CN102562008A - 渤海油气勘探开发一体化模式 - Google Patents

渤海油气勘探开发一体化模式 Download PDF

Info

Publication number
CN102562008A
CN102562008A CN2011100962633A CN201110096263A CN102562008A CN 102562008 A CN102562008 A CN 102562008A CN 2011100962633 A CN2011100962633 A CN 2011100962633A CN 201110096263 A CN201110096263 A CN 201110096263A CN 102562008 A CN102562008 A CN 102562008A
Authority
CN
China
Prior art keywords
development
exploration
well
oil
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100962633A
Other languages
English (en)
Inventor
熊斌辉
杨贝琦
熊琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011100962633A priority Critical patent/CN102562008A/zh
Publication of CN102562008A publication Critical patent/CN102562008A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明是专门针对浅海富烃盆地复杂油气田大幅度降低成本和风险、提高速度和资源利用率的勘探开发新模式。其以平台的小型化满足复杂油气田开发的通用性需要,用标准化降低成本,提高速度;整体搬运海上各类平台,将海上作业变为基地作业,降低了成本提高速度;标准平台整体撤离,重复使用,降低了油田开发风险;依托管线进行勘探开发,降低开发成本和勘探门限;实现勘探开发一体化连续钻井,将投产周期缩短到极致。随着成本和风险降低,勘探开发越来越大胆,资源利用率得以大幅度提高。

Description

渤海油气勘探开发一体化模式
技术领域
浅海油气勘探和开发。
背景技术
油气地质、勘探策略、开发设计。
发明内容
渤海湾盆地的典型油气藏为复杂多变的复式油气藏。断块多,地层横向变化大,油气层多。专家对其复杂程度形象地描述为“忽油忽水、忽上忽下、忽厚忽薄、忽稠忽稀、忽有忽无。”和“打碎的盘子又踹了一脚”来。渤海油气勘探开发一体化模式(简称一体化模式)就是针对浅水富油气盆地复杂油气藏发明的一种全新的勘探开发模式。
目前渤海油气勘探开发常规模式(简称常规模式)分勘探、设计、建造和开发4个阶段。勘探阶段通过探井和评价井确定油气田的规模和性质。设计阶段根据勘探结果对油气藏进行评价,并根据评价结果设计油气田开发的ODP方案。建造阶段根据ODP方案建造开发平台、FPSO船和其它附属装置。开发阶段,搬运、安装、调试平台等开发装置,钻开发井,生产油气。每个阶段都根据上阶段详细研究结果制定实施方案进行施工,是一种稳妥的量体裁衣式勘探开发常规模式。一体化模式与常规模式有两点不同,第一,从勘探直接到开发,中间没有设计和建造阶段;第二,勘探开发连续进行,中间没有时间间隔;是一种从勘探到投产当季完成的超速勘探开发模式。一体化模式构成如下:
1)[0005]  铺设区域线。
铺设两条区域线。东西线从塘沽至PL19-3油田。南北线从辽河口经PL19-3油田至潍河口。油气管线、海底电缆和海底光缆同时铺设。每条输油管年输油能力1000万方。电缆输电能力100万千瓦。光缆容量要大到塘沽基地可以全程监测和遥控1000个平台的生产。
2)开发标准平台
将目前常规的油气田开发装置从新组合,开发设计3种小型化标准开发平台和L船。用数量变化满足不同规模,用类型变化满足不同作业,使得标准平台可以开发所有非标准的复杂油气田。
C平台是无人采油平台,安装长期使用的装置和占用空间很小的小装置。J平台是阶段性作业平台,安装阶段使用的作业装置。Z平台是中心生产平台,负责处理和输送附近多个采油平台的油气,以及对采油平台的遥控和巡视,安装油气生产输送装置、采油平台遥控装置和人员生活设备。L船基本上是一个小型化的FPSO,在管线修通前负责石油的临时生产、储集和运输任务。
3)开发变形海金刚(详见变形海金刚专利,申请号2011100071501)
变形海金刚是一种整体拆卸、搬运和安装任何重量、中心、大小和形状的万能整体搬运船。渤海所有类型平台的拆卸、搬运和安装均由其完成。
4)滚动勘探开发。
将分散单点勘探,变为有管线为依托的集中勘探。依托管线逐步延伸勘探开发。随着油气田开发管线逐渐延伸成网。
5)一体化勘探开发。
以往渤海湾从勘探到开发一步步分得很清楚。勘探阶段打探井(相当于陆地的预探井),评价阶段打评价井(相当于陆地探井),开发设计阶段设计开发方案和设计开发平台(编写ODP报告),开发准备阶段制造、安装平台,开发阶段打开发井。而一体化勘探就是从勘探——开发各阶段连续进行,一次完成。
一体化模式按照陆地标准对钻井统一命名。预探井、探井、评价井和生产井。预探井——相当于常规模式的探井,圈闭的第一口井,用以探索圈闭含油气性。探井——相当于常规模式的评价井,断块(或岩性体)的第一口井,用以探索其含油气性。评价井——确定油气储量的井;而常规模式根据探井油藏压力等资料推算,不钻评价井,有一定的不确定性。生产井——生产油气的井,预探井、探井和评价井可以变为生产井,常规模式上述井一般都废弃。
预探井井位确定方法:选择圈闭中最大,石油地质条件最好的断块或岩性体进行首先钻探。井尽可能穿多层圈闭,特别是主要目的层。如断块预探井通常应该为定向井,贴近断层钻高点。将该断块的油气尽可能全部揭示出来。常规模式将井位下移到预期的开发经济门限,预探井、评价井合二为一。
探井井位确定方法:探井与预探井目的一致均为探索含油气性的井,所以井位确定方法一致,尽可能穿多层圈闭。如断块探井应贴近断层钻高点。常规模式将井位下移到预期的开发经济门限,探井、评价井合二为一。
评价井井位确定方法:确定储量和开发的经济性。首先钻M评价井,探不计管网费是否有经济性。如果成功,然后再钻D评价井,探计管网费是否有独立开发经济性。一个断块不计管网费有开发价值,算管网费没有开发价值,有可能加上其它断块就有开发价值。一个断块不计管网费都没有开发价值,则其没有开发价值。如果评价井定的位置过低,先钻D评价井就有可能漏掉联合开发的可能性。
一体化勘探开发方法:首先对复杂圈闭各断块进行排队,以确定钻探顺序。钻井船带C平台进行勘探。如果预探井发现油气藏太小,则停止该构造的勘探。如果发现油气藏,且测井解释确认值得钻M评价井,钻井平台不移动,接着钻M评价井。如果M评价井测井解释确认储量比预计小,不计管网费也没有经济性,则停止该构造勘探。如果有可能算管网费有独立开发价值,则立即接着钻D评价井。同时调L船对预探井和M评价井进行试产。如果D评价井钻探如预期,则继续钻探边井,并根据探边井结果,立即钻生产井。用C平台+L船对断块1进行开发。这样从预探到生产在3个月内就完成。
如果D评价井钻探结果算管网费没有独立开发价值,则用同样流程钻断块2。如果断块1+断块2联合具有开发价值,则平台不动,立即开发断块2。然后转回开发断块1。
如果断块1+断块2联合还不具有开发价值,则用同样流程钻断块3。如果断块1+断块2联合具有开发价值,则平台不动,立即开发断块3。然后转回开发断块1和断块2。如果断块1+断块2+断块3联合还不具有开发价值,则停止勘探。待研究后再做决定。
6)大会战
一旦勘探形势非常好,立即集中一切力量进行战略决战。首先集中钻井船这个构造带进行一体化勘探,同时动用库存平台。如果勘探形势好得不得了,甚至可以将其它海域的钻井船都调过来。这时库存平台肯定不够,可以暂时关闭附近一些相对低产的生产平台,将其挪过来,首先满足大会战需要。以后再用新生产的平台逐步恢复暂时关闭生产平台。这样大油田从预探到生产初具规模只需要1年。
7)油气输、储、运
油气全部由管线输送。用海上大油田的FPSO和陆地终端做石油储运中心。渤西、辽东湾、莱州湾、渤中各1-2个FPSO。渤西CFD11-1油田、辽东湾SZ36-1油田、莱州湾BZ28-1油田、渤中PL19-1油田均在各自海域中心,适合做储运中心。所有油田的石油全部输送到储运中心,再集中向外运输。天然气集中上三个陆地终端。辽东湾上辽西终端,莱州湾上龙口终端,渤中和渤西上塘沽终端。其它油气田不在用FPSO,仅在管线尚未修通时暂时用L船。 

Claims (5)

1.从预探井至生产井连续钻井的勘探开发一体化流程。
2.标准C平台、J平台、Z平台和L船设计思路和用标准装置开发浅海复杂油气田方案。
3.用变形海金刚整体搬运、安装、拆卸平台。
4.油气管线、电缆和光缆区域线铺设方案,以及依托区域线滚动勘探开发,逐渐成网的设计思路。
5.用一体化模式进行大会战方法。
CN2011100962633A 2011-04-18 2011-04-18 渤海油气勘探开发一体化模式 Pending CN102562008A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100962633A CN102562008A (zh) 2011-04-18 2011-04-18 渤海油气勘探开发一体化模式

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100962633A CN102562008A (zh) 2011-04-18 2011-04-18 渤海油气勘探开发一体化模式

Publications (1)

Publication Number Publication Date
CN102562008A true CN102562008A (zh) 2012-07-11

Family

ID=46408449

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100962633A Pending CN102562008A (zh) 2011-04-18 2011-04-18 渤海油气勘探开发一体化模式

Country Status (1)

Country Link
CN (1) CN102562008A (zh)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1247269A (zh) * 1998-09-09 2000-03-15 中国海洋石油渤海公司勘探部 边钻井边测试边进行早期试生产的方法及设施
US20080135233A1 (en) * 2006-12-08 2008-06-12 Horton Technologies, Llc Methods for Development of an Offshore Oil and Gas Field

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1247269A (zh) * 1998-09-09 2000-03-15 中国海洋石油渤海公司勘探部 边钻井边测试边进行早期试生产的方法及设施
US20080135233A1 (en) * 2006-12-08 2008-06-12 Horton Technologies, Llc Methods for Development of an Offshore Oil and Gas Field

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
方华灿: "我国海上边际油田采油平台选型浅谈", 《石油矿场机械》, vol. 34, no. 1, 30 January 2005 (2005-01-30) *
梁春秀,边晨旭,吴伟,王立贤,刘子良,赵志魁: "吉林油区勘探开发一体化模式的实践与探讨", 《中国石油勘探》, vol. 6, no. 3, 15 August 2001 (2001-08-15) *
肖侠: "我国首套多功能海洋钻修井机问世", 《石油工业技术监督》, no. 9, 15 September 2008 (2008-09-15) *

Similar Documents

Publication Publication Date Title
CN102089493B (zh) 海上设施及利用该海上设施安装井口平台的方法
RU2330154C1 (ru) Система и судно для технического обслуживания шельфовых месторождений
US3643736A (en) Subsea production station
Kaiser Offshore oil and gas records circa 2020
WO2008073815A1 (en) Methods for development of an offshore oil and gas field
WO2006090102A1 (en) Subsea tanker hydrocarbon production system
Hansen et al. Evolution of subsea production systems: a worldwide overview
CN101575946B (zh) 海洋平台三井架联动作业的方法
CN102562008A (zh) 渤海油气勘探开发一体化模式
US20040079530A1 (en) Method for, and the construction of, a long-distance well for the production, transport, storage and exploitation of mineral layers and fluids
Freire Campos basin deepwater giant fields
D'Souza et al. The semisubmersible floating production system: from Argyll to Appomattox
Bomba et al. Well, you've drilled'em. Now can you produce em? Panarctic Oils Ltd's test program-The Drake F76 Project
Mouillerat et al. CLOV Project: Overview
Walker et al. The Thunder Horse Project: A New Benchmark in the Gulf of Mexico
Egorov Feasibility study of the concept of the Dolginskoye field development with subsea production systems.
Evgenii Development of the cluster of fields in the Pechora Sea through the use of modern computer and engineering solutions
Andrey YUZHNO-KIRINSKOYE FIELD DEVELOPMENT METHOD SELECTION.
Young et al. Genesis development project-overview
Guihua et al. The technical analysis and study of decommissioning and abandonment of offshore oil field surface facilities and subsea system
Patten The first twenty years of oil and gas development offshore UK—an engineer reflects
RU2408764C1 (ru) Морская стационарная платформа для добычи углеводородов
Henry et al. Innovations in subsea development and operation
Sheehan Gjøa development opens new frontier
Adams et al. The development of the Maui gas and condensate field

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120711