CN102691295A - Spike tooth concrete tubular pile and construction method thereof - Google Patents
Spike tooth concrete tubular pile and construction method thereof Download PDFInfo
- Publication number
- CN102691295A CN102691295A CN2012101709641A CN201210170964A CN102691295A CN 102691295 A CN102691295 A CN 102691295A CN 2012101709641 A CN2012101709641 A CN 2012101709641A CN 201210170964 A CN201210170964 A CN 201210170964A CN 102691295 A CN102691295 A CN 102691295A
- Authority
- CN
- China
- Prior art keywords
- pile
- concrete tubular
- tooth
- tubular pile
- spike
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title abstract 2
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 239000002689 soil Substances 0.000 claims abstract description 10
- 238000002347 injection Methods 0.000 claims description 4
- 239000007924 injection Substances 0.000 claims description 4
- 239000012467 final product Substances 0.000 claims description 3
- 230000035515 penetration Effects 0.000 claims description 3
- 230000003068 static effect Effects 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention relates to a spike tooth concrete tubular pile for a building foundation and a construction method of the spike tooth concrete tubular pile. A plurality of square holes are formed in the pile body of a concrete tubular pile; spike teeth are plugged into the square holes before pile sinking; the sections of the spike teeth are square; an end cap is arranged at one end of each spike tooth; the end surface at the other end of the spike tooth is inclined; a steel pipe, of which the lower end is provided with a cone end socket, is placed in the concrete tubular pile after pile sinking; the spike teeth can be injected into a soil body by hammering the upper end of the steel pipe; and then concrete is poured into the concrete tubular pile. According to the invention, the spike teeth are placed in the pile body before pile sinking and are injected into the soil body after pile sinking, so that the friction force between the pile body and the geologic soil body on the condition that the pile sinking difficulty is not increased, that is, the bearing capacity of the pile is increased.
Description
One, technical field
The present invention relates to a kind of concrete tubular pile and job practices thereof, fourth tooth concrete tubular pile and job practices thereof that particularly a kind of building foundation is used.
Two, background technology:
Building foundation is as the concrete tubular pile of supporting usefulness; All using hammering, static pressure or vibration that concrete tubular pile is driven underground, do not go into the pipe stake, is to lean on the frictional force of pile tube wall and geology soil to support building as holding power; Improve stake and will improve the bearing capacity of stake with the native frictional force of geology; But the frictional force that improves stake and geology soil can or add the toothing bank do coarse of stake surface, so will make pile sinking difficult.
Three, summary of the invention:
The present invention overcomes above shortcoming, and a kind of fourth tooth concrete tubular pile and job practices thereof are provided.
The present invention realizes through following technical scheme:
A kind of fourth tooth concrete tubular pile and job practices thereof, the concrete tubular pile pile body is provided with several square holes, in square hole, fills in the fourth tooth before the pile sinking; Fourth tooth cross section is a square, and fourth tooth one end is provided with end cap, other end end slope; The steel pipe that behind the pile sinking lower end is had a cone termination is put into concrete tubular pile; The upper end of hammering steel pipe can be with in the fourth toothed portion injection soil body, and penetration concrete gets final product in concrete tubular pile thereafter.
The present invention has following characteristics:
The present invention inserts pile body with the fourth tooth before adopting pile sinking, again with the fourth toothed portion injection soil body, so, under the situation that does not increase the pile sinking difficulty, has increased the frictional force of pile body and geology soil behind the pile sinking, has promptly increased the bearing capacity of stake.
Four, description of drawings:
Below in conjunction with accompanying drawing the present invention is further described:
Accompanying drawing 1 is the sectional view of fourth tooth of the present invention in pile body.
Accompanying drawing 2 is the sectional view of part fourth tooth of the present invention outside pile body.
Among the figure: 1, steel pipe, 2, concrete tubular pile, 3, the cone termination, 4, the fourth tooth, 5, end cap, 6, the pile tube cap, 7, square hole.
Five, the specific embodiment:
Claims (1)
1. fourth tooth concrete tubular pile and job practices thereof, it is characterized in that: concrete tubular pile (1) pile body is provided with several square holes (7), in square hole, fills in fourth tooth (4) before the pile sinking; Fourth tooth cross section is a square; Fourth tooth one end is provided with end cap (5), other end end slope, and the steel pipe (1) that behind the pile sinking lower end is had cone termination (3) is put into concrete tubular pile; The upper end of hammering steel pipe; Can propose steel pipe with in the fourth toothed portion injection soil body, penetration concrete gets final product in concrete tubular pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101709641A CN102691295A (en) | 2012-05-30 | 2012-05-30 | Spike tooth concrete tubular pile and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101709641A CN102691295A (en) | 2012-05-30 | 2012-05-30 | Spike tooth concrete tubular pile and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102691295A true CN102691295A (en) | 2012-09-26 |
Family
ID=46857021
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101709641A Pending CN102691295A (en) | 2012-05-30 | 2012-05-30 | Spike tooth concrete tubular pile and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102691295A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103437347A (en) * | 2013-07-18 | 2013-12-11 | 杭州博数土木工程技术有限公司 | Steel pipe branch pile and construction method |
CN105002921A (en) * | 2015-07-22 | 2015-10-28 | 国家电网公司 | Steel pipe pole for electric transmission line |
CN105002922A (en) * | 2015-07-22 | 2015-10-28 | 国家电网公司 | Pile type precast foundation for steel pipe pole |
CN106087976A (en) * | 2016-08-01 | 2016-11-09 | 三峡大学 | A kind of prefabricated friction pile of new concrete and pile sinking process |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2398333Y (en) * | 1999-11-02 | 2000-09-27 | 刘次西 | Pile body containing thorn pile |
CN2828142Y (en) * | 2005-07-22 | 2006-10-18 | 张文巨 | Wolf tooth bar building pile |
-
2012
- 2012-05-30 CN CN2012101709641A patent/CN102691295A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2398333Y (en) * | 1999-11-02 | 2000-09-27 | 刘次西 | Pile body containing thorn pile |
CN2828142Y (en) * | 2005-07-22 | 2006-10-18 | 张文巨 | Wolf tooth bar building pile |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103437347A (en) * | 2013-07-18 | 2013-12-11 | 杭州博数土木工程技术有限公司 | Steel pipe branch pile and construction method |
CN103437347B (en) * | 2013-07-18 | 2016-06-29 | 浙江中隧桥波形钢腹板有限公司 | Steel pipe branch pile and construction method |
CN105002921A (en) * | 2015-07-22 | 2015-10-28 | 国家电网公司 | Steel pipe pole for electric transmission line |
CN105002922A (en) * | 2015-07-22 | 2015-10-28 | 国家电网公司 | Pile type precast foundation for steel pipe pole |
CN106087976A (en) * | 2016-08-01 | 2016-11-09 | 三峡大学 | A kind of prefabricated friction pile of new concrete and pile sinking process |
CN106087976B (en) * | 2016-08-01 | 2018-01-05 | 三峡大学 | A kind of concrete prefabricated friction pile and pile sinking process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011105703A3 (en) | Method for constructing a steel pipe/concrete composite pile in which the steel pipe is buried integrally with bedrock, and pile construction | |
CN102691295A (en) | Spike tooth concrete tubular pile and construction method thereof | |
CN104389305B (en) | A kind of back-up sand bamboo joint pile and construction method thereof | |
CN204185874U (en) | A kind of high gradient slope base configuration | |
CN103132515B (en) | Calabash type anchor rod | |
CN102733380A (en) | Lag pile and construction method thereof | |
CN104264703A (en) | Miniature vertical and inclined combined pile for power transmission tower | |
CN204875789U (en) | Building engineering piling equipment | |
CN203924072U (en) | The retaining wall supporting and protection structure of the super dark hand excavated pile of a kind of super large | |
CN202090352U (en) | Deep foundation pit bracing system with steel pipe piles-self-drilling type pre-stress anchor rods | |
CN204827213U (en) | Double dynamical head digs rig soon | |
CN205035789U (en) | Reduce bored concrete pile negative frictional force device | |
CN205475218U (en) | Settlement by soaking foundation pile basis reduces burden frictional resistance structure | |
CN204401615U (en) | A kind of pile top being applicable to Denudation monadnock landforms tube pile construction | |
KR20090050562A (en) | Long pile construction method using tapered steel pipe | |
JP5684069B2 (en) | Pile structure | |
CN212316901U (en) | Be adapted to interbedded tubular pile extension device of stratum | |
KR20090112431A (en) | Offshore pile reinforcement structure and its formation method | |
CN203855959U (en) | Circular-section anti-slide pile with bilateral haunched beams | |
CN207469238U (en) | Prefabricated flaring stake | |
CN203284775U (en) | High-bearing-capacity foundation pile | |
Lee et al. | A Study on the Ultimate Point Resistance of Rock Socketed Drilled Shafts Using FLAC3D and UDEC | |
CN203129130U (en) | Belled cast-in-place pile | |
CN103046550A (en) | Pile extractor with vibrating lantern ring and application method thereof | |
KR20130073052A (en) | Method of bundled pile footing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120926 |