[go: up one dir, main page]

CN102704499A - Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams - Google Patents

Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams Download PDF

Info

Publication number
CN102704499A
CN102704499A CN201210182979XA CN201210182979A CN102704499A CN 102704499 A CN102704499 A CN 102704499A CN 201210182979X A CN201210182979X A CN 201210182979XA CN 201210182979 A CN201210182979 A CN 201210182979A CN 102704499 A CN102704499 A CN 102704499A
Authority
CN
China
Prior art keywords
bamboo
wood
vertical
girt strip
grass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210182979XA
Other languages
Chinese (zh)
Other versions
CN102704499B (en
Inventor
李志清
周应新
王珏
胡瑞林
张汝文
王高
杨强
岳锐强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Geology and Geophysics of CAS
Original Assignee
Institute of Geology and Geophysics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Geology and Geophysics of CAS filed Critical Institute of Geology and Geophysics of CAS
Priority to CN201210182979.XA priority Critical patent/CN102704499B/en
Publication of CN102704499A publication Critical patent/CN102704499A/en
Application granted granted Critical
Publication of CN102704499B publication Critical patent/CN102704499B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本发明是一种错台竹木梯格构梁绿色固坡防护方法,其特征是将竹桩与木片结合使用,进行边坡深层与浅层联合防护,利用一种改良土进行培植绿化,竹桩直径为5-11cm,竹桩节节贯通,入土端削尖,竹桩表面刻有注浆孔,注浆孔均匀分布,注浆孔沿长度方向间隔不大于40cm,注浆孔直径不小于1cm,横向肋梁与竖向肋梁采用混凝土或钢筋混凝土材料,进行现浇施工,竹木格构梁为预制拼装结构,采用竹子作为竖向竹肋柱,采用木片交叉方式构成菱形格构,竖向竹肋柱直径为8-11cm,竖向竹肋柱之间采用木片作为横向木支撑,横向木支撑与竖向竹肋柱连接,支撑菱形格构重量,格构内培植改良土,改良土由当地壤土与改良剂组成。

Figure 201210182979

The invention is a green slope protection method for staggered bamboo and wood ladder lattice beams, which is characterized in that bamboo piles and wood chips are used in combination to protect the deep and shallow layers of the slope, and a kind of improved soil is used for cultivation and greening. The diameter of the pile is 5-11cm, the bamboo piles are pierced through, and the end of the soil is sharpened. The surface of the bamboo piles is engraved with grouting holes, and the grouting holes are evenly distributed. 1cm, the horizontal rib beam and vertical rib beam are made of concrete or reinforced concrete materials, and the construction is carried out. The bamboo-wood lattice beam is a prefabricated assembly structure. The diameter of the vertical bamboo rib columns is 8-11cm, and wood chips are used as horizontal wood supports between the vertical bamboo rib columns. Soil consists of local loam with amendments.

Figure 201210182979

Description

一种错台竹木梯格构梁绿色固坡防护方法A Green Slope Consolidation Protection Method for Staggered Bamboo and Wood Ladder Beams

技术领域 technical field

本发明是一种边坡生态绿化防护方法,属于土木工程设计施工领域。The invention relates to a slope ecological greening protection method, which belongs to the field of civil engineering design and construction.

背景技术 Background technique

随着国家基础设施的大规模投入,我国高速公路项目、省级公路项目大量开工,公路选线穿越绿化带,形成大量裸露边坡,植被遭到破坏,甚至退化。公路工程边坡防护设计方案,往往多采用水泥混凝土结构,虽然达到了工程防护的目的,但是在生态防护方面表现欠佳,尤其是岩质边坡,生态防护更是一大难题。本发明的目的就是基于环保绿化考虑,采用无污染、生态型防护技术,对岩质边坡、土质边坡进行绿化防护,在尽量短的时间内封闭边坡,促进植被生产,恢复生态环境。With the large-scale investment in national infrastructure, a large number of expressway projects and provincial highway projects have been started in my country. The route selection of the highway crosses the green belt, forming a large number of exposed slopes, and the vegetation is destroyed or even degraded. The slope protection design scheme of highway engineering often adopts cement concrete structure. Although the purpose of engineering protection is achieved, the performance in ecological protection is not good, especially for rocky slopes, and ecological protection is a big problem. The purpose of the present invention is based on the consideration of environmental protection and greening, adopts non-polluting and ecological protection technology, carries out greening protection on rocky slopes and soil slopes, closes the slopes in the shortest possible time, promotes vegetation production, and restores the ecological environment.

发明内容 Contents of the invention

本发明目的是提供一种错台竹木梯格构梁绿色固坡防护方法,用于解决土质边坡或岩质边坡生态绿化防护问题。The purpose of the present invention is to provide a green slope protection method for staggered bamboo and wood ladder lattice beams, which is used to solve the problem of ecological greening protection for soil slopes or rock slopes.

本发明的技术解决方案,一种错台竹木梯格构梁绿色固坡防护方法,其特征是将竹桩(即竹子)作为锚杆,将竹桩与木片结合使用进行边坡生态固坡,利用改良土进行培植绿化,达到边坡深层与浅层联合防护,竹桩直径为5-11cm,竹桩节节贯通,入土端削尖,竹桩表面刻有注浆孔,注浆孔均匀分布,注浆孔沿长度方向间隔不大于40cm,注浆孔直径不小于1cm,横向肋梁与竖向肋梁采用混凝土或钢筋混凝土材料,进行现浇施工,竹木格构梁为预制拼装结构,采用竹子作为竖向竹肋柱,采用木片交叉方式构成菱形格构,竖向竹肋柱直径为8-11cm,竖向竹肋柱之间采用木片作为横向木支撑,横向木支撑与竖向竹肋柱连接,支撑菱形格构重量,格构内培植改良土,改良土由当地壤土与改良剂组成,改良剂包括木本纤维、草本纤维、缓效性肥料,缓效性肥料为氮磷钾的混合材料,氮磷钾质量比例为1∶1∶1,木本纤维、草本纤维、缓效性肥料与壤土按质量比为10∶10∶3∶77进行混合,草籽采用黑麦草、高羊茅和狗牙根按质量比为1∶1∶1进行混合。具体防护技术包括如下步骤:The technical solution of the present invention is a green slope protection method for staggered bamboo and wood ladder lattice beams, which is characterized in that bamboo piles (i.e. bamboo) are used as anchor rods, and bamboo piles and wood chips are used in combination for slope ecological slope consolidation , using improved soil for cultivation and greening to achieve combined protection of the deep and shallow layers of the slope. The diameter of the bamboo pile is 5-11cm. The distribution of the grouting holes along the length direction is not more than 40cm, the diameter of the grouting holes is not less than 1cm, the transverse rib beam and the vertical rib beam are made of concrete or reinforced concrete materials, and the construction is carried out, and the bamboo and wood lattice beam is a prefabricated assembled structure , bamboo is used as the vertical bamboo rib column, and the diamond-shaped lattice structure is formed by crossing wood chips. The diameter of the vertical bamboo rib column is 8-11cm. Bamboo ribs and columns are connected to support the weight of the diamond-shaped lattice structure. Improved soil is cultivated in the lattice structure. The improved soil is composed of local loam and amendments. The amendments include woody fibers, herbal fibers, and slow-acting fertilizers. The slow-acting fertilizers are nitrogen and phosphorus. Potassium mixed material, the mass ratio of nitrogen, phosphorus and potassium is 1:1:1, woody fiber, herbaceous fiber, slow-acting fertilizer and loam are mixed according to the mass ratio of 10:10:3:77, and the grass seeds are ryegrass, Tall fescue and bermudagrass are mixed in a mass ratio of 1:1:1. Specific protection techniques include the following steps:

(1)开挖边坡,刷坡,整理坡面,坡顶与坡脚处设有排水沟,分级边坡设有碎落台与排水沟;(1) Excavate the side slope, brush the slope, and tidy up the slope surface. Drainage ditches are provided at the top and foot of the slope, and broken down platforms and drainage ditches are provided for graded slopes;

(2)放线,开挖横向与竖向肋梁槽,横向与竖向肋梁槽交叉点进行钻孔,钻孔内安置带有注浆孔的竹桩,将尖端放入孔内,竹桩入土深度不小于60cm,坡面露出竹桩部分长度与横向肋梁、竖向肋梁平齐,从竹桩底部开始注浆至坡面;(2) Set out the wires, excavate the horizontal and vertical rib beam grooves, drill holes at the intersection of the horizontal and vertical rib beam grooves, place bamboo piles with grouting holes in the drill holes, put the tips into the holes, and the bamboo piles The depth of the piles should not be less than 60cm, and the length of the exposed bamboo piles on the slope should be equal to the horizontal and vertical rib beams, and the grout should be injected from the bottom of the bamboo piles to the slope;

(3)在肋梁槽内现浇混凝土或钢筋混凝土,并喷水养护至规范要求的强度,竖向肋梁间隔为300cm-400cm,横向肋梁间隔为180cm-240cm;(3) Cast in-situ concrete or reinforced concrete in the rib beam groove, and spray water to maintain the strength required by the specification. The vertical rib beam interval is 300cm-400cm, and the transverse rib beam interval is 180cm-240cm;

(4)将预制拼装好的竹木格构梁安置在横向肋梁与竖向肋梁构成的格子内;(4) Place the prefabricated and assembled bamboo-wood lattice beams in the lattice formed by the horizontal rib beams and the vertical rib beams;

(5)将氮磷钾按质量比例为1∶1∶1进行混合,将木本纤维、草本纤维、缓效性肥料与壤土按质量比为10∶10∶3∶77配置成改良土,将黑麦草、高羊茅和狗牙根按质量比为1∶1∶1配置草籽,将改良土与草籽混合培植到竹木格构梁菱形框架内;(5) Mix nitrogen, phosphorus and potassium in a mass ratio of 1:1:1, and configure woody fiber, herbaceous fiber, slow-acting fertilizer and loam into improved soil in a mass ratio of 10:10:3:77. The ryegrass, tall fescue and bermudagrass are arranged with grass seeds according to the mass ratio of 1:1:1, and the improved soil and grass seeds are mixed and cultivated in the rhombus frame of bamboo and wood lattice beams;

(6)培植混合草籽的改良土,按照从左到右,从上到下进行施工,施工后喷适量水,用无纺布遮盖改良土,待草长出后进行定期修剪。(6) Cultivate the improved soil with mixed grass seeds. Construction is carried out from left to right and from top to bottom. After construction, spray appropriate amount of water, cover the improved soil with non-woven fabric, and trim regularly after the grass grows.

本发明优点:Advantages of the present invention:

施工简单,就地取材,绿色环保,节约能源,满足生态边坡防护的要求。The construction is simple, local materials are used, green and environmental protection, energy saving, and meet the requirements of ecological slope protection.

本发明适用范围:The scope of application of the present invention:

适用于土木工程中遇到的各种深层与浅层土质边坡绿化防护工程。It is suitable for various deep and shallow soil slope greening protection projects encountered in civil engineering.

附图说明: Description of drawings:

图1是竹木格构梁平面布置图。其中有竹桩1、木片2、竖向竹肋柱3、横向肋梁4、竖向肋梁5、横向木支撑6。Figure 1 is a plan layout of bamboo and wood lattice beams. Wherein there are bamboo piles 1, wood chips 2, vertical bamboo rib columns 3, horizontal rib beams 4, vertical rib beams 5, and horizontal wooden supports 6.

图2是竹木格构梁平面布置图的A-A剖面图。其中有竹桩1、注浆孔7。Fig. 2 is the A-A sectional view of the floor plan of the bamboo-wood lattice beam. Wherein bamboo stake 1, grouting hole 7 are arranged.

图3是竹木格构梁平面布置图的B放大图。其中有木片2、竖向竹肋柱3、横向木支撑6。Fig. 3 is an enlarged view of B of the floor plan layout of the bamboo-wood lattice beam. Wood chip 2, vertical bamboo rib column 3, horizontal wooden support 6 are arranged wherein.

具体实施方式: Detailed ways:

实施例:某高速公路土质边坡生态绿化防护方法如下,Embodiment: the ecological greening protection method of a certain expressway soil slope is as follows,

①某高6米、坡率为1∶1、长为30米的土质边坡,进行表层生态绿化;① For a soil slope with a height of 6 meters, a slope ratio of 1:1, and a length of 30 meters, carry out surface ecological greening;

②将氮磷钾按质量比例为1∶1∶1进行配置,将木本纤维、草本纤维、缓效性肥料与壤土按质量比为10∶10∶3∶77配置成改良土,共配置约30m3改良土,将黑麦草、高羊茅和狗牙根按质量比为1∶1∶1配置草籽,混合后的草籽共配置约30kg,将改良土与草籽混合备用;② Prepare nitrogen, phosphorus and potassium in a mass ratio of 1:1:1, and woody fibers, herbaceous fibers, slow-acting fertilizers and loam in a mass ratio of 10:10:3:77 to form improved soil. A total of about 30m 3 improved soil, mix ryegrass, tall fescue and bermudagrass with a mass ratio of 1:1:1 to prepare grass seeds, mix the grass seeds with a total of about 30kg, mix the improved soil and grass seeds for later use;

③对边坡进行刷坡、放线、钻孔,安装直径为7cm的竹桩,并进行注浆;③ Slope brushing, setting out, drilling holes on the slope, installing bamboo piles with a diameter of 7cm, and grouting;

④开挖横向肋梁槽与竖向肋梁槽,并进行混凝土现浇施工;④ Excavate the transverse rib beam groove and the vertical rib beam groove, and carry out the concrete pouring construction;

⑤将预制拼装好的竹木格构梁安置在横向肋梁与竖向肋梁构成的菱形框格内;⑤ Place the prefabricated and assembled bamboo-wood lattice beams in the rhombus frame formed by the transverse rib beams and vertical rib beams;

⑥按照从左到右、从上到下的施工顺序,将改良土与草籽的混合土进行培植,然后浇水,覆盖无纺布。⑥ According to the construction sequence from left to right and from top to bottom, cultivate the mixed soil of improved soil and grass seeds, then water and cover with non-woven fabric.

Claims (1)

1. the green solid sloping means of defence of a faulting of slab ends bamboo wooden ladder lattice girder is characterized in that the bamboo stake as anchor pole, the bamboo stake is used in combination with wood chip carries out slope ecological Gu Po; Utilize conditioned soil to cultivate greening, bamboo stake diameter is 5-11cm, and the bamboo stake connects successively; The end that buries is fined away, and injected hole is carved with on bamboo stake surface, and injected hole evenly distributes; Injected hole is not more than 40cm along its length at interval, and the injected hole diameter is not less than 1cm, and laterally girt strip adopts concrete or Reinforced Concrete Materials with vertical girt strip; Carry out cast-in-place construction, bamboo wood lattice girder is the precast assembly structure, adopts bamboo as vertical bamboo rib post; Adopt the wood chip interleaved mode to constitute the rhombus lattice, vertical bamboo rib column diameter is 8-11cm, vertically adopts wood chip as laterally wood support between the bamboo rib post; Laterally wood supports with vertical bamboo rib post and is connected, and supports rhombus lattice weight, cultivates conditioned soil in the lattice; Conditioned soil is made up of local loam and modifying agent, and modifying agent comprises woody fiber, draft fiber, controlled-release fertilizer, and controlled-release fertilizer is the mixed material of nitrogen phosphorus potassium; Nitrogen phosphorus potassium mass ratio is 1: 1: 1; Woody fiber, draft fiber, controlled-release fertilizer are 10: 10: 3 with loam by mass ratio: 77 mix, and it is to mix at 1: 1: 1 by mass ratio that grass-seed is adopted rye grass, Festuca Arundinacea and Bermuda grass, and the concrete grammar that adopts the stake of this kind bamboo, wood chip and conditioned soil to protect comprises the steps:
(1) excavation slope, brush slope put domaticly, and top, slope and toe place are provided with the gutter, and the classification side slope is provided with stage for heaping debris and gutter;
(2) unwrapping wire; Excavation laterally with vertical girt strip groove, laterally hole with vertical girt strip groove crosspoint, settle the bamboo stake that has injected hole in the boring; The hole is put at the tip; Bamboo stake embedded depth is not less than 60cm, domaticly exposes bamboo stake partial-length and laterally girt strip, vertical girt strip are concordant, and beginning slip casting is to domatic from bamboo stake bottom;
(3) cast-in-situ concrete or steel concrete in the girt strip groove, and the intensity of wet curing to code requirement, vertical girt strip is spaced apart 300cm-400cm, and the cross rib distance between girders is 180cm-240cm;
(4) precast assembly is good bamboo wood lattice girder is placed in the grid of horizontal girt strip and vertical girt strip formation;
(5) be to mix at 1: 1: 1 nitrogen phosphorus potassium by mass ratio; Is 10: 10: 3 with woody fiber, draft fiber, controlled-release fertilizer and loam by mass ratio: 77 are configured to conditioned soil; Is 1: 1: 1 configuration grass-seed with rye grass, Festuca Arundinacea and Bermuda grass by mass ratio, conditioned soil is mixed with grass-seed cultivate in the bamboo wood lattice girder rhombus framework;
(6) cultivate the conditioned soil of mixing grass-seed, according to from left to right, construct from top to bottom, spray suitable quantity of water in construction back hides conditioned soil with nonwoven, treats regularly to prune after grass grows.
CN201210182979.XA 2012-06-06 2012-06-06 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams Expired - Fee Related CN102704499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210182979.XA CN102704499B (en) 2012-06-06 2012-06-06 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210182979.XA CN102704499B (en) 2012-06-06 2012-06-06 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams

Publications (2)

Publication Number Publication Date
CN102704499A true CN102704499A (en) 2012-10-03
CN102704499B CN102704499B (en) 2014-06-18

Family

ID=46897531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210182979.XA Expired - Fee Related CN102704499B (en) 2012-06-06 2012-06-06 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams

Country Status (1)

Country Link
CN (1) CN102704499B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113519A (en) * 2015-08-20 2015-12-02 三峡大学 Grass-woven belt grid type slope ecological protection method
CN105340614A (en) * 2015-11-02 2016-02-24 棕榈园林股份有限公司 Novel hard slope lattice ecological afforestation structure and method
JP2016108936A (en) * 2014-11-26 2016-06-20 耕治 山内 Bamboo earth retaining structure
CN106149734A (en) * 2016-06-21 2016-11-23 西安科技大学 A kind of ground protective slope structure and construction method thereof
CN113338310A (en) * 2021-05-26 2021-09-03 中国建筑一局(集团)有限公司 Locally-available and degradable slope water and soil conservation pile, system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177045A (en) * 1995-12-25 1997-07-08 Goto Concrete Kk Rock fixing type soundproof tree-planted wall and formation method therefor
CN101831914A (en) * 2010-04-23 2010-09-15 中国科学院武汉岩土力学研究所 Method for protecting and greening rocky side slope
CN102172138A (en) * 2011-01-28 2011-09-07 中国科学院地质与地球物理研究所 Novel ecological side slope greening protective technology

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177045A (en) * 1995-12-25 1997-07-08 Goto Concrete Kk Rock fixing type soundproof tree-planted wall and formation method therefor
CN101831914A (en) * 2010-04-23 2010-09-15 中国科学院武汉岩土力学研究所 Method for protecting and greening rocky side slope
CN102172138A (en) * 2011-01-28 2011-09-07 中国科学院地质与地球物理研究所 Novel ecological side slope greening protective technology

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016108936A (en) * 2014-11-26 2016-06-20 耕治 山内 Bamboo earth retaining structure
CN105113519A (en) * 2015-08-20 2015-12-02 三峡大学 Grass-woven belt grid type slope ecological protection method
CN105340614A (en) * 2015-11-02 2016-02-24 棕榈园林股份有限公司 Novel hard slope lattice ecological afforestation structure and method
CN106149734A (en) * 2016-06-21 2016-11-23 西安科技大学 A kind of ground protective slope structure and construction method thereof
CN113338310A (en) * 2021-05-26 2021-09-03 中国建筑一局(集团)有限公司 Locally-available and degradable slope water and soil conservation pile, system and method
CN113338310B (en) * 2021-05-26 2022-05-24 中国建筑一局(集团)有限公司 Locally-available and degradable slope water and soil conservation pile, system and method

Also Published As

Publication number Publication date
CN102704499B (en) 2014-06-18

Similar Documents

Publication Publication Date Title
CN102691306B (en) Environment-friendly and energy-saving slope protection bamboo-wood lattice beam for mountain highway
CN105544460B (en) Cast-in-place plant growing type eco-concrete slope protection construction method
CN105113518B (en) Construction method for ecological slope protecting base material by arranging slot pits in slope surface
CN106638634A (en) Road rock slope vine ecological protection structure and construction method
CN203174619U (en) Reverse raft concrete terrace
CN109594568B (en) Rock slope ecological protection structure and method thereof
CN109723068B (en) Steep concrete frame beam slope protection system and construction method conducive to the growth of slope vegetation
CN206736931U (en) Highway Lithological Slope liana ecological safeguard structure
CN206768837U (en) Highway cutting slope ecological protective slope structure
CN205314115U (en) High steep side slope combined supporting greening structure of highway
CN102704499A (en) Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams
CN106958264A (en) A kind of highway greenbelt and its construction method
CN112144552A (en) Damaged mountain ecological vegetation restoration structure, implementation method and application thereof
CN205296069U (en) Cast -in -place ecological concrete bank protection of living type of planting
CN103628489B (en) Highway side slope reinforced structure
CN203334301U (en) Cave slope strengthening protection structure
CN103953053B (en) Plant-growing type eco-concrete anti-overflow device and construction method are built in inclined-plane
CN202644546U (en) Staggered joint bamboo ladder grid beam for ecological protection of side slope
CN209816870U (en) Conducive to slope vegetation growth steep concrete frame beam slope protection system
CN211006526U (en) Road soil slope green ecological protection structure suitable for ecological sensitive area
CN114059566B (en) Soft rock slope semi-rigid supporting and retaining structure and construction method thereof
CN216475115U (en) Recyclable slope lamination green protection grid
CN201567579U (en) Foundation pit supporting structure of gantry pine pile anchored rod
CN112359850B (en) Masonry protection structure of road engineering and construction method thereof
CN106436725B (en) With the construction method of the cutting stereoscopic protective structure of high polymer grouting reinforcement waterproof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140618

Termination date: 20190606

CF01 Termination of patent right due to non-payment of annual fee