CN102606368A - 可逆式水泵水轮机转轮直径的计算方法 - Google Patents

可逆式水泵水轮机转轮直径的计算方法 Download PDF

Info

Publication number
CN102606368A
CN102606368A CN2012100883551A CN201210088355A CN102606368A CN 102606368 A CN102606368 A CN 102606368A CN 2012100883551 A CN2012100883551 A CN 2012100883551A CN 201210088355 A CN201210088355 A CN 201210088355A CN 102606368 A CN102606368 A CN 102606368A
Authority
CN
China
Prior art keywords
mrow
diameter
pump turbine
msub
calculating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100883551A
Other languages
English (en)
Other versions
CN102606368B (zh
Inventor
易忠有
王雨会
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Beijing Engineering Corp Ltd
Hydrochina Beijing Engineering Corp
Original Assignee
Hydrochina Beijing Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Beijing Engineering Corp filed Critical Hydrochina Beijing Engineering Corp
Priority to CN201210088355.1A priority Critical patent/CN102606368B/zh
Publication of CN102606368A publication Critical patent/CN102606368A/zh
Application granted granted Critical
Publication of CN102606368B publication Critical patent/CN102606368B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Hydraulic Turbines (AREA)

Abstract

本发明公开了一种可逆式水泵水轮机转轮直径的计算方法,包括转轮高压侧直径及低压侧直径,通过多个水泵水轮机的转轮直径与最小扬程、最小扬程流量、比转速以及发电电动机额定轴输出功率等参数的相互关系的详细研究分析,提出一种简单计算可逆式水泵水轮机转轮直径计算的统计公式。所述的可逆式水泵水轮机转轮计算公式提供了科学合理的水泵水轮机转轮直径计算方法,使设计者无需通过水力模型试验的基础上即可进行计算、选取,从而节省了人力、物力,提高了效率。

Description

可逆式水泵水轮机转轮直径的计算方法
技术领域
本发明涉及一种水泵水轮机转轮直径的计算方法,尤其是一种可逆式水泵水轮机转轮直径的计算方法。
背景技术
在现有技术中可逆式水泵水轮机转轮直径的计算主要依靠机组模型试验或按水轮机工况估算单位流量后再确定。
(1)按模型试验确定:根据同水头/扬程段水泵水轮机组的综合模型特性曲线,综合考虑水泵工况性能及水轮机工况性能后选取合适的水轮机工况额定水头单位流量Q11,再根据下述计算公式水泵水轮机转轮直径:
D 1 = [ N r 8.88 × Q 11 × H r 1.5 ] 0.5
其中:D1-转轮高压侧直径(m);
Nr-水轮机工况额定功率(kW);
Hr-水轮机工况额定水头(m);
Q11-水轮机工况额定水头下的单位流量(m3/s)。
按上述方法存在以下缺限:
1)由于受蓄能电站建设条件限制,基本找不着同水头/扬程的水泵水轮机组综合模型特性曲线,需根据相近水头/扬程水泵水轮机模型经修型并经过试验后再绘制新的模型综合曲线,这样投资大大增加,且需花费近半年的模型试验时间。该方法仅适应于厂家投标或中标后针对电站做实际水力设计,而在工程可行性研究设计中,比选方案众多,不可能采用此方法。
2)该方法只能计算转轮高压侧直径,不能进行转轮低压侧直径计算。
(2)按水轮机工况估算单位流量计算:根据图1的Hr-nst统计曲线,初步选取水轮机工况额定水头下的比转速nst(m·kW)。Hr≥400m时,在Kt=2400曲线上选取nst;400m>Hr≥100m时可在Kt=2200曲线上选取nst;Hr<100m时在Kt=2000或Kt=1800曲线上选取nst,再按下式计算转轮直径:
Q11=0.003×nst-0.15
D 1 = [ N r 8.88 × Q 11 × H r 1.5 ] 0.5
上述:nst为水轮机工况额定水头下的比转速(m·kW);
Kt为水轮机工况额定水头下的比速系数。
按该方法计算,存在以下缺点:
1)该计算方法根据统计的不同水头段的比速系数曲线上选取水轮机工况额定水头下的比转速,一方面额定水头在一定范围内采用同一统计曲线,存在较大误差,另一方面,实际情况表明相同容量及相同额定水头的水泵水轮机,如果最小扬程不一样,其转轮直径将相差较大,而按上述方法计算其结果将一样,存在较大误差,在实际设计方案比较时不准确、不实用。
2)该方法纯粹是按水轮机工况计算转轮直径,而抽水蓄能电站水泵工况较水轮机工况更为复杂,一般按水泵工况设计,即优先保证水泵工况性能,如按上述方法计算,一般难以保证水泵工况性能,计算出来的直径不能很好满足水泵工况要求。
发明内容
本发明所要解决的技术问题是,提供一种以实际工程资料为依托,方法简单、使用方便的可逆式水泵水轮机转轮直径的计算方法。
为了解决上述技术问题,本发明采用的技术方案是:一种可逆式水泵水轮机转轮直径的计算方法,包括以下步骤:
(1)根据工程实际参数计算最小扬程流量
Figure BDA0000148156160000022
其中,Hpmin为可逆式水泵水轮机最小扬程,m;
Qpmin为可逆式水泵水轮机最小扬程流量,m3/s;
Nr为可逆式发电电动机额定轴输出功率,kW;
g为重力加速度,m/s2
ηp为可逆式水泵水轮机最小扬程效率,%;
(2)计算水泵水轮机最小扬程比转速,
Figure BDA0000148156160000031
其中,nr为水泵水轮机额定转速,r/min;
(3)计算水泵水轮机高压侧转轮直径:
D 1 = ( 0.3504 × n sp + 75.75 ) × H p min n r
Figure BDA0000148156160000033
其中K1=0.3504×nsp+75.75;
(4)计算水泵水轮机低压侧转轮直径:
D2=(0.006×nsp+0.3184)×D1
或D2=K2×D1
K2=0.006×nsp+0.3184。
所述可逆式水泵水轮机为单级定转速混流可逆式水泵水轮机。
本发明的有益效果是:本发明的水泵水轮机转轮直径计算公式包括转轮高压侧直径及低压侧直径,通过多个水泵水轮机的转轮直径与最小扬程、最小扬程流量、比转速以及发电电动机额定轴输出功率等参数的相互关系的详细研究分析,提出一种简单计算可逆式水泵水轮机转轮直径计算的统计公式。所述的可逆式水泵水轮机转轮计算公式提供了科学合理的水泵水轮机转轮直径计算方法,使设计者在无需通过水力模型试验的基础上即可进行计算,同时本计算从水泵工况计算,确保了水泵工况性能,从而节省了人力、物力的基础上更加准确,提高了效率。
附图说明
图1是现有技术按水轮机工况估算单位流量计算的Hr-nst统计曲线;
图2是本发明可逆式水泵水轮机转轮高压侧直径计算方法中K1值系数与水泵最小扬程比转速nsp的关系曲线图;
图3是本发明可逆式水泵水轮机转轮低压侧直径计算方法中K2值系数与水泵最小扬程比转速nsp的关系曲线图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细说明:
本发明的可逆式水泵水轮机转轮直径的计算方法,包括以下步骤:
(1)根据工程实际参数计算最小扬程流量
其中,Hpmin为可逆式水泵水轮机最小扬程,m;
Qpmin为可逆式水泵水轮机最小扬程流量,m3/s;
Nr为可逆式发电电动机额定轴输出功率,kW;
g为重力加速度,m/s2
ηp为可逆式水泵水轮机最小扬程效率,%;
(2)计算水泵水轮机最小扬程比转速,
Figure BDA0000148156160000042
其中,nr为水泵水轮机额定转速,r/min;
(3)计算水泵水轮机高压侧转轮直径:
D 1 = ( 0.3504 × n sp + 75.75 ) × H p min n r
Figure BDA0000148156160000044
其中K1=0.3504×nsp+75.75;
(4)计算水泵水轮机低压侧转轮直径:
D2=(0.006×nsp+0.3184)×D1
或D2=K2×D1
K2=0.006×nsp+0.3184。
所述可逆式水泵水轮机为单级混流式水泵水轮机。
具体地说,本发明可逆式水泵水轮机转轮直径计算方法公式:
D 1 = ( 0.3504 × n sp + 75.75 ) × H p min n r
D 1 = K 1 H p min n r
K1=0.3504×nsp+75.75;
D2=(0.006×nsp+0.3184)×D1
或D2=K2×D1
K2=0.006×nsp+0.3184。
是通过以下拟合方法得到的:根据表1中列出的已建、在建工程可逆式水泵水轮机转轮高压侧直径与最小扬程及额定转速的关系,拟合出K1-nsp曲线图,如图2所示,拟合成公式为:
K1=0.3504×nsp+75.75
根据表中列出的已建、在建工程可逆式水泵水轮机转轮低压侧直径与转轮高压侧转轮直径及最小扬程比转速的关系,拟合出K2-nsp曲线图,如图3所示,拟合成公式为:
K2=0.006×nsp+0.3184
表1已建抽水蓄能电站转轮直径与最小扬程、最小扬程流量及比转速关系表
  电站名称   Hpmin   Qpmin   nr   nsp   D1   D2   K1   D1计算值   K2   D2计算值
  Ohira   509   45   400   25.04   4.78   2.18   84.748   4.77   0.469   2.24
  chaira   613.4   29.5   600   26.44   3.52   1.638   85.275   3.51   0.477   1.67
  S.jares   235   10.1   500   26.47   2.46   1.2   80.236   2.61   0.477   1.24
  Hongawa   532.1   54.31   400   26.61   4.9   2.346   84.969   4.91   0.478   2.35
  Numapara   458   50   375   26.78   4.95   2.64   86.737   4.86   0.479   2.33
  Bajna Basta   531.7   50.8   428.6   27.59   4.828   2.18   89.74   4.6   0.484   2.23
  Chongpyong   474   39   450   27.66   4.055   1.868   83.814   4.13   0.484   2
  Okukiyotsu   461   54   375   27.7   5.2   0   90.821   4.89   0.485   2.37
  Taumsauk   233   75   200   29.04   6.475   3.239   84.838   6.56   0.493   3.23
  Tamhara   505.1   52.5   428.6   29.15   4.53   2.25   86.39   4.51   0.493   2.22
  Cabin creek   319   39   360   29.78   4.191   2.061   84.474   4.28   0.497   2.13
  Imaichi   528   59.3   428.6   29.96   4.62   2.258   86.174   4.62   0.498   2.3
  Drskensburg   420.5   58.1   375   30.78   4.72   2.316   86.316   4.73   0.503   2.38
  Okutataragi   366.8   76.7   300   31.35   5.638   2.8   88.314   5.54   0.507   2.81
  Helms   450   74   360   31.7   5.3   0   89.944   5.12   0.509   2.61
  Okuyoshjno   468   39.4   514.3   32.08   3.76   1.834   89.388   3.66   0.511   1.87
  Shimogo   392   62   375   33.52   4.61   2.47   87.315   4.62   0.52   2.4
  天荒坪   532   57.7   500   34.29   4.08   2.045   88.445   4.05   0.524   2.12
  电站名称   Hpmin   Qpmin   nr   nsp   D1   D2   K1   D1计算值   K2   D2计算值
  十三陵   440.4   43.5   500   34.3   3.6311   1.949   86.514   3.68   0.524   1.93
  呼和浩特   507.6   55.27   500   34.76   3.88   1.911   86.107   3.96   0.527   2.09
  广蓄二期   514   57.3   500   35.06   3.802   2.09   83.85   3.99   0.529   2.11
  Kinorwic   500   55.5   500   35.23   3.796   2.03   84.881   3.94   0.53   2.09
  Montezic   388   51.9   428.6   35.32   4.01   0   87.253   4.05   0.53   2.15
  Bath County   334   116   257.1   35.44   6.349   3.355   89.317   6.27   0.531   3.33
  广蓄一期   514   60   500   35.88   3.886   2.312   85.702   4   0.534   2.14
  Mosul II   321.4   31.23   500   36.81   3.13   0   87.295   3.18   0.539   1.71
  Prozelton   285   26.3   500   36.97   3.01   1.616   89.149   3   0.54   1.62
  Castaic   265   91   257.1   37.34   5.84   0   92.234   5.62   0.542   3.05
  宜兴   360   69.5   375   37.83   4.38   2.6   86.567   4.5   0.545   2.45
  Nabara   280.5   110   257   39.33   5.95   3.3   91.303   5.83   0.554   3.23
  溪口   242   17.3   600   40.67   2.248   1.332   86.704   2.33   0.562   1.31
  Anapo   292.1   45.5   428.6   40.92   3.575   0   89.653   3.59   0.564   2.02
  Shin   229.6   128.1   214.3   41.12   6.35   3.87   89.807   6.37   0.565   3.6
  Coo II   235   82.4   273   41.29   5.26   2.823   93.673   5.07   0.566   2.87
  明潭   357.2   72.3   400   41.39   4.3   0   91.007   4.26   0.567   2.42
  Rodund II   324   71.5   375   41.52   4.328   2.424   90.167   4.33   0.568   2.46
  张河湾   295.75   80.25   333.3   41.87   4.61   2.665   89.346   4.67   0.57   2.66
  蒲石河   294.37   101.05   300   42.43   5.2   0   90.924   5.18   0.573   2.97
  Viandeno   267   74.1   333   43.4   4.39   2.446   89.465   4.46   0.579   2.58
  Kisenyama   197   110   225   44.88   5.7   3.38   91.374   5.71   0.588   3.36
  Revin   212   69.2   300   44.92   4.33   2.72   89.216   4.44   0.588   2.61
  黑麋峰   276.2   106   300   45.59   5.15   2.83   92.964   5.08   0.592   3.01
  Mloty   248.8   96.5   300   47.04   4.94   3.25   93.956   4.85   0.601   2.91
  Raccoonmt   287   127   300   48.49   4.926   3.302   87.232   5.24   0.609   3.19
  Robiei   285   11.8   1000   49.52   1.65   1   97.738   1.57   0.616   0.97
  Bear-swamp   209   155   225   50.96   5.84   0   90.891   6.01   0.624   3.75
  桐柏   237.54   119.3   300   54.16   4.802   3.154   93.471   4.87   0.643   3.13
  泰安   223.58   112.36   300   55   4.548   3.012   91.248   4.74   0.648   3.07
  响水涧   178.94   137.35   250   59.89   5.139   3.28   96.043   5.18   0.649   3.51
  Shin toyone1#5#   180   122.9   250   56.4   5.42   3.525   101   5.13   0.657   3.37
  Shin toyone2#4#   180   122.9   257   57.98   5.42   3.525   103.82   5.02   0.666   3.34
  Juktan   199   109.8   300   59.33   4.588   3.1   97.57   4.54   0.674   3.06
  白莲河   191   151.3   250   59.85   5.177   3.315   93.649   5.35   0.678   3.63
  琅琊山   124.7   123.6   230.8   68.76   4.725   3.336   97.657   4.83   0.731   3.53
验算实施例如下:
实施例1
若已知抽水蓄能电站最小扬程Hpmin为295.13m,发电电动机额定轴输出功率268MW,额定转速为333.3r/min,水泵水轮机最小扬程效率92%,计算水泵水轮机转轮直径。
第一步:根据工程实际参数计算最小扬程流量Qpmin
Q p min = 0.97 × N r × η p g × H p min
= 0.97 × 268 × 1000 × 0.92 9.81 × 295.13
= 82.6 ( m 3 / s )
其中,
Hpmin为可逆式水泵水轮机最小扬程(m);
Qpmin为可逆式水泵水轮机最小扬程流量(m3/s);
Nr为可逆式发电电动机额定轴输出功率(kW);
g为重力加速度(m/s2);
ηp为可逆式水泵水轮机最小扬程效率(%)
第二步:计算水泵水轮机最小扬程比转速nsp
n sp = n r Q p min H p min 0.75
= 333.3 × 82.6 295.13 0.75
= 42.54 ( m - m 3 / s )
第三步:计算水泵水轮机高压侧转轮直径:
D 1 = ( 0.3504 × n sp + 75.75 ) × H p min n r
= ( 0.3504 × 42.54 + 75.75 ) × 295.13 333.3
= 4.673 ( m )
第四步:计算水泵水轮机低压侧转轮直径:
D2=(0.006×nsp+0.3184)×D1
=(0.006×42.54+0.3184)×4.673
=2.68(m)
表1中列出采用本发明的经验公式计算的结果和试验结果供参考。
以上所述的实施例仅用于说明本发明的技术思想及特点,其目的在于使本领域内的技术人员能够理解本发明的内容并据以实施,不能仅以本实施例来限定本发明的专利范围,即凡本发明所揭示的精神所作的同等变化或修饰,仍落在本发明的专利范围内。

Claims (2)

1.一种可逆式水泵水轮机转轮直径的计算方法,其特征在于,包括以下步骤:
(1)根据工程实际参数计算最小扬程流量
Figure FDA0000148156150000011
其中,Hpmin为可逆式水泵水轮机最小扬程,m;
Qpmin为可逆式水泵水轮机最小扬程流量,m3/s;
Nr为可逆式发电电动机额定轴输出功率,kW;
g为重力加速度,m/s2
ηp为可逆式水泵水轮机最小扬程效率,%;
(2)计算水泵水轮机最小扬程比转速,
Figure FDA0000148156150000012
其中,nr为水泵水轮机额定转速,r/min;
(3)计算水泵水轮机高压侧转轮直径:
D 1 = ( 0.3504 × n sp + 75.75 ) × H p min n r
Figure FDA0000148156150000014
其中K1=0.3504×nsp+75.75;
(4)计算水泵水轮机低压侧转轮直径:
D2=(0.006×nsp+0.3184)×D1
或D2=K2×D1
K2=0.006×nsp+0.3184。
2.根据权利要求1所述的可逆式水泵水轮机转轮直径的计算方法,其特征在于,所述可逆式水泵水轮机为单级定转速混流式可逆式水泵水轮机。
CN201210088355.1A 2012-03-29 2012-03-29 可逆式水泵水轮机转轮直径的计算方法 Active CN102606368B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210088355.1A CN102606368B (zh) 2012-03-29 2012-03-29 可逆式水泵水轮机转轮直径的计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210088355.1A CN102606368B (zh) 2012-03-29 2012-03-29 可逆式水泵水轮机转轮直径的计算方法

Publications (2)

Publication Number Publication Date
CN102606368A true CN102606368A (zh) 2012-07-25
CN102606368B CN102606368B (zh) 2014-02-05

Family

ID=46524052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210088355.1A Active CN102606368B (zh) 2012-03-29 2012-03-29 可逆式水泵水轮机转轮直径的计算方法

Country Status (1)

Country Link
CN (1) CN102606368B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112067181A (zh) * 2020-09-15 2020-12-11 中国电建集团成都勘测设计研究院有限公司 单级可逆式混流式水泵水轮机比转速计算方法
CN113642133A (zh) * 2021-09-01 2021-11-12 中国电建集团成都勘测设计研究院有限公司 水斗式水轮机转轮内宽计算方法
CN115048865A (zh) * 2022-06-13 2022-09-13 黄河勘测规划设计研究院有限公司 一种基于混流可逆式水泵水轮机的设计方法及系统

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000205101A (ja) * 1999-01-13 2000-07-25 Hitachi Ltd ポンプ水車
CN101245711A (zh) * 2007-02-16 2008-08-20 任明琪 轴流式叶轮机械的设计方法及叶片
CN201396234Y (zh) * 2009-05-14 2010-02-03 河南新飞纪元科技有限公司 一种冷却塔风机驱动专用超低比转速混流式水轮机转轮
CN202165202U (zh) * 2011-07-14 2012-03-14 中国水利水电科学研究院 一种亲鱼型轴流转桨式水轮机

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000205101A (ja) * 1999-01-13 2000-07-25 Hitachi Ltd ポンプ水車
CN101245711A (zh) * 2007-02-16 2008-08-20 任明琪 轴流式叶轮机械的设计方法及叶片
CN201396234Y (zh) * 2009-05-14 2010-02-03 河南新飞纪元科技有限公司 一种冷却塔风机驱动专用超低比转速混流式水轮机转轮
CN202165202U (zh) * 2011-07-14 2012-03-14 中国水利水电科学研究院 一种亲鱼型轴流转桨式水轮机

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112067181A (zh) * 2020-09-15 2020-12-11 中国电建集团成都勘测设计研究院有限公司 单级可逆式混流式水泵水轮机比转速计算方法
CN112067181B (zh) * 2020-09-15 2021-08-31 中国电建集团成都勘测设计研究院有限公司 单级可逆式混流式水泵水轮机比转速计算方法
CN113642133A (zh) * 2021-09-01 2021-11-12 中国电建集团成都勘测设计研究院有限公司 水斗式水轮机转轮内宽计算方法
CN113642133B (zh) * 2021-09-01 2023-05-09 中国电建集团成都勘测设计研究院有限公司 水斗式水轮机转轮内宽计算方法
CN115048865A (zh) * 2022-06-13 2022-09-13 黄河勘测规划设计研究院有限公司 一种基于混流可逆式水泵水轮机的设计方法及系统

Also Published As

Publication number Publication date
CN102606368B (zh) 2014-02-05

Similar Documents

Publication Publication Date Title
CN102182622B (zh) 一种六工况双向潮汐发电水轮机
CN108108562A (zh) 一种基于高斯分布的风电机组尾流的解析建模方法
CN107191308A (zh) 一种混流式水泵水轮机全特性曲线的预测方法
CN104933222B (zh) 水泵水轮机第一象限特性曲线理论预测方法
CN107076162B (zh) 反转式水泵水轮机、包括其的自发电系统及反转式水泵水轮机的优化设计方法
CN107035618A (zh) 一种基于尾流效应的风电场优化控制方法
CN110321632B (zh) 一种计算充分发展风电场的等效粗糙度的方法
CN101059119B (zh) 兆瓦级风力发电设备的风轮叶片
CN102606368A (zh) 可逆式水泵水轮机转轮直径的计算方法
CN103324863A (zh) 使用实测湍流强度修正风力发电机的测量功率曲线的方法
Zhang et al. Experimental and numerical study of reverse power generation in coastal axial flow pump system using coastal water
CN107329940B (zh) 立轴混流式水轮机电站空化系数计算方法
CN109684768A (zh) 一种跨音速轴流风扇/压气机多目标气动优化设计方法
CN110046420B (zh) 一种用于确定斜轴泵在不同叶片角度下飞逸转速的方法
CN105023099A (zh) 一种考虑湍流强度的风力发电机出力评估方法
CN104699888B (zh) 一种基于水泵水轮机的液力透平设计方法
Alom et al. Aerodynamic performance of an elliptical-bladed savonius rotor under the influence of number of blades and shaft
Rengma et al. Performance analysis of a two bladed Savonius water turbine cluster for perennial river-stream application at low water speeds
Tran et al. Design and analysis of a pico propeller hydro turbine applied in fish farms using CFD and experimental method
CN104895797B (zh) 大型低扬程泵装置型式的量化比选方法
CN202140236U (zh) 一种六工况双向潮汐发电水轮机
CN107075949B (zh) 反转式水泵水轮机的优化设计方法、以此设计的反转式水泵水轮机及自发电系统
CN201412262Y (zh) 管道梯级发电系统
CN112084594B (zh) 一种改进的潮流能水轮机性能预测方法
CN111486114B (zh) 一种具有流线曲率中盘的叶轮的设计方法及设计系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: POWER CHINA CONSTRUCTION GROUP BEIJING SURVEY DESI

Free format text: FORMER NAME: HYDROCHINA BEIJING ENGINEERING CORPORATION LIMITED

Owner name: HYDROCHINA BEIJING ENGINEERING CORPORATION LIMITED

Free format text: FORMER NAME: HYDROCHINA BEIJING ENGINEERING CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 100024 Beijing Chaoyang District city on the 1st Street West

Patentee after: POWERCHINA BEIJING ENGINEERING Corp.,Ltd.

Address before: 100024 Beijing Chaoyang District city on the 1st Street West

Patentee before: HYDROCHINA BEIJING ENGINEERING Corp.,Ltd.

Address after: 100024 Beijing Chaoyang District city on the 1st Street West

Patentee after: HYDROCHINA BEIJING ENGINEERING Corp.,Ltd.

Address before: 100024 Beijing Chaoyang District city on the 1st Street West

Patentee before: HYDROCHINA BEIJING ENGINEERING Corp.