CN102602659B - Double-layer double-conveying belt type conveyer for mine - Google Patents

Double-layer double-conveying belt type conveyer for mine Download PDF

Info

Publication number
CN102602659B
CN102602659B CN 201210066645 CN201210066645A CN102602659B CN 102602659 B CN102602659 B CN 102602659B CN 201210066645 CN201210066645 CN 201210066645 CN 201210066645 A CN201210066645 A CN 201210066645A CN 102602659 B CN102602659 B CN 102602659B
Authority
CN
China
Prior art keywords
double
layer
adhesive tape
frame
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201210066645
Other languages
Chinese (zh)
Other versions
CN102602659A (en
Inventor
曾远亮
杨小波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN DONGLIN MINING HAULAGE MACHINERY CO Ltd
Original Assignee
SICHUAN DONGLIN MINING HAULAGE MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN DONGLIN MINING HAULAGE MACHINERY CO Ltd filed Critical SICHUAN DONGLIN MINING HAULAGE MACHINERY CO Ltd
Priority to CN 201210066645 priority Critical patent/CN102602659B/en
Publication of CN102602659A publication Critical patent/CN102602659A/en
Application granted granted Critical
Publication of CN102602659B publication Critical patent/CN102602659B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

The invention discloses a double-layer double-conveying belt type conveyer for a mine. Racks and adhesive tapes of two sets of belt conveyers are overlapped longitudinally; a tensioning direction-changing mechanism of the belt conveyer on the upper layer is located in front of a drive mechanism on the lower layer; a tensioning direction-changing mechanism of the belt conveyer on the lower layer is arranged in a trench below a mounting basal surface and is adjacent to the drive mechanism on the lower layer; each of wheels at two ends of a tensioning car is provided with a double-wheel flange; anti-derail wheels in contact with the side faces of a guide rail are arranged at two sides below a car body; a plurality of supporting legs of rectangular frames in the middle parts of the two sets of belt conveyers are all double-layer composite supporting legs; the double-layer composite supporting legs are provided with a plurality of adjustable hoops; the rectangular frames on the upper layer and the lower layer are arranged in the corresponding hoops respectively; and each of the rectangular frames on the upper layer and the lower layer is connected with a lower supporting roller by a mounting frame, a groove-shaped supporting roller and a concave arc-shaped supporting frame. The double-layer double-conveying belt type conveyer for the mine guarantees stable, safe and high-efficiency running of equipment, is convenient to mount and wide in the range of application, and has high application value for small and medium mines, in particular for the improvement of old conveying roadways.

Description

The two conveying belt type conveyers of mining bilayer
Technical field
The present invention relates to the belt conveyer that uses under a kind of coal mine.
Background technology
Belt conveyer is because operational throughput is big, fed distance is long, safe and reliable, degree of automation is high, easy maintenance, recurrent expenses is low, applied widely, under China every profession and trade widespread use, particularly coal mine more than 90% is to adopt belt conveyer as transportation means.The middle and small scale coal mine of China southwestward is mainly the mountain region inclined seam, because thinner, the coal seam branch complexity in coal seam, the space of underworkings is subjected to investing the restriction with the coal seam, and large-scale efficient delivery system can't be installed, and generally adopts belt conveyer; Existing belt conveyer comprises frame, is located at upper and lower two-layer carrying roller, driver train, tensioning changed course mechanism, adhesive tape, stern barrel on the frame, frame comprises rectangular frame and several supporting legs, and driver train includes motor, retarder, coupler and the cylinder of being located at the frame head; Tensioning changed course mechanism comprises cylinder, tension car and the guide rail more than three, and tensioning changed course mechanism cylinder foremost is loaded on the tension car, and an end of a steel wire connects with tension car separately, and the other end is around on the pulley, and this pulley links to each other with the piston rod of oil cylinder; Adhesive tape is around on all cylinder and carrying roller, and carrying roller is loaded on rectangular frame or the supporting leg by the installation shaft at two ends.
The common arrangement separate unit is arranged belt conveyer on the underworkings base plate at present, if arrange two equipment, the tunnel need enlarge about 1 times, installs on the roadway floor side by side to guarantee equipment level.Domesticly in recent years the mining double-deck belt conveyer that transform voluntarily in the colliery occurred seldom measuring, its arrangement form is that two belt conveyers are arranged up and down, has realized saving the purpose in tunnel.It is two kinds of fixed type (as Fig. 1) and suspension types (as Fig. 2) that its keystone configuration form is divided into the middle part carrying roller, two-layer equipment all has independently actuating device, carrying roller, tensioning changed course device, stern barrel, adhesive tape etc. up and down, rely on the friction force of the driving drum of adhesive tape and driver train drive to make adhesive tape do the continuous closed-loop running, realize afterbody charging, head discharging, reach the purpose of convey materials.
More than two kinds of equipment all form the transformation of standard belt conveyer, in order to satisfy driver train and the tensioning changed course arrangement of mechanism of two-layer equipment up and down, have to the height of belt conveyer upper strata belt conveyer driver train to (particularly lower floor's belt conveyer driver train and stretching device place) between the belt conveyer tensioning changed course mechanism of lower floor improved, the equipment installation difficulty strengthens, height increase along with equipment, the safety of equipment operation, the corresponding reduction of stability, and because the device height increase, carry height of tunnel also to need corresponding increase, increased roadway construction difficulty and investment cost.Simultaneously its actuating device, tensioning changed course mechanism and frame width are too wide, need take People's Bank of China or the access path in tunnel, give the back personnel and make troubles by, overhaul of the equipments and material delivery.The equipment that has is arranged on the belt conveying drive end unit to reduce the height of stretching device position with the tensioning mechanism that alters course, to save the tunnel investment, but because the distance of tensioning changed course mechanism and driver train is longer, tension force provides needs a period of time, therefore the cylinder tension force of adhesive tape and driver train is less when device start, cause friction force less, the phenomenon that adhesive tape skids very easily occurs.
The double-deck belt conveyer of suspension type is that two suspension type belt conveyers are arranged in up and down on the same roadway floor, as shown in Figure 2, two supporting legs 50 of adhesive tape both sides correspondence link to each other with snub pulley 52 by upper and lower two-layer flute profile carrying roller 51, because flute profile carrying roller 51 is suspension type, the adhesive tape distance is less up and down, the double-deck back device height of installing is lower, and less demanding to the tunnel, its version is simple economy comparatively; But because hanging carrier roller 51 can't be installed aligning carrier roller, the carrying roller resistance is big, cause equipment failure rate height, the easy sideslip of adhesive tape, equipment energy consumption height, transport efficiency lower; Simultaneously because double-deck belt conveyer center of gravity is higher, its hanging carrier roller structure is activity form owing to carrying roller; under the situation of startup, shutdown, rubber belt from deviating, load change; carrying roller 51,52(be the upper strata carrying roller particularly) can swing vibration and the distortion that cause frame with the external force effect, there is big potential safety hazard.Owing to do not have and prevent that adhesive tape is concave arc section lower floor adhesive tape ribbon (being lifted because adhesive tape is tauted when moving from bottom to top), carrying roller 51 is not for there being fixing hanging structure form in addition, this equipment can't be realized moving under the change gradient condition of concave arc, convex arc etc., can only realize that 2 straight lines carry; Its supporting leg 50 adopts bolt of rear end plate to be connected with rectangular frame, because the down-hole is with a varied topography, belt conveyer height of landing leg and spacing are subjected to the landform variable effect bigger, bolt of rear end plate connects can't carry out corresponding adjusting, cause the belt conveyer zone face to be uneven, the installation of this equipment rectangular frame and supporting leg 50 simultaneously, adjustment, maintenance and dismounting later on are all inconvenient.
The double-deck belt conveyer of fixed type is that two common belt conveyors are arranged in up and down on the same roadway floor, as shown in Figure 1, two supporting legs 55 of adhesive tape both sides correspondence are equipped with upper and lower two-layer erecting frame 56, each layer erecting frame 56 links to each other with snub pulley 59 by flute profile carrying roller 57, linear pattern support 58, it is higher that the back device height is installed, device security hidden danger is big, poor stability, and common head-room can't satisfy the equipment needs simultaneously, and needing to expand high tunnel could install.Do not prevent adhesive tape concave arc section lower floor adhesive tape ribbon (being lifted because adhesive tape is tauted when moving from bottom to top) owing to have, this equipment can't realize that concave arc, convex arc etc. move above under 6 ° the change gradient condition; Snub pulley 59 is installed as the draw-in groove form, and the installation shaft at snub pulley 59 two ends is easy to jump out from draw-in groove in operational process, is prone to the situation that snub pulley drops; Its supporting leg 55 adopts bolt of rear end plate to be connected with rectangular frame, because the down-hole is with a varied topography, height of landing leg and spacing are subjected to the landform variable effect bigger, bolt of rear end plate connects can't carry out corresponding adjusting, cause the belt conveyer zone face to be uneven, the installation of this equipment rectangular frame and supporting leg 55 simultaneously, adjustment, maintenance and dismounting later on are all inconvenient; Above-mentioned each belt conveyer has seriously restricted the raising of coal mine output, so coal mining enterprise presses for a kind of conserve space, freight volume is big, safety performance is high conveyer.
Summary of the invention
The objective of the invention is to the above-mentioned deficiency at prior art, provide a kind of mining bilayer two conveying belt type conveyers, it doubles operational throughput under the situation that does not increase the tunnel investment, and stable, safe, the efficient operation of the equipment that guaranteed, and easy for installation, applied widely, to medium and small colliery particularly old conveying tunnel transformation high using value is arranged.
For achieving the above object, the two conveying belt type conveyers of mining bilayer of the present invention, comprise two cover belt conveyers, every cover belt conveyer includes frame, is located at upper and lower two-layer carrying roller, driver train, tensioning changed course mechanism, adhesive tape, stern barrel on the frame, frame comprises rectangular frame and several supporting legs, and driver train includes motor, retarder, coupler and the cylinder of being located at the frame head; Tensioning changed course mechanism comprises cylinder, tension car and the guide rail more than three, and tensioning changed course mechanism cylinder foremost is loaded on the tension car, and an end of a steel wire connects with tension car separately, and the other end is around on the pulley, and this pulley links to each other with the piston rod of oil cylinder; Adhesive tape is around on all cylinder and carrying roller, the frame and the adhesive tape that it is characterized in that two cover belt conveyers overlap at longitudinal component, the tensioning changed course mechanism of upper strata belt conveyer is positioned at the place ahead of lower floor's driver train, and the tensioning changed course mechanism of lower floor's belt conveyer is located in the following trench of installation base surface and contiguous lower floor driver train; The wheel at tension car two ends is provided with the two-wheel edge, and both sides are provided with the anti-derailing of guide rail contacts side surfaces and take turns below vehicle body; The rectangular frame of two cover belt conveyers is the double-layer composite supporting leg at several supporting legs that longitudinal overlap arranges the part connection, the double-layer composite supporting leg is provided with the chute of upper and lower layer, several anchor ears are located in separately the chute by jam nut, upper and lower layer rectangular frame is loaded in each self-corresponding anchor ear, two double-layer composite supporting legs of adhesive tape both sides correspondence link to each other by upper and lower tie-beam, on the upper and lower layer rectangular frame erecting frame is arranged fixedly all, upper and lower layer of erecting frame of adhesive tape both sides all flute profile carrying roller, the arcs of recesses support by separately links to each other with snub pulley.
The present invention is staggeredly arranged the driver train on upper strata and the driver train of lower floor at throughput direction, guarantee upper and lower layer driver train arrangement space, and realizes the transportation of levels material biobelt, discharging; Rotatable parts all are installed in the rectangular frame, have reduced the device space to greatest extent in, the safe operation normal at assurance equipment, guarantee the unimpeded of access path; Mechanism is located between upper strata driver train and the lower floor's driver train with upper strata tensioning changed course, for equipment operation provides enough tension force and has improved the tension force reaction time, tensioning changed course mechanism of lower floor is located in the following trench of installation base surface and contiguous lower floor driver train, assurance equipment adhesive tape when starting is non-slip, and assurance upper strata belt conveyer height unanimity (linearly), reduced the tunnel and transformed length and transform difficulty, the access path height does not reduce simultaneously, has improved device '; Adopt single wire tension version, reduce steel wire and twine; The tension car is the compact form of two-wheel edge+anti-derailing wheel, has reduced device height and width on the basis that guarantees equipment safety operation, has also reduced the tunnel and has transformed difficulty, realizes conserve space, convenient purpose of installing;
Upper and lower two cover belt conveyers of the present invention share the double-layer composite supporting leg at the middle part, each anchor ear is adjusted at lengthwise position on the supporting leg by jam nut, anchor ear drives supporting leg and can move along rectangular frame simultaneously, can adjust the position relation of double-layer composite supporting leg and rectangular frame according to the tunnel landform, guarantee that device height one causes the equipment operation more stable, install, dismantle more convenient simultaneously, the Device-General performance is good, is fit to batch manufacturing, enhances productivity; Simultaneously tie-beam can increase equipment intensity and limit height of materials, the concave arc section take place seriously to fly with situation under prevent that lower floor's adhesive tape from contacting with upper layer device, and do not damage adhesive tape; Replaced original horizontal linear support with the arcs of recesses support, erecting frame can be reduced downwards, reduced flute profile carrying roller setting height(from bottom), the lower belt surface height is shortened, reduced the height of middle part common mechanism on the basis that guarantees the levels space length, structure is more compact, has improved stabilization of equipment performance and safety performance.
As a further improvement on the present invention, the lower floor's erecting frame in the adhesive tape both sides also is provided with pressure roller, and pressure roller is positioned at the top of lower floor's flute profile carrying roller, and lower floor's adhesive tape is clipped between pressure roller and the groove profile carrier roller.Can make adhesive tape can not leave the carrying roller face in the concave arc fragment position, adhesive tape can't fly band, guarantees that adhesive tape passes through the concave arc section smoothly, has realized the change gradient safe operation of equipment between 6 °-20 °, and the applicable area of equipment is improved;
As a further improvement on the present invention, the installation shaft at two-layer snub pulley two ends is equipped with flat side, and erecting frame is provided with the U-lag corresponding with flat side, and installation shaft places U-lag, in the upper fixed of U-lag baffle plate is arranged; Can prevent that snub pulley (particularly upper strata belt conveyer) from coming off under the situation of vibrating, damaging, influence the normal operation of lower floor's belt conveyer and personal security;
In sum, the present invention doubles operational throughput under the situation that does not increase the tunnel investment, and the equipment that guaranteed is stable, safety, efficient operation, and easy for installation, applied widely, to medium and small colliery particularly old conveying tunnel transformation high using value is arranged.
Description of drawings
Fig. 1 is the cross sectional drawing of fixed double-deck conveyer for the middle part carrying roller.
Fig. 2 is the cross sectional drawing of the double-deck conveyer of suspension type for the middle part carrying roller.
Fig. 3 is the structural representation of the embodiment of the invention.
Fig. 4 is the birds-eye view of the embodiment of the invention.
Fig. 5 is Fig. 3 adhesive tape tension place cross sectional drawing at the middle and upper levels.
Fig. 6 is lower floor's adhesive tape tension place cross sectional drawing among Fig. 3.
Fig. 7 is double-layer composite supporting leg place, middle part cross sectional drawing.
Fig. 8 is the rack construction figure at double-layer composite supporting leg place, middle part.
Fig. 9 is that A among Fig. 8 is to view.
Figure 10 is the mounting structure figure at snub pulley two ends.
The specific embodiment
The present invention is further detailed explanation below in conjunction with accompanying drawing.
Extremely shown in Figure 9 by Fig. 3, the two conveying belt type conveyers of this mining bilayer, comprise that two are enclosed within the belt conveyer that longitudinal component overlaps, the upper strata belt conveyer comprises frame 1, be located on the frame 1 on, following two-layer carrying roller 2 and 3, driver train 4, tensioning changed course mechanism 5, adhesive tape 6, stern barrel 7, lower floor's belt conveyer comprises frame 31, be located on the frame 31 on, following two-layer carrying roller 32 and 33, driver train 34, tensioning changed course mechanism 35, adhesive tape 36, stern barrel 37, frame 1 or 31 includes rectangular frame 8 and several supporting legs 9, and driver train 4 or 34 includes the motor 10 of being located at the frame head, retarder 11, coupler 12 and cylinder 13; Tensioning changed course mechanism 5 or 35 includes four cylinders 14, tension car 15 and guide rail 16, tensioning changed course mechanism 5 or 35 cylinder 14 foremost is loaded on the tension car 15, one end of one steel wire 17 connects with tension car 15 separately, the other end is around on the pulley 18, and this pulley 18 links to each other with the piston rod of separately oil cylinder 19; Adhesive tape 6 or 36 be around in all cylinders 13,14,7 or 37 and carrying roller 2 and 3 or 32 and 33 on, frame 1 and 31, the adhesive tape 6 and 36 of two-layer belt conveyer overlap at longitudinal component, the tensioning changed course mechanism 5 of upper strata belt conveyer is positioned at the place ahead of lower floor's driver train 34, and the tensioning changed course mechanism 35 of lower floor's belt conveyer is located in the following trench 38 of installation base surface and contiguous lower floor driver train 34; The wheel 20 at tension car 15 two ends is provided with the two-wheel edge, and both sides are provided with the anti-derailing of guide rail 16 contacts side surfaces and take turns 22 below vehicle body 21; The rectangular frame 8 of two-layer belt conveyer is double-layer composite supporting leg 9a at several supporting legs 9 that longitudinal overlap arranges the part connection, double-layer composite supporting leg 9a is the channel-section steel structure and is provided with, the chute 23 of lower floor, several anchor ears 24 are located in separately the chute 23 by jam nut 25, on the composition, the channel-section steel of lower floor's rectangular frame 8 is loaded in each self-corresponding anchor ear 24, two double-layer composite supporting leg 9a of adhesive tape 6 and 36 both sides correspondences are by last, following tie- beam 26,27 link to each other, on, erecting frame 28 is all fixedly arranged on lower floor's rectangular frame 8,29, on the adhesive tape both sides, lower floor's erecting frame 28,29 equal flute profile carrying rollers 39 or 43 by separately, arcs of recesses support 40 or 44 links to each other with snub pulley 41 or 45, lower floor's erecting frame 29 in the adhesive tape both sides also is provided with pressure roller 42, pressure roller 42 is positioned at the top of lower floor's flute profile carrying roller 43, lower floor's adhesive tape 36 is clipped between pressure roller 42 and the groove profile carrier roller 43, also aligning carrier roller 49 can be set at interval on the flute profile carrying roller 39 or 43, adhesive tape is difficult for sideslip, and fault rate is low; As shown in figure 10, the installation shaft 46 at two-layer snub pulley 41,45 two ends is equipped with flat side, and erecting frame 28,29 is provided with the U-lag corresponding with flat side 47, and installation shaft 46 places U-lag 47, by screw baffle plate 48 is arranged fixedly above U-lag 47;
The present invention is staggeredly arranged upper strata driver train 4 and lower floor's driver train 34 at throughput direction, guarantees upper and lower layer driver train arrangement space, and realize that upper and lower layer of material transports smoothly, discharging; Rotatable parts all are installed in the rectangular frame 8, have reduced the device space to greatest extent in, the safe operation normal at assurance equipment, guarantee the unimpeded of access path; Mechanism 5 is located between upper strata driver train 4 and the lower floor's driver train 34 with upper strata tensioning changed course, tensioning changed course mechanism 35 of lower floor is located in the following trench 38 of installation base surface and contiguous lower floor driver train 34, for equipment operation provides enough tension force and has improved the tension force reaction time, assurance equipment adhesive tape when starting is non-slip, and can guarantee upper strata belt conveyer height unanimity (linearly), having reduced the tunnel transforms length and transforms difficulty, the access path height does not reduce simultaneously, has improved device '; Adopt single wire tension version, reduce steel wire and twine; Tension car 15 is the compact form of two-wheel edge+anti-derailing wheel 22, has reduced device height and width on the basis that guarantees equipment safety operation, has also reduced the tunnel and has transformed difficulty, realizes conserve space, convenient purpose of installing;
Upper and lower two-layer belt conveyer of the present invention shares double-layer composite supporting leg 9a at the middle part, each anchor ear 24 can be adjusted at lengthwise position on the supporting leg 9a by jam nut 25, anchor ear 24 drives supporting leg 9a and can move along rectangular frame 8 simultaneously, can adjust the position relation of double-layer composite supporting leg 9a and rectangular frame 8 according to the tunnel landform, guarantee that device height one causes the equipment operation more stable, install, dismantle more convenient simultaneously, the Device-General performance is good, is fit to batch manufacturing, enhances productivity; Simultaneously tie- beam 26,27 can increase equipment intensity and limit height of materials, the concave arc section take place seriously to fly with situation under prevent that lower floor's adhesive tape 36 from contacting with upper layer device, and do not damage adhesive tape; Replaced original horizontal linear support with arcs of recesses support 40 or 44, erecting frame 28,29 can be reduced downwards, flute profile carrying roller 39,43 setting height(from bottom) have been reduced, the lower belt surface height is shortened, reduced the height of middle part common mechanism on the basis that guarantees the levels space length, structure is more compact, has improved stabilization of equipment performance and safety performance; Pressure roller 42 can make adhesive tape 36 can not leave the carrying roller face in the concave arc fragment position, and adhesive tape can't fly band, guarantees that adhesive tape passes through the concave arc section smoothly, has realized the change gradient safe operation of equipment between 6 °-20 °, and the applicable area of equipment is improved; Baffle plate 48 can prevent particularly upper strata belt conveyer of snub pulley 41 or 45() under the situation of vibrating, damaging, come off, influence the normal operation of lower floor's belt conveyer and personal security.
The present invention doubles operational throughput not increasing under the situation of tunnel investment, and the equipment that guaranteed is stable, safety, efficient operation, and easy for installation, applied widely, to medium and small colliery particularly old conveying tunnel transformation high using value is arranged.

Claims (3)

1. two conveying belt type conveyers of a mining bilayer, comprise two cover belt conveyers, every cover belt conveyer includes frame, is located at upper and lower two-layer carrying roller, driver train, tensioning changed course mechanism, adhesive tape, stern barrel on the frame, frame comprises rectangular frame and several supporting legs, and driver train includes motor, retarder, coupler and the cylinder of being located at the frame head; Tensioning changed course mechanism comprises cylinder, tension car and the guide rail more than three, and tensioning changed course mechanism cylinder foremost is loaded on the tension car, and an end of a steel wire connects with tension car separately, and the other end is around on the pulley, and this pulley links to each other with the piston rod of oil cylinder; Adhesive tape is around on all cylinder and carrying roller, the frame and the adhesive tape that it is characterized in that two cover belt conveyers overlap at longitudinal component, the tensioning changed course mechanism of upper strata belt conveyer is positioned at the place ahead of lower floor's driver train, and the tensioning changed course mechanism of lower floor's belt conveyer is located in the following trench of installation base surface and contiguous lower floor driver train; The wheel at tension car two ends is provided with the two-wheel edge, and both sides are provided with the anti-derailing of guide rail contacts side surfaces and take turns below vehicle body; The rectangular frame of two cover belt conveyers is the double-layer composite supporting leg at several supporting legs that longitudinal overlap arranges the part connection, the double-layer composite supporting leg is provided with the chute of upper and lower layer, several anchor ears are located in separately the chute, upper and lower layer rectangular frame is loaded in each self-corresponding anchor ear, two double-layer composite supporting legs of adhesive tape both sides correspondence link to each other by upper and lower tie-beam, on the upper and lower layer rectangular frame erecting frame is arranged fixedly all, upper and lower layer of erecting frame of adhesive tape both sides all flute profile carrying roller, the arcs of recesses support by separately links to each other with snub pulley.
2. the two conveying belt type conveyers of mining bilayer as claimed in claim 1 is characterized in that also being provided with pressure roller at lower floor's erecting frame of adhesive tape both sides, and pressure roller is positioned at the top of lower floor's flute profile carrying roller, and lower floor's adhesive tape is clipped between pressure roller and the groove profile carrier roller.
3. two conveying belt type conveyers of mining bilayer as claimed in claim 1 or 2, the installation shaft that it is characterized in that two-layer snub pulley two ends is equipped with flat side, erecting frame is provided with the U-lag corresponding with flat side, and installation shaft places U-lag, in the upper fixed of U-lag baffle plate is arranged.
CN 201210066645 2012-03-14 2012-03-14 Double-layer double-conveying belt type conveyer for mine Expired - Fee Related CN102602659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210066645 CN102602659B (en) 2012-03-14 2012-03-14 Double-layer double-conveying belt type conveyer for mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210066645 CN102602659B (en) 2012-03-14 2012-03-14 Double-layer double-conveying belt type conveyer for mine

Publications (2)

Publication Number Publication Date
CN102602659A CN102602659A (en) 2012-07-25
CN102602659B true CN102602659B (en) 2013-07-17

Family

ID=46520551

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210066645 Expired - Fee Related CN102602659B (en) 2012-03-14 2012-03-14 Double-layer double-conveying belt type conveyer for mine

Country Status (1)

Country Link
CN (1) CN102602659B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103612867A (en) * 2012-12-04 2014-03-05 力博重工科技股份有限公司 Double-layer same-direction belt-type conveyor
CN103114872A (en) * 2012-12-11 2013-05-22 广东安元矿业技术服务有限公司 Steeply-inclined track lifting and transporting method
CN103350856A (en) * 2013-07-02 2013-10-16 无锡天惠塑机有限公司 Conveyor belt structure of corn conveyor
CN110202811A (en) * 2019-06-20 2019-09-06 天津赛象科技股份有限公司 Tire semi-products carcass ply and the mating conveying mechanism of molding machine and its operating method
CN112160216A (en) * 2020-09-16 2021-01-01 福建省铁拓机械股份有限公司 Antiseized regeneration drying roller and use regeneration agitated vessel of this cylinder

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2548784Y (en) * 2002-05-28 2003-05-07 上海人造板机器厂有限公司 Preassembled set
CN201801129U (en) * 2010-09-26 2011-04-20 深圳市今天物流技术有限公司 Filter rod box conveyor
CN202508560U (en) * 2012-03-14 2012-10-31 四川东林矿山运输机械有限公司 Mining double-layer double-conveying belt conveyer

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56127503A (en) * 1980-03-07 1981-10-06 Taikuu Kikai Kk Inclined conveyor
JP2801030B2 (en) * 1989-07-10 1998-09-21 芦森工業株式会社 Electrode wire for pipe corrosion protection
JPH09144488A (en) * 1995-11-20 1997-06-03 Yokohama Rubber Co Ltd:The Conveyer belt device for vertical conveyance

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2548784Y (en) * 2002-05-28 2003-05-07 上海人造板机器厂有限公司 Preassembled set
CN201801129U (en) * 2010-09-26 2011-04-20 深圳市今天物流技术有限公司 Filter rod box conveyor
CN202508560U (en) * 2012-03-14 2012-10-31 四川东林矿山运输机械有限公司 Mining double-layer double-conveying belt conveyer

Also Published As

Publication number Publication date
CN102602659A (en) 2012-07-25

Similar Documents

Publication Publication Date Title
CN102602659B (en) Double-layer double-conveying belt type conveyer for mine
CN102295134B (en) Rail suspension type conveyor
CN103097610A (en) Rail conveyor system
CN202016482U (en) Side shifting type shunting device
CN202245041U (en) Suspension rail conveyor
CN203781191U (en) Turning device of rubber belt conveyor
CN204823128U (en) Reversible conveyer of dummy car
CN201330068Y (en) Carrier roller with adjustable groove angle
CN202508560U (en) Mining double-layer double-conveying belt conveyer
CN101054131A (en) Belt conveyor transmission system with discharging car
CN2871446Y (en) Miniature mineral telescopic tunnelling belt conveyor
CN203667545U (en) Mining bridge type reversed loader adjustable unloading blocking plate
CN104229451B (en) Double-strand conveying-type Handling device
CN103662610A (en) Pipe frame machine body conveyor belt pressing device
CN104790705A (en) Comb tooth exchange transportation vehicle of self-stabilizing structure and vehicle parking fixing frame used cooperatively
CN205221809U (en) Cantilever type hydraulic pressure lift belt bidirectional transport machine
CN201678242U (en) Road falling and deviation resistant belt storage bin of gate trough-belt conveyer
CN201385929Y (en) A belt conveyor with a retractable head
CN201746073U (en) Novel supporting roller of plane cornering sealing-tape machine
CN205932163U (en) Middle power device reaches belt conveyor including this power device
CN209029886U (en) A kind of removal cable coaster
CN203728050U (en) Tail of scraper conveyor
CN103410560B (en) Short distance leather belt reshipment machine
CN208699777U (en) Heavy grade downlink gateway belt machine belt pressing device
CN205443816U (en) Assembled single shield sleeper for TBM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130717

Termination date: 20190314

CF01 Termination of patent right due to non-payment of annual fee