CN102528246B - Three-wire welding process for vertical welding - Google Patents
Three-wire welding process for vertical welding Download PDFInfo
- Publication number
- CN102528246B CN102528246B CN201210056755.4A CN201210056755A CN102528246B CN 102528246 B CN102528246 B CN 102528246B CN 201210056755 A CN201210056755 A CN 201210056755A CN 102528246 B CN102528246 B CN 102528246B
- Authority
- CN
- China
- Prior art keywords
- welding
- wire
- welding wire
- gun
- torch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003466 welding Methods 0.000 title claims abstract description 453
- 238000000034 method Methods 0.000 title claims abstract description 25
- 230000001681 protective effect Effects 0.000 claims description 3
- 238000007664 blowing Methods 0.000 abstract description 13
- 239000002184 metal Substances 0.000 abstract description 10
- 238000005516 engineering process Methods 0.000 description 6
- 230000008018 melting Effects 0.000 description 6
- 238000002844 melting Methods 0.000 description 6
- 230000036544 posture Effects 0.000 description 6
- 230000005484 gravity Effects 0.000 description 4
- 230000005496 eutectics Effects 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000008021 deposition Effects 0.000 description 2
- 238000009659 non-destructive testing Methods 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Arc Welding In General (AREA)
Abstract
本发明公开了一种针对立焊的三丝焊接工艺,在焊机上安装有设置第一焊丝的第一焊枪、设置第二焊丝的第二焊枪和设置第三焊丝的第三焊枪,第二焊枪和第三焊枪对称地设置在第一焊枪正下方的两侧,每个焊枪上分别设置有焊枪姿态调整装置,每个焊丝分别配有送丝机构、焊接电源和保护气体装置。本发明通过三个焊枪的空间排布,以及三个焊丝的焊接参数匹配,使得第二焊丝和第三焊丝产生的电弧气体吹力及保护气体吹力产生向上和向内的分力,托住流淌的熔化金属,从而实现对熔池几何尺寸的控制,保证了焊接质量。
The invention discloses a three-wire welding process for vertical welding. A first welding torch with a first welding wire, a second welding torch with a second welding wire and a third welding torch with a third welding wire are installed on the welding machine. The welding torch and the third welding torch are symmetrically arranged on both sides directly below the first welding torch, each welding torch is provided with a welding torch attitude adjustment device, and each welding wire is equipped with a wire feeding mechanism, a welding power supply and a shielding gas device. In the present invention, through the spatial arrangement of the three welding guns and the matching of the welding parameters of the three welding wires, the arc gas blowing force and the shielding gas blowing force generated by the second welding wire and the third welding wire generate upward and inward component forces, supporting The flowing molten metal realizes the control of the geometric size of the molten pool and ensures the welding quality.
Description
技术领域technical field
本发明涉及焊接技术,具体的说,是涉及一种针对于立焊的三丝焊接技术。The invention relates to welding technology, in particular to a three-wire welding technology for vertical welding.
背景技术Background technique
立焊技术,尤其是厚板立焊操作广泛用于集装箱船设计与建造、大型储油罐、高炉炉壳等装配领域。然而立焊时焊条熔化形成的熔滴及熔池中熔化金属受到重力极易下坠溢流,这就使焊缝成形困难,焊缝成形也不如平焊美观。Vertical welding technology, especially thick plate vertical welding operation, is widely used in the design and construction of container ships, large oil storage tanks, blast furnace shells and other assembly fields. However, during vertical welding, the molten metal formed by the melting of the electrode and the molten metal in the molten pool can easily fall and overflow due to gravity, which makes the formation of the weld difficult, and the formation of the weld is not as beautiful as that of the flat welding.
多丝共熔池焊接技术由于其高的焊接速度、高的熔敷速度得到了广泛的应用。试验研究表明双丝焊的速度和熔敷率是单丝焊的3~4倍,三丝焊又是单丝焊的4~5倍以上,尤其是对于中厚板焊接,可较大程度提到焊接效率。同时,多丝共熔池的焊接技术还具有对熔池,即熔池空间尺寸、组织成分等可控性的功能。The multi-wire eutectic pool welding technology has been widely used due to its high welding speed and high deposition speed. Experimental research shows that the speed and deposition rate of twin-wire welding are 3-4 times that of single-wire welding, and three-wire welding is more than 4-5 times that of single-wire welding. Especially for medium and thick plate welding, it can greatly improve to welding efficiency. At the same time, the welding technology of the multi-wire eutectic pool also has the function of controlling the molten pool, that is, the spatial size and tissue composition of the molten pool.
发明内容Contents of the invention
本发明要解决的是立焊时由于焊条熔化使焊缝成形困难,焊缝成形质量偏低的技术问题,利用多丝共熔池焊接技术高效和对熔池可控的特点,提供一种针对立焊的三丝焊接工艺。The present invention aims to solve the technical problem that the welding seam is difficult to form due to the melting of the electrode and the quality of the welding seam is low during vertical welding. It utilizes the characteristics of high efficiency of the multi-wire eutectic pool welding technology and the controllability of the molten pool to provide a method for Three-wire welding process for vertical welding.
为了解决上述技术问题,本发明通过以下的技术方案予以实现:In order to solve the above technical problems, the present invention is achieved through the following technical solutions:
一种针对立焊的三丝焊接工艺,该焊接工艺所基于的三丝焊接系统包括焊机,所述焊机上安装有设置第一焊丝的第一焊枪、设置第二焊丝的第二焊枪和设置第三焊丝的第三焊枪,所述第二焊枪和所述第三焊枪对称地设置在所述第一焊枪正下方的两侧,所述第一焊枪、所述第二焊枪和所述第三焊枪上分别设置有焊枪姿态调整装置,所述第一焊丝、所述第二焊丝和所述第三焊丝上分别配有送丝机构、焊接电源和保护气体装置;A three-wire welding process for vertical welding, the three-wire welding system on which the welding process is based includes a welding machine on which a first welding torch with a first welding wire, a second welding torch with a second welding wire and A third welding torch with a third welding wire is provided, the second welding torch and the third welding torch are symmetrically arranged on both sides directly below the first welding torch, the first welding torch, the second welding torch and the first welding torch The three welding guns are respectively equipped with welding gun attitude adjustment devices, and the first welding wire, the second welding wire and the third welding wire are respectively equipped with a wire feeding mechanism, a welding power supply and a shielding gas device;
包括以下步骤:Include the following steps:
(1)沿焊接方向使所述第一焊枪位于前端,使所述第二焊枪和所述第三焊枪位于后端,利用所述焊枪姿态调整装置分别调整所述第一焊枪、所述第二焊枪和所述第三焊枪,使得第一焊丝、所述第二焊丝和所述第三焊丝两两之间的尖端距离为10~20mm;(1) The first welding torch is located at the front end along the welding direction, the second welding torch and the third welding torch are located at the rear end, and the first welding torch and the second welding torch are respectively adjusted by the welding torch posture adjustment device. welding gun and the third welding gun, so that the tip distance between the first welding wire, the second welding wire and the third welding wire is 10-20 mm;
(2)利用所述焊枪姿态调整装置分别调整所述第一焊枪、所述第二焊枪和所述第三焊枪的焊枪姿态,使第一焊丝与待焊平面的垂直线之间的夹角为0°~15°之间,所述第二焊丝和第三焊丝与待焊平面的夹角为45°~75°之间,所述第二焊丝和第三焊丝分别与待焊平面的垂直线之间的夹角为15°~25°之间;(2) Use the welding torch attitude adjustment device to adjust the welding torch attitudes of the first welding torch, the second welding torch and the third welding torch respectively, so that the included angle between the first welding wire and the vertical line of the plane to be welded is Between 0° and 15°, the included angle between the second welding wire and the third welding wire and the plane to be welded is between 45° and 75°, and the second welding wire and the third welding wire are respectively perpendicular to the plane to be welded The angle between them is between 15° and 25°;
(3)开始施焊,采用熔化极气体保护法进行第一层焊接,其中所述第一焊丝的焊接电流为130~160A,焊接电压为20~24V,焊接速度为6~12cm/min,气体流量为40~45L/min,焊接电源为直流正接;所述第二焊丝和所述第三焊丝的焊接电流为140~160A,焊接电压为20~24V,焊接速度为6~12cm/min,气体流量为45~50L/min,焊接电源为直流正接;(3) Welding starts, and the first layer of welding is carried out by using the molten electrode gas protection method, wherein the welding current of the first welding wire is 130-160A, the welding voltage is 20-24V, the welding speed is 6-12cm/min, and the gas The flow rate is 40-45L/min, the welding power supply is DC positive connection; the welding current of the second welding wire and the third welding wire is 140-160A, the welding voltage is 20-24V, the welding speed is 6-12cm/min, the gas The flow rate is 45-50L/min, and the welding power source is DC positive connection;
(4)第一层焊接完成之后,利用所述焊枪姿态调整装置分别调整所述第二焊丝和第三焊丝分别与待焊平面的垂直线之间的夹角为25°~45°之间;(4) After the first layer of welding is completed, use the welding torch attitude adjustment device to adjust the included angle between the second welding wire and the third welding wire and the vertical line of the plane to be welded to be between 25° and 45°;
(5)采用熔化极气体保护法进行第二层焊接,其中所述第一焊丝的焊接电流为180~220A,焊接电压为24~28V,焊接速度为16~22cm/min,气体流量为55~65L/min,焊接电源为直流正接;所述第二焊丝和所述第三焊丝的焊接电流为200~240A,焊接电压为24~28V,焊接速度为16~22cm/min,气体流量为60~75L/min,焊接电源为直流正接。(5) The second layer of welding is carried out by using the molten electrode gas protection method, wherein the welding current of the first welding wire is 180-220A, the welding voltage is 24-28V, the welding speed is 16-22cm/min, and the gas flow rate is 55- 65L/min, the welding power supply is DC positive connection; the welding current of the second welding wire and the third welding wire is 200-240A, the welding voltage is 24-28V, the welding speed is 16-22cm/min, and the gas flow rate is 60-240A 75L/min, the welding power supply is DC positive connection.
其中,所述焊枪姿态调整装置包括横向调整装置、竖向调整装置、纵向调整装置和角度调整装置。Wherein, the welding torch posture adjustment device includes a horizontal adjustment device, a vertical adjustment device, a longitudinal adjustment device and an angle adjustment device.
本发明的有益效果是:The beneficial effects of the present invention are:
本发明通过三个焊枪的空间排布,以及三个焊丝的焊接参数匹配,使得第二焊丝和第三焊丝产生的电弧气体吹力及保护气体吹力产生向上和向内的分力,托住流淌的熔化金属,从而实现对熔池几何尺寸的控制,保证了焊接质量。In the present invention, through the spatial arrangement of the three welding guns and the matching of the welding parameters of the three welding wires, the arc gas blowing force and the shielding gas blowing force generated by the second welding wire and the third welding wire generate upward and inward component forces, supporting The flowing molten metal realizes the control of the geometric size of the molten pool and ensures the welding quality.
附图说明Description of drawings
图1是本发明所提供的针对立焊的三丝焊接系统的结构示意图;Fig. 1 is a schematic structural view of a three-wire welding system for vertical welding provided by the present invention;
图2是本发明所提供的针对立焊的三丝焊接工艺示意图;Fig. 2 is a schematic diagram of the three-wire welding process for vertical welding provided by the present invention;
图3是图2的侧视图;Fig. 3 is a side view of Fig. 2;
图4是图2的正视图。Fig. 4 is a front view of Fig. 2 .
图中:11、第一焊丝,12、第一焊枪,21、第二焊丝,22、第二焊枪,31、第三焊丝,32、第三焊枪,4:焊枪姿态调整装置,5:送丝机构,6:焊接电源,7、待焊工件。In the figure: 11, the first welding wire, 12, the first welding torch, 21, the second welding wire, 22, the second welding torch, 31, the third welding wire, 32, the third welding torch, 4: welding torch attitude adjustment device, 5: wire feeding Mechanism, 6: welding power supply, 7, workpiece to be welded.
具体实施方式Detailed ways
下面结合附图和实施例对本发明作进一步的详细描述:Below in conjunction with accompanying drawing and embodiment the present invention will be described in further detail:
如图1所示,本实施例披露了一种针对立焊的三丝焊接系统,在焊机上安装有三个焊枪,分别称之为第一焊枪12、第二焊枪22和第三焊枪32,其上分别设置第一焊丝11、第二焊丝21和第三焊丝31。第二焊枪22和第三焊枪32分别位于第一焊枪12正下方的两侧,并且第二焊枪22和第三焊枪32相对于第一焊枪12的安装位置对称。As shown in Figure 1, this embodiment discloses a three-wire welding system for vertical welding, three welding torches are installed on the welding machine, which are respectively referred to as the first welding torch 12, the second welding torch 22 and the third welding torch 32, The first welding wire 11 , the second welding wire 21 and the third welding wire 31 are respectively arranged thereon. The second welding torch 22 and the third welding torch 32 are respectively located on two sides directly below the first welding torch 12 , and the installation positions of the second welding torch 22 and the third welding torch 32 are symmetrical with respect to the first welding torch 12 .
第一焊枪12、第二焊枪22和第三焊枪32上分别设置有焊枪姿态调整装置4。其中,焊枪姿态调整装置4具体包括横向调整装置、竖向调整装置、纵向调整装置和角度调整装置。横向调整装置、竖向调整装置、纵向调整装置和角度调整装置都是现有焊接设备上通用的调整装置。The first welding torch 12 , the second welding torch 22 and the third welding torch 32 are respectively provided with a welding torch attitude adjusting device 4 . Wherein, the welding torch posture adjustment device 4 specifically includes a horizontal adjustment device, a vertical adjustment device, a longitudinal adjustment device and an angle adjustment device. Horizontal adjustment device, vertical adjustment device, longitudinal adjustment device and angle adjustment device are all general adjustment devices on existing welding equipment.
第一焊丝11、第二焊丝21和第三焊丝31上分别配有送丝机构、焊接电源和保护气体装置。The first welding wire 11 , the second welding wire 21 and the third welding wire 31 are equipped with a wire feeding mechanism, a welding power source and a shielding gas device respectively.
如图2至图4所示,本实施例同时披露了一种针对立焊的三丝焊接工艺,该焊接工艺采用三丝熔化极气体保护焊接方法,焊接顺序为两层两道焊,焊接材料采用与焊接工件屈服强度同等级的焊丝或者焊条。As shown in Figures 2 to 4, this embodiment also discloses a three-wire welding process for vertical welding. The welding process adopts a three-wire melting electrode gas shielded welding method. Use welding wire or electrodes of the same grade as the yield strength of the workpiece to be welded.
焊接前认真熟悉施工图纸及工艺,检测坡口尺寸及装配精度是否符合相应质量标准要求,对待焊区域进行除油、除渣、杂物清理,避免杂质对焊接质量的影响。Before welding, carefully familiarize yourself with the construction drawings and processes, check whether the groove size and assembly accuracy meet the requirements of the corresponding quality standards, and remove oil, slag, and debris in the area to be welded to avoid the impact of impurities on the welding quality.
实施例1Example 1
本焊接工艺特别针对于厚度25mm的焊接工件,并采用单面V型坡口焊接,对接坡口角度为60°±5°。This welding process is especially aimed at welding workpieces with a thickness of 25mm, and adopts single-sided V-shaped groove welding, and the butt groove angle is 60°±5°.
沿焊接方向使第一焊枪12位于前端,使第二焊枪22和第三焊枪32位于后端,即焊接方向为向上立焊时,第一焊枪12的位置在上,第二焊枪22和第三焊枪32的位置在下。立焊时,第一焊丝11在熔化工件形成焊接熔池的过程中起到主要作用,第二焊丝21和第三焊丝31起到调节熔池几何尺寸、托住受到重力作用而向下流淌的熔融金属的作用。Make the first welding gun 12 be positioned at the front end along the welding direction, make the second welding gun 22 and the 3rd welding gun 32 be positioned at the rear end, promptly welding direction is when upward vertical welding, the position of the first welding gun 12 is on the top, the second welding gun 22 and the third welding gun 32 are positioned at the rear end. The position of the welding torch 32 is below. During vertical welding, the first welding wire 11 plays a major role in the process of melting the workpiece to form a welding pool, and the second welding wire 21 and the third welding wire 31 play a role in adjusting the geometric size of the molten pool and supporting the flow of the molten pool under the action of gravity. The action of molten metal.
焊接之前分别调整三个焊枪的焊接姿态,利用横向调节装置、竖向调节装置和纵向调节装置分别调整第一焊丝11、第二焊丝21和第三焊丝31两两之间的尖端距离为10mm,以使第一焊丝11、第二焊丝21和第三焊丝31之间的间距控制在产生一个焊接熔池的范围内。Before welding, adjust the welding postures of the three welding guns respectively, and use the horizontal adjustment device, the vertical adjustment device and the longitudinal adjustment device to adjust the distance between the tips of the first welding wire 11, the second welding wire 21 and the third welding wire 31 to be 10mm respectively. The distance between the first welding wire 11 , the second welding wire 21 and the third welding wire 31 is controlled within the range of producing a weld pool.
利用焊枪姿态调整装置分别调整第一焊枪12、第二焊枪22和第三焊枪32的焊枪姿态,第一焊丝11与待焊平面的垂直线之间的夹角为γ,第二焊丝21和第三焊丝31与待焊平面的夹角为β,第二焊丝21和第三焊丝31分别与待焊平面的垂直线之间的夹角α。使夹角γ为0°,使夹角α为45°,保证第二焊丝21和第三焊丝31产生的电弧气体吹力及各电弧的保护气体吹力对熔池产生向上的分力,托住流淌的金属;使夹角β为15°之间,保证第二焊丝21和第三焊丝31产生的电弧气体吹力对熔池产生向内的分力,控制熔池几何尺寸。Utilize the welding torch attitude adjusting device to adjust the welding torch attitude of the first welding torch 12, the second welding torch 22 and the third welding torch 32 respectively, the included angle between the first welding wire 11 and the vertical line of the plane to be welded is γ, the second welding wire 21 and the first welding torch The included angle between the third welding wire 31 and the plane to be welded is β, and the included angle α between the second welding wire 21 and the third welding wire 31 and the vertical line of the plane to be welded respectively. The included angle γ is 0°, and the included angle α is 45° to ensure that the blowing force of the arc gas generated by the second welding wire 21 and the third welding wire 31 and the blowing force of the protective gas of each arc generate an upward component force on the molten pool. Hold the flowing metal; make the included angle β between 15°, ensure that the blowing force of the arc gas generated by the second welding wire 21 and the third welding wire 31 produces an inward component force on the molten pool, and control the geometric size of the molten pool.
进行第一层施焊,其中第一焊丝11的焊接电流为130~135A,焊接电压为20~21V,焊接速度为6~8cm/min,气体流量为40~45L/min,焊接电源为直流正接;第二焊丝21和第三焊丝31的焊接电流为140~145A,焊接电压为20~21V,焊接速度为6~8cm/min,气体流量为45~50L/min,焊接电源为直流正接。Carry out the first layer of welding, wherein the welding current of the first welding wire 11 is 130-135A, the welding voltage is 20-21V, the welding speed is 6-8cm/min, the gas flow rate is 40-45L/min, and the welding power supply is DC positive connection The welding current of the second welding wire 21 and the third welding wire 31 is 140-145A, the welding voltage is 20-21V, the welding speed is 6-8cm/min, the gas flow rate is 45-50L/min, and the welding power supply is DC positive connection.
第一层焊接完成之后,利用角度调整装置分别调整第二焊丝21和第三焊丝31分别与待焊平面的垂直线之间的夹角为25°;After the first layer of welding is completed, use the angle adjustment device to adjust the angle between the second welding wire 21 and the third welding wire 31 and the vertical line of the plane to be welded respectively to be 25 °;
进行第二层焊接,其中第一焊丝11的焊接电流为180~185A,焊接电压为24~25V,焊接速度为16~18cm/min,为气体流量55~60L/min,焊接电源为直流正接;第二焊丝21和第三焊丝31的焊接电流为200~210A,焊接电压为24~25V,焊接速度为16~18cm/min,气体流量为60~65L/min,焊接电源为直流正接。Carry out the second layer of welding, wherein the welding current of the first welding wire 11 is 180-185A, the welding voltage is 24-25V, the welding speed is 16-18cm/min, the gas flow rate is 55-60L/min, and the welding power supply is DC positive connection; The welding current of the second welding wire 21 and the third welding wire 31 is 200-210A, the welding voltage is 24-25V, the welding speed is 16-18cm/min, the gas flow rate is 60-65L/min, and the welding power supply is DC positive connection.
实施例2Example 2
本焊接工艺特别针对于厚度30mm的焊接工件,并采用单面V型坡口焊接,对接坡口角度为60°±5°。This welding process is especially aimed at welding workpieces with a thickness of 30mm, and adopts single-sided V-shaped groove welding, and the butt groove angle is 60°±5°.
沿焊接方向使第一焊枪12位于前端,使第二焊枪22和第三焊枪32位于后端,即焊接方向为向上立焊时,第一焊枪12的位置在上,第二焊枪22和第三焊枪32的位置在下。立焊时,第一焊丝11在熔化工件形成焊接熔池的过程中起到主要作用,第二焊丝21和第三焊丝31起到调节熔池几何尺寸、托住受到重力作用而向下流淌的熔融金属的作用。Make the first welding gun 12 be positioned at the front end along the welding direction, make the second welding gun 22 and the 3rd welding gun 32 be positioned at the rear end, promptly welding direction is when upward vertical welding, the position of the first welding gun 12 is on the top, the second welding gun 22 and the third welding gun 32 are positioned at the rear end. The position of the welding torch 32 is below. During vertical welding, the first welding wire 11 plays a major role in the process of melting the workpiece to form a welding pool, and the second welding wire 21 and the third welding wire 31 play a role in adjusting the geometric size of the molten pool and supporting the flow of the molten pool under the action of gravity. The action of molten metal.
焊接之前分别调整三个焊枪的焊接姿态,利用横向调节装置、竖向调节装置和纵向调节装置分别调整第一焊丝11、第二焊丝21和第三焊丝31两两之间的尖端距离为15mm,以使第一焊丝11、第二焊丝21和第三焊丝31之间的间距控制在产生一个焊接熔池的范围内。Before welding, adjust the welding postures of the three welding torches respectively, and use the horizontal adjustment device, vertical adjustment device and longitudinal adjustment device to adjust the distance between the tips of the first welding wire 11, the second welding wire 21 and the third welding wire 31 to be 15mm respectively. The distance between the first welding wire 11 , the second welding wire 21 and the third welding wire 31 is controlled within the range of producing a weld pool.
利用焊枪姿态调整装置分别调整第一焊枪12、第二焊枪22和第三焊枪32的焊枪姿态,第一焊丝11与待焊平面的垂直线之间的夹角为γ,第二焊丝21和第三焊丝31与待焊平面的夹角为β,第二焊丝21和第三焊丝31分别与待焊平面的垂直线之间的夹角α。使夹角γ为8°,使夹角α为60°,保证第二焊丝21和第三焊丝31产生的电弧气体吹力及各电弧的保护气体吹力对熔池产生向上的分力,托住流淌的金属;使夹角β为20°之间,保证第二焊丝21和第三焊丝31产生的电弧气体吹力对熔池产生向内的分力,控制熔池几何尺寸。Utilize the welding torch attitude adjusting device to adjust the welding torch attitude of the first welding torch 12, the second welding torch 22 and the third welding torch 32 respectively, the included angle between the first welding wire 11 and the vertical line of the plane to be welded is γ, the second welding wire 21 and the first welding torch The included angle between the third welding wire 31 and the plane to be welded is β, and the included angle α between the second welding wire 21 and the third welding wire 31 and the vertical line of the plane to be welded respectively. The included angle γ is 8°, and the included angle α is 60° to ensure that the blowing force of the arc gas generated by the second welding wire 21 and the third welding wire 31 and the blowing force of the protective gas of each arc generate an upward component force on the molten pool. Hold the flowing metal; make the included angle β between 20°, ensure that the blowing force of the arc gas generated by the second welding wire 21 and the third welding wire 31 produces an inward component force on the molten pool, and control the geometric size of the molten pool.
进行第一层施焊,其中第一焊丝11的焊接电流为140~145A,焊接电压为21~22V,焊接速度为8~10cm/min,气体流量为40~45L/min,焊接电源为直流正接;第二焊丝21和第三焊丝31的焊接电流为145~150A,焊接电压为21~22V,焊接速度为8~10cm/min,气体流量为45~50L/min,焊接电源为直流正接。Carry out the first layer of welding, wherein the welding current of the first welding wire 11 is 140-145A, the welding voltage is 21-22V, the welding speed is 8-10cm/min, the gas flow rate is 40-45L/min, and the welding power supply is DC positive connection The welding current of the second welding wire 21 and the third welding wire 31 is 145-150A, the welding voltage is 21-22V, the welding speed is 8-10cm/min, the gas flow is 45-50L/min, and the welding power supply is DC positive connection.
第一层焊接完成之后,利用角度调整装置分别调整第二焊丝21和第三焊丝31分别与待焊平面的垂直线之间的夹角为40°;After the first layer of welding is completed, use the angle adjustment device to adjust the angle between the second welding wire 21 and the third welding wire 31 and the vertical line of the plane to be welded to be 40°;
进行第二层焊接,其中第一焊丝11的焊接电流为190~200A,焊接电压为25~26V,焊接速度为18~20cm/min,为气体流量55~60L/min,焊接电源为直流正接;第二焊丝21和第三焊丝31的焊接电流为210~220A,焊接电压为25~26V,焊接速度为18~20cm/min,气体流量为65~70L/min,焊接电源为直流正接。Carry out the second layer of welding, wherein the welding current of the first welding wire 11 is 190-200A, the welding voltage is 25-26V, the welding speed is 18-20cm/min, the gas flow rate is 55-60L/min, and the welding power supply is DC positive connection; The welding current of the second welding wire 21 and the third welding wire 31 is 210-220A, the welding voltage is 25-26V, the welding speed is 18-20cm/min, the gas flow rate is 65-70L/min, and the welding power supply is direct current.
实施例3Example 3
本焊接工艺特别针对于厚度40mm的焊接工件,并采用单面V型坡口焊接,对接坡口角度为60°±5°。This welding process is especially aimed at welding workpieces with a thickness of 40mm, and adopts single-sided V-shaped groove welding, and the butt groove angle is 60°±5°.
沿焊接方向使第一焊枪12位于前端,使第二焊枪22和第三焊枪32位于后端,即焊接方向为向上立焊时,第一焊枪12的位置在上,第二焊枪22和第三焊枪32的位置在下。立焊时,第一焊丝11在熔化工件形成焊接熔池的过程中起到主要作用,第二焊丝21和第三焊丝31起到调节熔池几何尺寸、托住受到重力作用而向下流淌的熔融金属的作用。Make the first welding gun 12 be positioned at the front end along the welding direction, make the second welding gun 22 and the 3rd welding gun 32 be positioned at the rear end, promptly welding direction is when upward vertical welding, the position of the first welding gun 12 is on the top, the second welding gun 22 and the third welding gun 32 are positioned at the rear end. The position of the welding torch 32 is below. During vertical welding, the first welding wire 11 plays a major role in the process of melting the workpiece to form a welding pool, and the second welding wire 21 and the third welding wire 31 play a role in adjusting the geometric size of the molten pool and supporting the flow of the molten pool under the action of gravity. The action of molten metal.
焊接之前分别调整三个焊枪的焊接姿态,利用横向调节装置、竖向调节装置和纵向调节装置分别调整第一焊丝11、第二焊丝21和第三焊丝31两两之间的尖端距离为20mm,以使第一焊丝11、第二焊丝21和第三焊丝31之间的间距控制在产生一个焊接熔池的范围内。Before welding, adjust the welding postures of the three welding guns respectively, and use the horizontal adjustment device, vertical adjustment device and longitudinal adjustment device to adjust the tip distance between the first welding wire 11, the second welding wire 21 and the third welding wire 31 respectively to 20mm. The distance between the first welding wire 11 , the second welding wire 21 and the third welding wire 31 is controlled within the range of producing a weld pool.
利用焊枪姿态调整装置分别调整第一焊枪12、第二焊枪22和第三焊枪32的焊枪姿态,第一焊丝11与待焊平面的垂直线之间的夹角为γ,第二焊丝21和第三焊丝31与待焊平面的夹角为β,第二焊丝21和第三焊丝31分别与待焊平面的垂直线之间的夹角α。使夹角γ为15°,使夹角α为75°,保证第二焊丝21和第三焊丝31产生的电弧气体吹力及各电弧的保护气体吹力对熔池产生向上的分力,托住流淌的金属;使夹角β为25°,保证第二焊丝21和第三焊丝31产生的电弧气体吹力对熔池产生向内的分力,控制熔池几何尺寸。Utilize the welding torch attitude adjusting device to adjust the welding torch attitude of the first welding torch 12, the second welding torch 22 and the third welding torch 32 respectively, the included angle between the first welding wire 11 and the vertical line of the plane to be welded is γ, the second welding wire 21 and the first welding torch The included angle between the third welding wire 31 and the plane to be welded is β, and the included angle α between the second welding wire 21 and the third welding wire 31 and the vertical line of the plane to be welded respectively. The included angle γ is 15°, and the included angle α is 75° to ensure that the blowing force of the arc gas generated by the second welding wire 21 and the third welding wire 31 and the blowing force of the shielding gas of each arc generate an upward component force on the molten pool. Hold the flowing metal; make the included angle β 25° to ensure that the blowing force of the arc gas generated by the second welding wire 21 and the third welding wire 31 generates an inward component force on the molten pool, and controls the geometric size of the molten pool.
进行第一层施焊,其中第一焊丝11的焊接电流为150~160A,焊接电压为22~24V,焊接速度为10~12cm/min,气体流量为40~45L/min,焊接电源为直流正接;第二焊丝21和第三焊丝31的焊接电流为155~160A,焊接电压为22~24V,焊接速度为10~12cm/min,气体流量为45~50L/min,焊接电源为直流正接。Carry out the first layer of welding, wherein the welding current of the first welding wire 11 is 150-160A, the welding voltage is 22-24V, the welding speed is 10-12cm/min, the gas flow rate is 40-45L/min, and the welding power supply is DC positive connection The welding current of the second welding wire 21 and the third welding wire 31 is 155~160A, the welding voltage is 22~24V, the welding speed is 10~12cm/min, the gas flow is 45~50L/min, and the welding power supply is DC positive connection.
第一层焊接完成之后,利用角度调整装置分别调整第二焊丝21和第三焊丝31分别与待焊平面的垂直线之间的夹角为45°;After the first layer of welding is completed, use the angle adjustment device to adjust the angle between the second welding wire 21 and the third welding wire 31 and the vertical line of the plane to be welded to be 45°;
进行第二层焊接,其中第一焊丝11的焊接电流为210~220A,焊接电压为26~28V,焊接速度为20~22cm/min,为气体流量60~65L/min,焊接电源为直流正接;第二焊丝21和第三焊丝31的焊接电流为220~240A,焊接电压为26~28V,焊接速度为20~22cm/min,气体流量为65~75L/min,焊接电源为直流正接。Carry out the second layer of welding, wherein the welding current of the first welding wire 11 is 210-220A, the welding voltage is 26-28V, the welding speed is 20-22cm/min, the gas flow rate is 60-65L/min, and the welding power supply is DC positive connection; The welding current of the second welding wire 21 and the third welding wire 31 is 220-240A, the welding voltage is 26-28V, the welding speed is 20-22cm/min, the gas flow rate is 65-75L/min, and the welding power supply is direct current.
焊接完成之后进行清理及检测,具体包括:1.焊后仔细清除焊缝焊渣及飞溅物;2.焊后按照相关标准对焊缝进行无损检测;3.对于有缺陷需返修的焊缝,根据实际情况进行修复,修复后再进行无损检测;4.焊缝质量应符合相关验收标准的要求。After the welding is completed, clean up and inspect, including: 1. Carefully remove weld slag and spatter after welding; 2. Conduct non-destructive testing on the weld according to relevant standards after welding; 3. For defective welds that need to be repaired, Repair according to the actual situation, and then carry out non-destructive testing after repair; 4. The quality of welds should meet the requirements of relevant acceptance standards.
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以作出很多形式的具体变换,这些均属于本发明的保护范围之内。Although the preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments. The above-mentioned specific embodiments are only illustrative and not restrictive. Those of ordinary skill in the art Under the enlightenment of the present invention, without departing from the purpose of the present invention and the scope of protection of the claims, personnel can also make specific changes in many forms, and these all belong to the protection scope of the present invention.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210056755.4A CN102528246B (en) | 2012-03-07 | 2012-03-07 | Three-wire welding process for vertical welding |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201210056755.4A CN102528246B (en) | 2012-03-07 | 2012-03-07 | Three-wire welding process for vertical welding |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN102528246A CN102528246A (en) | 2012-07-04 |
| CN102528246B true CN102528246B (en) | 2014-07-30 |
Family
ID=46336953
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201210056755.4A Expired - Fee Related CN102528246B (en) | 2012-03-07 | 2012-03-07 | Three-wire welding process for vertical welding |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102528246B (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104785906B (en) * | 2012-12-20 | 2016-09-07 | 天津大学 | Four integral type welding methods |
| CN104625361B (en) * | 2015-01-23 | 2017-10-31 | 天津大学 | Three-wire welding torch, welding system and method for double-arc and cold wire pulse hybrid welding |
| JP2017196653A (en) * | 2016-04-28 | 2017-11-02 | 株式会社神戸製鋼所 | Gas shield arc welding system and gas shield arc welding method |
| CN108838490A (en) * | 2018-07-19 | 2018-11-20 | 南昌航空大学 | A kind of arcing device for the control of underwater transverse weld appearance of weld |
| CN112139629A (en) * | 2020-09-23 | 2020-12-29 | 天津七所高科技有限公司 | High-frequency pulse three-wire indirect electric arc welding method and device |
| CN112570856B (en) * | 2020-12-09 | 2022-07-01 | 中国石油天然气集团有限公司 | Cold and hot welding wire matching welding device and system for oil gas conveying steel pipe |
| CN113263282B (en) * | 2021-05-19 | 2022-10-25 | 烟台大学 | All-position suspension type vertical welding device between gapless materials |
| CN113732446B (en) * | 2021-08-25 | 2023-03-10 | 中国船舶重工集团公司第七二五研究所 | Bypass coupling three-wire indirect electric arc welding method with controllable electric arc space structure |
| CN119566475B (en) * | 2025-02-10 | 2025-06-17 | 河南卫华重型机械股份有限公司 | A multi-machine collaborative welding method for thick plate drum groove |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS62197279A (en) * | 1986-02-20 | 1987-08-31 | Mitsubishi Heavy Ind Ltd | Consumable electrode type arc welding method |
| JP4749555B2 (en) * | 2001-01-19 | 2011-08-17 | 株式会社ダイヘン | Three-electrode arc welding control method |
| CN101134260A (en) * | 2007-10-25 | 2008-03-05 | 上海交通大学 | Three wire open arc welding method |
| CN201275660Y (en) * | 2008-09-25 | 2009-07-22 | 藏伟 | Gas protecting electric welding machine |
-
2012
- 2012-03-07 CN CN201210056755.4A patent/CN102528246B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN102528246A (en) | 2012-07-04 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102528246B (en) | Three-wire welding process for vertical welding | |
| CN102528237B (en) | Welding process for carbon steel process pipeline | |
| CN104014912B (en) | The arc-welding of a kind of titanium or titanium alloy component increases material reproducing method | |
| CN105215525B (en) | Bypass heated filament plasma arc welding (PAW) connection device and welding method | |
| CN102990235B (en) | Fusing method of laser welding with filler wires using double TIG welding torches | |
| CN103252557B (en) | Welding method achieving medium thick plate backing welding without back gouging | |
| CN104493368A (en) | Plasma-melting electrode electric arc dynamic composite welding device and welding method thereof | |
| CN110576245A (en) | Fully automatic argon arc welding method for girth weld of duplex stainless steel pipe | |
| CN108907420B (en) | Submerged arc automatic welding method for transverse large joint of ship body | |
| CN204997223U (en) | Bypass heater plasma arc weld device | |
| CN105195872A (en) | Double-sided submerged arc back-chipping-free welding technology for pipeline steel | |
| CN103551711B (en) | A high-efficiency welding method for single-pass single-side welding and double-side forming of medium-thick plates | |
| CN108687429B (en) | Double-electric double-wire submerged arc welding method for high-strength steel plate | |
| CN103817449A (en) | Plasma arc and melt electrode electric arc composite welding method and device | |
| CN103433630B (en) | A kind of pulsed wire feeding laser-electric arc spot soldering method | |
| CN102744499A (en) | Double-side double-arc welding process for root layer of pipeline | |
| CN101862919B (en) | A thick plate AZ31 magnesium alloy welded joint and its double-sided welding method | |
| CN103273177B (en) | A double TIG welding system and its welding method for thick plate parts | |
| CN104708179B (en) | Application of Double TIG Welding Method in Implementing Thick Plate Welding | |
| CN106271140A (en) | A kind of plasma MAG complex welding method | |
| CN204353659U (en) | Plasma-melt pole electrical arc dynamic complex welder | |
| CN203765179U (en) | Hybrid welding device with plasma arc mode and consumable electrode electric arc mode | |
| CN103978288A (en) | Method for welding by TIG (Tungsten Inert Gas arc Welding)-MIG (Metal inert-gas welding) serially connecting way | |
| CN101711192A (en) | Method and device for permanently interconnecting components from a heat-meltable metal material | |
| CN106695065A (en) | T-shaped plate one-side welding pulse bottoming welding method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140730 Termination date: 20210307 |