[go: up one dir, main page]

CN102493640A - Scaffold guardrail - Google Patents

Scaffold guardrail Download PDF

Info

Publication number
CN102493640A
CN102493640A CN2011104130320A CN201110413032A CN102493640A CN 102493640 A CN102493640 A CN 102493640A CN 2011104130320 A CN2011104130320 A CN 2011104130320A CN 201110413032 A CN201110413032 A CN 201110413032A CN 102493640 A CN102493640 A CN 102493640A
Authority
CN
China
Prior art keywords
guard bar
fastener
scaffold
scaffolding guard
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104130320A
Other languages
Chinese (zh)
Inventor
李祥正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baikai Engineering Co ltd
Original Assignee
Baikai Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baikai Engineering Co ltd filed Critical Baikai Engineering Co ltd
Priority to CN2011104130320A priority Critical patent/CN102493640A/en
Publication of CN102493640A publication Critical patent/CN102493640A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

A scaffold guardrail comprises a lower cross bar, two supporting pieces, an upper cross bar, two fasteners and a plurality of connecting rods, wherein the two supporting pieces are combined at two ends of the lower cross bar and respectively provided with an outward opening for the two supporting pieces to be respectively forked on the vertical bars at the same side of two adjacent scaffolds and pressed on the upper side of a connecting bolt of the vertical bars; by the structure, the scaffold can be quickly combined on one side surface of the scaffold to provide supporting and retaining effects, and construction on the side surface can be facilitated.

Description

鹰架护栏Scaffold guardrail

技术领域 technical field

本发明涉及一种建筑施工器具,尤指一种可快速结合在鹰架一侧面以提供支撑、围挡作用,而且可利于在该侧面进行施工的鹰架护栏。 The invention relates to a building construction tool, especially a scaffold guardrail that can be quickly combined with one side of a scaffold to provide support and enclosure, and facilitate construction on the side.

背景技术 Background technique

如图1所示,一般已知的鹰架结构,是在平行设置的两鹰架10的两侧面(即靠近建筑物的一侧面及其相反侧面)分别各设置一交叉拉杆11,以作为将该两鹰架10支撑于固定距离及作为侧边围挡之用。其中,该交叉拉杆11 的四个端部分别可分离地结合在该两鹰架10 的立杆12靠近上、下端的结合插销13上。 As shown in Figure 1, the generally known scaffold structure is to set a cross tie rod 11 respectively on the two sides of two parallel scaffolds 10 (that is, the side near the building and the opposite side) to serve as the The two scaffolds 10 are supported at a fixed distance and serve as side enclosures. Wherein, the four ends of the cross tie rods 11 are respectively detachably combined on the vertical rods 12 of the two scaffolds 10 near the upper and lower ends of the coupling pins 13.

然而,由于该两相邻鹰架10之间靠近建筑物的一侧面(即内侧面),被该交叉拉杆11分割成四个三角形区域,而该三角形区域的斜角对于于油漆、贴磁砖或传递物等施工时习惯水平及上下移动作业的一般人,会形成非常大的障碍,进而会因此而影响到施工顺畅及效率。 Yet, because this two adjacent scaffolds 10 are close to a side (i.e. inner side) of building, be divided into four triangular areas by this cross brace 11, and the oblique angle of this triangular area is very important for painting, tiling. Ordinary people who are accustomed to level and moving up and down during construction, such as passing objects, will form a very large obstacle, which will affect the smoothness and efficiency of construction.

发明内容 Contents of the invention

本发明主要目的在于提供一种可快速结合在鹰架一侧面以提供支撑、围挡作用,而且可利于在该侧面进行施工的鹰架护栏。 The main purpose of the present invention is to provide a scaffold guardrail that can be quickly combined on one side of the scaffold to provide support and enclosure, and can facilitate construction on the side.

具体而言,本发明所述鹰架护栏包括一下横杆、两支撑件、一上横杆、两扣件及多数连接杆。该两支撑件结合在该下横杆的两端,该两支撑件分别具有向外的一开口供其分别叉设在两相邻鹰架同一侧的立杆上,并压在该立杆结合插销的上侧;该上横杆平行位于该下横杆的上方;两扣件分别结合在该上横杆的两端,该两扣件分别供可分离地扣合及束紧在该两立杆上;以及多数连接杆间隔设在该上、下横杆之间,且该连接杆的两端分别可摆动地结合在该上、下横杆上,使该上、下横杆可水平状地相互靠合。 Specifically, the scaffold guardrail of the present invention includes a lower cross bar, two supports, an upper cross bar, two fasteners and a plurality of connecting rods. The two supports are combined at both ends of the lower cross bar, and each of the two supports has an outward opening for them to be forked on the vertical bars on the same side of the two adjacent scaffoldings, and pressed against the vertical bars. The upper side of the bolt; the upper cross bar is located parallel to the top of the lower cross bar; and most of the connecting rods are arranged at intervals between the upper and lower cross bars, and the two ends of the connecting rods are respectively swingably combined on the upper and lower cross bars, so that the upper and lower cross bars can be horizontally close to each other.

该扣件包括一固定半环结合在该上横杆的端部,且扣在该鹰架的立杆内侧边;一活动半环一端可摆动地结合于该固定半环一端,另一端具有一凸部,该活动半环扣在该立杆的外侧边,该凸部上具有呈开口状的一缺槽;一锁杆可摆动地结合于该固定半环的另一端,且可供嵌入该缺槽中,于该锁杆上具有一螺纹段; The fastener includes a fixed half ring combined with the end of the upper cross bar, and buckled on the inner side of the vertical bar of the scaffold; A protrusion, the movable half ring is buckled on the outer side of the vertical rod, and the protrusion has a slot in the shape of an opening; a lock bar is swingably combined with the other end of the fixed half ring, and can be used for Embedded in the slot, there is a threaded section on the locking rod;

一螺帽螺设于该锁杆的螺纹段上,且螺锁在该凸部外侧以使该固定半环与该活动半环相对靠合而夹紧该立管。 A nut is screwed on the threaded section of the locking rod, and screwed on the outside of the protrusion so that the fixed half-ring and the movable half-ring are relatively abutted to clamp the standpipe.

该下横杆的上侧面具有多数间隔设置的下枢片,该上横杆的下侧面具有多数间隔设置的上枢片,该连接杆的两端分别具有一连接片,且分别利用两轴栓将该两连接片与该上枢片及该下枢片枢设。 The upper side of the lower cross bar has a plurality of lower pivot pieces arranged at intervals, the lower side of the upper cross bar has a plurality of upper pivot pieces arranged at intervals, and the two ends of the connecting rod respectively have a connecting piece, and respectively use two shaft bolts to The two connecting pieces are pivoted to the upper pivot piece and the lower pivot piece.

该下枢片具有一下枢槽供容纳该连接杆下端的连接片,该上枢片具有一上枢槽供容纳该连接杆上端的连接片。 The lower pivot piece has a lower pivot groove for accommodating the connecting piece at the lower end of the connecting rod, and the upper pivot piece has an upper pivot groove for accommodating the connecting piece at the upper end of the connecting rod.

该下横杆具有一中段及两弯折段,该两弯折段位于该下横杆中段的两端且使该两支撑件与该下横杆的中段形成高度差,进而使该鹰架护栏组装在该鹰架上时,其扣件与相邻鹰架护栏的扣件错开。 The lower cross bar has a middle section and two bent sections, and the two bent sections are located at both ends of the lower cross bar middle section and make the two supports form a height difference with the middle section of the lower cross bar, thereby making the scaffold guardrail When assembled on the scaffold, its fasteners are staggered with the fasteners of the adjacent scaffold guardrails.

该鹰架护栏组装在该鹰架上时,其扣件位于相邻且具有平直状下横杆的鹰架护栏的扣件的上方或下方。 When the scaffolding guardrail is assembled on the scaffolding, its fasteners are located above or below the fasteners of the adjacent scaffolding guardrails having a straight lower cross bar.

该支撑件呈U字形。 The supporting member is U-shaped.

如此,当本发明鹰架护栏组装在鹰架上时,便可藉由该下横杆、上横杆及多数连接杆围设在该鹰架的侧面,以使其具有支撑及围挡功效。而且,其亦可将两相邻鹰架之间靠近建筑物的一侧面(即内侧面),分割成数个矩形区域,而使其可符合一般人油漆、贴磁砖或传递物品等施工时需水平及上下移动作业的习惯,以减少施工障碍,进而可使施工顺畅及提升施工效率。特别是,利用该两支撑件叉设在两相邻鹰架的同一侧的立杆上并压在该立杆结合插销的上侧,可利用该下横杆及该多数连接杆将该上横杆水平支撑在上方,以使其仅需要利用该两扣件分别扣合及束紧在该两立杆上,即可将其牢固且稳定的组装在该鹰架上,所以其组装可较为方便及快速。另外,藉由该多数连接杆的两端分别可摆动地结合在该上、下横杆上的结构设计,更是使得该上、下横杆可水平状的相互靠合,以使其可因此大幅缩小整体的体积,进而方便运输及收放。 In this way, when the scaffold guardrail of the present invention is assembled on the scaffold, the lower cross bar, the upper cross bar and a plurality of connecting rods can be used to surround the side of the scaffold, so that it has the functions of support and enclosure. Moreover, it can also divide the side (i.e. the inner side) close to the building between two adjacent scaffolds into several rectangular areas, so that it can meet the construction needs of ordinary people when painting, pasting tiles or passing articles. The habit of moving horizontally and up and down to reduce construction obstacles, thereby making construction smooth and improving construction efficiency. In particular, the two supporting parts are forked on the vertical rods on the same side of two adjacent scaffoldings and pressed against the upper side of the vertical rods combined with the bolts, the upper horizontal rods and the plurality of connecting rods can be used to connect the upper horizontal rods The pole is supported horizontally above, so that it can be firmly and stably assembled on the scaffold only by fastening and fastening the two fasteners on the two vertical poles respectively, so its assembly can be more convenient and fast. In addition, due to the structural design that the two ends of the plurality of connecting rods are respectively swingably combined with the upper and lower cross bars, the upper and lower cross bars can be horizontally attached to each other, so that it can thus The overall volume is greatly reduced, which facilitates transportation and storage.

附图说明 Description of drawings

图1为已知鹰架结构的立体示意图。 FIG. 1 is a schematic perspective view of a known scaffold structure.

图2为本发明第一实施例的实施状态图。 Fig. 2 is an implementation state diagram of the first embodiment of the present invention.

图3为本发明第一实施例局部放大示意图。 Fig. 3 is a partially enlarged schematic diagram of the first embodiment of the present invention.

图4为本发明第一实施例连接杆两端的放大示意图。 Fig. 4 is an enlarged schematic view of both ends of the connecting rod according to the first embodiment of the present invention.

图5为本发明第一实施例扣件的放大示意图(打开状态)。 Fig. 5 is an enlarged schematic view (open state) of the fastener according to the first embodiment of the present invention.

图6为本发明第一实施例扣件的放大示意图(封闭状态)。 Fig. 6 is an enlarged schematic view (closed state) of the fastener according to the first embodiment of the present invention.

图7为本发明第一实施例收合动作示意图。 Fig. 7 is a schematic diagram of the folding action of the first embodiment of the present invention.

图8为本发明第二实施例。 Fig. 8 is a second embodiment of the present invention.

图9为本发明第三实施例。 Fig. 9 is a third embodiment of the present invention.

标号说明: Label description:

鹰架10;交叉拉杆11; Scaffold 10; cross tie rod 11;

立杆12;结合插销13; Pole 12; Combined with latch 13;

下横杆20;下枢片21; Lower cross bar 20; Lower pivot piece 21;

下枢槽22;中段23;  Lower pivot groove 22; Middle section 23;

弯折段24;支撑件30; Bending section 24; Support member 30;

上横杆40;上枢片41; Upper cross bar 40; Upper pivot piece 41;

上枢槽42;中段43;  Upper pivot groove 42; Middle section 43;

弯折段44 ;扣件50; Bending section 44; Fastener 50;

固定半环51;活动半环52;  Fixed half ring 51; Movable half ring 52;

锁杆53;螺帽54;  Lock bar 53; Nut 54;

凸部55;缺槽56; Protrusion 55; Notch 56;

螺纹段57;连接杆60; threaded segment 57; connecting rod 60;

连接片61;轴栓62; connecting piece 61; shaft bolt 62;

鹰架70;立杆71; Scaffold 70; Pole 71;

结合插销72。 Combine latch 72 .

具体实施方式 Detailed ways

请参阅图2~图7所示,为本发明所述鹰架护栏的第一实施例,其指出该鹰架护栏包括一下横杆20、两支撑件30、一上横杆40、两扣件50及两连接杆60。其中:该下横杆20设置呈水平状。该两支撑件30分别呈U字形,且分别结合在该下横杆20的两端,该两支撑件30的开口朝向外,以供其可分别叉设在两相邻鹰架70的同一侧立杆71上,并压在该立杆71结合插销72的上侧。该上横杆40平行位于该下横杆20的正上方。该两扣件50分别结合在该上横杆40的两端,且该两扣件50分别供可分离地扣合及束紧在该两立杆71上。该两连接杆60间隔设在该上横杆40与该下横杆20之间,且该连接杆60的两端分别可摆动地结合在该上横杆40及该下横杆20上,使该上、下横杆40、20可水平状地相互靠合。 Please refer to Figures 2 to 7, which are the first embodiment of the scaffold guardrail of the present invention, which point out that the scaffold guardrail includes a lower cross bar 20, two support members 30, an upper cross bar 40, and two fasteners. 50 and two connecting rods 60. Wherein: the lower cross bar 20 is set horizontally. The two support members 30 are U-shaped respectively, and are combined with the two ends of the lower cross bar 20 respectively. The openings of the two support members 30 face outward, so that they can be forked on the same side of two adjacent scaffolds 70 respectively. On the vertical rod 71, and press on the upper side of the vertical rod 71 combined with the latch 72. The upper cross bar 40 is located directly above the lower cross bar 20 in parallel. The two fasteners 50 are respectively combined with two ends of the upper cross bar 40 , and the two fasteners 50 are respectively detachably fastened and fastened to the two upright bars 71 . The two connecting rods 60 are spaced between the upper cross bar 40 and the lower cross bar 20, and the two ends of the connecting rod 60 are respectively swingably combined with the upper cross bar 40 and the lower cross bar 20, so that The upper and lower cross bars 40, 20 can lean against each other horizontally.

在该图3及图4中指出,该下横杆20的上侧面具有间隔设置的两下枢片21,该下枢片21具有一下枢槽22。该上横杆40的下侧面具有间隔设置的两上枢片41,该上枢片41具有一上枢槽42。该连接杆60的两端分别具有一连接片61供分别嵌入该下枢槽22及该上枢槽42之中,且分别利用两轴栓62将该两连接片61与该下枢片21及该上枢片41枢设。 As indicated in FIG. 3 and FIG. 4 , the upper side of the lower cross bar 20 has two lower pivot pieces 21 arranged at intervals, and the lower pivot pieces 21 have a lower pivot groove 22 . The lower side of the upper cross bar 40 has two upper pivot pieces 41 arranged at intervals, and the upper pivot pieces 41 have an upper pivot groove 42 . The two ends of the connecting rod 60 respectively have a connecting piece 61 for inserting in the lower pivot groove 22 and the upper pivot groove 42 respectively, and the two connecting pieces 61 are connected with the lower pivot piece 21 and the upper pivot groove 42 respectively by using two shaft bolts 62. The upper pivot piece 41 is pivotally arranged.

在该图5及图6中指出,该扣件50包括一固定半环51、一活动半环52、一锁杆53及一螺帽54。其中: In this FIG. 5 and FIG. 6 , the fastener 50 includes a fixed half ring 51 , a movable half ring 52 , a locking bar 53 and a nut 54 . in:

该固定半环51结合在该上横杆40的端部,且可供扣在该立杆71的内侧边。 The fixing half ring 51 is combined with the end of the upper cross bar 40 and can be buckled on the inner side of the upright bar 71 .

该活动半环52一端可摆动地结合在该固定半环51一端,另一端具有一凸部55。该活动半环52可供扣在该立杆71的外侧边,该凸部55上具有呈开口状的一缺槽56。 One end of the movable half ring 52 is swingably coupled to one end of the fixed half ring 51 , and the other end has a protrusion 55 . The movable half ring 52 can be buckled on the outer side of the upright rod 71 , and the protrusion 55 has an opening-shaped slot 56 .

该锁杆53可摆动地结合在该固定半环51的另一端,且可供嵌入该缺槽56中,于该锁杆53上具有一螺纹段57。 The locking rod 53 is swingably coupled to the other end of the fixed half ring 51 and can be inserted into the slot 56 . The locking rod 53 has a threaded section 57 .

该螺帽54螺设于该锁杆53的螺纹段57上,且可螺锁在该凸部55外侧以使该固定半环51 与该活动半环52相对靠合而夹紧该立管71。 The nut 54 is screwed on the threaded section 57 of the lock bar 53, and can be screwed on the outside of the protrusion 55 so that the fixed half ring 51 and the movable half ring 52 are relatively abutted to clamp the standpipe 71 .

请参阅图8所示,为本发明第二实施例,其结构与第一实施例大致相同,差别在于该第二实施例的下横杆20具有一中段23及两弯折段24。该两弯折段24位于该中段23的两端且呈向下弯折状,以使该两支撑件30低于该中段23,进而使该鹰架护栏组装在该鹰架70上时,其扣件50位于相邻且具有平直状下横杆20的鹰架护栏的扣件50上方。当然,在本实施例中,该两弯折段24亦可呈向上弯折状,以使该两支撑件30高于该中段23,进而使该鹰架护栏组装在该鹰架70上时,其扣件50位于相邻且具有平直状下横杆20的鹰架护栏的扣件50下方(图中未示)。 Please refer to FIG. 8 , which is the second embodiment of the present invention. Its structure is substantially the same as that of the first embodiment, except that the lower cross bar 20 of the second embodiment has a middle section 23 and two bent sections 24 . The two bent sections 24 are located at the two ends of the middle section 23 and are bent downward, so that the two supports 30 are lower than the middle section 23, so that when the scaffold guardrail is assembled on the scaffold 70, its The fastener 50 is located above the fastener 50 of the adjacent scaffolding guardrail with the straight lower rail 20 . Of course, in this embodiment, the two bent sections 24 can also be bent upwards, so that the two supports 30 are higher than the middle section 23, so that when the scaffold guardrail is assembled on the scaffold 70, Its fastener 50 is located below the fastener 50 of the adjacent scaffolding guardrail having a straight lower cross bar 20 (not shown in the figure).

请参阅图9所示,为本发明第三实施例,其结构与第一实施例大致相同,差别在于该第三实施例的上横杆40具有一中段43及两弯折段44。该两弯折段44 位于该中段43的两端且呈向上弯折状,以使该两扣件50高于该中段43,进而使该鹰架护栏组装在该鹰架70上时,其扣件50位于相邻且具有平直状上横杆40的鹰架护栏的扣件50上方。当然,在本实施例中,该两弯折段44亦可呈向下弯折状,以使该两扣件50低于该中段43,进而使该鹰架护栏组装在该鹰架70上时,其扣件50位于相邻且具有平直状上横杆40的鹰架护栏的扣件50下方(图中未示)。 Please refer to FIG. 9 , which is a third embodiment of the present invention. Its structure is substantially the same as that of the first embodiment, except that the upper cross bar 40 of the third embodiment has a middle section 43 and two bending sections 44 . The two bent sections 44 are located at the two ends of the middle section 43 and are bent upwards, so that the two fasteners 50 are higher than the middle section 43, so that when the scaffold guardrail is assembled on the scaffold 70, the buckle The member 50 is located above the fastener 50 of the adjacent scaffolding rail with the straight upper rail 40 . Of course, in this embodiment, the two bent sections 44 can also be bent downwards, so that the two fasteners 50 are lower than the middle section 43, so that when the scaffold guardrail is assembled on the scaffold 70 , the fastener 50 is located below the fastener 50 of the adjacent scaffolding guardrail with a straight upper cross bar 40 (not shown in the figure).

由于本发明鹰架护栏组装在鹰架70上时,可藉由该下横杆20、上横杆40及两连接杆60围设在该鹰架70的侧面,以使其具有支撑及围挡功效。而且,其亦可将两相邻鹰架70之间靠近建筑物的一侧面(即内侧面),分割成数个矩形区域,而使其可符合一般人油漆、贴磁砖或传递物品等施工时需水平及上下移动作业的习惯,以减少施工障碍,进而可使更为顺畅地施工及提升施工效率。特别是,利用该两支撑件30叉设在两相邻鹰架70的同一侧立杆71上,并压在该立杆71结合插销72的上侧,可利用该下横杆20及该两连接杆60将该上横杆40支撑在该下横杆20的上方,使其仅需要利用该两扣件50分别扣合及束紧在该两立杆71上,即可将其牢固且稳定地组装在该鹰架70上,所以其组装可较为方便及快速。另外,藉由该两连接杆60的两端分别可摆动地结合在该上横杆40及该下横杆20上的结构设计,更是使得该上、下横杆40、20可水平状的相互靠合,以使其可因此大幅缩小整体体积,进而方便运输及收放(如图7所示)。 When the scaffold guardrail of the present invention is assembled on the scaffold 70, it can be surrounded by the lower cross bar 20, the upper cross bar 40 and the two connecting rods 60 on the side of the scaffold 70, so that it has support and enclosure effect. Moreover, it can also be divided into several rectangular areas between two adjacent scaffoldings 70 near one side of the building (i.e., the inner side), so that it can meet the requirements of ordinary people when painting, sticking tiles or passing articles. The habit of moving horizontally and up and down is required to reduce construction obstacles, thereby enabling smoother construction and improving construction efficiency. In particular, the two supports 30 are forked on the same side poles 71 of two adjacent scaffolds 70, and pressed against the upper side of the poles 71 combined with the bolts 72, the lower cross bar 20 and the two The connecting rod 60 supports the upper cross bar 40 above the lower cross bar 20, so that it only needs to use the two fasteners 50 to fasten and fasten the two vertical bars 71 respectively to make it firm and stable. Assembled on the scaffold 70, so its assembly can be more convenient and fast. In addition, due to the structural design that the two ends of the two connecting rods 60 are respectively swingably combined with the upper cross bar 40 and the lower cross bar 20, the upper and lower cross bars 40, 20 can be moved horizontally. Close to each other, so that the overall volume can be greatly reduced, which is convenient for transportation and storage (as shown in Figure 7).

Claims (9)

1. scaffolding guard bar is characterized in that comprising:
One sheer pole;
Two support members are combined in the two ends of this sheer pole, and this two support member has an outside opening respectively and supplies it to pitch respectively in the vertical rod that is located at two adjacent scaffold the same sides, and is pressed in the upside that this vertical rod combines latch;
One cross tube, the parallel top that is positioned at this sheer pole;
Two fasteners are combined in the two ends of this cross tube respectively, and this two fastener supplies respectively to fasten separably and tightens in this two vertical rod; And most connecting rods, be located between this upper and lower cross bar at interval, and the two ends of this connecting rod are combined in respectively on this upper and lower cross bar swingably, make this upper and lower cross bar can the closing each other of horizontal ground.
2. scaffolding guard bar according to claim 1 is characterized in that, this fastener comprises:
One stationary half is combined in the end of this cross tube, and is buckled in the vertical rod inner side edge of this scaffold;
One movable semi-ring, an end are incorporated into this stationary half one end swingably, and the other end has a protuberance, and this activity semi-ring is buckled in the outer side edges of this vertical rod, have an opening-like short slot on this protuberance;
One locking bar is incorporated into the other end of this stationary half swingably, and can supply to embed in this short slot, on this locking bar, has a thread segment; And
One nut, spiral shell are located on the thread segment of this locking bar, and screw lock in this protuberance outside so that this stationary half and the relative closing of this activity semi-ring and clamp this standpipe.
3. scaffolding guard bar according to claim 1 and 2; It is characterized in that; The upper side of this sheer pole has most following pivot sheets that are provided with at interval; The downside of this cross tube has most last pivot sheets that are provided with at interval, and the two ends of this connecting rod have a connecting piece respectively, and utilize respectively the diaxon bolt with this two brace with upward pivot sheet and this time pivot sheet are pivoted.
4. scaffolding guard bar according to claim 3 is characterized in that, this time pivot sheet has the pivot groove and supplies to hold the brace of this connecting rod lower end, and the pivot sheet has pivot groove on and supplies to hold the brace on this connecting rod this on.
5. scaffolding guard bar according to claim 3; It is characterized in that; These sheer pole tool one stage casing and two bending segments; This two bending segment is positioned at the two ends in this sheer pole stage casing and makes the stage casing of this two support member and this sheer pole form difference in height, and then when making this scaffolding guard bar be assembled on this scaffold, the fastener of its fastener and adjacent scaffolding guard bar staggers.
6. scaffolding guard bar according to claim 5 is characterized in that, when this scaffolding guard bar is assembled on this scaffold, its fastener be positioned at adjacent and have the flat sheer pole scaffolding guard bar fastener above or below.
7. scaffolding guard bar according to claim 3; It is characterized in that; This cross tube has a stage casing and two bending segments; This two bending segment is positioned at the two ends in this cross tube stage casing and makes the stage casing of this two fastener and this cross tube form difference in height, and then when making this scaffolding guard bar be assembled on this scaffold, the fastener of its fastener and adjacent scaffolding guard bar staggers.
8. scaffolding guard bar according to claim 7 is characterized in that, when this scaffolding guard bar is assembled on this scaffold, its fastener be positioned at adjacent and have the flat cross tube scaffolding guard bar fastener above or below.
9. scaffolding guard bar according to claim 3 is characterized in that this support member is the U font.
CN2011104130320A 2011-12-13 2011-12-13 Scaffold guardrail Pending CN102493640A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104130320A CN102493640A (en) 2011-12-13 2011-12-13 Scaffold guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104130320A CN102493640A (en) 2011-12-13 2011-12-13 Scaffold guardrail

Publications (1)

Publication Number Publication Date
CN102493640A true CN102493640A (en) 2012-06-13

Family

ID=46185494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104130320A Pending CN102493640A (en) 2011-12-13 2011-12-13 Scaffold guardrail

Country Status (1)

Country Link
CN (1) CN102493640A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070278041A1 (en) * 2006-05-31 2007-12-06 Sonny Scaffolds, Inc. Quick-connect/disconnect guardrail scaffolding system and method
TWM345105U (en) * 2008-03-04 2008-11-21 xiang-zheng Li Dual balustrade safety structure for scaffolds
JP4629743B2 (en) * 2008-02-08 2011-02-09 ホリー株式会社 Temporary scaffold
EP1878850B1 (en) * 2006-07-15 2011-04-27 Combisafe International Ab Scaffolding system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070278041A1 (en) * 2006-05-31 2007-12-06 Sonny Scaffolds, Inc. Quick-connect/disconnect guardrail scaffolding system and method
EP1878850B1 (en) * 2006-07-15 2011-04-27 Combisafe International Ab Scaffolding system
JP4629743B2 (en) * 2008-02-08 2011-02-09 ホリー株式会社 Temporary scaffold
TWM345105U (en) * 2008-03-04 2008-11-21 xiang-zheng Li Dual balustrade safety structure for scaffolds

Similar Documents

Publication Publication Date Title
CN103410304B (en) A kind of Novel scaffold system
CN1875161B (en) Decorative post stays for railing systems
CN106468114A (en) Adjustable fence
CN202467161U (en) Connection structure of scaffold
US7963367B2 (en) Toeboard clamp system
CN202064635U (en) Formwork forming fastener
CN102493640A (en) Scaffold guardrail
CN205369637U (en) Tent
CN206034870U (en) Scaffold frame of new generation of many function combination of environment -friendly formula
CN201439636U (en) Door type scaffold
CN100554628C (en) A kind of bracing or strutting arrangement
CN108222497B (en) Building template system
CN102428239A (en) Cover board installation structure for a construction site
TWM447485U (en) Supporting base for solar panel
CN212176813U (en) Regularization 12 pieces of formula tower crane guardrails that piece together
CN201574572U (en) Angle-adjustable operating platform hanging rack
CN209369480U (en) A kind of slope fence
CN221682689U (en) A construction fence
CN204475977U (en) A kind of chromatic steel sandwich plate enclosing
CN207812978U (en) A kind of heavy grade Sloping roof concreting job platform
HUE025912T2 (en) A support member assembly
KR20200117824A (en) A Study on the Hypothesis Tread Plates for Framed Construction
CN220599427U (en) Combined invisible guardrail assembly
CN105888220A (en) Scaffold structure
CN201053208Y (en) Temporary safety railing galvanized steel pipe buckle

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120613