Cutting method for models of source end of electrical power system Download PDF

Info

Publication number
CN102510129B
CN102510129B CN 201110338630 CN201110338630A CN102510129B CN 102510129 B CN102510129 B CN 102510129B CN 201110338630 CN201110338630 CN 201110338630 CN 201110338630 A CN201110338630 A CN 201110338630A CN 102510129 B CN102510129 B CN 102510129B
Authority
CN
China
Prior art keywords
model
transformer
equivalent
models
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110338630
Other languages
Chinese (zh)
Other versions
CN102510129A (en
Inventor
宋鑫
赵家庆
丁宏恩
杨启京
吴庆曦
韩晓
芦克莉
任远
彭晖
周宇植
肖翔
程健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Original Assignee
Nari Technology Co Ltd
Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, Suzhou Power Supply Co Ltd of Jiangsu Electric Power Co filed Critical Nari Technology Co Ltd
Priority to CN 201110338630 priority Critical patent/CN102510129B/en
Publication of CN102510129A publication Critical patent/CN102510129A/en
Application granted granted Critical
Publication of CN102510129B publication Critical patent/CN102510129B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a cutting method for models, which is used after the disposable equipment models of a transformer substation are fed to an automatic dispatching master station system and before the models are imported into the dispatching master station system. The cutting method includes the steps: extracting the modes needing to be equated from the feed models of the transformer substation; providing equated cutting strategies according to the extracted equated models, and manually selecting the models needing to be equated and new model types after equating as needed; and cutting down the equated models and adding the new models after equating. By the aid of the method, a user can cut the models of the transformer substation in an equated manner and then import the models into the master station system according to practical needs, so that the requirement of importing as needed is met, and the models finally imported into the system are complete and dynamic. Besides, daily use and management of the user are facilitated, pressure of useless equipment models imported into the system on system load is reduced, and safety and practicality of the master station system synchronous to the models of the transformer substation are enhanced.

Description

Electric power system source end model method of cutting out
Technical field
The present invention relates to a kind of novel electric power system source end model cutting method, being used for transformer station safeguards to the model source end of scheduling station, transformer station's end is with after sending main website on the primary equipment model, main station system is according to user's different demands, provide multiple model to reduce strategy, and before the model import system, carry out model according to the reduction strategy that the user selects and reduce, remove the part that main station system is not paid close attention in the model, belong to the power automation technical field.
Background technology
The automation of transformation substations cooperates by the exchange of model information with the dispatching and monitoring main website, be the operation monitoring of electrical network and the network-wide security economical operation guarantee that provides the foundation, yet because development and application direction and research and develop the difference of the degree of depth between factory's substation automation system and dispatching and monitoring main website, caused primary equipment model that transformer station provides and the demand of main website that certain difference is arranged.The scheduling station system often can only passively accept the model information that transformer station provides, can't before the model import system, screen required model according to demand, can only carry out equivalence to unwanted model again behind the model import system handles, do so just to have caused to retain in the system a large amount of useless equivalent device models of quilt are arranged, continuous development along with the electrical network scale, amount of information is increasing, these type of more and more useless model informations will certainly constitute huge pressure to system load, and form potential safety hazard.
Summary of the invention
The objective of the invention is to solve the deficiency that existing transformer station model model in the main station system exists synchronously, effectively solve and again model is carried out equivalence processing after transformer station model imports main station system, can't remove by this problem of equivalent equipment.Satisfy the requirement that the user imports as required to transformer station model, and the equivalence that offers the multiple mode of user flexibly is tactful, making the personnel that use the dispatching automation main station system just carry out equivalence to transformer station model before the transformer station model import system handles, reduce unwanted model, make that the model of final import system is complete and keen-witted and capable.
For achieving the above object, the technical solution used in the present invention is:
A kind of novel electric power system source end model cutting method, it is characterized in that: the scheduling station system reduces model before the model import system that the source end is sent, and may further comprise the steps:
1) the primary equipment CIM model that send the dispatching automation main station system to meet the IEC61970 standard on the source end (transformer station);
2) described dispatching automation main station system is resolved this model, and extract equivalent equipment by electric power system general knowledge, the information that extracts comprises the affiliated electric pressure, rdfid sign of this equipment etc. at least, and by electric pressure, device type is selected the displaying of classifying of the equivalent equipment of these extractions for artificial definition;
According to the general knowledge of electric power system, generally, scheduling station might be done equivalent the processing to transformer or circuit, and equivalent state estimation, the dispatcher's trend of making things convenient for later calculated, and keeps the equipment that the dispatcher pays close attention to simultaneously.
3) the model customization guide of reducing strategy several strategies that can provide the model equivalence automatically select to reduce strategy for the user, by the artificial newly-increased model of equivalent reduction model and equivalent back of selecting as required;
Model reduction strategy comprises the transformer equivalence at least becomes load, and the circuit equivalence becomes load or generator.
4) for artificial selection is intact reduce strategy after, the dispatching automation main station system is reduced strategy according to the equivalence of artificial selection and is reduced model, reduces the model that fallen by equivalence according to reducing device type in the strategy and topological relation;
The equivalent priority of handling of reducing is to reduce transformer trail official circuit earlier from high to low.
For transformer, it is carried out equivalence after, search for all equipment that link to each other with this transformer and reduce according to topological relation; If find have other transformers to link to each other with this transformer in the equivalent reduction process of transformer, but the artificial equivalence of other transformers of definition of not selecting is reduced strategy, and other transformers will be reduced according to defined reduction strategy so; Defined equivalent circuit as if having in the equipment of finding to be reduced in the equivalent reduction process of transformer, then this circuit is no longer done the equivalent processing of reducing; For circuit, after it is carried out equivalence, then need to reduce this circuit.
5) after model is reduced and finished, increase new Equivalent Model according to device type and the topological relation reduced in the strategy.
For transformer, after reduction is finished, will on putting, transformer indicate by equivalence; For circuit, after reduction was finished, if search the equipment that links to each other with this circuit in the our station side of this circuit, then an end that links to each other with circuit at this equipment hung up newly-increased model.
After transformer has been done equivalence in the corresponding model, all will delete with the mesolow side all devices that this transformer links, after sweep equipment is finished, equivalent sign on transformer is put.After corresponding line had been done equivalence, this circuit was deleted, to hanging up equivalent machine utilization or the generator of artificial appointment on should circuit our station end node.If after finding the transformer equivalence, the equivalent circuit of selected needs is deleted, then this circuit is no longer done the equivalent processing of reducing.As after finding the transformer equivalence, other do not select equivalent transformer to link to each other with this equivalence transformer under the identical electric pressure, and then other transformers also need be done the equivalence reduction processing same with equivalent transformer.
6) reduction is disposed back and increase model after the new Equivalent Model imports described dispatching automation main station system.
The function that the present invention realizes comprises three parts:
(1) send in the model in transformer station, extract needing equivalent model by electric power system general knowledge;
(2) according to the Equivalent Model that extracts, the equivalent strategy of reducing is provided, artificial requirement-based selection finally needs equivalent model and the new model type behind the equivalence;
(3) will be reduced by the model of equivalence according to the topological relation of model and artificial definition before, and the new model behind the interpolation equivalence.
The beneficial effect that the present invention reaches:
Method of the present invention makes the user can according to the actual requirements transformer station model be carried out importing main station system again after equivalence is reduced processing, satisfy the requirement that the user imports as required to transformer station model, and the equivalence that offers the multiple mode of user flexibly is tactful, making the personnel that use the dispatching automation main station system just carry out equivalence to transformer station model before the transformer station model import system handles, reduce unwanted model, make that the model of final import system is complete and keen-witted and capable.What be convenient to the user dailyly uses and manages, and has reduced useless device model and has imported pressure to system load, has improved fail safe and the practicality of the synchronous main station system of transformer station model.
Description of drawings
Fig. 1 model is reduced strategic process figure.
Embodiment
Below in conjunction with accompanying drawing the present invention is done further detailed introduction.
As shown in Figure 1, electric power system of the present invention source end model method of cutting out process is:
At first resolve the primary equipment model file that send in the transformer station, the user selects relevant device according to actual needs, carry out equivalence and reduce the strategy customization, extracting may need to do equivalent transformer and circuit, lists the equipment that extracts by electric pressure in equivalent strategy.
Equivalent reduction strategy is with transformer and circuit, by the electric pressure classification, provides equivalence to become generator and equivalence to become two kinds of equivalent modes of load.The user can select a plurality of transformers and circuit to carry out the equivalence reduction as required simultaneously.
Then, carrying out equivalent device type and judge, is transformer or circuit according to the equivalent device type of selecting, and carries out different equivalences respectively and reduces process.
Equivalence when being transformer by equivalent equipment is reduced process: before carrying out the equivalence reduction, need earlier model to be carried out the topological analysis search, with in this transformer, the low-pressure side winding be starting point by topological relation search for all with transformer in, the equipment that links to each other of low-pressure side winding, and these equipment are put reduce sign.Indicate with these unit deletions according to reducing, and transformer put equivalent sign that such model process of reducing has just been finished.
As defined transformer and circuit and carry out equivalence and reduce, then handle the reduction of transformer earlier, with in this transformer, the low-pressure side winding is the equipment that start point search links to each other.And these equipment are put reduce sign.According to reducing sign with these unit deletions.
If the transformer of in the equivalent reduction process of transformer, finding to have other undefined equivalences by topology with this defined equivalent transformer in, the low-pressure side winding links to each other, the transformer of these undefined equivalences also can be reduced strategy according to the equivalence of the equivalent winding of definition and carry out the equivalence processing so.
Equivalence when being circuit by equivalent equipment is reduced process: defined equivalence if any circuit, after then isallobaric device is reduced and is finished, judge whether this circuit is deleted, finish as deleted then this time the reduction, then delete this circuit as not deleting, our station side at this circuit searches the equipment that links to each other with this circuit, and hangs up newly-increased generator or load at the end that this equipment links to each other with circuit.
Above-described embodiment does not limit the present invention in any form, and all employings are equal to replaces or technical scheme that the mode of equivalent transformation obtains, all drops in protection scope of the present invention.

Claims (7)

1. electric power system source end model cutting method, it is characterized in that: the dispatching automation main station system is reduced model before the model import system that the source end is sent, and may further comprise the steps:
1) the primary equipment CIM model that send the dispatching automation main station system to meet the IEC61970 standard on the end of source;
2) described dispatching automation main station system is resolved this model, and extracts equivalent equipment by electric power system general knowledge, by electric pressure, device type with the displaying of classifying of the equivalent equipment of these extractions;
3) the model customization guide of reducing strategy several strategies that can provide the model equivalence automatically select to reduce strategy for the user, by the artificial newly-increased model of equivalent reduction model and equivalent back of selecting as required;
4) for artificial selection is intact reduce strategy after, the dispatching automation main station system is reduced strategy according to the equivalence of artificial selection and is reduced model, reduces the model that fallen by equivalence according to reducing device type in the strategy and topological relation;
5) after model is reduced and finished, increase new Equivalent Model according to device type and the topological relation reduced in the strategy;
6) will reduce and increase model after the new Equivalent Model, import described dispatching automation main station system.
2. electric power system according to claim 1 source end model cutting method is characterized in that: need equivalent equipment to comprise transformer or circuit in the model.
3. electric power system according to claim 1 source end model cutting method is characterized in that: step 2) in the information that extracts comprise affiliated electric pressure, rdfid sign, the title of this equipment at least.
4. electric power system according to claim 1 source end model cutting method is characterized in that: model is reduced strategy and is comprised the transformer equivalence at least and becomes load in the step 3), and the circuit equivalence becomes load or generator.
5. electric power system according to claim 4 source end model cutting method is characterized in that: for transformer, it is carried out equivalence after, search for all equipment that link to each other with this transformer mesolow side and reduce according to topological relation; If find have other transformers to link to each other with this transformer in the equivalent reduction process of transformer, but the artificial equivalence of other transformers of definition of not selecting is reduced strategy, and other transformers will be reduced according to defined reduction strategy so; Defined equivalent circuit as if having in the equipment of finding to be reduced in the equivalent reduction process of transformer, then this circuit is no longer done the equivalent processing of reducing; For circuit, after it is carried out equivalence, then need to reduce this circuit.
6. according to claim 4 or 5 described electric power system source end model cutting methods, it is characterized in that: reducing the priority of handling in the step 4) is to reduce circuit after reducing transformer earlier.
7. electric power system according to claim 6 source end model cutting method is characterized in that: in the step 5), for transformer, reduce finish after, transformer is put equivalent the sign; For circuit, after reduction was finished, if search the equipment that links to each other with this circuit in the our station side of this circuit, then an end that links to each other with circuit at this equipment hung up newly-increased model.
CN 201110338630 2011-11-01 2011-11-01 Cutting method for models of source end of electrical power system Active CN102510129B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110338630 CN102510129B (en) 2011-11-01 2011-11-01 Cutting method for models of source end of electrical power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110338630 CN102510129B (en) 2011-11-01 2011-11-01 Cutting method for models of source end of electrical power system

Publications (2)

Publication Number Publication Date
CN102510129A CN102510129A (en) 2012-06-20
CN102510129B true CN102510129B (en) 2013-10-09

Family

ID=46222188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110338630 Active CN102510129B (en) 2011-11-01 2011-11-01 Cutting method for models of source end of electrical power system

Country Status (1)

Country Link
CN (1) CN102510129B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104597767A (en) * 2015-01-21 2015-05-06 云南电力调度控制中心 On-line monitoring model, power grid model and integrated modeling method for on-line monitoring model and power grid model
CN105046585A (en) * 2015-08-11 2015-11-11 国电南瑞科技股份有限公司 Multi-region security checking method with freely tailorable calculation range

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1408595A1 (en) * 2002-10-10 2004-04-14 Abb Research Ltd. Determining parameters of an equivalent circuit representing a transmission section of an electrical network
CN1763782A (en) * 2005-09-30 2006-04-26 清华大学 Automatic generation method of equivalent model of power system external network
CN101098069A (en) * 2007-06-13 2008-01-02 苏州工业园区慧思敦软件有限公司 Electric power scheduling simulation system electric network display process
CN101192754A (en) * 2007-12-11 2008-06-04 中国电力科学研究院 A Realization Method Considering the Comprehensive Load Model of Distribution Network in Power System
CN101354702A (en) * 2008-05-05 2009-01-28 国网南京自动化研究院 An Interactive Realization Method of Power System Graphics Based on IEC61970 Standard

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1411613A1 (en) * 2002-10-14 2004-04-21 Abb Research Ltd. Simulation of an electrical power transmission network

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1408595A1 (en) * 2002-10-10 2004-04-14 Abb Research Ltd. Determining parameters of an equivalent circuit representing a transmission section of an electrical network
CN1763782A (en) * 2005-09-30 2006-04-26 清华大学 Automatic generation method of equivalent model of power system external network
CN101098069A (en) * 2007-06-13 2008-01-02 苏州工业园区慧思敦软件有限公司 Electric power scheduling simulation system electric network display process
CN101192754A (en) * 2007-12-11 2008-06-04 中国电力科学研究院 A Realization Method Considering the Comprehensive Load Model of Distribution Network in Power System
CN101354702A (en) * 2008-05-05 2009-01-28 国网南京自动化研究院 An Interactive Realization Method of Power System Graphics Based on IEC61970 Standard

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
基于模糊理论的双边交易裁减模型;杨洪明 等;《电力系统自动化》;20021025;第26卷(第20期);24-28 *
杨洪明 等.基于模糊理论的双边交易裁减模型.《电力系统自动化》.2002,第26卷(第20期),24-28.
杨洪明 等.输电阻塞消除中裁减目标对交易裁减的影响分析.《继电器》.2004,第32卷(第24期),10-14.
输电阻塞消除中裁减目标对交易裁减的影响分析;杨洪明 等;《继电器》;20041216;第32卷(第24期);10-14 *

Also Published As

Publication number Publication date
CN102510129A (en) 2012-06-20

Similar Documents

Publication Publication Date Title
CN106877509B (en) Analysis and judgment of distribution network line faults and alarm analysis methods
CN102521398B (en) Modeling method for substation-dispatching center two-level distributed type power grid
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN104538958B (en) The intelligent analysis method of Electricity customers electrical network access point and system
CN103366051B (en) Primary equipment and the method and system of secondary device modeling
CN101272051A (en) Information system integration method for power grid production control area and management information area
CN102522819A (en) Record wave pattern modeling method for fault record device of intelligent transformer substation
CN102957205A (en) Method and system for establishing distribution network model
CN104112242B (en) Power system 10kV busbar voltage yield analysis system and methods
CN110674282B (en) Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method
CN103544652A (en) Power grid industry classification load automatic statistical method and system
CN107844962B (en) Distribution network engineering cost data collection system based on standard data structure
CN109951747B (en) Method for intelligently identifying household change relation and household meter relation of platform area and meter searching instrument
CN110688724A (en) Intelligent identification method for distribution network line co-tower erection
CN105048630A (en) Intelligent scheduling control system and method based on data automatic analysis system
CN105279275A (en) Point list configuration method of dispatch master station end
CN102437644A (en) Distribution transformer long-distance monitoring system based on GPRS (general packet radio service)
CN102968096A (en) Safe error proof verifying method for master station type comprehensive intelligent error proof system
CN102510129B (en) Cutting method for models of source end of electrical power system
CN103530743A (en) Method for establishing information management system for distribution network line
CN105843125A (en) Transformer station sequence operation system and method based on state identification technology
CN106651226A (en) Smart distribution grid user access scheme aided analysis method based on big data technology
CN107016066A (en) Measuring point matching method and device in power grid model modeling process
CN104537571B (en) A kind of information in power dispatching center graphical representation method based on GIS
CN106530112A (en) Distribution management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SUZHOU POWER SUPPLY CO., LTD, JIANGSU ELECTRIC POW

Effective date: 20120720

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Song Xin

Inventor after: Zhou Yuzhi

Inventor after: Xiao Xiang

Inventor after: Cheng Jian

Inventor after: Zhao Jiaqing

Inventor after: Ding Hongen

Inventor after: Yang Qijing

Inventor after: Wu Qingxi

Inventor after: Han Xiao

Inventor after: Lu Keli

Inventor after: Ren Yuan

Inventor after: Peng Hui

Inventor before: Song Xin

Inventor before: Xiao Xiang

Inventor before: Wang Yuwei

Inventor before: Cheng Jian

Inventor before: Ding Hongen

Inventor before: Yang Qijing

Inventor before: Wu Qingxi

Inventor before: Han Xiao

Inventor before: Zhu Ying

Inventor before: Lu Keli

Inventor before: Ren Yuan

Inventor before: Peng Hui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SONG XIN DING HONGEN YANG QIJING WU QINGXI HAN XIAO ZHU YING LU KELI REN YUAN PENG HUI XIAO XIANG WANG YUWEI CHENG JIAN TO: SONG XIN ZHAO JIAQING DING HONGEN YANG QIJING WU QINGXI HAN XIAO LU KELI REN YUAN PENG HUI ZHOU YUZHI XIAO XIANG CHENG JIAN

TA01 Transfer of patent application right

Effective date of registration: 20120720

Address after: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Applicant after: NARI Technology Development Co., Ltd.

Co-applicant after: Suzhou Power Supply Co., Ltd. of Jiangsu Electric Power Company

Address before: High road high tech Development Zone Nanjing city Jiangsu province 210061 No. 20

Applicant before: NARI Technology Development Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant