan layout of the bamboo-wood lattice beam.
具体实施方式: Detailed ways:
实施例:某高速公路土质边坡生态绿化防护方法如下,Embodiment: the ecological greening protection method of a certain expressway soil slope is as follows,
①某高6米、坡率为1∶1、长为30米的土质边坡,进行表层生态绿化;① For a soil slope with a height of 6 meters, a slope ratio of 1:1, and a length of 30 meters, carry out surface ecological greening;
②将氮磷钾按质量比例为1∶1∶1进行配置,将木本纤维、草本纤维、缓效性肥料与壤土按质量比为10∶10∶3∶77配置成改良土,共配置约30m3改良土,将黑麦草、高羊茅和狗牙根按质量比为1∶1∶1配置草籽,混合后的草籽共配置约30kg,将改良土与草籽混合备用;② Prepare nitrogen, phosphorus and potassium in a mass ratio of 1:1:1, and woody fibers, herbaceous fibers, slow-acting fertilizers and loam in a mass ratio of 10:10:3:77 to form improved soil. A total of about 30m 3 improved soil, mix ryegrass, tall fescue and bermudagrass with a mass ratio of 1:1:1 to prepare grass seeds, mix the grass seeds with a total of about 30kg, mix the improved soil and grass seeds for later use;
③对边坡进行刷坡、放线、钻孔,安装直径为7cm的竹桩,并进行注浆;③ Slope brushing, setting out, drilling holes on the slope, installing bamboo piles with a diameter of 7cm, and grouting;
④开挖横向肋梁槽与竖向肋梁槽,并进行混凝土现浇施工;④ Excavate the transverse rib beam groove and the vertical rib beam groove, and carry out the concrete pouring construction;
⑤将预制拼装好的竹木格构梁安置在横向肋梁与竖向肋梁构成的菱形框格内;⑤ Place the prefabricated and assembled bamboo-wood lattice beams in the rhombus frame formed by the transverse rib beams and vertical rib beams;
⑥按照从左到右、从上到下的施工顺序,将改良土与草籽的混合土进行培植,然后浇水,覆盖无纺布。⑥ According to the construction sequence from left to right and from top to bottom, cultivate the mixed soil of improved soil and grass seeds, then water and cover with non-woven fabric.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210182979.XA CN102704499B (en) | 2012-06-06 | 2012-06-06 | Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210182979.XA CN102704499B (en) | 2012-06-06 | 2012-06-06 | Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102704499A true CN102704499A (en) | 2012-10-03 |
CN102704499B CN102704499B (en) | 2014-06-18 |
Family
ID=46897531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210182979.XA Expired - Fee Related CN102704499B (en) | 2012-06-06 | 2012-06-06 | Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102704499B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105113519A (en) * | 2015-08-20 | 2015-12-02 | 三峡大学 | Grass-woven belt grid type slope ecological protection method |
CN105340614A (en) * | 2015-11-02 | 2016-02-24 | 棕榈园林股份有限公司 | Novel hard slope lattice ecological afforestation structure and method |
JP2016108936A (en) * | 2014-11-26 | 2016-06-20 | 耕治 山内 | Bamboo earth retaining structure |
CN106149734A (en) * | 2016-06-21 | 2016-11-23 | 西安科技大学 | A kind of ground protective slope structure and construction method thereof |
CN113338310A (en) * | 2021-05-26 | 2021-09-03 | 中国建筑一局(集团)有限公司 | Locally-available and degradable slope water and soil conservation pile, system and method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09177045A (en) * | 1995-12-25 | 1997-07-08 | Goto Concrete Kk | Rock fixing type soundproof tree-planted wall and formation method therefor |
CN101831914A (en) * | 2010-04-23 | 2010-09-15 | 中国科学院武汉岩土力学研究所 | Method for protecting and greening rocky side slope |
CN102172138A (en) * | 2011-01-28 | 2011-09-07 | 中国科学院地质与地球物理研究所 | Novel ecological side slope greening protective technology |
-
2012
- 2012-06-06 CN CN201210182979.XA patent/CN102704499B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09177045A (en) * | 1995-12-25 | 1997-07-08 | Goto Concrete Kk | Rock fixing type soundproof tree-planted wall and formation method therefor |
CN101831914A (en) * | 2010-04-23 | 2010-09-15 | 中国科学院武汉岩土力学研究所 | Method for protecting and greening rocky side slope |
CN102172138A (en) * | 2011-01-28 | 2011-09-07 | 中国科学院地质与地球物理研究所 | Novel ecological side slope greening protective technology |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016108936A (en) * | 2014-11-26 | 2016-06-20 | 耕治 山内 | Bamboo earth retaining structure |
CN105113519A (en) * | 2015-08-20 | 2015-12-02 | 三峡大学 | Grass-woven belt grid type slope ecological protection method |
CN105340614A (en) * | 2015-11-02 | 2016-02-24 | 棕榈园林股份有限公司 | Novel hard slope lattice ecological afforestation structure and method |
CN106149734A (en) * | 2016-06-21 | 2016-11-23 | 西安科技大学 | A kind of ground protective slope structure and construction method thereof |
CN113338310A (en) * | 2021-05-26 | 2021-09-03 | 中国建筑一局(集团)有限公司 | Locally-available and degradable slope water and soil conservation pile, system and method |
CN113338310B (en) * | 2021-05-26 | 2022-05-24 | 中国建筑一局(集团)有限公司 | Locally-available and degradable slope water and soil conservation pile, system and method |
Also Published As
Publication number | Publication date |
---|---|
CN102704499B (en) | 2014-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102691306B (en) | Environment-friendly and energy-saving slope protection bamboo-wood lattice beam for mountain highway | |
CN105544460B (en) | Cast-in-place plant growing type eco-concrete slope protection construction method | |
CN105113518B (en) | Construction method for ecological slope protecting base material by arranging slot pits in slope surface | |
CN106638634A (en) | Road rock slope vine ecological protection structure and construction method | |
CN203174619U (en) | Reverse raft concrete terrace | |
CN109594568B (en) | Rock slope ecological protection structure and method thereof | |
CN109723068B (en) | Steep concrete frame beam slope protection system and construction method conducive to the growth of slope vegetation | |
CN206736931U (en) | Highway Lithological Slope liana ecological safeguard structure | |
CN206768837U (en) | Highway cutting slope ecological protective slope structure | |
CN205314115U (en) | High steep side slope combined supporting greening structure of highway | |
CN102704499A (en) | Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams | |
CN106958264A (en) | A kind of highway greenbelt and its construction method | |
CN112144552A (en) | Damaged mountain ecological vegetation restoration structure, implementation method and application thereof | |
CN205296069U (en) | Cast -in -place ecological concrete bank protection of living type of planting | |
CN103628489B (en) | Highway side slope reinforced structure | |
CN203334301U (en) | Cave slope strengthening protection structure | |
CN103953053B (en) | Plant-growing type eco-concrete anti-overflow device and construction method are built in inclined-plane | |
CN202644546U (en) | Staggered joint bamboo ladder grid beam for ecological protection of side slope | |
CN209816870U (en) | Conducive to slope vegetation growth steep concrete frame beam slope protection system | |
CN211006526U (en) | Road soil slope green ecological protection structure suitable for ecological sensitive area | |
CN114059566B (en) | Soft rock slope semi-rigid supporting and retaining structure and construction method thereof | |
CN216475115U (en) | Recyclable slope lamination green protection grid | |
CN201567579U (en) | Foundation pit supporting structure of gantry pine pile anchored rod | |
CN112359850B (en) | Masonry protection structure of road engineering and construction method thereof | |
CN106436725B (en) | With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140618 Termination date: 20190606 |
|
CF01 | Termination of patent right due to non-payment of annual fee |