CN102677631A - Concrete vibrating equipment and side slope concrete construction method - Google Patents
Concrete vibrating equipment and side slope concrete construction method Download PDFInfo
- Publication number
- CN102677631A CN102677631A CN2012101317522A CN201210131752A CN102677631A CN 102677631 A CN102677631 A CN 102677631A CN 2012101317522 A CN2012101317522 A CN 2012101317522A CN 201210131752 A CN201210131752 A CN 201210131752A CN 102677631 A CN102677631 A CN 102677631A
- Authority
- CN
- China
- Prior art keywords
- concrete
- electric winch
- vibrator
- vibration plate
- side slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 39
- 238000007789 sealing Methods 0.000 claims description 5
- 238000000926 separation method Methods 0.000 claims description 5
- 238000012423 maintenance Methods 0.000 claims description 4
- 230000001174 ascending effect Effects 0.000 claims description 3
- 238000013329 compounding Methods 0.000 claims description 2
- 238000004804 winding Methods 0.000 abstract 2
- 238000005056 compaction Methods 0.000 abstract 1
- 230000002262 irrigation Effects 0.000 abstract 1
- 238000003973 irrigation Methods 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000003801 milling Methods 0.000 abstract 1
- 230000005662 electromechanics Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005728 strengthening Methods 0.000 description 2
- 238000012913 prioritisation Methods 0.000 description 1
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Revetment (AREA)
Abstract
The invention provides concrete vibrating equipment, which comprises a vibrator and an electric winch tractor. The vibrator comprises a commonly used vibro-compaction vibrator and a vibro-milling vibrator, the electric winch tractor comprises an electric winch and a tractor, the tractor is provided with walking wheels and a frame, the electric winch is installed on the frame, the electric winch is provided with a winding drum, a motor and a controller, and the motor is electrically connected with the controller; and one end of a pull rope is connected onto the vibrating plate of the vibrator, the other end of the pull rope is wound on the winding drum of the electric winch. When the equipment is used for side slope concrete construction, the vibrator moves upwards, downwards, leftwards and rightwards under the control of the electric winch tractor in combination with manual operation, and the electric winch tractor is manually pushed and positioned above a side slope under construction. By adopting the concrete vibrating equipment, the labor intensity of construction personnel is greatly reduced, the construction quality is guaranteed and the construction progress is accelerated; and the concrete vibrating equipment has the characteristics of simple structure, low manufacturing cost and convenience in use and transportation, and is particularly suitable for the side slope construction of river dikes or medium-size and small-size irrigation ditches.
Description
Technical field
The present invention relates to side slope concrete construction technology fields such as river levee or middle-size and small-size irrigated area water channel.
Background technology
Be the fastness of strengthening river levee or middle-size and small-size irrigated area water channel etc. and the frictional resistance that reduces current; Generally can carry out concrete strengthening, in concrete construction, use concrete vibrator to come jolt ramming to polish concrete usually the side slope of river levee or middle-size and small-size irrigated area water channel; This concrete vibrator has vibration plate, the machine that shakes, the controller that vibrates, stay cord and action bars; The machine that shakes is installed on the vibration plate, and operation pull bar and stay cord end are connected on the vibration plate, and the electromechanics that shakes is connected to the controller that vibrates; Its construction sequence is following:
A. smooth side slope is installed longitudinal subdivision mould bar on side slope, form some minutes compartments;
B. the concrete of in minute compartment, constructing, construction sequence is following:
B1. with concrete placement vehicle concrete is poured in the branch compartment, manual work is shakeout;
B2. artificial stay cord and the action bars operation concrete vibrator of passing through makes concrete vibrator move along the side slope upper and lower, left and right, and jolt ramming divides the concrete in the compartment;
B3. artificial stay cord and the action bars operation concrete vibrator of passing through makes concrete vibrator move along the side slope upper and lower, left and right, and vibration divides the concrete in the compartment;
B4. maintenance divides the concrete in the compartment, and making it reach design strength becomes concrete segment;
B5. the separation mould bar with concrete segment removes, and changes the outfit to go up the expansion sealing rod;
C. the concrete of in the adjacent branch compartment of concrete segment that step B accomplishes, constructing, construction sequence is identical with B1, B2, B3, B4 among the step B.
In work progress, in the bottom of side slope or divide limit inside and outside the compartment, by left and right the moving of 1 workman's hand-held bar control vibrator; Top in side slope; The other end that is stood in the top pulling stay cord of branch compartment by several workmans is controlled the upper and lower mobile of vibrator, the job practices that this concrete vibrator is moved through stay cord and action bars by manual work, and labour intensity is very big; Be difficult to guarantee construction quality, construction speed is slow.
Summary of the invention
The objective of the invention is to propose a kind of side slope concrete construction method, it adopts novel concrete vibrating equipment, has time saving and energy saving characteristics, can effectively reduce side slope Concrete Construction cost, guarantees construction quality, accelerating construction progress.
The object of the invention can be realized through following technical scheme:
A kind of concrete vibrating equipment; Include vibrator and electric winch car, said vibrator has vibration plate, the machine that shakes, the controller that vibrates, stay cord and action bars, and the machine that shakes is installed on the vibration plate; One end of action bars is connected on the vibration plate, and the electromechanics that shakes is connected to the controller that vibrates; The electric winch car includes electric winch and tractor; Tractor has road wheel and vehicle frame; Electric winch is installed on the vehicle frame, and electric winch has reel, motor and controller, and reel is by motor driven; Electric electromechanics is connected to controller, and controller has ascending, descending, on/off button; One end of stay cord is connected on the vibration plate of vibrator or the machine that shakes, and the other end of stay cord is wire-wrapped on the reel of electric winch car.
Vibrator comprises jolt ramming vibrator and vibration vibrator, and the machine that shakes of jolt ramming vibrator is installed on the vibration plate, and the vibration vibrator is also installed a mill vibration plate at the back side of vibration plate through the machine rotating shaft of shaking, and the mill vibration plate is by machine driven rotary and the vibration of shaking.
A kind of side slope concrete construction method may further comprise the steps:
A. smooth side slope is installed longitudinal subdivision mould bar on side slope, form some minutes compartments;
B. the concrete of in minute compartment, constructing, construction sequence is following:
B1. with concrete placement vehicle concrete is poured in the branch compartment, manual work is shakeout;
B2. divide the concrete in the compartment with the jolt ramming of above-mentioned concrete vibrating equipment;
B3. divide the concrete in the compartment with the vibration of above-mentioned concrete vibrating equipment;
B4. maintenance divides the concrete in the compartment, and making it reach design strength becomes concrete segment;
C. the concrete of in the adjacent branch compartment of concrete segment that step B accomplishes, constructing, construction sequence is identical with B1, B2, B3, B4 among the step B.
The vibrator that in step B2, uses is the jolt ramming vibrator, and this vibrator has rectangle or square vibration plate;
The vibrator that in step B3, uses has circular vibration plate as vibration vibrator, this vibrator, and the machine that shakes is supported by vibration plate, and a mill vibration plate is installed through the rotating shaft of the machine that shakes in the back side of vibration plate, and the mill vibration plate is by machine driven rotary and the vibration of shaking.
In step B2 and step B3, the electric winch car is through the top in manpower and the tab-delimited storehouse of road wheel, and vibrator upwards or down moves through stay cord and the control of electric winch car compounding practice bar, moves to the left or to the right through action bars control.
Prioritization scheme is: in the construction sequence of step B, comprise in addition:
B5. the separation mould bar with concrete segment removes, and changes the outfit to go up the expansion sealing rod.
The present invention has following outstanding substantive distinguishing features and obvious improvement:
1, the present invention cooperates manpower to control vibrator through the electric winch car, changes traditional mode that relies on manpower transportable concrete vibrator on side slope fully, greatly reduces constructor's labour intensity, guarantees construction quality, accelerating construction progress;
2, concrete vibrating equipment of the present invention have simple in structure, cost is low, the characteristics of use and convenient transportation; The electric winch car that wherein increases; Directly shift onto on river levee or the water channel dike and use; Need not to lay guide rail, conveniently moving is specially adapted to the slope construction of river levee or middle-size and small-size irrigated area water channel.
Description of drawings
Fig. 1 uses jolt ramming vibrator construction side slope concrete sketch map for the present invention.
Fig. 2 uses vibration vibrator construction side slope concrete sketch map for the present invention.
The specific embodiment
Below in conjunction with accompanying drawing the present invention is described further.
Embodiment
With reference to figure 1 and Fig. 2, a kind of concrete vibrating equipment includes vibrator 1 and electric winch car.Said vibrator 1 has vibration plate 11, the machine 13 that shakes, the controller 14 that vibrates, stay cord 10 and action bars 12, and the machine 13 that shakes is installed on the vibration plate 11, and an end of action bars 12 is connected on the vibration plate 11, and the machine 11 that shakes is electrically connected to the controller 14 that vibrates; The electric winch car includes electric winch and tractor; Tractor has road wheel 30 and vehicle frame 31; Electric winch is installed on the vehicle frame 31; Electric winch has reel 20, motor 22 and controller 21, and motor 22 is electrically connected to controller 21, and said controller 21 has ascending, descending, on/off button; One end of stay cord 10 is connected on the vibration plate 11 of vibrator 1, and the other end of stay cord 10 is wire-wrapped on the reel 20 of electric winch car.
The vibrator that uses in the present embodiment has two kinds: a kind ofly be jolt ramming vibrator (like Fig. 1), this vibrator has rectangle or square vibration plate 11; The machine 13 that shakes directly is installed on the vibration plate 11; Another kind of is vibration vibrator (like Fig. 2), and the vibration plate 11 of this vibrator is circular vibration plate; The machine 13 that shakes is supported by vibration plate 11, and a mill vibration plate 15 is installed through the rotating shaft of the machine 13 that shakes in the back side of vibration plate 11, and mill vibration plate 15 is by machine 13 driven rotary and the vibration of shaking.
Use above-mentioned concrete vibrating equipment to carry out the side slope concrete construction, job practices may further comprise the steps:
A. smooth side slope is installed longitudinal subdivision mould bar on side slope, form some minutes compartments;
B. the concrete of in minute compartment, constructing, construction sequence is following:
B1. with concrete placement vehicle concrete is poured in the branch compartment, manual work is shakeout;
B2. divide the concrete in the compartment with the jolt ramming of concrete vibrating equipment; This step is used the jolt ramming vibrator; Method of operating is the end face in side slope, operates the electric winch car by 1-2 people, moves it or locatees; Make the reel 20 of electric winch rotate withdrawal or loosen stay cord 10 through operation control 21, cooperate manual work vibrator 1 upper and lower, left and right to be moved through action bars; Make vibrator 1 left and right moving by 1 people's control operation bar 12 simultaneously;
B3. divide the concrete in the compartment with the vibration of concrete vibrating equipment, this step is used the vibration vibrator, and its method of operating is identical with the B2 step;
B4. maintenance divides the concrete in the compartment, and making it reach design strength becomes concrete segment;
B5. the separation mould bar with concrete segment removes, and changes the outfit to go up the expansion sealing rod; Like steps A is to adopt the treated separation mould bar with sealing performance, and this step can be saved;
C. the concrete of in the adjacent branch compartment of concrete segment that step B accomplishes, constructing, construction sequence is identical with B1, B2, B3, B4 among the step B.
Facts have proved that the present invention cooperates manpower to control vibrator through the electric winch car, greatly reduces constructor's labour intensity, make the heavy coolie of ten minutes become assignment easily, can guarantee side slope Concrete Construction quality, accelerating construction progress; That concrete vibrating equipment of the present invention has is simple in structure, cost is low, the characteristics of use and convenient transportation; The electric winch car that wherein increases; Directly shift onto on river levee or the water channel dike and use; Need not to lay guide rail, conveniently moving is specially adapted to the side slope concrete construction of river levee or middle-size and small-size irrigated area water channel.
Claims (5)
1. electric winch car; It is characterized in that: include electric winch and tractor, tractor has road wheel (30) and vehicle frame (31), and electric winch is installed on the vehicle frame (31); Electric winch has reel (20), motor (22) and controller (21); Reel (20) is driven by motor (22), and motor (22) is electrically connected to controller (21), and said controller (21) has ascending, descending, on/off button.
2. concrete vibrating equipment; Include vibrator and electric winch car; Said vibrator has vibration plate (11), the machine that shakes (13), the controller that vibrates (14), stay cord (10) and action bars (12), and the machine that shakes (13) is installed on the vibration plate (11), and an end of action bars (12) is connected on the vibration plate (11); The machine (13) that shakes is electrically connected to the controller that vibrates (14); It is characterized in that: the electric winch car is an electric winch car as claimed in claim 1, and an end of stay cord (10) is connected on vibration plate (11) or the machine that shakes (13), and the other end of stay cord (10) is wire-wrapped on the reel (20) of electric winch car.
3. concrete vibrating equipment according to claim 2; It is characterized in that: said vibration plate (11) is circular vibration plate; A mill vibration plate (15) is installed through the rotating shaft of the machine that shakes (13) in the back side of vibration plate (11), and mill vibration plate (15) is by the machine that shakes (13) driven rotary and vibration.
4. side slope concrete construction method may further comprise the steps:
Smooth side slope is installed longitudinal subdivision mould bar on side slope, form some minutes compartments;
The concrete of in minute compartment, constructing, construction sequence is following:
B1. concrete is poured in the branch compartment, manual work is shakeout;
B2. divide the concrete in the compartment with the jolt ramming of concrete vibrating equipment;
B3. divide the concrete surface in the compartment with the concrete vibrating equipment plain grinding light that shakes;
B4. maintenance divides the concrete in the compartment, and making it reach design strength becomes concrete segment;
The concrete of in the adjacent branch compartment of concrete segment that step B accomplishes, constructing, construction sequence is identical with B1, B2, B3, B4 among the step B;
It is characterized in that: used concrete vibrating equipment is the described concrete vibrating equipment of claim 2 among the step B2; Used concrete vibrating equipment is the described concrete vibrating equipment of claim 3 among the step B3; In step B2 and step B3; The electric winch car is positioned the top of branch compartment through manpower and road wheel (30); Vibrator upwards or down moves through the control of stay cord (10) and electric winch car compounding practice bar (12), controls left through action bars (12) simultaneously or moves right.
5. side slope concrete construction method according to claim 1 is characterized in that the construction sequence of step B comprises in addition:
B5. the separation mould bar with concrete segment removes, and changes the outfit to go up the expansion sealing rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101317522A CN102677631A (en) | 2012-05-02 | 2012-05-02 | Concrete vibrating equipment and side slope concrete construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101317522A CN102677631A (en) | 2012-05-02 | 2012-05-02 | Concrete vibrating equipment and side slope concrete construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102677631A true CN102677631A (en) | 2012-09-19 |
Family
ID=46810150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101317522A Pending CN102677631A (en) | 2012-05-02 | 2012-05-02 | Concrete vibrating equipment and side slope concrete construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102677631A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107186858A (en) * | 2017-06-05 | 2017-09-22 | 青岛林川工程技术咨询有限公司 | Automatic vibrating equipment |
CN108818899A (en) * | 2018-05-31 | 2018-11-16 | 宁波联城住工科技有限公司 | A kind of concrete surface processing equipment and its process of surface treatment |
CN110509438A (en) * | 2019-07-26 | 2019-11-29 | 贵州建工安顺建筑工程有限公司 | A leveling treatment method for karst landform rock slope |
CN113737733A (en) * | 2020-05-29 | 2021-12-03 | 广西建工集团海河水利建设有限责任公司 | Construction method for lining concrete of channel side slope |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH082884A (en) * | 1994-06-22 | 1996-01-09 | Yaskawa Electric Corp | Stop method for hoisting and lowering machine |
CN2288959Y (en) * | 1996-10-14 | 1998-08-26 | 归鼎华 | Hand-held light hoister |
CN2504246Y (en) * | 2001-09-20 | 2002-08-07 | 韩俊陆 | Single drum winch |
CN2883466Y (en) * | 2006-04-20 | 2007-03-28 | 中国葛洲坝水利水电工程集团有限公司 | Paving host winch for asphalt concrete slope |
CN201165664Y (en) * | 2007-12-11 | 2008-12-17 | 河南普美斯科技有限公司 | concrete paving machine |
CN201190285Y (en) * | 2008-04-29 | 2009-02-04 | 中国水利水电第一工程局 | Asphalt concrete knife type vibrator |
CN101973495A (en) * | 2010-10-30 | 2011-02-16 | 曹福林 | Novel long-range control explosion-proof motor-driven winch |
CN102359276A (en) * | 2011-09-30 | 2012-02-22 | 石家庄铁道大学 | Concrete pouring fast construction method |
-
2012
- 2012-05-02 CN CN2012101317522A patent/CN102677631A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH082884A (en) * | 1994-06-22 | 1996-01-09 | Yaskawa Electric Corp | Stop method for hoisting and lowering machine |
CN2288959Y (en) * | 1996-10-14 | 1998-08-26 | 归鼎华 | Hand-held light hoister |
CN2504246Y (en) * | 2001-09-20 | 2002-08-07 | 韩俊陆 | Single drum winch |
CN2883466Y (en) * | 2006-04-20 | 2007-03-28 | 中国葛洲坝水利水电工程集团有限公司 | Paving host winch for asphalt concrete slope |
CN201165664Y (en) * | 2007-12-11 | 2008-12-17 | 河南普美斯科技有限公司 | concrete paving machine |
CN201190285Y (en) * | 2008-04-29 | 2009-02-04 | 中国水利水电第一工程局 | Asphalt concrete knife type vibrator |
CN101973495A (en) * | 2010-10-30 | 2011-02-16 | 曹福林 | Novel long-range control explosion-proof motor-driven winch |
CN102359276A (en) * | 2011-09-30 | 2012-02-22 | 石家庄铁道大学 | Concrete pouring fast construction method |
Non-Patent Citations (2)
Title |
---|
《三峡大学学报(自然科学版)》 20071231 陈永清等 斜坡摊铺混凝土振动碾牵引车的设计 第533-535页 2-5 , 第6期 * |
陈永清等: "斜坡摊铺混凝土振动碾牵引车的设计", 《三峡大学学报(自然科学版)》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107186858A (en) * | 2017-06-05 | 2017-09-22 | 青岛林川工程技术咨询有限公司 | Automatic vibrating equipment |
CN107186858B (en) * | 2017-06-05 | 2022-05-13 | 中交第四公路工程局有限公司 | Automatic vibrating equipment |
CN108818899A (en) * | 2018-05-31 | 2018-11-16 | 宁波联城住工科技有限公司 | A kind of concrete surface processing equipment and its process of surface treatment |
CN110509438A (en) * | 2019-07-26 | 2019-11-29 | 贵州建工安顺建筑工程有限公司 | A leveling treatment method for karst landform rock slope |
CN110509438B (en) * | 2019-07-26 | 2021-04-06 | 贵州建工安顺建筑工程有限公司 | Leveling treatment method for karst landform rock slope |
CN113737733A (en) * | 2020-05-29 | 2021-12-03 | 广西建工集团海河水利建设有限责任公司 | Construction method for lining concrete of channel side slope |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102677631A (en) | Concrete vibrating equipment and side slope concrete construction method | |
CN204199640U (en) | A kind of Novel powder wall telephone | |
CN203296022U (en) | Sand gritter for channel | |
CN109680953B (en) | Discharging and mixing vibrating device for self-moving regenerated block | |
CN103872622B (en) | Built on stilts cable laying tractor and Special-purpose lifting instrument thereof | |
CN105804745B (en) | Portable scraper loader | |
CN207363676U (en) | A kind of self-propelled ditch cable trench trolley | |
KR20010076802A (en) | Sprinkler for Curing of Tunnel Lining Concrete and Curing Method of Tunnel Lining Concrete for Using the Sprinkler | |
CN102747733B (en) | Pouring machine and pouring method for concrete of road shoulder on high-speed railroad bed section | |
CN207387952U (en) | Self-walking bridge beam slab roughening machine | |
CN104153325B (en) | For the heavy thickness concrete automatic pouring machine of the domatic band reinforced mesh of channel | |
CN202595700U (en) | Concrete vibrating equipment for riverbank or canal slope construction | |
CN2298278Y (en) | Combined vibrating spreading machine | |
CN101949169B (en) | Large pipeline sludge dredging machine | |
CN202672156U (en) | High-speed-railway roadbed-section road-shoulder concrete pouring machine | |
CN202401427U (en) | Integrated slip form equipment for paving concrete and sand and vibrating sand for bed of canal | |
CN101705748A (en) | Formwork for placing concrete on slope surface | |
CN208359065U (en) | A kind of automatic strand pulling machine of withdrawing stick | |
CN101942804A (en) | Bridge surface construction vehicle for high-speed railway | |
CN205604733U (en) | Movable for building small -size intelligence oscillating -column pump | |
CN203296023U (en) | Paving compacting trolley for channel sand gritter | |
CN212506710U (en) | Hidden culvert dredging device | |
CN205399218U (en) | A self -propelled vibrations framed bent for construction of overpass concrete box beam | |
CN203334248U (en) | Distribution trolley of channel gritter | |
CN201801322U (en) | High-speed railway deck construction vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120919 |