[go: up one dir, main page]

CN102493430A - Method for prevention and emergency treatment of soil geological hazards - Google Patents

Method for prevention and emergency treatment of soil geological hazards Download PDF

Info

Publication number
CN102493430A
CN102493430A CN201110390417XA CN201110390417A CN102493430A CN 102493430 A CN102493430 A CN 102493430A CN 201110390417X A CN201110390417X A CN 201110390417XA CN 201110390417 A CN201110390417 A CN 201110390417A CN 102493430 A CN102493430 A CN 102493430A
Authority
CN
China
Prior art keywords
soil
treatment
fluoride
emergency
hours
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110390417XA
Other languages
Chinese (zh)
Other versions
CN102493430B (en
Inventor
邓云
杜联祥
Original Assignee
方文盛
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 方文盛 filed Critical 方文盛
Priority to CN201110390417.XA priority Critical patent/CN102493430B/en
Publication of CN102493430A publication Critical patent/CN102493430A/en
Application granted granted Critical
Publication of CN102493430B publication Critical patent/CN102493430B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Abstract

本发明涉及一种预防和应急处理土壤地质危害的方法,属于地质危害处理技术领域。该方法首先在土壤中加入氟化剂、石灰、水泥和粉煤灰,将各组分按比例与土壤相拌合,或者将上述各组分溶于水中,以水溶液按比例浇入土壤中,或者以溶液或悬浮液形式压力注入受损土体中;反应10小时~24小时。本发明可以应用到广泛的土体山坡和路基地基以及河堤,大坝,沟渠和堰塘土壤的应急处理,预防处理和永久修复处理。可应用在应急加固稳定在崩塌边缘的土堤山坡和大坝,修复公路,铁路,机场,和建筑结构的土基,也可以应急或永久预防和处理/修复土基中因环境因素变化而生成钙矾石或类似矿物质对基础设施的破坏。The invention relates to a method for preventing and emergency treating soil geological hazards, belonging to the technical field of geological hazards treatment. The method firstly adds fluorinating agent, lime, cement and fly ash to the soil, and mixes each component with the soil in proportion, or dissolves the above-mentioned components in water, and pours the water solution into the soil in proportion, Or pressure injection into the damaged soil in the form of solution or suspension; react for 10 hours to 24 hours. The invention can be applied to the emergency treatment, preventive treatment and permanent restoration treatment of extensive soil slopes and roadbed foundations, as well as embankments, dams, ditches and weir pond soils. It can be applied to emergency reinforcement and stabilization of earth embankment hillsides and dams on the edge of collapse, repairing the soil foundation of roads, railways, airports, and building structures, and can also be used for emergency or permanent prevention and treatment/repair of soil foundations caused by changes in environmental factors Damage to infrastructure by ettringite or similar minerals.

Description

一种预防和应急处理土壤地质危害的方法A Method for Preventing and Emergency Handling of Soil Geological Hazards

技术领域 technical field

本发明涉及一种预防和应急处理土壤地质危害的方法,属于地质危害处理技术领域。The invention relates to a method for preventing and emergency treating soil geological hazards, belonging to the technical field of geological hazards treatment.

背景技术 Background technique

膨胀土和软土的分布十分广泛,世界上40多个国家均有分布,我国每个省,市,自治区都有膨胀土和软土存在。我国每年由于膨胀土地基损坏而致害的建筑面积达1000万平方米以上,公路及铁路受其危害的程度尤为严重。因膨胀土对天然环境、社会以及基础建设设施的破坏作用(如滑坡,泥流,路面的开裂、隆起或沉陷,建筑物基础因膨胀土季节性胀缩而移位和断裂,进而引起建筑物墙面开裂等等)具有反复性和长期潜在危害性,据不完全统计,仅中国每年因膨胀土造成的经济损失就达150亿美元。因此,治理膨胀土的危害,以确保工程安全与质量一直困扰着工程界,是世界公认的重大技术难题。常见的地质危害包括:a.河堤和土坝由于水流的冲刷而引起的坍塌崩溃;b.大雨和地震后的山体滑坡;c.公路,铁路,机场和建筑物下的土基的损坏。Expansive soil and soft soil are widely distributed in more than 40 countries in the world. Expansive soil and soft soil exist in every province, city, and autonomous region in my country. In our country, the building area caused by damage to the expansive soil foundation reaches more than 10 million square meters every year, and the degree of damage to highways and railways is particularly serious. Due to the destructive effect of expansive soil on the natural environment, society and infrastructure (such as landslides, mud flows, cracking, uplift or subsidence of the road surface, the displacement and fracture of the foundation of the building due to the seasonal expansion and contraction of the expansive soil, which in turn causes the building Cracks on the wall, etc.) have repetitive and long-term potential hazards. According to incomplete statistics, the economic loss caused by expansive soil in China alone reaches 15 billion U.S. dollars every year. Therefore, controlling the hazards of expansive soils to ensure engineering safety and quality has been perplexing the engineering community and is a major technical problem recognized worldwide. Common geological hazards include: a. The collapse and collapse of embankments and earth dams due to the erosion of water flow; b. Landslides after heavy rain and earthquakes; c. Damage to roads, railways, airports and soil foundations under buildings.

膨胀土和软土常常引发上述的地质危害。膨胀土吸水则体积膨涨,密度变小,失水则变干,收缩,变硬。这一特性使富含膨胀土和软土的地带/土体成为容易带来地质灾害的发生地。基建设施常因其存在而发生开裂,沉陷,坍塌等破坏。我国每个省,市,自治区都有膨胀土和软土存在,每年汛期来临时,常常出现山体或道路基础的土壤流失带来的灾害或破坏损失,给当地的生命财产安全和经济带来巨大的损失。另一个常见危害是勘探中漏掉的软土,其微弱的承载力常常带来局部损坏。解决治理膨胀土/软土这一世界公认的重大技术难题对加速我国现代化基础设施建设,保护人民生命财产和国家财产是十分重要和紧急的。Expansive soils and soft soils often cause the above-mentioned geological hazards. When expansive soil absorbs water, it expands in volume and becomes less dense, and when it loses water, it becomes dry, shrinks, and hardens. This feature makes the zone/soil rich in expansive soil and soft soil a place that is prone to geological disasters. Infrastructure facilities often suffer from cracking, subsidence, collapse and other damages due to their existence. There are expansive soils and soft soils in every province, city, and autonomous region in my country. When the flood season comes every year, disasters or damages caused by soil loss of mountains or road foundations often occur, which brings huge losses to the local life and property safety and economy. Loss. Another common hazard is soft soils missed during exploration, whose poor bearing capacity often leads to localized damage. It is very important and urgent to solve the world-recognized major technical problem of treating expansive soil/soft soil to accelerate the construction of modern infrastructure in my country and protect people's lives and property as well as national property.

膨胀土路基处理方法通常采用以下三种:(1)改性土壤;(2)控制湿度;(3)换土。一般来说,必须对土壤进行物理和化学改性才能满足工程需要。人类的绝大多数的建筑土木结构都是建立在土壤上的。然而,土壤本身并不一定是一种好的建筑材料,因为土壤本身没有较高的抗拉和抗压强度,而且土壤本身的体积稳定性也较差,因此环境的变化,包括各种自然灾害,会给土壤带来破坏。物理改性主要是通过提高土壤的密度来改善土壤的力学性能;化学改性是在土壤中加入改性材料通过化学反应以改变土壤颗粒的结构,物理和化学性能。利用石灰、水泥类或其他固化材料,通过与膨胀土进行物理化学作用来实现对膨胀土的改性处理,以达到增强膨胀土强度,降低遇水膨胀的体积不稳定性的目的。目前,使用石灰对膨胀土固化稳定处理的方法,在施工实践中较为普遍且受欢迎,但是,用石灰来处理膨胀土时也有难题,当土壤硫酸盐含量高过8000ppm时,使用石灰会引起比不用时更大的膨胀。这种情况下,现在在国外(如美国)的实践是禁止使用石灰来稳定富含硫酸盐的土壤。另外,石灰在土壤被水浸泡时容易流失,效果不易持久。由于在工程实践中不可能完全了解把握相关土壤的全部特性,地质危害仍不断发生。其它的化学改性方法也不太适合地质危害的应急处理。控制湿度方法,包括预湿土壤以及试图控制和稳定土壤的含水量,或者,试图阻拦土壤颗粒与周围水分的接触,以减少土壤的膨胀,例如聚合物稳定剂的使用。聚合物稳定剂需要和土壤拌合;酸性稳定剂没有长期稳定效果。当石灰和磨细高炉矿渣一起使用时相对有效,但是所需的反应时间过长,并不适用于应急处理。膨胀土路基建设中换土处理是相对简单且有效的方法。换土就是挖除原有的膨胀土,填充沙砾土或其他非膨胀土,换土深度则需要根据原生膨胀土的物化特性以及当地的气候特点确定。The following three methods are usually used for expansive soil subgrade treatment: (1) modifying soil; (2) controlling humidity; (3) replacing soil. In general, physical and chemical modification of the soil is necessary to meet engineering needs. The vast majority of human buildings and civil structures are built on soil. However, the soil itself is not necessarily a good building material, because the soil itself does not have high tensile and compressive strength, and the volume stability of the soil itself is also poor, so changes in the environment, including various natural disasters , causing damage to the soil. Physical modification is mainly to improve the mechanical properties of soil by increasing the density of soil; chemical modification is to add modified materials to soil to change the structure, physical and chemical properties of soil particles through chemical reactions. Using lime, cement or other solidification materials to achieve the modification of expansive soil through physical and chemical interaction with expansive soil, so as to achieve the purpose of enhancing the strength of expansive soil and reducing the volume instability of water swelling. At present, the method of using lime to solidify and stabilize expansive soil is more common and popular in construction practice. However, there are also difficulties when using lime to treat expansive soil. Greater swell when not in use. In this case, the current practice in foreign countries (such as the United States) is to prohibit the use of lime to stabilize sulphate-rich soils. In addition, lime is easy to lose when the soil is soaked in water, and the effect is not easy to last. Because it is impossible to fully understand and grasp all the characteristics of relevant soils in engineering practice, geological hazards still occur continuously. Other chemical modification methods are not suitable for emergency treatment of geological hazards. Moisture control methods, including pre-wetting the soil and attempting to control and stabilize the soil moisture content, or, attempting to block soil particles from contact with surrounding moisture to reduce soil swelling, such as the use of polymeric stabilizers. Polymer stabilizers need to be mixed with the soil; acid stabilizers have no long-term stabilizing effect. Lime is relatively effective when used with finely ground blast furnace slag, but the reaction time required is too long to be suitable for emergency treatment. Soil replacement is a relatively simple and effective method in expansive soil subgrade construction. Soil replacement is to dig out the original expansive soil and fill it with gravel soil or other non-expansive soil. The depth of soil replacement needs to be determined according to the physical and chemical characteristics of the original expansive soil and the local climate characteristics.

另一类常见的例子是年久失修的水利设施。当河堤,大坝,沟渠,堰塘中的土壤在长期的水流冲刷,浸泡和虫蚁吞噬之下,密度会降低,而且其中的部分的粘合剂(cementing agent),如硫酸钙,也会流失。当暴雨和洪水来临时,倒塌现象就可能会发生。目前常采用的方法是添土加固。但添土加固的缺点在于费用大,工期长,不适合用于紧急情况,而且施工安全不能保障。同样,修补地基时的灌浆等方法花费比较大。Another common example is water facilities that are in a state of disrepair. When the soil in embankments, dams, ditches, and weir ponds is washed by long-term water, soaked and swallowed by insects and ants, the density will decrease, and some of the cementing agents, such as calcium sulfate, will also will be lost. When heavy rains and floods come, collapses can happen. The commonly used method is to add soil reinforcement. However, the disadvantage of adding soil reinforcement is that it costs a lot, the construction period is long, it is not suitable for emergency situations, and the construction safety cannot be guaranteed. Similarly, methods such as grouting when repairing the foundation are relatively expensive.

当房屋大楼地基建立在膨胀土/软土上时,如果地下水位发生变化,可使土壤承载力下降,或者天然环境条件造成土壤中生成高膨胀性的钙矾石,即可能引起基础移动倾斜,进而引起房屋建筑物发生倾斜,使建筑物墙体损坏,严重的时候会使得房屋不能使用。目前常用的处理方法是通过灌浆等方法来修补基础地基。When the foundation of a building is built on expansive soil/soft soil, if the groundwater level changes, the soil bearing capacity will decrease, or the natural environmental conditions will cause the formation of highly expansive ettringite in the soil, which may cause the foundation to move and tilt. In turn, it will cause the building to tilt, damage the wall of the building, and in severe cases, the house will be unusable. At present, the commonly used treatment method is to repair the foundation foundation by grouting and other methods.

发明内容 Contents of the invention

本发明的目的是提出一种预防和应急处理土壤地质危害的方法,利用无机化学反应,使用储量丰富的矿物质或是只需简单工艺生产的无机化合物,以快速稳定和增强地基土壤,使基础或地基恢复原位,防止房屋倾斜或结构性开裂的继续发展;或者预防和应急处理防止地表土壤(包括山体)流失,保护人民生命财产的安全。The purpose of this invention is to propose a method for preventing and emergency treatment of soil geological hazards, using inorganic chemical reactions, using minerals with abundant reserves or inorganic compounds produced by simple processes, to quickly stabilize and strengthen the foundation soil, and make the foundation Or the foundation is restored to its original position to prevent the building from tilting or the continued development of structural cracks; or prevention and emergency treatment to prevent the loss of surface soil (including mountains) and protect the safety of people's lives and property.

本发明提出的预防和应急处理土壤危害的方法,对于稳定和增强地基土壤处理,其过程包括以下步骤:The method for the prevention and emergency treatment of soil hazards proposed by the present invention, for stabilizing and strengthening foundation soil treatment, its process comprises the following steps:

(1)在土壤中加入氟化剂、石灰、水泥和粉煤灰,其中加入各组分占土壤的重量百分比为:(1) add fluorinating agent, lime, cement and fly ash in soil, wherein add each component and account for the weight percentage of soil is:

Figure BDA0000114744440000021
Figure BDA0000114744440000021

(2)将上述各组分按比例与土壤相拌合,或者将上述各组分按比例溶于水中,以水溶液或悬浮液浇入土壤中;(2) Mix the above-mentioned components with the soil in proportion, or dissolve the above-mentioned components in water in proportion, and pour them into the soil with aqueous solution or suspension;

(3)反应10小时~24小时。(3) React for 10 hours to 24 hours.

本发明提出的预防和应急处理土壤地质危害的方法,对于土工结构如河堤、大坝、沟渠、堰塘和土坡等地质灾害的应急处理,或者对于发生一次或再生土壤流失地质灾害的危机应急处理,其过程包括以下步骤:The method for the prevention and emergency treatment of soil geological hazards proposed by the present invention is for the emergency treatment of geotechnical structures such as embankments, dams, ditches, weir ponds and soil slopes, or for the crisis of once or regenerated soil loss geological disasters Emergency treatment, the process includes the following steps:

(1)在土壤中加入氟化剂、石灰、水泥和粉煤灰,其中加入各组分占土壤的重量百分比为:(1) add fluorinating agent, lime, cement and fly ash in soil, wherein add each component and account for the weight percentage of soil is:

Figure BDA0000114744440000031
Figure BDA0000114744440000031

(2)将上述各组分以溶液或悬浮液形式压力注入受损土体中;(2) Pressure injection of the above-mentioned components into the damaged soil in the form of solution or suspension;

(3)反应10小时~24小时。(3) React for 10 hours to 24 hours.

上述两种方法中,所加的氟化剂可以为以下三种形式中的任何一种:In the above two methods, the added fluorinating agent can be any of the following three forms:

a:氟化钠a: sodium fluoride

b:氟化钾b: Potassium fluoride

c:氟化钠或氟化钾与氟化钙的混合物,混合的重量百分比为:(氟化钠或氟化钾)∶氟化钙=70%∶30%。c: a mixture of sodium fluoride or potassium fluoride and calcium fluoride, the weight percentage of mixing is: (sodium fluoride or potassium fluoride): calcium fluoride = 70%: 30%.

本发明提出的一种预防和应急处理土壤地质危害的方法,拌入、渗入或注入可提供自由氟离子的含氟化合物添加剂,迅速提高粘土类土壤或膨胀土壤的强度,以消除膨胀土的遇水膨胀性。控制浓度的氟离子的体积小,因而可以快速迁移,与土壤中相关成分快速反应,使土壤提高承载能力和体积稳定性。在这一过程中,对大型机械器材的依赖非常少。因此本发明可以应用到广泛的土体山坡和路基地基以及河堤,大坝,沟渠和堰塘土壤的应急处理,预防处理和永久修复处理。可应用在应急加固稳定在崩塌边缘的土堤山坡和大坝,修复公路,铁路,机场,和建筑结构的土基,也可以应急或永久预防和处理/修复土基中因环境因素变化而生成钙矾石或类似矿物质对基础设施的破坏。A method for preventing and emergency treatment of soil geological hazards proposed by the present invention, mixing, infiltrating or injecting fluorine-containing compound additives that can provide free fluorine ions, rapidly improving the strength of clay soil or expansive soil, so as to eliminate the occurrence of expansive soil water swelling. Fluoride ions with a controlled concentration are small in size, so they can migrate quickly and react quickly with related components in the soil, so that the soil can improve its bearing capacity and volume stability. In this process, there is very little reliance on large mechanical equipment. Therefore, the present invention can be applied to emergency treatment, preventive treatment and permanent restoration treatment of extensive soil hillsides and roadbed foundations, as well as embankments, dams, ditches and weir pond soils. It can be applied to emergency reinforcement and stabilization of earth embankment hillsides and dams on the edge of collapse, repairing the soil foundation of roads, railways, airports, and building structures, and can also be used for emergency or permanent prevention and treatment/repair of soil foundations caused by changes in environmental factors Damage to infrastructure by ettringite or similar minerals.

具体实施方式 Detailed ways

本发明提出的预防和应急处理土壤危害的方法,对于稳定和增强地基土壤处理,其过程包括以下步骤:The method for the prevention and emergency treatment of soil hazards proposed by the present invention, for stabilizing and strengthening foundation soil treatment, its process comprises the following steps:

(1)在土壤中加入氟化剂、石灰、水泥和粉煤灰,其中加入各组分占土壤的重量百分比为:(1) add fluorinating agent, lime, cement and fly ash in soil, wherein add each component and account for the weight percentage of soil is:

Figure BDA0000114744440000032
Figure BDA0000114744440000032

(2)将上述各组分按比例与土壤相拌合,或者将上述各组分按比例溶于水中,以水溶液或悬浮液浇入土壤中;(2) Mix the above-mentioned components with the soil in proportion, or dissolve the above-mentioned components in water in proportion, and pour them into the soil with aqueous solution or suspension;

(3)反应10小时~24小时。(3) React for 10 hours to 24 hours.

本发明提出的预防和应急处理土壤地质危害的方法,对于土工结构如河堤、大坝、沟渠、堰塘和土坡等地质灾害的应急处理,或者对于发生一次或再生土壤流失地质灾害的危机应急处理,其过程包括以下步骤:The method for the prevention and emergency treatment of soil geological hazards proposed by the present invention is for the emergency treatment of geotechnical structures such as embankments, dams, ditches, weir ponds and soil slopes, or for the crisis of once or regenerated soil loss geological disasters Emergency treatment, the process includes the following steps:

(1)在土壤中加入氟化剂、石灰、水泥和粉煤灰,其中加入各组分占土壤的重量百分比为:(1) add fluorinating agent, lime, cement and fly ash in soil, wherein add each component and account for the weight percentage of soil is:

Figure BDA0000114744440000042
Figure BDA0000114744440000042

(2)将上述各组分以溶液或悬浮液形式压力注入受损土体中;(2) Pressure injection of the above-mentioned components into the damaged soil in the form of solution or suspension;

(3)反应10小时~24小时。(3) React for 10 hours to 24 hours.

上述两种方法中,所加的氟化剂可以为以下三种形式中的任何一种:In the above two methods, the added fluorinating agent can be any of the following three forms:

a:氟化钠a: sodium fluoride

b:氟化钾b: Potassium fluoride

c:氟化钠或氟化钾与氟化钙的混合物,混合的重量百分比为:(氟化钠或氟化钾)∶氟化钙=70%∶30%。c: a mixture of sodium fluoride or potassium fluoride and calcium fluoride, the weight percentage of mixing is: (sodium fluoride or potassium fluoride): calcium fluoride = 70%: 30%.

本发明提出的预防和应急处理土壤地质危害的方法,通过引入可释放氟离子的化合物添加剂,例如氟化钠,用以除去在膨胀土壤中因环境(如水分含量)变化所生成的钙矾石或类似矿物质,以减少在富含硫酸盐的土层的膨胀或损坏。本发明方法可应用于预防或应急修复或翻新公路、机场跑道、建筑物等基础损坏引起的表面的开裂、隆起或损坏,以及类似的建筑的基层或次基层由于钙矾石或类似矿物质的生成而引起基础局部抬起而损坏的情况。本发明方法也适用于维修已遭破坏的现有建筑的基础。对于用石灰或不用石灰稳定处理的土层,都可通过引入设定数量的释放氟离子的化合物添加剂来预防,减少或消除潜在的或已经发生的因膨胀引起的损坏或破坏。The method for the prevention and emergency treatment of soil geological hazards proposed by the present invention is to remove the ettringite generated in expansive soil due to changes in the environment (such as moisture content) by introducing a compound additive that can release fluoride ions, such as sodium fluoride or similar minerals to reduce swelling or damage in sulphate-rich soils. The method of the present invention can be applied to prevent or emergency repair or refurbish the surface cracking, uplift or damage caused by damage to foundations such as roads, airport runways, buildings, etc., and the base or sub-base of similar buildings due to the formation of ettringite or similar minerals The situation where the foundation is partially lifted and damaged due to generation. The method of the invention is also suitable for repairing the foundations of existing buildings which have been damaged. For soil layers stabilized with lime or without lime, it is possible to prevent, reduce or eliminate potential or existing damage or destruction caused by expansion by introducing a set amount of compound additives that release fluoride ions.

本发明方法具有很强的普遍使用性,即使土壤种类不同,也可以使用本发明的方法。本发明是将特定的材料添加到土壤中,添加方法可以是通过固体化合物或化合物溶液把氟离子释放到土壤中去,产生化学反应,从而达到加固土壤的目的。本发明方法中的氟化剂包括含氟无机化合物或者含氟无机化合物与其它常用的土壤稳定剂的混合物。常用的土壤稳定剂包括石灰,粉煤灰,水泥等。The method of the invention has strong universal applicability, even if the soil types are different, the method of the invention can also be used. The present invention adds specific materials to the soil, and the adding method can be to release fluoride ions into the soil through solid compounds or compound solutions to generate chemical reactions, thereby achieving the purpose of strengthening the soil. The fluorinating agent in the method of the present invention includes a fluorine-containing inorganic compound or a mixture of a fluorine-containing inorganic compound and other commonly used soil stabilizers. Commonly used soil stabilizers include lime, fly ash, cement, etc.

以下介绍本发明方法的实施例。Examples of the method of the present invention are described below.

实施例一Embodiment one

在修建公路的过程中,碰到一段软土需要拌和降塑和增强处理。经测试,土壤的塑性指标为18,而粉粒和粘粒的含量为20%,硫酸盐含量为0.1%,可以用本发明的以下几种方法之一进行处理:In the process of road construction, a section of soft soil needs to be mixed, plasticized and strengthened. After testing, the plasticity index of soil is 18, and the content of silt and clay is 20%, and sulfate content is 0.1%, can handle with one of following several methods of the present invention:

1、将氟化钠直接与土壤拌和,氟化钠用量为土壤重量的0.5%。掺水拌和后,进行分层夯实,每层厚度可达15厘米。在12小时后,可以进行下一步施工。1. Mix sodium fluoride directly with the soil, and the dosage of sodium fluoride is 0.5% of the soil weight. After mixing with water, carry out layer-by-layer compaction, and the thickness of each layer can reach 15 cm. After 12 hours, the next step of construction can be carried out.

2、混合使用含氟化合物和石灰,氟化物中,氟化钠和氟化钙的质量比为:氟化钠∶氟化钙=4∶1,石灰的用量为土壤的重量的5%,含氟化合物添加剂的用量为土壤重量的0.5%。掺水拌和后,进行分层夯实,每层厚度可达15厘米。在24小时后,可以进行下一步施工。2. Mixed use of fluorine-containing compounds and lime. Among fluorides, the mass ratio of sodium fluoride to calcium fluoride is: sodium fluoride: calcium fluoride = 4:1, and the amount of lime is 5% of the weight of the soil. The dosage of fluorine compound additive is 0.5% of soil weight. After mixing with water, carry out layer-by-layer compaction, and the thickness of each layer can reach 15 cm. After 24 hours, the next step of construction can be carried out.

3、混合使用氟化钾添加剂和水泥,水泥的用量为土壤重量的10%,氟化钾的用量为土壤重量的0.5%。掺水拌和后,进行分层夯实,每层厚度可达15厘米。在24小时后,可以进行下一步施工。3. Potassium fluoride additive and cement are mixed, the amount of cement is 10% of the weight of the soil, and the amount of potassium fluoride is 0.5% of the weight of the soil. After mixing with water, carry out layer-by-layer compaction, and the thickness of each layer can reach 15 cm. After 24 hours, the next step of construction can be carried out.

实施例二Embodiment two

在修建土坝的过程中,碰到一段软土需要拌和降塑和增强处理。经测试,土壤的塑性指标为18,而粉粒和粘粒的含量为29%,硫酸盐含量为0.08%,可以用本发明的以下方法之一进行处理:During the construction of the earth dam, a section of soft soil needs to be mixed to reduce plastic and strengthen. After testing, the plastic index of the soil is 18, while the content of silt and clay is 29%, and the sulfate content is 0.08%, which can be processed with one of the following methods of the present invention:

1、将氟化钠直接与土壤拌和,用量为土壤重量的0.7%。掺水拌和后,进行分层压实,每层厚度可达15到45厘米。在12小时后,可以进行下一步施工。1. Mix sodium fluoride directly with the soil, and the dosage is 0.7% of the soil weight. After mixing with water, it is compacted in layers, and the thickness of each layer can reach 15 to 45 cm. After 12 hours, the next step of construction can be carried out.

2、混合使用氟化钠和石灰,石灰的用量为土壤的重量的6%,氟化钠的用量为土壤重量的0.6%。掺水拌和后,进行分层压实,每层厚度可达15到45厘米。在24小时后,可以进行下一步施工。2. Sodium fluoride and lime are mixed, the consumption of lime is 6% of the weight of the soil, and the consumption of sodium fluoride is 0.6% of the weight of the soil. After mixing with water, it is compacted in layers, and the thickness of each layer can reach 15 to 45 cm. After 24 hours, the next step of construction can be carried out.

3、混合使用氟化钾和水泥,水泥的用量为土壤的重量的10%,氟化钾的用量为土壤重量的1.0%。掺水拌和后,进行分层压实,每层厚度可达15到45厘米。在24小时后,可以进行下一步施工。3. Potassium fluoride and cement are mixed, the amount of cement is 10% of the weight of the soil, and the amount of potassium fluoride is 1.0% of the weight of the soil. After mixing with water, it is compacted in layers, and the thickness of each layer can reach 15 to 45 cm. After 24 hours, the next step of construction can be carried out.

4、混合使用含氟化合物添加剂和粉煤灰,含氟化合物中,氟化钾和氟化钙的质量比为:氟化钾∶氟化钙=6∶1,粉煤灰用量为土壤重量的20%,氟化合物添加剂用量为土壤重量的0.5%。掺水拌和后,进行分层压实,每层厚度可达15到45厘米。在12小时后,可以进行下一步施工。实施例三4. Mixed use of fluorine-containing compound additives and fly ash. Among the fluorine-containing compounds, the mass ratio of potassium fluoride to calcium fluoride is: potassium fluoride: calcium fluoride = 6:1, and the amount of fly ash is the soil weight 20%, and the dosage of fluorine compound additive is 0.5% of the soil weight. After mixing with water, it is compacted in layers, and the thickness of each layer can reach 15 to 45 cm. After 12 hours, the next step of construction can be carried out. Embodiment Three

在修复房屋基础的过程中,碰到一段基础下的膨胀土需要稳定和增强处理。经测试,土壤的塑性指标为25,而粉粒和粘粒的含量为20%,硫酸盐含量为0.06%,可以用本发明的以下方法之一进行处理:In the process of repairing the foundation of the house, a section of expansive soil under the foundation needs to be stabilized and strengthened. After testing, the plasticity index of soil is 25, and the content of silt and clay is 20%, and sulfate content is 0.06%, can handle with one of following method of the present invention:

1、钻单孔或多孔,将饱和氟化钠溶液分次直接注入到膨胀土中,氟化物总用量为估计的膨胀土重量的1%。每次注入含氟化合物后(0.3%)封孔,观察房屋的向下沉降的程度。每两周一次,直到沉降稳定下来,或者用量达到了1.0%。1. Drill a single hole or multiple holes, inject saturated sodium fluoride solution directly into the expansive soil in stages, and the total amount of fluoride is 1% of the estimated weight of the expansive soil. After each injection of fluorine-containing compound (0.3%), the hole is sealed, and the degree of downward settlement of the house is observed. Every two weeks until settlement stabilizes or 1.0% is used.

2、钻单孔或多孔,将氟化钠添加剂和石灰饱和溶液分次分别直接注入到膨胀土中,氟化钠为膨胀土重量的1%,石灰的用量为膨胀土重量的10%。每次先注入氟化物后(0.3%)封孔,一周后再注入石灰溶液(3%),观察房屋的向下沉降的程度。每两周一循环,直到沉降稳定下来,或者氟化物用量达到了1.0%以及石灰的用量达到10%。2. Drill a single hole or a multi-hole, inject sodium fluoride additive and lime saturated solution directly into the expansive soil in stages, the sodium fluoride is 1% of the weight of the expansive soil, and the amount of lime is 10% of the weight of the expansive soil. Each time, inject fluoride (0.3%) to seal the holes, and then inject lime solution (3%) after one week to observe the degree of house sinking. Cycle every two weeks until sedimentation stabilizes or 1.0% fluoride and 10% lime are achieved.

实施例四Embodiment Four

在稳固出现裂缝、频临滑坡危险的山体时,需要对山体中的软土或膨胀土进行稳定和增强处理。经测试,土壤的塑性指标为15,而粉粒和粘粒的含量为30%,硫酸盐含量为0.01%,可以用本发明的以下方法之一进行处理:When stabilizing a mountain with cracks and danger of landslides, it is necessary to stabilize and strengthen the soft soil or expansive soil in the mountain. After testing, the plastic index of the soil is 15, and the content of silt and clay is 30%, and the sulfate content is 0.01%, which can be processed with one of the following methods of the present invention:

1、仔细观察山体的开裂情况,记录下各个裂缝的位置和深度。选择深度大于30cm的裂缝注入氟化钾添加剂饱和溶液,直到溶液从裂缝中溢出为止。停止灌注,连续观测山体移动的情况。两周后再次注浆,直到山体移动稳定或是停止。1. Carefully observe the cracking of the mountain, and record the position and depth of each crack. Select a crack with a depth greater than 30cm and inject a saturated solution of potassium fluoride additive until the solution overflows from the crack. Stop the perfusion and continuously observe the movement of the mountain. Grouting was repeated two weeks later until the movement of the mountain stabilized or stopped.

2、仔细观察山体的开裂情况,记录下各个裂缝的位置和深度。选择深度大于30cm的裂缝分次注入氟化钠和石灰饱和溶液。先注入氟化钠添加剂饱和溶液,直到溶液从裂缝中溢出为止。一周后,再注入氟化钠和石灰饱和溶液,直到溶液从裂缝中溢出为止。停止灌注,连续观测山体移动的情况。一周后再次开始注浆过程,直到山体移动稳定或是停止。2. Carefully observe the cracking of the mountain, and record the position and depth of each crack. Select cracks with a depth greater than 30cm and inject sodium fluoride and lime saturated solution in stages. Inject a saturated solution of sodium fluoride additive until the solution overflows from the crack. A week later, inject a saturated solution of sodium fluoride and lime until the solution overflows from the crack. Stop the perfusion and continuously observe the movement of the mountain. Start the grouting process again a week later until the movement of the mountain stabilizes or stops.

实施例五Embodiment five

膨胀土等因素引起的路面鼓起或塌陷不仅会带来驾驶的不舒适,而且会威胁行车安全。目前没有较好的处理方法,只能是把鼓起的路面磨平,但是这样会减少路面的使用寿命。在这种情况下,可以用本发明的以下方法之一进行处理:Pavement swelling or subsidence caused by expansive soil and other factors will not only bring driving discomfort, but also threaten driving safety. At present, there is no better way to deal with it, only to smooth the bulging road surface, but this will reduce the service life of the road surface. In this case, one of the following methods of the present invention can be used for processing:

1、在路面鼓起的部分钻孔,孔径为1厘米,间距约1米。钻孔要钻透软土或膨胀土,或者至少要钻到两米深。注入氟化钠饱和溶液,直到路面高度。用铁板或其它承载物盖住钻孔,恢复通车。一周后测量路面高度的变化。如果变化不大,移开铁板,继续注入氟化钠饱和溶液的操作。1. Drill holes in the bulging part of the road surface with a diameter of 1 cm and a distance of about 1 meter. Boreholes are drilled through soft or expansive soils, or at least to a depth of two meters. Inject sodium fluoride saturated solution up to road level. Cover the borehole with an iron plate or other bearings and resume traffic. The change in pavement height was measured after one week. If there is little change, remove the iron plate and continue to inject the saturated sodium fluoride solution.

2、在路面鼓起的部分钻孔,孔径为1厘米,间距约1米。钻孔要钻透软土或膨胀土,或者至少要钻到两米深。注入氟化合物添加剂和石灰的饱和混合溶液,直到路面高度。氟化物中,氟化钾和氟化钙的质量比为:氟化钾∶氟化钙=8∶1,用铁板或其它承载物盖住钻孔,恢复通车。一周后测量路面高度的变化。如果变化不大,移开铁板,继续注入注入氟化合物添加剂和石灰的混合溶液的操作。2. Drill holes in the bulging part of the road surface with a diameter of 1 cm and a distance of about 1 meter. Boreholes are drilled through soft or expansive soils, or at least to a depth of two meters. Inject a saturated mixed solution of fluorochemical additives and lime up to the pavement level. Among the fluorides, the mass ratio of potassium fluoride to calcium fluoride is: potassium fluoride: calcium fluoride = 8:1. Cover the borehole with an iron plate or other load-bearing objects and resume traffic. The change in pavement height was measured after one week. If there is little change, remove the iron plate and continue to inject the mixed solution of fluorine compound additive and lime.

Claims (3)

1. the method for prevention and emergency processing soil geology harm is characterized in that this method may further comprise the steps:
(1-1) in soil, add fluorization agent, lime, cement and flyash, the percentage by weight that wherein adds each ingredients constitute soil is:
Figure FDA0000114744430000011
(1-2) with above-mentioned each component in proportion with soil mix mutually, perhaps that above-mentioned each component is soluble in water, pour in the soil in proportion with the aqueous solution;
(1-3) reaction is 10 hours~24 hours.
2. the method for prevention and emergency processing soil geology harm is characterized in that this method may further comprise the steps:
(2-1) in soil, add fluorization agent, lime, cement and flyash, the percentage by weight that wherein adds each ingredients constitute soil is:
Figure FDA0000114744430000012
(2-2) above-mentioned each component is injected the impaired soil body with solution or form of suspension pressure;
(2-3) reaction is 10 hours~24 hours.
3. according to claim 1 or claim 2 method is characterized in that wherein said fluorization agent is any in following three kinds of forms:
A: sodium fluoride
B: potassium fluoride
C: the mixture of sodium fluoride or potassium fluoride and calcirm-fluoride, the percentage by weight of mixing is: (sodium fluoride or potassium fluoride): calcirm-fluoride=70%: 30%.
CN201110390417.XA 2011-11-30 2011-11-30 Method for prevention and emergency treatment of soil geological hazards Expired - Fee Related CN102493430B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110390417.XA CN102493430B (en) 2011-11-30 2011-11-30 Method for prevention and emergency treatment of soil geological hazards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110390417.XA CN102493430B (en) 2011-11-30 2011-11-30 Method for prevention and emergency treatment of soil geological hazards

Publications (2)

Publication Number Publication Date
CN102493430A true CN102493430A (en) 2012-06-13
CN102493430B CN102493430B (en) 2014-05-28

Family

ID=46185286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110390417.XA Expired - Fee Related CN102493430B (en) 2011-11-30 2011-11-30 Method for prevention and emergency treatment of soil geological hazards

Country Status (1)

Country Link
CN (1) CN102493430B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106350072A (en) * 2016-08-05 2017-01-25 太仓市粮满仓土肥服务专业合作社 Soil remediation agent

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1363531A (en) * 2002-02-07 2002-08-14 大庆油田建设设计研究院 Slurry consolidation agent
WO2008152855A1 (en) * 2007-06-08 2008-12-18 Irie, Masaaki Soil modification technique and soil shielding technique
CN101440617A (en) * 2007-11-21 2009-05-27 武汉双博新技术有限公司 High strength powder soil curing agent and use thereof in highway construction
JP2011036846A (en) * 2009-08-17 2011-02-24 Natoo Kenkyusho:Kk Method of manufacturing moisture adsorbent, and moisture adsorbent

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1363531A (en) * 2002-02-07 2002-08-14 大庆油田建设设计研究院 Slurry consolidation agent
WO2008152855A1 (en) * 2007-06-08 2008-12-18 Irie, Masaaki Soil modification technique and soil shielding technique
CN101440617A (en) * 2007-11-21 2009-05-27 武汉双博新技术有限公司 High strength powder soil curing agent and use thereof in highway construction
JP2011036846A (en) * 2009-08-17 2011-02-24 Natoo Kenkyusho:Kk Method of manufacturing moisture adsorbent, and moisture adsorbent

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106350072A (en) * 2016-08-05 2017-01-25 太仓市粮满仓土肥服务专业合作社 Soil remediation agent

Also Published As

Publication number Publication date
CN102493430B (en) 2014-05-28

Similar Documents

Publication Publication Date Title
Archibong et al. A review of the principles and methods of soil stabilization
US4084381A (en) Stabilization of earth subsurface layers
Pan et al. Research progress on in-situ protection status and technology of earthen sites in moisty environment
CN105926633A (en) Method for protecting surrounding soil or building in foundation pit construction
Millet et al. USA practice slurry wall specifications 10 years later
Onyelowe Soil stabilization techniques and procedures in the developing countries-Nigeria
CN106087880B (en) A kind of dam that 300 meter level is high and its construction technology
CN208777297U (en) A foundation structure combined with pile foundation after in-situ solidification of silt and soft soil layer
CN104293354B (en) A kind of anti-thin power soil stabilizer and preparation method and application
CN102493430A (en) Method for prevention and emergency treatment of soil geological hazards
CN112813756A (en) Roadbed based on municipal soft soil and construction method
CN106223307B (en) A kind of physically improved method for combining reduction swelled ground Expansion Potential with load
US3799787A (en) Admixtures for filling natural and artificial subterranean voids
Zahra Review on Properties and Applications of Grouting Technique
CN207109877U (en) A kind of new concrete anti-corrosion foundation pile
CN107447720B (en) A kind of village Lower Reaches of The Yellow River Kuan Tanqu platform method
KR102701524B1 (en) METHOD FOR MARINE LAND RECLAMATION by SMARTSOIL USING SOFT SOIL LIKE CLAY AND SILT IN SEA FOR PREVENTING LAND SETTLEMENT
JPS609171B2 (en) How to build a continuous water-stop wall
Dixit et al. Rajasthan
Fatani et al. Foundations on salt bearing soils of Jizan
Subbotin et al. Improving the efficiency of foundation construction in permafrost conditions on the example of the use of geopolymer materials
Rajpura et al. Review of Industrial Waste Used In Stabilization of Expansive Soil in Road Subgrade
CN108708371A (en) A kind of seepage proof curtain concrete composite pile and its construction method
CN108612119A (en) A kind of construction method of high-pressure rotary-spray seepage proof curtain
Moh et al. A small hole could become really big

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140528