CN102636732B - Method for searching for 10kV power grid grounding based on six-sigma tool - Google Patents

Method for searching for 10kV power grid grounding based on six-sigma tool Download PDF

Info

Publication number
CN102636732B
CN102636732B CN201210112592.7A CN201210112592A CN102636732B CN 102636732 B CN102636732 B CN 102636732B CN 201210112592 A CN201210112592 A CN 201210112592A CN 102636732 B CN102636732 B CN 102636732B
Authority
CN
China
Prior art keywords
ground connection
switch
ground
tagmeme
searching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210112592.7A
Other languages
Chinese (zh)
Other versions
CN102636732A (en
Inventor
赵亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201210112592.7A priority Critical patent/CN102636732B/en
Publication of CN102636732A publication Critical patent/CN102636732A/en
Application granted granted Critical
Publication of CN102636732B publication Critical patent/CN102636732B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Locating Faults (AREA)

Abstract

The invention relates to a method for searching for 10kV power grid grounding based on a six-sigma tool and belongs to the field of power grid running. The method comprises the following steps of: establishing a line database, namely, listing and arraying all branches on a bus bar of an independent 10kV power grid, surveying and filling performance data; establishing a causality matrix, assessing and rating, and sorting; and performing grounding searching operation. According to the method provided by the invention, the six-sigma tool is adopted; a switching sequence table is established on the basis of the data; the hit rate of searching grounding can be increased by using the switching sequence table; the searching time is shortened; the safety running of a power supply system is recovered as soon as possible; and the normal production is ensured.

Description

A kind of method of searching 10kV electrical network ground connection based on Six Sigma instrument
Technical field
The invention belongs to operation of power networks field, technology and the method for operating of earth fault searched in dispatching of power netwoks, relates to the utilization of quality improvement and analytical approach and the related tool of six Sigma Management.
Background technology
The big-and-middle-sized 10kV of integrated iron and steel works power supply system is main supply network, and wherein the small current neutral grounding system through grounding through arc also occupies certain proportion.Select neutral by arc extinction coil grounding mode, compensated earth point capacitance current, residual flow diminishes, and reaches blow-out, prevents expansion accident.This earthing mode cannot be realized zero-sequenceprotection tripping operation disengagement failure circuit, allows ground connection operation two hours, conventionally adopts Small Electric Current Earthing And Routing Device and artificial pulling load method to search ground path, finds post-tensioning road excision ground path.In actual motion, just because of arc extinction compensation effect, residual flow is little, is subject to the various factors such as the method for operation, earthing position, line parameter circuit value, though producer makes great efforts to improve to line selection device for low current, actual motion route selection accuracy is undesirable, and accuracy is lower than 50%.Therefore artificial experience is searched ground path, is the important means of processing earth fault.Artificial experience is searched ground connection, and object is to use the time as soon as possible, by minimum step, finds out exactly ground path.
Taiyuan Iron and Steel Co. power scheduling, in the process of processing earth fault over the years, though accumulated certain experience, has formed a set of frame-type operation scheme, in processing, substantially can find on request ground path, but still has when exceeding two hours and can not find ground path.In the shortest time, finding ground path or find ground path by minimum operation steps has certain contingency, lacks the operation that a set of more scientific, more accurate system is supported earthing searching.This rule of thumb and sensation are processed earth fault, add peopleware difference, and treatment effect has a great difference, and such operation is more coarse, also not up to standard.This is not suitable with the standardization of work, the propelling target that becomes more meticulous, inadaptable with the corporate strategy target of pursuing being outstanding.
Summary of the invention
The present invention is by setting up 10kV power supply network line characteristic database, use Six Sigma instrument and analytical approach data characteristic on the impact of the ground connection probability sequence of comprehensively giving a mark, the generation tagmeme table of operating a switch.Property database can move actual change according to network system and upgrade, and by computer software, automatically upgrades tagmeme table.This tagmeme table is used in dispatching of power netwoks, improves the reliability of searching ground connection operating basis, improves and searches ground path hit rate.
The present invention be take computing machine as carrier, the grounding fault system of setting up with Six Sigma method, and the relevant valuable module of set (expert's historical experience storehouse, standard earthing searching flow process etc.), can be used as yardman work reference tool and skills training instrument, finally help yardman to find fast ground path, make system avoid extendability breaking accident, recover safe operation, guarantee company's equipment runs well and normal production.
Technical scheme of the present invention is:
1. set up track data storehouse, all shunt lists on a bus of independent 10kV power supply network are arranged, investigate and fill in performance data;
Described performance data project has:
The basis factor:
(1) form of conductors: direct-furnish cable, aerial bare line, suspended insulated guide wire, overground cable, built on stilts and cable segmentation joint line;
(2) cable or aerial condutor length
(3) cable or aerial condutor divide number
(4) cable mid head number
(5) cable trace: dedicated tunnel (ditch), direct-burried
(6) pole line path: building, trees, dust
(7) be with user power utilization maintenance management level
Dynamic factor:
(1) weather: strong wind, thunderstorm, rain and snow mixed (sleet)
(2) break ground the construction of construction, high-altitude,
(3) increase branch (user)
(4) whether test
(5) intermediate cable head increases.
2 set up cause-effect relationship matrix, assessment marking, sequence;
Described cause-effect relationship matrix comprises basic factor causality matrix and dynamic factor causality matrix.
Basis factor causality matrix table:
Figure 673347DEST_PATH_IMAGE002
Dynamic factor causality matrix table:
Figure 390767DEST_PATH_IMAGE003
Each circuit marking sequence
The project of red sign is relevant with quantity or number, and their score value is processed by following:
N is plowed to circuit to be arranged by descending order according to number or quantity, 1/n(, with fractional representation, is retained to two-decimal) as differential, this project total points in table 1, table 2 of take is radix, maximum score value is: radix+n/n, the second score value are: radix+(n-1)/n ... finally
Score value: a radix+1/n.Like this, each circuit has again big or small fine difference not departing under the prerequisite of basic minute of this characteristic, plays by a minute effect for sequence.
3 earthing searching operation stepss:
The first step, searches ground path by ground connection Selected Inspection device, tries to operate a switch selected circuit, if ground connection is eliminated after operating a switch, illustrates and searches correctly; If do not find ground path, carry out artificial search program.
Second step, cuts apart electrical network, by drawing bus connection switch, interconnection to operate earthing electric network on a large scale, cuts apart, finally only have one section of busbar grounding, just can use the circuit tagmeme table of operating a switch, by tagmeme examination bracing wire road, in order to get rid of whether ground connection of interconnection, can first try to draw interconnection.
The 3rd step, by the tagmeme table examination bracing wire road of operating a switch, if announcement trunk user is out of service, line-to-ground is just eliminated, and this is single supply user ground connection; If before bracing wire road, user does not have a power failure, load switching, to other power supply, is found to ground connection transfer, this is dual power supply user ground connection; If there is no above-mentioned two situations, circuit outlet master switch is pulled open, by tagmeme, draw successively, until ground connection is eliminated, find ground path.
The 4th step, reparation is specifically searched and processed to notice site work personnel's earth wire road earth point.
4 experts databases, record the processing procedure of all previous earth fault, with forum's message way of submission, this fault handling are proposed to personal view and suggestion, by interchange, improve earth fault processing horizontal.
5 earth fault processing horizontal monitoring, being about to the horizontal key element of all previous grounding records and compares: as find ground path through the item number of grid switching operation, elapsed time, the operate a switch number etc. of circuit of examination, with diagrammatic form, represent, for finding the also variation of evaluation work level.
Beneficial effect of the present invention
The present invention uses Six Sigma instrument, by data, is according to setting up the tagmeme table of operating a switch, using this tagmeme table to improve and search ground connection hit rate, shorten and search the time, make electric power system recover as early as possible safe operation, guarantee normally to produce, a kind of unprecedented theory of operation foundation is provided.
To every time circuit according to different qualities marking sequence, by every time circuit according to ranked first of ground connection possibility maximum, the like, last tagmeme ground connection possibility is minimum.When this busbar grounding, preferential examination stop sorting first circuit, hit rate improves.
Embodiment
Embodiment: the line characteristic data of the one section of bus belt in Shanxi Taigang Stainless Steel Co., Ltd's step-down station are:
1. three steel power 1#: direct-furnish cable, cable duct, two intermediate cable heads
2. three steel power 3#: direct-furnish cable, cable duct
3. shaft furnace 2# line: direct-furnish cable, cable duct, two users, newly reconstruct circuit
4. coking 5#: direct-furnish cable, cable duct, stand the test in the recent period
5. the 1# of Dongchan: direct-furnish cable, cable duct, part direct-burried, two users, You Liang branch, 3 medial head
6. 3# extinguishing arc: direct-furnish cable, cable vault, cable are very short
7. sintering 6#: direct-furnish cable, two users
8. fully utilize line: overground cable mixes, multi-user, multiple-limb, certain customers' equipment control is poor, 5 of medial head, partial cables direct-burried
Line length comparison: 8. > 5. > 3. > 4. > 7. > 1. > 2. > is 6.
According to standards of grading, fill in following table:
Figure 785977DEST_PATH_IMAGE004
* cable and the differential 1/8=0.125 of built on stilts length;
⑧90+1=91 ⑤30+7/8=30.875 ③30+6/8=30.75
④30+5/8=30.625 ⑦30+4/8=30.5 ①30+3/8=30.375
②30+2/8=30.25 ⑥30+1/8=30.125
Only has ⑧⑤You branch, differential 1/2=0.5
⑧54+1=55 ⑤38+0.5=38.5
8. 5. 1. there is intermediate cable head: differential 1/3=0.333
⑧38+1=39 ⑤38+0.666=38.666 ①38+0.333=38.333
8. 5. have direct-buried cable, 5. > is 8. for direct-burried part: differential 0.5
⑧98+0.5=98.5 ⑤98+1=99
Fill in the tagmeme table of operating a switch:
Figure 538032DEST_PATH_IMAGE005
If there was inclement weather the same day, at overhead type circuit, add corresponding score value, form interim tagmeme table.In order to using.To take bus as unit through all circuits of extinguishing arc earthed system after the same method, generate the tagmeme table of operating a switch separately, in order to using.
, when ground connection occurs, the first step, searches ground path by ground connection Selected Inspection device, the examination selected circuit of operating a switch, if ground connection is eliminated after operating a switch, illustrate and searches correctly.If do not find ground path, carry out artificial search program.
Second step, cuts apart electrical network, will be on a large scale earthing electric network cut apart (by drawing the operations such as bus connection switch, interconnection), finally only have one section of busbar grounding, just can use the circuit tagmeme table of operating a switch, by tagmeme, try bracing wire road.In order to get rid of whether ground connection of interconnection, can first try to draw interconnection.
The 3rd step, exactly by the tagmeme table examination bracing wire road of operating a switch.If announcement trunk user (stopping equipment) out of service line-to-ground is just eliminated, this is single supply user ground connection.If before bracing wire road, user does not have a power failure, load switching, to other power supply, is found to ground connection transfer, this is dual power supply user ground connection.If there is no above-mentioned two situations, circuit outlet master switch is pulled open, by tagmeme, draw successively, until ground connection is eliminated, find ground path.
The 4th step, reparation is specifically searched and processed to notice site work personnel's earth wire road earth point.

Claims (1)

1. based on Six Sigma instrument, search a method for 10kV electrical network ground connection, it is characterized in that comprising and set up track data storehouse, all shunt lists on a bus of independent 10kV power supply network are arranged, investigate and fill in performance data; Set up cause-effect relationship matrix, use Six Sigma instrument and analytical approach performance data on the impact of the ground connection probability sequence of comprehensively giving a mark, the generation tagmeme table of operating a switch; Earthing searching operation steps; Described earthing searching operation steps is: the first step, by ground connection Selected Inspection device, search ground path, and try to operate a switch selected circuit, if ground connection is eliminated after operating a switch, illustrate and search correctly; If do not find ground path, carry out artificial search program;
Second step, cuts apart electrical network, by drawing bus connection switch, interconnection to operate earthing electric network on a large scale, cuts apart, finally only have one section of busbar grounding, just use the circuit tagmeme table of operating a switch, by tagmeme examination bracing wire road, in order to get rid of whether ground connection of interconnection, interconnection is drawn in first examination;
The 3rd step, by the tagmeme table examination bracing wire road of operating a switch, if announcement trunk user is out of service, line-to-ground is just eliminated, and this is single supply user ground connection; If before bracing wire road, user does not have a power failure, load switching, to other power supply, is found to ground connection transfer, this is dual power supply user ground connection; If there is no above-mentioned two situations, circuit outlet master switch is pulled open, by tagmeme, draw successively, until ground connection is eliminated, find ground path;
The 4th step, reparation is specifically searched and processed to notice site work personnel's earth wire road earth point.
CN201210112592.7A 2012-04-17 2012-04-17 Method for searching for 10kV power grid grounding based on six-sigma tool Active CN102636732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210112592.7A CN102636732B (en) 2012-04-17 2012-04-17 Method for searching for 10kV power grid grounding based on six-sigma tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210112592.7A CN102636732B (en) 2012-04-17 2012-04-17 Method for searching for 10kV power grid grounding based on six-sigma tool

Publications (2)

Publication Number Publication Date
CN102636732A CN102636732A (en) 2012-08-15
CN102636732B true CN102636732B (en) 2014-04-16

Family

ID=46621200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210112592.7A Active CN102636732B (en) 2012-04-17 2012-04-17 Method for searching for 10kV power grid grounding based on six-sigma tool

Country Status (1)

Country Link
CN (1) CN102636732B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106501676A (en) * 2016-11-02 2017-03-15 国网福建省电力有限公司 A kind of method based on electrical power distribution automatization system lost territory failure line selection
CN111930729B (en) * 2020-07-02 2021-04-06 上海微亿智造科技有限公司 Method and system for dynamically calculating six-sigma numerical value of large data volume in real time

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1843464B1 (en) * 2006-04-04 2012-10-17 Dialog Semiconductor GmbH Voltage-to-current converter
US8589081B2 (en) * 2009-07-24 2013-11-19 Bio-Rad Laboratories, Inc. System and method to determine sigma of a clinical diagnostic process

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
六西格玛管理在电解铝行业的应用;李钊;《四川有色金属》;20051231(第4期);37-42 *
六西格玛管理法在供电服务中的应用;胡笳等;《广东电力》;20090331;第22卷(第3期);47-51 *
李钊.六西格玛管理在电解铝行业的应用.《四川有色金属》.2005,(第4期),37-42.
胡笳等.六西格玛管理法在供电服务中的应用.《广东电力》.2009,第22卷(第3期),47-51.

Also Published As

Publication number Publication date
CN102636732A (en) 2012-08-15

Similar Documents

Publication Publication Date Title
CN102426305B (en) Power grid thunder damage risk evaluation method
CN103871003A (en) Power distribution network fault diagnosis method utilizing historical fault data
CN103020761B (en) A kind of power distribution network repair method based on automatic division unit and evaluation
CN104809665B (en) A kind of power distribution network method for early warning based on improvement Apriori algorithm
CN103776492B (en) OPGW condition monitoring system
Chen et al. A numerical approach for hybrid simulation of power system dynamics considering extreme icing events
CN106501676A (en) A kind of method based on electrical power distribution automatization system lost territory failure line selection
CN102800029A (en) Risk probability evaluation method for same-tower multi-circuit power transmission line
CN102856869B (en) Wiring method for realizing direct-current deicing of ground wire of converter station
CN102636732B (en) Method for searching for 10kV power grid grounding based on six-sigma tool
CN108919043A (en) Power distribution network small current earthing wire-selecting method based on Multi-source Information Fusion
CN113013871A (en) Load transfer method for power distribution network equipment during fault and maintenance
CN106443334B (en) A fault line selection method for distribution network based on zero-sequence current differential polarity comparison
Chun et al. Research on differentiated lightning protection comprehensive management for the 500-kV power network in the area near the three gorges project
Brown Hurricane hardening efforts in Florida
CN101907675A (en) A method for finding faults in distribution network lines
CN102937690A (en) Lightning stroke failure disconnection positioning method based on information interaction
Saha et al. Smart grid and WAMS in Indian context-A review
CN106771878B (en) A kind of monitoring method of wind power plant shaft tower lightning stroke drop point
CN104700318A (en) Method for identifying weak link of power distribution network based on equipment power flow topology
Li et al. Live-line operation and maintenance of power distribution networks
CN108229863B (en) Power supply reliability calculation method for power distribution network
CN110879329A (en) Lightning protection optimization and fault location method suitable for high-altitude landscape tower
JP2007166848A (en) Investigation and analysis support system for cause of distribution line accident
CN106154106A (en) Layering cascade system failure line selection logic decision method based on route selection result

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant