[go: up one dir, main page]

CN102510029A - Ground potential electrified bar cutter device changing method - Google Patents

Ground potential electrified bar cutter device changing method Download PDF

Info

Publication number
CN102510029A
CN102510029A CN2011103752213A CN201110375221A CN102510029A CN 102510029 A CN102510029 A CN 102510029A CN 2011103752213 A CN2011103752213 A CN 2011103752213A CN 201110375221 A CN201110375221 A CN 201110375221A CN 102510029 A CN102510029 A CN 102510029A
Authority
CN
China
Prior art keywords
pole
operator
ground
knife device
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103752213A
Other languages
Chinese (zh)
Other versions
CN102510029B (en
Inventor
陆茂鑫
王昭夏
赵国柱
戴阿兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Electric Power Co filed Critical Shanghai Municipal Electric Power Co
Priority to CN201110375221.3A priority Critical patent/CN102510029B/en
Publication of CN102510029A publication Critical patent/CN102510029A/en
Application granted granted Critical
Publication of CN102510029B publication Critical patent/CN102510029B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

一种地电位带电调换杆刀装置的方法,属电线或电缆的架空安装领域。其采用地电位作业方法,借助转动转向型扒杆和可360度旋转的绝缘吊装臂,在保证带电作业最小安全距离的前提下,实现带电调换杆上杆刀装置,以减少停电时间,提高检修工作效率,提高供电线路的有效输电时间和在线供电率,提高电网运行的安全性和可靠性。其在作业过程中无需借助绝缘斗臂车或平台,适合带电作业车辆无法达到的线路和作业场所,新增了带电作业项目,扩大了作业范围,有效地提高了检修工作的计划性,减少了操作工作量,为广大城郊和农村地区的带电作业起到了积极的推动和促进作用。可广泛用于电力架空线路的带电检修、维护领域。

The invention relates to a method for exchanging a rod knife device with electrified ground potential, which belongs to the field of overhead installation of electric wires or cables. It adopts the ground potential operation method, with the help of the rotating steering pole and the insulated lifting arm that can rotate 360 degrees, on the premise of ensuring the minimum safe distance for live work, it realizes the live exchange pole upper knife device, so as to reduce power failure time and improve maintenance. Work efficiency, improve the effective transmission time and online power supply rate of power supply lines, and improve the safety and reliability of power grid operation. It does not need insulated arm trucks or platforms during the operation, and is suitable for lines and work places that cannot be reached by live working vehicles. It adds live work items, expands the scope of work, effectively improves the planning of maintenance work, and reduces The operating workload has played a positive role in promoting and promoting the live work in the vast suburbs and rural areas. It can be widely used in the field of live overhaul and maintenance of power overhead lines.

Description

一种地电位带电调换杆刀装置的方法A method for exchanging rod knife device with ground potential electrification

技术领域 technical field

本发明属于电线或电缆的架空安装领域,尤其涉及一种用于杆刀装置的带电更换/安装方法。The invention belongs to the field of overhead installation of electric wires or cables, and in particular relates to a live replacement/installation method for a rod knife device.

背景技术 Background technique

在配电线路上,杆刀装置是一种改变电网运行方式,控制系统潮流的电气设备。On the power distribution line, the rod knife device is an electrical device that changes the operation mode of the power grid and controls the power flow of the system.

杆刀装置经过一定年限的使用后,需要进行调换,以保证线路的稳定可靠运行。After a certain number of years of use, the rod knife device needs to be replaced to ensure the stable and reliable operation of the line.

为了避免线路停电,通常供电公司尽可能地采用带电作业的方式来进行杆刀装置的调换工作。In order to avoid power outages on the line, usually the power supply company uses live work as much as possible to replace the rod knife device.

目前,带电调换杆刀的作业方式必须依赖绝缘斗臂车,使用中间电位作业法。At present, the operation method of exchanging the rod knife with electricity must rely on the insulated arm truck and use the intermediate potential operation method.

前述的“中间电位作业法”,指人体处于接地体和带电体之间的电位状态,使用绝缘工具间接接触带电设备来达到其检修目的的方法。The aforementioned "intermediate potential operation method" refers to the method in which the human body is in the potential state between the grounded body and the charged body, and the insulated tool is used to indirectly contact the live equipment to achieve its maintenance purpose.

中间电位作业是作业人员通过绝缘工具(梯、台、车)对大地绝缘后在近距离用绝缘工具对带电作业进行的作业,故此种作业方法主要适用于作业点离大地较近,或作业点设备复杂采用地电位作业完成较困难,用等电位作业又具有一定危险性的场合。Intermediate potential work is the work that operators use insulating tools (ladders, platforms, cars) to insulate the earth and then use insulating tools to perform live work at close range. It is difficult to complete the operation with ground potential when the equipment is complex, and it is dangerous to use equipotential operation.

然而,当调换杆刀的施工场所位于河流湖泊边、铁路高速旁、高架轨道交通旁、农田农庄附近和拥挤狭窄的道路边时,绝缘斗臂车无法停靠,即不能使用现有的带电作业方法进行作业,调换杆刀将不得不对线路停电。However, when the construction site for exchanging pole knives is located beside rivers and lakes, beside high-speed railways, next to elevated rail transit, near farmland and farms, and on the side of crowded and narrow roads, the insulated arm truck cannot stop, that is, the existing live working method cannot be used Carrying out work, exchanging rod knife will have to cut off the power to circuit.

假设停电调换杆刀装置,每次至少要停役两条线路,平均停电调换杆刀停电时间至少4小时,严重影响了电力用户正常的用电,造成了用户与电力企业双方的经济损失。Assuming that the pole-knife device is replaced during a power outage, at least two lines must be out of service each time. The average power outage for pole-knife replacement is at least 4 hours, which seriously affects the normal power consumption of power users and causes economic losses for both users and power companies.

在调换上述有施工环境限制的杆刀装置时,迫切需要改变现有作业方式,研发一种新的带电更换作业方式。When exchanging the above-mentioned rod knife device with construction environment restrictions, it is urgent to change the existing operation method and develop a new live replacement operation method.

发明内容 Contents of the invention

本发明所要解决的技术问题是提供一种地电位带电调换杆刀装置的方法,其能够在绝缘斗臂车和吊车无法使用的环境中,在线路不停电的情况下,采用地电位作业方法来实现带电调换杆刀装置,其弥补了高架绝缘斗臂车不能到达作业点调换杆刀的缺点,新增了带电作业项目,扩大了作业范围,有效地提高了检修工作的计划性,减少了操作工作量,同时也提高了电网运行的安全性和可靠性,为广大城郊和农村地区的带电作业起到了积极的推动和促进作用。The technical problem to be solved by the present invention is to provide a method for exchanging the rod knife device with ground potential charging, which can use the ground potential operation method in the environment where the insulating bucket truck and the crane cannot be used, and the line is not powered off. Realize the device of exchanging the pole knife with electricity, which makes up for the shortcoming that the overhead insulated bucket truck cannot reach the operation point to exchange the pole knife, adds a new live work item, expands the scope of work, effectively improves the planning of maintenance work, and reduces the number of operations. At the same time, it also improves the safety and reliability of the power grid operation, and plays a positive role in promoting and promoting the live work in the vast suburbs and rural areas.

本发明的技术方案是:提供一种地电位带电调换杆刀装置的方法,包括登杆作业人员和地面作业人员配合,对设置在杆上的杆刀装置进行更换,其中,所述的杆刀装置位于电杆顶部,与其相连的三相架空线路及其支撑横担位于杆刀装置下方的电杆上,其特征是:The technical solution of the present invention is to provide a method for exchanging the rod knife device with electricity on the ground potential, including the cooperation between the operator on the pole and the operator on the ground to replace the rod knife device arranged on the pole, wherein the pole knife The device is located on the top of the pole, and the three-phase overhead line connected to it and its supporting crossarm are located on the pole below the pole knife device. Its characteristics are:

A、登杆作业人员使用绝缘操作杆将三相架空线路的避雷器退出运行;A. The pole operator uses the insulating operating rod to deactivate the arrester of the three-phase overhead line;

B、登杆作业人员在支撑横担位下方的电杆上,与三相架空线路走向成90度夹角方向,设置第一横向支撑悬臂,其所述第一横向支撑悬臂在距电杆远端的一端上设置有一固定转向底座;B. On the electric pole under the support cross-arm position, the climbing pole operator sets the first horizontal support cantilever in the direction of an angle of 90 degrees with the direction of the three-phase overhead line, and the first horizontal support cantilever is far away from the electric pole. One end of the end is provided with a fixed steering base;

C、登杆作业人员在横向悬臂支撑的上方,同向设置第二横向支撑悬臂,并在第二横向支撑悬臂的距电杆近端一侧和第一横向支撑悬臂在距电杆远端一侧之间,设置用于加强第一横向支撑悬臂的斜撑;C. The climbing pole operator sets the second horizontal support cantilever in the same direction above the horizontal cantilever support, and the second horizontal support cantilever is on the side near the pole and the first horizontal support cantilever is at the far end of the pole. Between the sides, a diagonal brace for strengthening the cantilever of the first lateral support is arranged;

D、登杆作业人员安装导线耐张绝缘子绝缘罩,做好绝缘遮蔽措施;D. The pole operator installs the insulation cover of the wire tension insulator and takes insulation and shielding measures;

E、登杆作业人员以第一横向支撑悬臂为平台,使用绝缘工具进行三相架空线路之内侧相闸刀两侧桩头引线拆除工作,并将桩头引线下降至同相导线的临时固定处进行固定;E. Using the first horizontal support cantilever as a platform, the climbing pole operators use insulated tools to remove the pile head leads on both sides of the inner phase switch knife of the three-phase overhead line, and lower the pile head leads to the temporary fixing place of the same phase wire. fixed;

F、登杆作业人员以第一、第二横向支撑悬臂为平台,使用绝缘工具分别拆除三相架空线路之中相和外侧相闸刀两侧桩头引线,并将各个桩头引线下降至同相导线的临时固定处进行固定;F. Using the first and second lateral support cantilever as a platform, the climbing pole operators use insulating tools to remove the pile head leads on both sides of the middle phase and the outer phase switch knife of the three-phase overhead line, and lower the pile head leads to the same phase. Fix the temporary fixing place of the wire;

G、登杆作业人员在第一、第二横向支撑悬臂上装设纵向支撑杆,在纵向支撑杆的上部,安装转向型扒杆及其绝缘吊臂组件;G. The climbing pole operator installs a longitudinal support rod on the first and second lateral support cantilevers, and installs a steering pole and its insulating boom assembly on the upper part of the longitudinal support rod;

H、地面作业人员安装地面卷扬设备;H. Ground operators install ground hoisting equipment;

I、登杆作业人员和地面作业人员配合,在绝缘吊臂组件、转向型扒杆和地面卷扬设备之间安装吊绳;I. The climbing rod operator and the ground operator cooperate to install the sling between the insulating boom assembly, the steering pole and the ground hoisting equipment;

J、登杆作业人员登上第二横向支撑悬臂,转动转向型扒杆的绝缘吊臂至杆刀装置上方合适位置,将吊绳与待更换的杆刀装置固定、连接;J. The climbing pole operator boards the second lateral support cantilever, turns the insulating boom of the steering type pole to a suitable position above the pole knife device, and fixes and connects the sling to the pole knife device to be replaced;

K、地面作业人员通过地面卷扬设备将已与杆刀装置连接的吊绳微微吊紧至绷紧受力状态;K. The ground operators use the ground hoisting equipment to slightly tighten the sling that has been connected to the rod knife device to a state of tension;

L、登杆作业人员拆卸杆刀装置与杆刀支架之间的固定螺丝,L. The pole-climbing operator removes the fixing screws between the pole-knife device and the pole-knife bracket,

M、地面作业人员和登杆作业人员配合,通过地面卷扬设备将待更换的杆刀装置吊起,登杆作业人员转动转向型扒杆的绝缘吊臂,将待更换的杆刀装置平移至三相架空线路所在空间区域之外,然后将其降至地面;M. The ground operator and the climbing pole operator cooperate to lift the rod knife device to be replaced through the ground hoisting equipment, and the pole climbing operator turns the insulating boom of the steering pole to move the pole knife device to be replaced to outside the space area where the three-phase overhead line is located, and then lower it to the ground;

N、地面作业人员将固结在吊绳末端的待更换的杆刀装置拆下,将新的杆刀装置固结在吊绳末端;N. The ground operator removes the pole knife device to be replaced fixed at the end of the suspension rope, and fixes the new pole knife device at the end of the suspension rope;

O、地面作业人员和登杆作业人员配合,通过地面卷扬设备将新的杆刀装置吊起至杆上待安装位置所在平面;O. Cooperate with ground operators and pole climbers, lift the new pole knife device to the plane where the position to be installed on the pole is located through the ground hoisting equipment;

P、登杆作业人员转动转向型扒杆的绝缘吊臂,将新的杆刀装置平移至杆上待安装位置;P. The pole-climbing operator turns the insulating boom of the steering-type pole, and translates the new pole knife device to the position on the pole to be installed;

Q、登杆作业人员和地面作业人员配合,通过放松吊绳,将新的杆刀装置缓慢移至杆刀固定支架上;Q. The pole-climbing operator and the ground operator cooperate to slowly move the new pole-knife device to the pole-knife fixing bracket by loosening the sling;

R、登杆作业人员紧固杆刀装置与杆刀支架之间的固定螺丝,安装固定好新杆刀装置,对就位的新杆刀装置进行拉开、合上调试,检查闸刀接触符合要求,然后将杆刀装置置于拉开位置;R. The pole-climbing operator tightens the fixing screws between the pole-knife device and the pole-knife bracket, installs and fixes the new pole-knife device, pulls and closes the new pole-knife device in place for debugging, and checks that the switch knife contact is in compliance. requirements, and then place the lever knife device in the pull-off position;

S、登杆作业人员退至第一、第二横向支撑悬臂上,依次顺序分别开始恢复三相架空线路之外侧相、中相和内侧相两侧桩头引线与杆刀装置之间的连接;S. The pole-climbing operator retreats to the first and second lateral support cantilevers, and starts to restore the connection between the pile head lead wires and the pole knife device on the outer phase, middle phase, and inner phase of the three-phase overhead line in sequence;

T、登杆作业人员配合拆除转向型扒杆各零部件及相关导线耐张绝缘子绝缘罩,解除各相线路上的绝缘遮蔽措施;T. The pole-climbing workers cooperate to remove the components of the steering pole and the insulation cover of the relevant wire tension insulator, and remove the insulation and shielding measures on each phase line;

U、登杆作业人员使用绝缘操作杆将三相架空线路的避雷器投入运行;U. The pole operator uses the insulating operating rod to put the arrester of the three-phase overhead line into operation;

V、登杆作业人员将绝缘操作工器具吊至地面后,依次拆除转向型扒杆及其绝缘吊臂组件、第二横向支撑悬臂和第一横向支撑悬臂,清除杆上作业遗留物后,返回地面;V. After the climbing pole operator lifts the insulating operator equipment to the ground, remove the steering pole and its insulating boom assembly, the second lateral support cantilever and the first lateral support cantilever in sequence, and return to the ground;

W、地面作业人员拆除地面卷扬设备;W. Ground operators dismantle the ground hoisting equipment;

X、作业人员整理地面作业现场,清点作业工具,向当值调度汇报作业已经结束,撤离作业现场。X. Operators tidy up the ground work site, count the work tools, report to the on-duty dispatcher that the work is over, and evacuate the work site.

其中,所述的绝缘吊臂组件位于转向型扒杆的上端,所述的绝缘吊臂组件的纵向高度位置,高于待更换杆刀装置所在的平面位置。Wherein, the insulating boom assembly is located at the upper end of the steering-type grilling rod, and the longitudinal height of the insulating boom assembly is higher than the plane position where the rod knife device to be replaced is located.

其所述的内侧相是指三相架空线路中靠近登杆作业人员的一相架空线路,所述的外侧相是指三相架空线路中远离登杆作业人员的一相架空线路。The inner phase refers to one phase of the three-phase overhead lines that is close to the pole climbers, and the outer phase refers to the one phase of the three-phase overhead lines that is far away from the pole climbers.

本申请技术方案所述的方法,采用地电位作业方法,借助转动转向型扒杆和可360度旋转的绝缘吊装臂,在保证带电作业最小安全距离的前提下,实现带电调换杆上杆刀装置,以减少停电时间,提高检修工作效率,提高供电线路的有效输电时间和在线供电率,提高电网运行的安全性和可靠性。The method described in the technical solution of this application adopts the ground potential operation method, and realizes the pole knife device on the live exchange pole under the premise of ensuring the minimum safe distance for live work with the help of the rotating steering pole and the insulating lifting arm that can rotate 360 degrees , to reduce power outage time, improve maintenance work efficiency, improve the effective transmission time and online power supply rate of power supply lines, and improve the safety and reliability of power grid operation.

与现有技术比较,本发明的优点是:Compared with prior art, the advantages of the present invention are:

1.在线路不停电的情况下,采用地电位作业方法来实现带电调换杆刀装置,能够减少停电时间,有效提高检修工作的效率,提高供电线路的有效输电时间和在线供电率;1. When the line is not powered off, the ground potential operation method is used to realize the live exchange rod knife device, which can reduce the power outage time, effectively improve the efficiency of maintenance work, and improve the effective transmission time and online power supply rate of the power supply line;

2.对作业场所的要求空间小,在作业过程中无需借助绝缘斗臂车或平台,适合带电作业车辆无法达到的线路和作业场所;2. The requirements for the workplace are small, and there is no need to use insulated bucket trucks or platforms during the operation, which is suitable for lines and workplaces that cannot be reached by live working vehicles;

3.所需作业工具和装置较少,且均可拆卸/分解和人工搬运/携带,大大减少了操作的工作量。3. Fewer operating tools and devices are required, and all of them can be disassembled/disassembled and manually carried/carried, which greatly reduces the workload of operation.

附图说明 Description of drawings

图1是本发明的作业步骤方框示意图;Fig. 1 is a schematic block diagram of operation steps of the present invention;

图2是本发明转向型扒杆及其绝缘吊臂组件的结构示意图。Fig. 2 is a schematic structural view of the steering pole and its insulating boom assembly of the present invention.

具体实施方式 Detailed ways

下面结合附图对本发明做进一步说明。The present invention will be further described below in conjunction with the accompanying drawings.

图1中,给出了本申请技术方案的作业步骤,其至少包括:In Fig. 1, the operation steps of the technical solution of the present application are provided, which at least include:

A、登杆作业人员使用绝缘操作杆将三相架空线路的避雷器退出运行;A. The pole operator uses the insulating operating rod to deactivate the arrester of the three-phase overhead line;

B、登杆作业人员在支撑横担位下方的电杆上,与三相架空线路走向成90度夹角方向,设置第一横向支撑悬臂,其所述第一横向支撑悬臂在距电杆远端的一端上设置有一固定转向底座;B. On the electric pole under the support cross-arm position, the climbing pole operator sets the first horizontal support cantilever in the direction of an angle of 90 degrees with the direction of the three-phase overhead line, and the first horizontal support cantilever is far away from the electric pole. One end of the end is provided with a fixed steering base;

C、登杆作业人员在横向悬臂支撑的上方,同向设置第二横向支撑悬臂,并在第二横向支撑悬臂的距电杆近端一侧和第一横向支撑悬臂在距电杆远端一侧之间,设置用于加强第一横向支撑悬臂的斜撑;C. The climbing pole operator sets the second horizontal support cantilever in the same direction above the horizontal cantilever support, and the second horizontal support cantilever is on the side near the pole and the first horizontal support cantilever is at the far end of the pole. Between the sides, a diagonal brace for strengthening the cantilever of the first lateral support is arranged;

D、登杆作业人员安装导线耐张绝缘子绝缘罩,做好绝缘遮蔽措施;D. The pole operator installs the insulation cover of the wire tension insulator and takes insulation and shielding measures;

E、登杆作业人员以第一横向支撑悬臂为平台,使用绝缘工具进行三相架空线路之内侧相闸刀两侧桩头引线拆除工作,并将桩头引线下降至同相导线的临时固定处进行固定;E. Using the first horizontal support cantilever as a platform, the climbing pole operators use insulated tools to remove the pile head leads on both sides of the inner phase switch knife of the three-phase overhead line, and lower the pile head leads to the temporary fixing place of the same phase wire. fixed;

F、登杆作业人员以第一、第二横向支撑悬臂为平台,使用绝缘工具分别拆除三相架空线路之中相和外侧相闸刀两侧桩头引线,并将各个桩头引线下降至同相导线的临时固定处进行固定;F. Using the first and second lateral support cantilever as a platform, the climbing pole operators use insulating tools to remove the pile head leads on both sides of the middle phase and the outer phase switch knife of the three-phase overhead line, and lower the pile head leads to the same phase. Fix the temporary fixing place of the wire;

G、登杆作业人员在第一、第二横向支撑悬臂上装设纵向支撑杆,在纵向支撑杆的上部,安装转向型扒杆及其绝缘吊臂组件;G. The climbing pole operator installs a longitudinal support rod on the first and second lateral support cantilevers, and installs a steering pole and its insulating boom assembly on the upper part of the longitudinal support rod;

H、地面作业人员安装地面卷扬设备;H. Ground operators install ground hoisting equipment;

I、登杆作业人员和地面作业人员配合,在绝缘吊臂组件、转向型扒杆和地面卷扬设备之间安装吊绳;I. The climbing rod operator and the ground operator cooperate to install the sling between the insulating boom assembly, the steering pole and the ground hoisting equipment;

J、登杆作业人员登上第二横向支撑悬臂,转动转向型扒杆的绝缘吊臂至杆刀装置上方合适位置,将吊绳与待更换的杆刀装置固定、连接;J. The climbing pole operator boards the second lateral support cantilever, turns the insulating boom of the steering type pole to a suitable position above the pole knife device, and fixes and connects the sling to the pole knife device to be replaced;

K、地面作业人员通过地面卷扬设备将已与杆刀装置连接的吊绳微微吊紧至绷紧受力状态;K. The ground operators use the ground hoisting equipment to slightly tighten the sling that has been connected to the rod knife device to a state of tension;

L、登杆作业人员拆卸杆刀装置与杆刀支架之间的固定螺丝,L. The pole-climbing operator removes the fixing screws between the pole-knife device and the pole-knife bracket,

M、地面作业人员和登杆作业人员配合,通过地面卷扬设备将待更换的杆刀装置吊起,登杆作业人员转动转向型扒杆的绝缘吊臂,将待更换的杆刀装置平移至三相架空线路所在空间区域之外,然后将其降至地面;M. The ground operator and the climbing pole operator cooperate to lift the rod knife device to be replaced through the ground hoisting equipment, and the pole climbing operator turns the insulating boom of the steering pole to move the pole knife device to be replaced to outside the space area where the three-phase overhead line is located, and then lower it to the ground;

N、地面作业人员将固结在吊绳末端的待更换的杆刀装置拆下,将新的杆刀装置固结在吊绳末端;N. The ground operator removes the pole knife device to be replaced fixed at the end of the suspension rope, and fixes the new pole knife device at the end of the suspension rope;

O、地面作业人员和登杆作业人员配合,通过地面卷扬设备将新的杆刀装置吊起至杆上待安装位置所在平面;O. Cooperate with ground operators and pole climbers, lift the new pole knife device to the plane where the position to be installed on the pole is located through the ground hoisting equipment;

P、登杆作业人员转动转向型扒杆的绝缘吊臂,将新的杆刀装置平移至杆上待安装位置;P. The pole-climbing operator turns the insulating boom of the steering-type pole, and translates the new pole knife device to the position on the pole to be installed;

Q、登杆作业人员和地面作业人员配合,通过放松吊绳,将新的杆刀装置缓慢移至杆刀固定支架上;Q. The pole-climbing operator and the ground operator cooperate to slowly move the new pole-knife device to the pole-knife fixing bracket by loosening the sling;

R、登杆作业人员紧固杆刀装置与杆刀支架之间的固定螺丝,安装固定好新杆刀装置,对就位的新杆刀装置进行拉开、合上调试,检查闸刀接触符合要求,然后将杆刀装置置于拉开位置;R. The pole-climbing operator tightens the fixing screws between the pole-knife device and the pole-knife bracket, installs and fixes the new pole-knife device, pulls and closes the new pole-knife device in place for debugging, and checks that the switch knife contact is in compliance. requirements, and then place the lever knife device in the pull-off position;

S、登杆作业人员退至第一、第二横向支撑悬臂上,依次顺序分别开始恢复三相架空线路之外侧相、中相和内侧相两侧桩头引线与杆刀装置之间的连接;S. The pole-climbing operator retreats to the first and second lateral support cantilevers, and starts to restore the connection between the pile head lead wires and the pole knife device on the outer phase, middle phase, and inner phase of the three-phase overhead line in sequence;

T、登杆作业人员配合拆除转向型扒杆各零部件及相关导线耐张绝缘子绝缘罩,解除各相线路上的绝缘遮蔽措施;T. The pole-climbing workers cooperate to remove the components of the steering pole and the insulation cover of the relevant wire tension insulator, and remove the insulation and shielding measures on each phase line;

U、登杆作业人员使用绝缘操作杆将三相架空线路的避雷器投入运行;U. The pole operator uses the insulating operating rod to put the arrester of the three-phase overhead line into operation;

V、登杆作业人员将绝缘操作工器具吊至地面后,依次拆除转向型扒杆及其绝缘吊臂组件、第二横向支撑悬臂和第一横向支撑悬臂,清除杆上作业遗留物后,返回地面;V. After the climbing pole operator lifts the insulating operator equipment to the ground, remove the steering pole and its insulating boom assembly, the second lateral support cantilever and the first lateral support cantilever in sequence, and return to the ground;

W、地面作业人员拆除地面卷扬设备;W. Ground operators dismantle the ground hoisting equipment;

X、作业人员整理地面作业现场,清点作业工具,向当值调度汇报作业已经结束,撤离作业现场。X. Operators tidy up the ground work site, count the work tools, report to the on-duty dispatcher that the work is over, and evacuate the work site.

其所述的内侧相是指三相架空线路中靠近登杆作业人员的一相架空线路,所述的外侧相是指三相架空线路中远离登杆作业人员的一相架空线路。The inner phase refers to one phase of the three-phase overhead lines that is close to the pole climbers, and the outer phase refers to the one phase of the three-phase overhead lines that is far away from the pole climbers.

其所述的绝缘吊臂组件位于转向型扒杆的上端,所述的绝缘吊臂组件的纵向高度位置,高于待更换杆刀装置所在的平面位置。The insulating boom assembly is located at the upper end of the steering-type grilling rod, and the longitudinal height position of the insulating boom assembly is higher than the plane position where the rod knife device to be replaced is located.

本技术方案的方法包括登杆作业人员和地面作业人员配合,对设置在杆上的杆刀装置进行更换,其中,所述的杆刀装置位于电杆顶部,与其相连的三相架空线路及其支撑横担位于杆刀装置下方的电杆上。The method of this technical solution includes the cooperation of the pole-climbing operator and the ground operator to replace the pole knife device arranged on the pole, wherein the pole knife device is located on the top of the pole, and the three-phase overhead line connected to it and its The supporting cross arm is located on the electric pole below the pole knife device.

地电位作业法指人体处于地(零)电位状态下,使用绝缘工具间接接触带电设备,来达到检修目的的方法。The ground potential operation method refers to the method of using insulated tools to indirectly contact live equipment to achieve the purpose of maintenance when the human body is in the state of ground (zero) potential.

其特点是人体处于地电位时,不占据带电设备对地的空间尺寸。Its characteristic is that when the human body is at the ground potential, it does not occupy the space size of the live equipment to the ground.

地电位作业法是间接作业法的一种。Ground potential work method is a kind of indirect work method.

该项目的开发能够减少停电时间,有效提高检修工作的计划性,大大减少操作班工作量,一次带电作业可省去大量的供电运行设备操作步骤,并且调整运行方式的减少,使设备的损耗也大幅度降低,一次成功的“地电位二面带电调换杆刀”作业,可挽回约4小时电量损失,此项目的推广与应用将大大扩大带电作业的适应面,对今后的检修、抢修带来很大的益处,提高了企业的竞争优势。The development of this project can reduce power outage time, effectively improve the planning of maintenance work, and greatly reduce the workload of the operation team. A live operation can save a large number of operation steps of power supply operation equipment, and reduce the adjustment of operation mode, so that the loss of equipment is also reduced. It has been greatly reduced, and a successful operation of "replacing the pole knife with live electricity on both sides of the ground potential" can recover the power loss of about 4 hours. The promotion and application of this project will greatly expand the adaptability of live work, and bring great benefits to future maintenance and emergency repairs. Great benefit, improve the competitive advantage of the enterprise.

经济效益:若一次成功的“地电位带电调换杆刀”作业可挽回约4小时电量损失,则每次作业可增加的售电量为:Economic benefits: If a successful operation of "replacing the rod knife with electricity on the ground potential" can recover the power loss of about 4 hours, the increased electricity sales for each operation is:

=1.732×电压×电流×功率因数×时间×2=1.732×voltage×current×power factor×time×2

=1.732×10kV×200A×0.78×4×2=1.732×10kV×200A×0.78×4×2

≈21615.36kW·H≈21615.36kW·H

若以每千瓦时0.6元计算,也就至少增加电费收入12969.22元。If it is calculated at 0.6 yuan per kWh, it will increase the electricity fee income by at least 12969.22 yuan.

此外,由于本作业法在作业时无需使用辅助车辆,使得整个作业过程无能源消耗、减少排放、无污染。做到了真正意义上的绿色作业。In addition, since this operation method does not need to use auxiliary vehicles during operation, the entire operation process has no energy consumption, reduced emissions, and no pollution. It has achieved a real green operation.

图2中,给出了本方法所涉及的转向型扒杆及其绝缘吊臂组件的结构示意,其中,该装置包括转动支架、吊臂4、第一定滑轮1、吊钩3、绳索6、第二定滑轮12、动滑轮2。In Fig. 2, the structural diagram of the steering type grill bar and its insulating boom assembly involved in the method is given, wherein the device includes a rotating bracket, a boom 4, a first fixed pulley 1, a hook 3, and a rope 6 , the second fixed pulley 12, movable pulley 2.

其转动支架与高压线塔或电杆连接。Its rotating bracket is connected with high-voltage line tower or electric pole.

吊臂4包括自由端和固定端。吊臂4的固定端与支架连接,该固定端上设有第一定滑轮1;吊臂4的固定端设有第二定滑轮12。The boom 4 includes a free end and a fixed end. The fixed end of the boom 4 is connected with the bracket, and the fixed end is provided with a first fixed pulley 1; the fixed end of the boom 4 is provided with a second fixed pulley 12.

绳索6依次套设在第一定滑轮1、第二定滑轮12、动滑轮2,固定在第二定滑轮12处。The rope 6 is sheathed in the first fixed pulley 1, the second fixed pulley 12, and the movable pulley 2 in sequence, and is fixed at the second fixed pulley 12.

动滑轮2上设有吊钩3。The movable pulley 2 is provided with a suspension hook 3 .

转动支架包括第二横向支撑悬臂8、第一横向支撑悬臂9、纵向支撑杆11。The rotating bracket includes a second transverse support arm 8 , a first transverse support arm 9 , and a longitudinal support bar 11 .

第二横向支撑悬臂8的一端与高压线塔或电杆连接。第二横向支撑悬臂8的另一端与纵向支撑杆11连接。One end of the second transverse support cantilever 8 is connected with a high-voltage line tower or an electric pole. The other end of the second transverse support arm 8 is connected to the longitudinal support rod 11 .

第一横向支撑悬臂9的一端与高压线塔或电杆连接;第一横向支撑悬臂9的另一端与纵向支撑杆11连接。One end of the first transverse support cantilever 9 is connected to a high voltage line tower or pole; the other end of the first transverse support cantilever 9 is connected to a longitudinal support bar 11 .

转动支架还包括斜撑10。The rotating bracket also includes a diagonal brace 10 .

斜撑10的一端与第二横向支撑悬臂8连接,斜撑10的另一端与第一横向支撑悬臂杆9连接。One end of the diagonal brace 10 is connected with the second transverse support cantilever 8 , and the other end of the diagonal brace 10 is connected with the first transverse support cantilever rod 9 .

转动支架上设有登脚梯7。A step ladder 7 is provided on the rotating bracket.

该装置上还设有吊臂固定斜撑杆5。The device is also provided with a boom fixed diagonal brace 5.

吊臂4通过吊臂固定斜撑杆5固定在纵向支撑杆11上。The boom 4 is fixed on the longitudinal support rod 11 through the boom fixing diagonal brace 5 .

采用上述结构的装置后,由于其吊臂可在纵向支撑杆(业内亦俗称拔杆)上作360度的旋转,且吊臂、带电作业用绝缘绳索及相关附件等均符合带电作业安全规程的绝缘要求,具有较高的绝缘性,保证了带电作业人员的安全,为带电作业和安全操作提供了保障。After adopting the device with the above structure, because the boom can rotate 360 degrees on the longitudinal support rod (also commonly known as the pulling rod in the industry), and the boom, insulated ropes for live work and related accessories are all in line with the safety regulations for live work. Insulation requirements, with high insulation, to ensure the safety of live workers, and provide a guarantee for live work and safe operation.

此外,该装置的结构还保证了零件拆卸方便,有助于实现地电位状态下进行轻松安装。In addition, the structure of the device ensures easy removal of parts, which facilitates easy installation at ground potential.

同时,360度旋转绝缘吊装臂的尺寸,保证了带电作业时的最小安全距离。At the same time, the size of the 360-degree rotating insulating lifting arm ensures the minimum safe distance during live working.

360度旋转绝缘吊装臂材料和结构设计,保证了足够的机械强度,可实现作业人员站立进行“翻线”操作,起吊杆刀装置。The material and structural design of the 360-degree rotating insulated lifting arm ensure sufficient mechanical strength, allowing the operator to stand up and carry out the "turning over" operation and lift the boom knife device.

360度旋转绝缘吊装臂的转动,由360度旋转绝缘吊装臂下层的人进行操作吊臂旋转。The rotation of the 360-degree rotating insulating lifting arm is operated by the person on the lower floor of the 360-degree rotating insulating lifting arm.

待更换或新的杆刀装置的升降,由地面作业人员进行操作和控制,以保证匀速安全起吊。The lifting of the rod-knife device to be replaced or new is operated and controlled by the ground operator to ensure safe lifting at a uniform speed.

由于本发明采用地电位作业方法来实现带电调换杆刀装置,能够减少停电时间,有效提高检修工作的效率,提高供电线路的有效输电时间和在线供电率,在作业过程中无需借助绝缘斗臂车或平台,适合带电作业车辆无法达到的线路和作业场所,新增了带电作业项目,扩大了作业范围,有效地提高了检修工作的计划性,减少了操作工作量,同时也提高了电网运行的安全性和可靠性,为广大城郊和农村地区的带电作业起到了积极的推动和促进作用。Since the present invention adopts the ground potential operation method to realize the live exchange rod knife device, it can reduce the power outage time, effectively improve the efficiency of maintenance work, improve the effective power transmission time and online power supply rate of the power supply line, and do not need to use the insulating arm truck during the operation process Or platform, suitable for lines and workplaces that live-line work vehicles cannot reach. New live-line work items have been added to expand the scope of work, effectively improve the planning of maintenance work, reduce the workload of operations, and also improve the reliability of power grid operation. The safety and reliability have played a positive role in promoting and promoting the live-line work in the vast suburbs and rural areas.

本发明可广泛用于电力架空线路的带电检修、维护领域。The invention can be widely used in the field of live overhaul and maintenance of electric power overhead lines.

Claims (4)

1.一种地电位带电调换杆刀装置的方法,包括登杆作业人员和地面作业人员配合,对设置在杆上的杆刀装置进行更换,其中,所述的杆刀装置位于电杆顶部,与其相连的三相架空线路及其支撑横担位于杆刀装置下方的电杆上,其特征是:1. A method for exchanging a pole knife device with electrification at ground potential, comprising the cooperation of the pole operator and the ground operator to replace the pole knife device arranged on the pole, wherein the pole knife device is located at the top of the pole, The three-phase overhead line connected to it and its supporting cross-arm are located on the pole under the pole-cutter device, and its characteristics are: A、登杆作业人员使用绝缘操作杆将三相架空线路的避雷器退出运行;A. The pole operator uses the insulating operating rod to deactivate the arrester of the three-phase overhead line; B、登杆作业人员在支撑横担位下方的电杆上,与三相架空线路走向成90度夹角方向,设置第一横向支撑悬臂,其所述第一横向支撑悬臂在距电杆远端的一端上设置有一固定转向底座;B. On the electric pole under the support cross-arm position, the climbing pole operator sets the first horizontal support cantilever in the direction of an angle of 90 degrees with the direction of the three-phase overhead line, and the first horizontal support cantilever is far away from the electric pole. One end of the end is provided with a fixed steering base; C、登杆作业人员在横向悬臂支撑的上方,同向设置第二横向支撑悬臂,并在第二横向支撑悬臂的距电杆近端一侧和第一横向支撑悬臂在距电杆远端一侧之间,设置用于加强第一横向支撑悬臂的斜撑;C. The climbing pole operator sets the second horizontal support cantilever in the same direction above the horizontal cantilever support, and the second horizontal support cantilever is on the side near the pole and the first horizontal support cantilever is at the far end of the pole. Between the sides, a diagonal brace for strengthening the cantilever of the first lateral support is arranged; D、登杆作业人员安装导线耐张绝缘子绝缘罩,做好绝缘遮蔽措施;D. The pole operator installs the insulation cover of the wire tension insulator and takes insulation and shielding measures; E、登杆作业人员以第一横向支撑悬臂为平台,使用绝缘工具进行三相架空线路之内侧相闸刀两侧桩头引线拆除工作,并将桩头引线下降至同相导线的临时固定处进行固定;E. Using the first horizontal support cantilever as a platform, the climbing pole operators use insulated tools to remove the pile head leads on both sides of the inner phase switch knife of the three-phase overhead line, and lower the pile head leads to the temporary fixing place of the same phase wire. fixed; F、登杆作业人员以第一、第二横向支撑悬臂为平台,使用绝缘工具分别拆除三相架空线路之中相和外侧相闸刀两侧桩头引线,并将各个桩头引线下降至同相导线的临时固定处进行固定;F. Using the first and second lateral support cantilever as a platform, the climbing pole operators use insulating tools to remove the pile head leads on both sides of the middle phase and the outer phase switch knife of the three-phase overhead line, and lower the pile head leads to the same phase. Fix the temporary fixing place of the wire; G、登杆作业人员在第一、第二横向支撑悬臂上装设纵向支撑杆,在纵向支撑杆的上部,安装转向型扒杆及其绝缘吊臂组件;G. The climbing pole operator installs a longitudinal support rod on the first and second lateral support cantilevers, and installs a steering pole and its insulating boom assembly on the upper part of the longitudinal support rod; H、地面作业人员安装地面卷扬设备;H. Ground operators install ground hoisting equipment; I、登杆作业人员和地面作业人员配合,在绝缘吊臂组件、转向型扒杆和地面卷扬设备之间安装吊绳;I. The climbing rod operator and the ground operator cooperate to install the sling between the insulating boom assembly, the steering pole and the ground hoisting equipment; J、登杆作业人员登上第二横向支撑悬臂,转动转向型扒杆的绝缘吊臂至杆刀装置上方合适位置,将吊绳与待更换的杆刀装置固定、连接;J. The climbing pole operator boards the second lateral support cantilever, turns the insulating boom of the steering type pole to a suitable position above the pole knife device, and fixes and connects the sling to the pole knife device to be replaced; K、地面作业人员通过地面卷扬设备将已与杆刀装置连接的吊绳微微吊紧至绷紧受力状态;K. The ground operators use the ground hoisting equipment to slightly tighten the sling that has been connected to the rod knife device to a state of tension; L、登杆作业人员拆卸杆刀装置与杆刀支架之间的固定螺丝,L. The pole-climbing operator removes the fixing screws between the pole-knife device and the pole-knife bracket, M、地面作业人员和登杆作业人员配合,通过地面卷扬设备将待更换的杆刀装置吊起,登杆作业人员转动转向型扒杆的绝缘吊臂,将待更换的杆刀装置平移至三相架空线路所在空间区域之外,然后将其降至地面;M. The ground operator and the climbing pole operator cooperate to lift the rod knife device to be replaced through the ground hoisting equipment, and the pole climbing operator turns the insulating boom of the steering pole to move the pole knife device to be replaced to outside the space area where the three-phase overhead line is located, and then lower it to the ground; N、地面作业人员将固结在吊绳末端的待更换的杆刀装置拆下,将新的杆刀装置固结在吊绳末端;N. The ground operator removes the pole knife device to be replaced fixed at the end of the suspension rope, and fixes the new pole knife device at the end of the suspension rope; O、地面作业人员和登杆作业人员配合,通过地面卷扬设备将新的杆刀装置吊起至杆上待安装位置所在平面;O. Cooperate with ground operators and pole climbers, lift the new pole knife device to the plane where the position to be installed on the pole is located through the ground hoisting equipment; P、登杆作业人员转动转向型扒杆的绝缘吊臂,将新的杆刀装置平移至杆上待安装位置;P. The pole-climbing operator turns the insulating boom of the steering-type pole, and translates the new pole knife device to the position on the pole to be installed; Q、登杆作业人员和地面作业人员配合,通过放松吊绳,将新的杆刀装置缓慢移至杆刀固定支架上;Q. The pole-climbing operator and the ground operator cooperate to slowly move the new pole-knife device to the pole-knife fixing bracket by loosening the sling; R、登杆作业人员紧固杆刀装置与杆刀支架之间的固定螺丝,安装固定好新的杆刀装置,对就位的新杆刀装置进行拉开、合上调试,检查闸刀接触符合要求,然后将杆刀装置置于拉开位置;R. The pole-climbing operator tightens the fixing screws between the pole knife device and the pole knife bracket, installs and fixes the new pole knife device, pulls and closes the new pole knife device in place for debugging, and checks the contact of the gate knife Meet the requirements, then put the rod knife device in the pull-off position; S、登杆作业人员退至第一、第二横向支撑悬臂上,依次顺序分别开始恢复三相架空线路之外侧相、中相和内侧相两侧桩头引线与杆刀装置之间的连接;S. The pole-climbing operator retreats to the first and second lateral support cantilevers, and starts to restore the connection between the pile head lead wires and the pole knife device on the outer phase, middle phase, and inner phase of the three-phase overhead line in sequence; T、登杆作业人员配合拆除转向型扒杆各零部件及相关导线耐张绝缘子绝缘罩,解除各相线路上的绝缘遮蔽措施;T. The pole-climbing workers cooperate to remove the components of the steering pole and the insulation cover of the relevant wire tension insulator, and remove the insulation and shielding measures on each phase line; U、登杆作业人员使用绝缘操作杆将三相架空线路的避雷器投入运行;U. The pole operator uses the insulating operating rod to put the arrester of the three-phase overhead line into operation; V、登杆作业人员将绝缘操作工器具吊至地面后,依次拆除转向型扒杆及其绝缘吊臂组件、第二横向支撑悬臂和第一横向支撑悬臂,清除杆上作业遗留物后,返回地面;V. After the climbing pole operator lifts the insulating operator equipment to the ground, remove the steering pole and its insulating boom assembly, the second lateral support cantilever and the first lateral support cantilever in sequence, and return to the ground; W、地面作业人员拆除地面卷扬设备;W. Ground operators dismantle the ground hoisting equipment; X、作业人员整理地面作业现场,清点作业工具,向当值调度汇报作业已经结束,撤离作业现场。X. Operators tidy up the ground work site, count the work tools, report to the on-duty dispatcher that the work is over, and evacuate the work site. 2.按照权利要求1所述的地电位带电调换杆刀装置的方法,其特征是所述的绝缘吊臂组件位于转向型扒杆的上端,所述的绝缘吊臂组件的纵向高度位置,高于待更换杆刀装置所在的平面位置。2. The method according to claim 1, wherein the method for exchanging the rod-knife device with electricity on the ground potential is characterized in that the insulating boom assembly is located at the upper end of the steering-type pickling rod, and the longitudinal height position of the insulating boom assembly is high. At the plane position where the rod knife device to be replaced is located. 3.按照权利要求1所述的地电位带电调换杆刀装置的方法,其特征是所述的内侧相是指三相架空线路中靠近登杆作业人员的一相架空线路,所述的外侧相是指三相架空线路中远离登杆作业人员的一相架空线路。3. According to the method for exchanging the rod knife device with ground potential electrification according to claim 1, it is characterized in that said inner phase refers to a phase overhead line close to the pole operator in the three-phase overhead line, and said outer phase It refers to the one-phase overhead line that is far away from the climbing pole operators among the three-phase overhead lines. 4.按照权利要求1所述的地电位带电调换杆刀装置的方法,其特征是所述的方法,采用地电位作业方法,借助转动转向型扒杆和可360度旋转的绝缘吊装臂,在保证带电作业最小安全距离的前提下,实现带电调换杆上杆刀装置,以减少停电时间,提高检修工作效率,提高供电线路的有效输电时间和在线供电率,提高电网运行的安全性和可靠性。4. According to the method for exchanging the rod knife device with ground potential charging according to claim 1, it is characterized in that the described method adopts the ground potential operation method, with the help of the rotary steering type pole and the insulating lifting arm that can rotate 360 degrees, in the Under the premise of ensuring the minimum safe distance for live-line work, realize the pole-upper knife device for live-line replacement, so as to reduce power outage time, improve maintenance work efficiency, improve the effective transmission time of power supply lines and online power supply rate, and improve the safety and reliability of power grid operation .
CN201110375221.3A 2011-11-22 2011-11-22 Ground potential electrified bar cutter device changing method Active CN102510029B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110375221.3A CN102510029B (en) 2011-11-22 2011-11-22 Ground potential electrified bar cutter device changing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110375221.3A CN102510029B (en) 2011-11-22 2011-11-22 Ground potential electrified bar cutter device changing method

Publications (2)

Publication Number Publication Date
CN102510029A true CN102510029A (en) 2012-06-20
CN102510029B CN102510029B (en) 2015-02-18

Family

ID=46222089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110375221.3A Active CN102510029B (en) 2011-11-22 2011-11-22 Ground potential electrified bar cutter device changing method

Country Status (1)

Country Link
CN (1) CN102510029B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106463940A (en) * 2014-01-20 2017-02-22 曙光电子通讯工程(株) Auxiliary device for power distribution facility live-line working, and power distribution facility live-line working method using same
CN109586206A (en) * 2018-11-27 2019-04-05 国网福建省电力有限公司 A kind of zigbee wireless remote control network of livewire work
CN114172070B (en) * 2021-09-30 2023-08-11 国网山东省电力公司潍坊供电公司 Vertical pole removing device for distribution network overhead line

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0833136A (en) * 1994-07-11 1996-02-02 Fujikura Ltd Electric wire lifting method at suspension support
CN200997499Y (en) * 2006-09-05 2007-12-26 上海电力带电作业技术开发有限公司 Insulated platform apparatus for 360degree rotary electric operation
CN201215876Y (en) * 2008-06-12 2009-04-01 宁夏电力公司吴忠供电局 Assistant hanging rack for mounting top rack of electric pole
CN101557087A (en) * 2009-01-20 2009-10-14 重庆市电力公司江北供电局 High-voltage live working insulating hanging pole

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0833136A (en) * 1994-07-11 1996-02-02 Fujikura Ltd Electric wire lifting method at suspension support
CN200997499Y (en) * 2006-09-05 2007-12-26 上海电力带电作业技术开发有限公司 Insulated platform apparatus for 360degree rotary electric operation
CN201215876Y (en) * 2008-06-12 2009-04-01 宁夏电力公司吴忠供电局 Assistant hanging rack for mounting top rack of electric pole
CN101557087A (en) * 2009-01-20 2009-10-14 重庆市电力公司江北供电局 High-voltage live working insulating hanging pole

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106463940A (en) * 2014-01-20 2017-02-22 曙光电子通讯工程(株) Auxiliary device for power distribution facility live-line working, and power distribution facility live-line working method using same
CN106463939A (en) * 2014-01-20 2017-02-22 曙光电子通讯工程(株) Auxiliary device for power distribution facility live-line working, and power distribution facility live-line working method using same
CN106463941A (en) * 2014-01-20 2017-02-22 曙光电子通讯工程(株) Power distribution facility live-line working method
CN106463938A (en) * 2014-01-20 2017-02-22 曙光电子通讯工程(株) Power distribution facility live-line working method
CN106463938B (en) * 2014-01-20 2018-09-07 曙光电子通讯工程(株) Controller switching equipment livewire work method
CN106463941B (en) * 2014-01-20 2018-09-07 曙光电子通讯工程(株) Controller switching equipment livewire work method
CN106463939B (en) * 2014-01-20 2018-09-11 曙光电子通讯工程(株) Controller switching equipment livewire work auxiliary device and the controller switching equipment livewire work method for utilizing this device
CN106463940B (en) * 2014-01-20 2018-09-11 曙光电子通讯工程(株) Controller switching equipment livewire work auxiliary device and the method for carrying out controller switching equipment livewire work using it
CN109586206A (en) * 2018-11-27 2019-04-05 国网福建省电力有限公司 A kind of zigbee wireless remote control network of livewire work
CN114172070B (en) * 2021-09-30 2023-08-11 国网山东省电力公司潍坊供电公司 Vertical pole removing device for distribution network overhead line

Also Published As

Publication number Publication date
CN102510029B (en) 2015-02-18

Similar Documents

Publication Publication Date Title
CN103086278A (en) Sliding type gantry crane and application thereof
CN202026034U (en) Overhead wire insulation wire lifter for 10-kilovolt circuit
CN105337217B (en) A kind of instrument and its method of charged for replacement extra-high voltage ground electrode circuit linear insulator
CN103618249A (en) technology for electrified overhaul of +-500kV double-circuit direct-current power transmission lines on same tower
CN109787145B (en) 10kV load replacement side phase isolating switch device and method
CN105932601B (en) Disconnected strand of overhead grounding wire method for repairing and mending
CN102510029B (en) Ground potential electrified bar cutter device changing method
CN202575753U (en) Slidable gantry crane
CN105416098A (en) Subway overhead line system overhaul barrow
CN204382187U (en) A kind of contact net inclined cantilever insulator replacement tool
CN104538889A (en) Live-line replacing method of straight pole insulator of distribution network line
CN207269128U (en) A device for replacing post insulators with electricity
CN201737616U (en) Double-lifting pole
CN103795003B (en) Line apparatus is carried in the insulation of 35kV supply line live line working
CN104113007A (en) Operation method for replacing strain insulator of 35kV overhead distribution line in live state
CN104538888B (en) A kind of distribution line straight line pole cross-arm charged for replacement method
CN103178469A (en) Operating method for replacing suspension type porcelain bottle of straight line pole for 35-kV overhead distribution line in electrified manner
CN207269129U (en) Adjustable post insulator live replacement device
CN203582320U (en) Power equipment lifting device
CN103010965A (en) Special tool of 110kVGW4-type for hoisting switch blades and porcelain bottles
CN201234089Y (en) Protective interval for live operation on 1000kV AC very high voltage line
CN102290738B (en) Construction method for replacing 35kV line tension pole cross arm
CN201466565U (en) Wire lifting device of vehicle with insulating boom
CN203415877U (en) Hoisting tool for replacing isolation switch
CN203339566U (en) A limited track cabin for live working

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121017

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121017

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

C14 Grant of patent or utility model
GR01 Patent grant