CN102539133B - Repair line of piping unit box - Google Patents
Repair line of piping unit box Download PDFInfo
- Publication number
- CN102539133B CN102539133B CN201110435974.9A CN201110435974A CN102539133B CN 102539133 B CN102539133 B CN 102539133B CN 201110435974 A CN201110435974 A CN 201110435974A CN 102539133 B CN102539133 B CN 102539133B
- Authority
- CN
- China
- Prior art keywords
- unit box
- closing mechanism
- opening
- test
- piping unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
- Examining Or Testing Airtightness (AREA)
Abstract
本发明涉及一种配管单元箱检修线,该检修线包括存放单元、检修单元、以及配管单元箱和头罩开闭机构自动取送装置,存放单元包括待修缓存区和修竣缓存区,分别用于存放待修品和合格品,检修单元包括分解区、检修区、组装区和开闭机构试验区,分解区内设置有分解工作台,检修区内设置有检查工作台,组装区内设置有组装工作台,开闭结构试验区内设置有配管单元箱和头罩开闭机构试验台,用于配管单元箱和头罩开闭机构的性能试验。本发明能够对CHR2型动车组及其它各型动车组用配管单元箱和头罩开闭机构进行综合性能试验,也可以对配管单元箱、头罩开闭机构单独进行试验,包括配管单元箱的气密性试验、动作试验、头罩开闭机构的气密性试验、动作试验等。
The invention relates to a piping unit box maintenance line. The maintenance line includes a storage unit, a maintenance unit, and an automatic pick-up and delivery device for the piping unit box and the hood opening and closing mechanism. The storage unit includes a buffer area to be repaired and a repaired buffer area. It is used to store products to be repaired and qualified products. The maintenance unit includes a disassembly area, an inspection area, an assembly area and an opening and closing mechanism test area. There is a disassembly workbench in the disassembly area, an inspection workbench in the inspection area, and an inspection workbench in the assembly area. There is an assembly workbench, and a piping unit box and a hood opening and closing mechanism test bench are set in the opening and closing structure test area for performance tests of the piping unit box and the hood opening and closing mechanism. The present invention can carry out the comprehensive performance test on the piping unit box and the opening and closing mechanism of the head cover for the CHR2 type EMU and other various types of EMUs, and can also test the piping unit box and the opening and closing mechanism of the head cover separately, including the piping unit box Air tightness test, action test, air tightness test of hood opening and closing mechanism, action test, etc.
Description
技术领域 technical field
本发明涉及一种铁路车辆检修线,具体地说,涉及一种CRH型动车组配管单元箱检修线。 The invention relates to a railway vehicle maintenance line, in particular to a CRH-type EMU piping unit box maintenance line. the
背景技术Background technique
目前,我国运行的高速动车组有CRH1、CRH2、CRH3和CRH5四种车型,各个车型的配管单元箱和头罩开闭机构技术参数也不相同,在进行检修时,需要设立不同的检修基地分别对不同车型的配管单元箱和头罩开闭机构进行检修,配管单元箱和头罩开闭机构只能单独检测,不能同时综合性能试验检测,检修效率低,且占用的检修场地面积大,使建设成本大。 At present, there are four types of high-speed EMUs operating in my country: CRH1, CRH2, CRH3 and CRH5. The technical parameters of the piping unit box and the hood opening and closing mechanism of each model are different. When performing maintenance, different maintenance bases need to be set up. To overhaul the piping unit box and the hood opening and closing mechanism of different models, the piping unit box and the hood opening and closing mechanism can only be tested separately, and the comprehensive performance test cannot be tested at the same time, the maintenance efficiency is low, and the maintenance site occupied is large. Construction costs are high. the
发明内容Contents of the invention
本发明的目的在于针对CRH型高速动车组在进行配管单元箱和头罩开闭机构检修时存在的上述问题,提供了一种配管单元箱检修线,该检修线主要用于CRH2型动车组配管单元箱-头罩开闭机构的检修和试验,可同时对配管单元箱和头罩开闭机构进行中和性能试验检测,并可兼容其他车型配管单元箱和头罩开闭机构的检修和试验。 The purpose of the present invention is to solve the above-mentioned problems existing in the maintenance of the piping unit box and the hood opening and closing mechanism of the CRH high-speed EMU, and to provide a piping unit box inspection line, which is mainly used for the piping of the CRH2 type EMU. The maintenance and test of the unit box-hood opening and closing mechanism can carry out the neutralization performance test on the piping unit box and the hood opening and closing mechanism at the same time, and it is compatible with the maintenance and testing of the piping unit box and the hood opening and closing mechanism of other models . the
本发明的技术方案为:一种配管单元箱检修线,该检修线包括存放单元、检修单元、以及配管单元箱和头罩开闭机构自动取送装置,存放单元包括待修缓存区和修竣缓存区,分别用于存放待修品和合格品,检修单元包括分解区、检修区、组装区和开闭机构试验区,分解区内设置有分解配管单元箱和头罩开闭机构的分解工作台,检修区内设置有检查配管单元箱和头罩开闭机构零部件的检查工作台,组装区内设置有组装配管单元箱和头罩开闭机构的组装工作台,开闭机构试验区内设置有配管单元箱和头罩开闭机构试验台,用于配管单元箱和头罩开闭机构的性能试验,所述的试验台包括控制装置和机械装置,机械装置包括装配工作台和气动夹具,装配工作台包括工作台体,工作台体内安装有模拟车载配管单元箱,工作台体的上表面安装有全自动夹紧的气动夹具,控制装置通过电磁阀和传感器控制头罩开闭机构的头罩开闭气缸和锁头开闭气缸、以及气动夹具的夹具开闭气缸动作。 The technical solution of the present invention is: a piping unit box maintenance line, the maintenance line includes a storage unit, a maintenance unit, and an automatic pick-up and delivery device for the piping unit box and the hood opening and closing mechanism, the storage unit includes a buffer area to be repaired and a repaired The buffer area is used to store the products to be repaired and the qualified products respectively. The maintenance unit includes the disassembly area, the maintenance area, the assembly area and the opening and closing mechanism test area. In the maintenance area, there is an inspection workbench for inspecting the components of the piping unit box and the hood opening and closing mechanism. In the assembly area, there is an assembly workbench for assembling the piping unit box and the hood opening and closing mechanism. In the opening and closing mechanism test area The piping unit box and the hood opening and closing mechanism test bench are set up for the performance test of the piping unit box and the hood opening and closing mechanism. The test bench includes a control device and a mechanical device, and the mechanical device includes an assembly workbench and a pneumatic fixture , the assembly workbench includes a workbench body, a simulated vehicle-mounted piping unit box is installed in the workbench body, a fully automatic clamping pneumatic clamp is installed on the upper surface of the workbench body, and the control device controls the opening and closing mechanism of the hood through solenoid valves and sensors. The hood opening and closing cylinder, the lock head opening and closing cylinder, and the clamp opening and closing cylinder of the pneumatic clamp operate. the
优选的是,气动夹具包括支架,支架上安装有夹具开闭气缸和与夹具开闭气缸连接的夹子,支架上还设置有安全锁紧气缸,该安全锁紧气缸安装在夹具开闭气缸的一侧。 Preferably, the pneumatic clamp includes a bracket on which a clamp opening and closing cylinder and a clamp connected with the clamp opening and closing cylinder are installed, and a safety locking cylinder is also arranged on the bracket, and the safety locking cylinder is installed on one side of the clamp opening and closing cylinder. side. the
优选的是,控制装置包括控制柜、安装在控制柜内的工控机、以及与工控机连接的液晶 显示器,控制柜上设置有空压机和气源,控制柜内安装有夹具开闭电磁阀、电控减压阀、开闭阀、压力传感器和泄压阀,夹具开闭电磁阀和电控减压阀均与气源连接,并通过安全阀与空压机连接。 Preferably, the control device includes a control cabinet, an industrial computer installed in the control cabinet, and a liquid crystal display connected with the industrial computer, the control cabinet is provided with an air compressor and an air source, and the control cabinet is equipped with a clamp opening and closing solenoid valve, The electric pressure reducing valve, opening and closing valve, pressure sensor and pressure relief valve, the clamp opening and closing solenoid valve and the electric control pressure reducing valve are all connected to the air source, and connected to the air compressor through the safety valve. the
优选的是,控制柜上设置有与各个阀、传感器、头罩开闭、锁头开闭、夹具松紧及空压机启停相应的手动按钮开关和手动/自动转换开关。 Preferably, the control cabinet is provided with a manual button switch and a manual/automatic switch corresponding to each valve, sensor, opening and closing of the hood, opening and closing of the lock, tightening of the clamp, and start and stop of the air compressor. the
优选的是,工控机通过夹具开闭电磁阀与夹具开闭气缸连接。 Preferably, the industrial computer is connected to the clamp opening and closing cylinder through the clamp opening and closing solenoid valve. the
优选的是,工控机依次通过电控减压阀、开闭阀、压力传感器、以及设置在配管单元箱内的头罩开闭电磁阀与头罩开闭气缸连接。 Preferably, the industrial computer is sequentially connected to the hood opening and closing cylinder through the electronically controlled pressure reducing valve, the opening and closing valve, the pressure sensor, and the hood opening and closing solenoid valve arranged in the piping unit box. the
优选的是,工控机依次通过电控减压阀、开闭阀、压力传感器、以及设置在配管单元箱内的锁头开闭电磁阀与锁头开闭气缸连接。 Preferably, the industrial computer is sequentially connected to the lock head opening and closing cylinder through the electronically controlled pressure reducing valve, the opening and closing valve, the pressure sensor, and the lock head opening and closing electromagnetic valve arranged in the piping unit box. the
优选的是,待修缓存区和修竣缓存区内均设置有配管单元箱和头罩开闭机构存放架,用于存放开闭机构的待修品和合格品。 Preferably, both the unrepaired buffer area and the repaired buffer area are provided with a piping unit box and a hood opening and closing mechanism storage rack for storing the unrepaired and qualified products of the opening and closing mechanism. the
优选的是,配管单元箱和头罩开闭机构自动取送装置为堆高车和悬臂吊。 Preferably, the automatic pick-up and delivery devices for the piping unit box and the hood opening and closing mechanism are stackers and jib cranes. the
本发明的有益效果为:本发明能够对CHR2型动车组及其它各型动车组用配管单元箱和头罩开闭机构进行综合性能试验,也可以对配管单元箱、头罩开闭机构单独进行试验,包括配管单元箱的气密性试验、动作试验、头罩开闭机构的气密性试验、动作试验等,且试验可采用自动和手动两种方式,自动试验时,自动控制试验进程,自动测试、自动保存试验参数,并进行分析判断,给出试验合格与否的结果。 The beneficial effects of the present invention are: the present invention can carry out the comprehensive performance test on the piping unit box and the hood opening and closing mechanism for the CHR2 type EMU and other types of EMUs, and can also conduct the comprehensive performance test on the piping unit box and the hood opening and closing mechanism separately. The test includes the air tightness test of the piping unit box, the action test, the air tightness test of the hood opening and closing mechanism, the action test, etc., and the test can be carried out in two ways, automatic and manual. During the automatic test, the test process is automatically controlled. Automatically test and save test parameters, analyze and judge, and give the result of whether the test is qualified or not. the
附图说明Description of drawings
图1为本发明具体实施例配管单元箱和头罩开闭机构试验台的气动原理图; Fig. 1 is the pneumatic schematic diagram of the piping unit box and the hood opening and closing mechanism test bench of the specific embodiment of the present invention;
图2为本发明具体实施例模拟车载配管单元箱的气动原理图; Fig. 2 is the aerodynamic schematic diagram of simulating the vehicle-mounted piping unit box of a specific embodiment of the present invention;
图3为本发明具体实施例气动夹具的结构示意图。 Fig. 3 is a schematic structural diagram of a pneumatic clamp according to a specific embodiment of the present invention. the
具体实施方式Detailed ways
以下结合附图对本发明作进一步说明。 The present invention will be further described below in conjunction with accompanying drawing. the
如图1至3所示,一种配管单元箱检修线,该检修线包括存放单元、检修单元、以及配管单元箱和头罩开闭机构自动取送装置,存放单元包括待修缓存区和修竣缓存区,分别用于存放待修品和合格品,检修单元包括分解区、检修区、组装区和开闭机构试验区,分解区内设置有分解配管单元箱和头罩开闭机构的分解工作台,检修区内设置有检查配管单元箱和头 罩开闭机构零部件的检查工作台,组装区内设置有组装配管单元箱和头罩开闭机构的组装工作台,开闭机构试验区内设置有配管单元箱和头罩开闭机构试验台,用于配管单元箱和头罩开闭机构的性能试验。待修缓存区和修竣缓存区内均设置有配管单元箱和头罩开闭机构存放架,用于存放开闭机构的待修品和合格品。配管单元箱和头罩开闭机构自动取送装置为堆高车和悬臂吊。 As shown in Figures 1 to 3, a pipeline unit box maintenance line includes a storage unit, a maintenance unit, and an automatic pick-up and delivery device for the piping unit box and the hood opening and closing mechanism. The storage unit includes a buffer area to be repaired and a maintenance unit Completion cache area is used to store the products to be repaired and qualified products respectively. The maintenance unit includes disassembly area, maintenance area, assembly area and opening and closing mechanism test area. Workbench, the inspection workbench for inspecting the piping unit box and the parts of the hood opening and closing mechanism is set in the maintenance area, the assembly workbench for assembling the piping unit box and the hood opening and closing mechanism is set in the assembly area, and the opening and closing mechanism test area The piping unit box and the hood opening and closing mechanism test bench are installed inside, which are used for the performance test of the piping unit box and the hood opening and closing mechanism. Both the buffer area to be repaired and the buffer area to be repaired are equipped with a piping unit box and a storage rack for the opening and closing mechanism of the hood, which are used to store the products to be repaired and qualified products of the opening and closing mechanism. The automatic pick-up and delivery devices for the piping unit box and the hood opening and closing mechanism are stackers and cantilever cranes. the
配管单元箱和头罩开闭机构试验台包括控制装置和机械装置,机械装置包括装配工作台和气动夹具,装配工作台包括工作台体,工作台体内安装有模拟车载配管单元箱,工作台体的上表面安装有全自动夹紧的气动夹具,控制装置通过电磁阀和传感器控制头罩开闭机构的头罩开闭气缸1和锁头开闭气缸2、以及气动夹具的夹具开闭气缸3的动作。气动夹具包括支架4,支架4上安装有夹具开闭气缸3和与夹具开闭气缸3连接的夹子5,支架4上还设置有安全锁紧气缸6,该安全锁紧气缸6安装在夹具开闭气缸3的一侧。控制装置包括控制柜、安装在控制柜内的工控机、以及与工控机连接的液晶显示器,控制柜内安装有夹具开闭电磁阀3、电控减压阀8、开闭阀9、压力传感器10和泄压阀11,夹具开闭电磁阀7和电控减压阀8均与气源连接,并通过安全阀12与空压机连接。控制柜上设置有与各个阀、传感器、头罩开闭、锁头开闭、夹具松紧及空压机启停相应的手动按钮开关和手动/自动转换开关。工控机通过夹具开闭电磁阀7与夹具开闭气缸3连接;工控机依次通过电控减压阀8、开闭阀9、压力传感器10、以及设置在配管单元箱内的头罩开闭电磁阀13与头罩开闭气缸1连接;工控机依次通过电控减压阀8、开闭阀9、压力传感器10、以及设置在配管单元箱内的锁头开闭电磁阀14与锁头开闭气缸2连接。 Piping unit box and hood opening and closing mechanism test bench includes control device and mechanical device, mechanical device includes assembly workbench and pneumatic fixture, assembly workbench includes workbench body, and simulated vehicle-mounted piping unit box is installed in the workbench body The upper surface of the upper surface is equipped with a fully automatic clamping pneumatic clamp. The control device controls the hood opening and closing cylinder 1 and the lock head opening and closing cylinder 2 of the hood opening and closing mechanism through the solenoid valve and the sensor, and the clamp opening and closing cylinder 3 of the pneumatic clamp. Actions. The pneumatic clamp includes a bracket 4 on which a clamp opening and closing cylinder 3 and a clamp 5 connected to the clamp opening and closing cylinder 3 are installed. The support 4 is also provided with a safety locking cylinder 6 installed on the clamp opening Close one side of cylinder 3. The control device includes a control cabinet, an industrial computer installed in the control cabinet, and a liquid crystal display connected to the industrial computer. The control cabinet is equipped with a clamp opening and closing solenoid valve 3, an electronically controlled pressure reducing valve 8, an opening and closing valve 9, and a pressure sensor. 10 and pressure relief valve 11, clamp opening and closing solenoid valve 7 and electric control pressure reducing valve 8 are all connected with air source, and are connected with air compressor through safety valve 12. The control cabinet is equipped with a manual button switch and a manual/automatic switch corresponding to each valve, sensor, opening and closing of the hood, opening and closing of the lock, tightening of the clamp, and start and stop of the air compressor. The industrial computer is connected to the clamp opening and closing cylinder 3 through the fixture opening and closing solenoid valve 7; The valve 13 is connected with the hood opening and closing cylinder 1; the industrial computer sequentially communicates with the locking opening and closing solenoid valve 14 through the electric control pressure reducing valve 8, the opening and closing valve 9, the pressure sensor 10, and the locking opening and closing solenoid valve 14 arranged in the piping unit box. Close cylinder 2 connection. the
工作原理:配管单元箱和头罩开闭机构由堆高车运输至待修缓存区进行存放,并通过悬臂吊将配管单元箱和头罩开闭机构在分解区、检修区、组装区和头罩开闭机构性能试验区之间进行吊装移动,并分别进行零部件分解、检查、组装、试验等工序,在工序间实现有序传送,按节拍和工艺实施检修、组装,并对开闭机构及配管单元箱进行综合性能试验,最后进入修竣缓存区进行存放。在检修过程中通过信息终端机进行信息交换。 Working principle: The piping unit box and the opening and closing mechanism of the hood are transported by the stacker to the buffer area to be repaired for storage, and the piping unit box and the opening and closing mechanism of the hood are placed in the disassembly area, maintenance area, assembly area and head area by the cantilever crane. Hoisting and moving between the performance test areas of the cover opening and closing mechanism, and the parts are disassembled, inspected, assembled, tested and other processes are carried out respectively, orderly transmission is realized between the processes, maintenance and assembly are carried out according to the rhythm and process, and the opening and closing mechanism is inspected. and piping unit box for comprehensive performance test, and finally enter the repair buffer area for storage. Information exchange is carried out through the information terminal during the maintenance process. the
试验时,手动操作和自动操作。手动操作通过控制柜上对应按钮开关进行操作,自动操作通过显示器上相应画面按钮控制工控机自动运行。 During the test, manual operation and automatic operation. Manual operation is performed through the corresponding button switch on the control cabinet, and automatic operation is controlled by the corresponding screen button on the display to control the automatic operation of the industrial computer. the
(一)手动操作 (1) Manual operation
试验前先打开所有空开,打开泄压阀,将所有气缸内压力泄到0时关闭。将控制柜手动/自动转换开关打到手动。按下夹具开闭电磁阀关闭按钮,将试验配管单元箱和头罩开闭机构固定到装配工作台上。 Before the test, open all air switches, open the pressure relief valve, and close it when the pressure in all cylinders is released to 0. Turn the manual/automatic transfer switch of the control cabinet to manual. Press the closing button of the clamp opening and closing solenoid valve, and fix the test piping unit box and the hood opening and closing mechanism to the assembly workbench. the
1、绝缘电阻试验 1. Insulation resistance test
将配管单元箱及头罩开闭机构外部电路连接绝缘电阻测试回路。打开绝缘电阻测试仪开关,施加500V高压,通过按键启动,看仪表显示绝缘电阻示数,大于30MΩ为合格,否则为不合格。 Connect the piping unit box and the external circuit of the hood opening and closing mechanism to the insulation resistance test circuit. Turn on the switch of the insulation resistance tester, apply 500V high voltage, start it by pressing the button, and watch the meter display the insulation resistance reading, if it is greater than 30MΩ, it is qualified, otherwise it is unqualified. the
2、头罩开闭机构动作试验 2. Action test of the opening and closing mechanism of the hood
按下空压机启动按钮,按下开闭阀打开按钮,按下头罩打开按钮,当头罩打开到位指示灯亮时记录压力表示值。按下锁头开闭按钮,当锁头打开到位指示灯亮时记录压力表示值。 Press the air compressor start button, press the on-off valve open button, press the hood open button, and record the pressure indication value when the hood is fully open and the indicator light is on. Press the lock opening and closing button, and record the pressure indication value when the lock head is fully open and the indicator light is on. the
将可调直流电源打到手动并调整输出电压为DC100V(DC85V-DC115V),打开开闭阀,当压力表的示值为0.4MPa时,关闭开闭阀。按下锁头开闭按钮,当锁头打开到位指示灯亮时,按下头罩开闭按钮,看头罩打开到位指示灯是否变亮,记录从按下头罩开闭按钮到头罩打开到位指示灯变亮时间,看是否在5-12S内。按下锁头开闭按钮,当锁头闭合到位指示灯亮时,再次按下锁头开闭按钮,当锁头打开到位指示灯亮时按下头罩开闭按钮,看头罩关闭到位指示灯是否变亮,记录从按下头罩开闭按钮到头罩关闭到位指示灯变亮时间,看是否在5-12S内。按下锁头开闭按钮,直到锁头闭合到位指示灯变亮。动作试验正常,即为合格。 Turn the adjustable DC power supply to manual and adjust the output voltage to DC100V (DC85V-DC115V), open the on-off valve, and close the on-off valve when the pressure gauge indicates 0.4MPa. Press the lock opening and closing button. When the lock head is fully open and the indicator light is on, press the hood open and close button to see if the hood open and close indicator is on. Record the time from pressing the hood open and close button to the hood fully open indicator light. Turn on the time to see if it is within 5-12S. Press the lock opening and closing button, when the lock head closed in place indicator light is on, press the lock head opening and closing button again, when the lock head is fully open and in place indicator light is on, press the hood opening and closing button, and see if the hood closed in place indicator light changes On, record the time from pressing the hood opening and closing button to the hood closed in place indicator light on, to see if it is within 5-12S. Press the lock opening and closing button until the indicator light of the lock head is fully closed. If the action test is normal, it is qualified. the
试验结束,按下空压机停止按钮。按下泄漏阀打开按钮,直到压力表的示值为0.1MPa时按下泄漏阀关闭按钮。 After the test is over, press the stop button of the air compressor. Press the leak valve open button until the pressure gauge indicates 0.1MPa and press the leak valve close button. the
3、配管单元箱动作试验 3. Piping unit box action test
按下空压机启动按钮,将可调直流电源打到手动并调整输出电压为DC85V,打开开闭阀,当压力表的示值为0.4MPa时,关闭开闭阀。按下头罩开闭按钮,当头罩打开到位指示灯变亮时再次按下头罩开闭按钮,直到头罩关闭到位指示灯变亮。动作试验正常,即为合格。将可调直流电源打到手动并调整输出电压为DC115V,再次按以上步骤进行试验。 Press the start button of the air compressor, turn the adjustable DC power supply to manual and adjust the output voltage to DC85V, open the on-off valve, and close the on-off valve when the pressure gauge indicates 0.4MPa. Press the hood opening and closing button, and when the hood opening and closing indicator light turns on, press the hood opening and closing button again until the hood closing indicator turns on. If the action test is normal, it is qualified. Turn the adjustable DC power supply to manual and adjust the output voltage to DC115V, and conduct the test again according to the above steps. the
试验结束,按下空压机停止按钮。按下泄漏阀打开按钮,直到压力表的示值为0.15MPa时按下泄漏阀关闭按钮。 After the test is over, press the stop button of the air compressor. Press the open button of the leak valve until the indication value of the pressure gauge is 0.15MPa and press the close button of the leak valve. the
4、配管单元箱气密性试验 4. Air tightness test of piping unit box
按下空压机启动按钮,按下开闭阀打开按钮,当压力表示值为0.2MPa时按下开闭阀闭合按钮,记录压力表示数,保压5分钟,观察该示数变化情况,记录新示数。 Press the start button of the air compressor, press the open button of the on-off valve, press the close button of the on-off valve when the pressure indication value is 0.2MPa, record the pressure indication, keep the pressure for 5 minutes, observe the change of the indication, and record new count. the
按下开闭阀打开按钮,当压力表示值为0.83MPa时按下开闭阀闭合按钮,重复以上操作。 Press the open button of the on-off valve, press the close button of the on-off valve when the pressure indication value is 0.83MPa, and repeat the above operation. the
按下开闭阀打开按钮,当压力表示值为1.0MPa时按下开闭阀闭合按钮,重复以上操作。 Press the open button of the on-off valve, press the close button of the on-off valve when the pressure indication value is 1.0MPa, and repeat the above operation. the
试验结束,按下空压机停止按钮。 After the test is over, press the stop button of the air compressor. the
5、头罩开闭机构气密性试验 5. Air tightness test of the opening and closing mechanism of the hood
按下空压机启动按钮,按下开闭阀打开按钮,当压力表示值为1.0MPa时按下开闭阀闭合 按钮,记录压力表示数,保压5分钟,观察该示数变化情况,记录新示数。 Press the start button of the air compressor, press the open button of the on-off valve, press the close button of the on-off valve when the pressure indication value is 1.0MPa, record the pressure indication, keep the pressure for 5 minutes, observe the change of the indication, and record new count. the
试验结束,按下空压机停止按钮。按下泄漏阀打开按钮,直到压力表的示值为0.2MPa时按下泄漏阀关闭按钮。 After the test is over, press the stop button of the air compressor. Press the leak valve open button until the pressure gauge indicates 0.2MPa and press the leak valve close button. the
(二)自动操作 (2) Automatic operation
试验前,先打开所有空开,打开泄压阀,将所有气缸内压力泄到0时关闭。将控制柜手动/自动转换开关打到自动。按下夹具夹紧按钮,将试验配管单元箱和头罩开闭机构固定到试验台上。 Before the test, first open all air switches, open the pressure relief valve, and close it when the pressure in all cylinders is released to 0. Turn the manual/automatic transfer switch of the control cabinet to automatic. Press the clamp clamp button to fix the test piping unit box and the hood opening and closing mechanism to the test bench. the
1、绝缘电阻试验 1. Insulation resistance test
将配管单元箱及头罩开闭机构外部电路接绝缘电阻测试接头。打开绝缘电阻测试仪开关,施加500V高压,通过遥控口启动。在显示屏上按下上位机“绝缘电阻试验”开始按钮,合格与否会在显示器的显示屏上显示,试验结束后点停止、退出。 Connect the piping unit box and the external circuit of the hood opening and closing mechanism to the insulation resistance test connector. Turn on the switch of the insulation resistance tester, apply a high voltage of 500V, and start it through the remote control port. Press the start button of the upper computer "insulation resistance test" on the display screen, and whether it is qualified or not will be displayed on the display screen of the display screen. After the test is over, click stop and exit. the
试验结束,关闭绝缘电阻测试仪开关。并将外部电路拆下。 After the test is over, turn off the switch of the insulation resistance tester. And remove the external circuit. the
2、头罩开闭机构动作试验 2. Action test of the opening and closing mechanism of the hood
将可调直流电源选到自动,在显示器的显示屏上点击“头罩开闭机构动作试验”自动进行试验。点击开始进行试验,试验结束后点击停止、退出。 Select the adjustable DC power supply to be automatic, and click on the "hood opening and closing mechanism action test" on the display screen of the monitor to automatically conduct the test. Click to start the test, and click to stop and exit after the test. the
3、配管单元箱动作试验 3. Piping unit box action test
将可调直流电源选到自动,在显示器的显示屏上点击“配管单元箱动作试验”自动进行试验。点击开始进行试验,试验结束后点击停止、退出。 Select the adjustable DC power supply to be automatic, and click "Piping unit box action test" on the display screen of the monitor to automatically conduct the test. Click to start the test, and click to stop and exit after the test. the
4、配管单元箱气密性试验 4. Air tightness test of piping unit box
在显示器的显示屏上点击“配管单元箱气密性试验”自动进行试验。点击开始进行试验,试验结束后点击停止、退出。 On the display screen of the monitor, click "Piping Unit Box Air Tightness Test" to perform the test automatically. Click to start the test, and click to stop and exit after the test. the
5、头罩开闭机构气密性试验 5. Air tightness test of the opening and closing mechanism of the hood
在显示器的显示屏上点击“头罩开闭机构气密性试验”自动进行试验。点击开始进行试验,试验结束后点击停止、退出。 On the display screen of the monitor, click "airtightness test of the opening and closing mechanism of the hood" to perform the test automatically. Click to start the test, and click to stop and exit after the test. the
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110435974.9A CN102539133B (en) | 2011-12-23 | 2011-12-23 | Repair line of piping unit box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110435974.9A CN102539133B (en) | 2011-12-23 | 2011-12-23 | Repair line of piping unit box |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102539133A CN102539133A (en) | 2012-07-04 |
CN102539133B true CN102539133B (en) | 2014-09-03 |
Family
ID=46346575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110435974.9A Expired - Fee Related CN102539133B (en) | 2011-12-23 | 2011-12-23 | Repair line of piping unit box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102539133B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105136489B (en) * | 2015-10-21 | 2017-10-13 | 中车四方车辆有限公司 | Train head-shield opening and closing device wind energy test equipment and method of testing |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1329738A (en) * | 1998-12-09 | 2002-01-02 | 富士通株式会社 | On-vehicle vehicle guide apparatus, communication server system, and substitute vehicle guide system |
CN1740765A (en) * | 2004-03-30 | 2006-03-01 | 纳博特斯克株式会社 | Mechanism for detecting maintenance period of brake control device for railway vehicles |
CN201548411U (en) * | 2009-12-04 | 2010-08-11 | 太原鹏跃电子科技有限公司 | Examination and reparation detecting device for automatic derailment braking device |
-
2011
- 2011-12-23 CN CN201110435974.9A patent/CN102539133B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1329738A (en) * | 1998-12-09 | 2002-01-02 | 富士通株式会社 | On-vehicle vehicle guide apparatus, communication server system, and substitute vehicle guide system |
CN1740765A (en) * | 2004-03-30 | 2006-03-01 | 纳博特斯克株式会社 | Mechanism for detecting maintenance period of brake control device for railway vehicles |
CN201548411U (en) * | 2009-12-04 | 2010-08-11 | 太原鹏跃电子科技有限公司 | Examination and reparation detecting device for automatic derailment braking device |
Also Published As
Publication number | Publication date |
---|---|
CN102539133A (en) | 2012-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101813573B (en) | Automatic control valve life tester | |
CN203236203U (en) | EGR valve assembly and detection production line | |
CN205449409U (en) | Airtight pressure measurement | |
CN102004018A (en) | Helium pressurization and recovery system for valve low-temperature test | |
CN102081005A (en) | Leak detection equipment | |
CN201876393U (en) | Hydraulic fatigue test system for engine body | |
CN102539133B (en) | Repair line of piping unit box | |
CN206804242U (en) | Intermediate of brake valve air-leakage test experimental bench | |
CN201340451Y (en) | Novel automatic testing tool for square lithium batteries | |
CN102519740A (en) | Tubing unit box and hood opening-closing mechanism test bed | |
CN104330233B (en) | Automatic detection control method for hand-held air inflation gun | |
CN204064590U (en) | A kind of air-brake coupling hose air pressure level pressure detection experiment machine | |
CN2898802Y (en) | Checker of pressure-releasing valve | |
CN103674722B (en) | A kind of method of high intensity soldering and sealing fuel tank positive pressure test and positive pressure test system thereof | |
CN212539594U (en) | High-efficient pressure regulating box testboard | |
CN211652063U (en) | Fatigue detection platform and detection system for stop valve of LPG integrated valve | |
CN209639920U (en) | Automotive transmission oil pump pump body oil tightness test bench | |
CN111693276B (en) | High-efficiency pressure regulating box test method | |
CN202770625U (en) | Portable and intelligent detection apparatus for safety valve | |
CN208635985U (en) | An air-tightness detection device for a water outlet valve | |
CN208223754U (en) | Detection tool for tightness of intake manifold | |
CN105466652A (en) | Detection device of diaphragm valve | |
CN109084974A (en) | Portable pressure relief valve calibration equipment | |
CN202372320U (en) | Multi-purpose air tightness test bed | |
CN108132126A (en) | A kind of combined machine hydraulic cylinder spillage test method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Shao Lipeng Inventor after: Ma Fei Inventor after: Liang Yajun Inventor after: Zhang Xingtian Inventor before: Xing Xiaodong Inventor before: Shao Lipeng Inventor before: Ma Fei Inventor before: Liang Yajun Inventor before: Qiu Haibo |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: XING XIAODONG SHAO LIPENG MA FEI LIANG YAJUN QIU HAIBO TO: SHAO LIPENG MA FEI LIANG YAJUN ZHANG XINGTIAN |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: 266000 Shandong province Qingdao City, Ruichang Road No. 231 Patentee after: CRRC QINGDAO SIFANG ROLLING STOCK RESEARCH INSTITUTE Co.,Ltd. Address before: 266000 No. 231, Ruichang Road, Sifang District, Shandong, Qingdao Patentee before: QINGDAO SIFANG ROLLING STOCK RESEARCH INSTITUTE Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140903 |
|
CF01 | Termination of patent right due to non-payment of annual fee |