A kind of elevated road and control method thereof with ascending/decending box stall
Technical field
The present invention relates to a kind of elevated road and control method thereof, especially, relate to a kind of elevated road and control method thereof with ascending/decending box stall.
Background technology
Along with the continuous quickening of Chinese Urbanization's process, urban population density is increasing, and the vehicle owning amount is constantly soaring, thereby causes congested in traffic phenomenon more and more serious.In order to alleviate congested in traffic problem, elevated road is built in many cities one after another on arterial traffic, to increase the traffic capacity of road.
Because the characteristic of urban layout, our elevated road have very significantly " morning and evening tides " phenomenon usually, i.e. a special period in a day, such as the working peak period, the magnitude of traffic flow of a direction increases severely, the then corresponding minimizing of the magnitude of traffic flow of another direction; In another special period, such as next peak period, otherwise then.
Existing elevated road is as depicted in figs. 1 and 2, comprise bent cap 14, be used to support the pier stud 13 of bent cap 14, and bent cap 14 surfaces is provided with some tracks 11.In addition, also 11 centre is set with box stall 12 in the track, and its number of track-lines with both sides evenly separates.Yet, in above-mentioned two special period, can occur a direction vehicle on the existing elevated road usually and block up, the phenomenon that the other direction vehicle is rare, thus can't make full use of existing elevated road.
Therefore, be badly in need of existing elevated road is transformed, with alleviate that above-mentioned defective causes peak period congestion in road phenomenon, make it can satisfy the transport need under the different situations.
Summary of the invention
Because the above-mentioned defective of prior art; Technical problem to be solved by this invention provides a kind of elevated road and control method thereof with ascending/decending box stall; It can regulate the position of box stall flexibly according to the actual traffic flow; Thereby the number of track-lines of its both sides of reasonable distribution reduces the phenomenon of the traffic congestion under the various situation, realizes the utilization to greatest extent of elevated road.
For realizing above-mentioned purpose; The invention provides a kind of elevated road with ascending/decending box stall; Comprise bent cap, be used to support the pier stud of bent cap; Wherein, said bent cap surface is provided with some tracks, also comprises left side box stall, intermediate section jube and right side box stall; Wherein, Said road surface central authorities and the seam that goes up and down during the outside in two tracks of central authorities is respectively arranged with, a left side go up and down seam and the right seam that goes up and down, said intermediate section jube, left side box stall and right side box stall are arranged on the seam that goes up and down in said, a left side through lifting gear respectively and go up and down in seam and the right seam that goes up and down, and make that said intermediate section jube, left side box stall and right side box stall can be with respect to the road surface displacements of going up and down.
Further, above-mentioned elevated road with ascending/decending box stall, wherein, said lifting gear is a hoist.
Further, above-mentioned elevated road with ascending/decending box stall, wherein, said hoist is a fork type elevator.
Further, above-mentioned elevated road with ascending/decending box stall, wherein, said intermediate section jube, left side box stall and right side box stall all are fixedly installed on the platform of said hoist.
Further, above-mentioned elevated road with ascending/decending box stall, wherein, said lifting gear is the ascending/decending pulley.
Further, above-mentioned elevated road with ascending/decending box stall, wherein, said lifting gear is arranged on said bent cap below.
Further, above-mentioned elevated road with ascending/decending box stall, wherein, said middle up-down is stitched, left up-down is stitched and the below that all extends to said bent cap is stitched in right side up-down.
Further, above-mentioned elevated road with ascending/decending box stall, wherein, said elevated road is eight tracks.
In addition; The present invention also provides a kind of control method of the above-mentioned elevated road with ascending/decending box stall; Wherein, When the vehicle number of the left and right sides, said track is close, said intermediate section jube is risen to surface, said track, saidly part jube on the left side and part jube on the right side and drop to said track lower face; When right side, said track vehicle increases, the said jube that parts on the left side is risen to surface, said track, said intermediate section jube with part jube on the right side and drop to said track lower face; When left side, said track vehicle increases, the said jube that parts on the right side is risen to surface, said track, said intermediate section jube and part jube on the left side and drop to said track lower face.
Therefore, the elevated road with ascending/decending box stall of the present invention distributes the track quantity on the both direction flexibly through a plurality of liftable box stalls are set on the track; To alleviate the traffic congestion under the different situations; It is easy to operate, is easy to realize having very strong practicality.
Description of drawings
Fig. 1 is the road structure sketch map of elevated road in the prior art;
Fig. 2 is the structural representation in the cross section of elevated road in the prior art;
Fig. 3 is the road structure sketch map of elevated road when the intermediate section jube is worked among the present invention;
Fig. 4 is the structural representation in the cross section of elevated road when the intermediate section jube is worked among the present invention;
Fig. 5 is the road structure sketch map of elevated road when the right side box stall is worked among the present invention;
Fig. 6 is the structural representation in the cross section of elevated road when the right side box stall is worked among the present invention;
Fig. 7 is the road structure sketch map of elevated road when the left side box stall is worked among the present invention;
Fig. 8 is the structural representation in the cross section of elevated road when the left side box stall is worked among the present invention.
The specific embodiment
Below will combine accompanying drawing that the technique effect of design of the present invention, concrete structure and generation is described further, to understand the object of the invention, characteristic and effect fully.
Referring to Fig. 3 and Fig. 4, the elevated road with ascending/decending box stall of the present invention includes bent cap 23, is used to support the pier stud 22 of bent cap 23.On bent cap 23 surfaces, also be provided with some tracks 21; Seam 24 and rightly go up and down to stitch 26 goes up and down on road surface central authorities and the seam 25 that goes up and down during the outside in two tracks of central authorities is respectively arranged with, a left side; Go up and down during 29 of intermediate section jube 28, left side box stall 27 and right side box stalls are arranged on through the lifting gear (not shown) respectively seam 25, a left side goes up and down in seam 24 and the right seam 26 that goes up and down, and intermediate section jube 28, left side box stall 27 and right side box stall 29 can be according to the actual requirements with respect to the road surface displacement of going up and down.
Wherein, middle up-down seam 25, a left side three slits that seam 24 and the right seam 26 that goes up and down are arranged on the bent cap 23 of going up and down, and may extend into the below of bent cap 23, be used for fixing and place lifting gear and corresponding box stall.
Particularly; Lifting gear is installed in the below of bent cap 23; It can adopt hoist, during seam 26 is gone up and down on up-down seam 25, left side up-down seam 24 and the right side in being fixedly installed on, intermediate section jube 28, left side box stall 27 and right side box stall 29 is fixedly installed on respectively on the platform of hoist separately again.In the time of needs, can start hoist corresponding box stall is risen to the top, road surface, perhaps drop to the below, road surface.Preferably, hoist of the present invention can adopt fork type elevator.
In another preferred embodiment of the present invention, lifting gear can adopt the ascending/decending pulley.Intermediate section jube 28, left side box stall 27 and right side box stall 29 are fixedly connected with separately ascending/decending pulley respectively, and under the traction of pulley, the displacement of going up and down.
Introduce the mode of operation with elevated road of ascending/decending box stall of the present invention in detail with reference to accompanying drawing below.
Like Fig. 3 and shown in Figure 4, the elevated road with ascending/decending box stall among the present invention has eight tracks.When the wagon flow of both direction is suitable, start lifting gear, will part jube 27 on the left side and part jube 29 on the right side and drop to the below, road surface, intermediate section jube 28 rises to the top, road surface, thus each Four-Lane Road about the road surface is divided into.
Vehicle flowrate is bigger when the left side, the right vehicle flowrate hour, like Fig. 5 and shown in Figure 6; Start lifting gear; To part jube 27 on the left side and drop to the below, road surface with intermediate section jube 28, and part jube 29 on the right side and rise to the top, road surface, then the left side is five tracks; The right is three tracks, thereby has effectively alleviated the situation of traffic congestion.
Vehicle flowrate is bigger when the right, left side vehicle flowrate hour, like Fig. 7 and shown in Figure 8; Intermediate section jube 28 with part jube 29 on the right side and drop to the below, road surface, part jube 27 on the left side and rise to the top, road surface, then the left side is three tracks; The right is five tracks, thereby has effectively alleviated the situation of traffic congestion.
Through adopting the elevated road with ascending/decending box stall of the present invention, can adopt corresponding box stall according to different road traffic conditions, thus the number of lanes of reasonable distribution both direction, the situation of alleviation traffic congestion.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art need not creative work and just can design according to the present invention make many modifications and variation.Therefore, all technician in the art all should be in the determined protection domain by claims under this invention's idea on the basis of existing technology through the available technical scheme of logical analysis, reasoning, or a limited experiment.