[go: up one dir, main page]

CN102438287B - Method for shutting off cells - Google Patents

Method for shutting off cells Download PDF

Info

Publication number
CN102438287B
CN102438287B CN201110373355.1A CN201110373355A CN102438287B CN 102438287 B CN102438287 B CN 102438287B CN 201110373355 A CN201110373355 A CN 201110373355A CN 102438287 B CN102438287 B CN 102438287B
Authority
CN
China
Prior art keywords
cell
handover request
community
capacity
coverage cell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110373355.1A
Other languages
Chinese (zh)
Other versions
CN102438287A (en
Inventor
卫琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Haiyun Technology Co ltd
Original Assignee
New Postcom Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New Postcom Equipment Co Ltd filed Critical New Postcom Equipment Co Ltd
Priority to CN201110373355.1A priority Critical patent/CN102438287B/en
Publication of CN102438287A publication Critical patent/CN102438287A/en
Application granted granted Critical
Publication of CN102438287B publication Critical patent/CN102438287B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. Transmission Power Control [TPC] or power classes
    • H04W52/02Power saving arrangements
    • H04W52/0203Power saving arrangements in the radio access network or backbone network of wireless communication networks
    • H04W52/0206Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/70Reducing energy consumption in communication networks in wireless communication networks

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本发明提供了一种关断小区的方法,该方法通过限制覆盖小区在从收到一容量提升小区发送的切换请求开始到收到该小区发送的休眠通知消息为止这一时间段,接受其他容量提升小区用于进行小区关断的切换请求,能避免多个小区同时关断所致的关断失败问题。

The present invention provides a method for shutting down a cell. The method limits the covered cell to accept other capacity during the time period from receiving a handover request sent by a capacity boosting cell to receiving a dormancy notification message sent by the cell. Upgrading the handover request used by the cell for cell shutdown can avoid the problem of shutdown failure caused by simultaneous shutdown of multiple cells.

Description

一种关断小区的方法A method of shutting down a cell

技术领域 technical field

本发明涉及移动通信系统中的小区管理技术,特别是涉及一种关断小区的方法。The invention relates to cell management technology in a mobile communication system, in particular to a method for shutting down a cell.

背景技术 Background technique

在现有的能量节约(Energy Saving,简称ES)机制中,为了实现能量节约,可以采用特定的机制来关断某些小区的射频(RF),以减少无线信号污染。比如,白天,办公地区的人员增加,业务量增大,而住宅区的人数减少;晚上则相反。就可以在白天关断一部分住宅区的小区的RF,晚上再开启;而晚上关断一部分办公地区的小区的RF,白天再开启。In the existing energy saving (Energy Saving, ES for short) mechanism, in order to realize energy saving, a specific mechanism may be adopted to turn off the radio frequency (RF) of some cells, so as to reduce wireless signal pollution. For example, during the day, the number of people in the office area increases and the business volume increases, while the number of people in the residential area decreases; the opposite is true at night. It is possible to turn off the RF of some residential areas during the day and turn it on again at night; and turn off the RF of some office areas at night and turn it on again during the day.

目前常用的ES机制应用场景有两种,一种为异系统(Inter-RAT)ES场景,如图1所示,由2G、3G的小区A和B组成无缝覆盖的网络,在其中的热点区域布置E-UTRAN小区C、D、E、F、G为容量提升小区,以增大系统容量和提供特定的LTE服务。另一种为演进的NodeB之间(Inter-eNB)ES场景,如图2所示,覆盖小区和容量提升小区均为E-UTRAN小区,小区A和B提供基本覆盖,小区C、D、E、F、G为布置在热点地区的容量提升小区。Currently, there are two commonly used ES mechanism application scenarios. One is the inter-RAT ES scenario. As shown in Figure 1, a seamless coverage network is composed of 2G and 3G cells A and B. The hotspots in the Regional deployment E-UTRAN cells C, D, E, F, and G are capacity-enhancing cells to increase system capacity and provide specific LTE services. The other is the evolved inter-NodeB (Inter-eNB) ES scenario, as shown in Figure 2, the coverage cell and the capacity enhancement cell are both E-UTRAN cells, cells A and B provide basic coverage, and cells C, D, and E , F, and G are capacity-enhancing cells arranged in hot spots.

在ES机制中,只有容量提升小区可以被关断/激活。现在已经采纳的基于信令的ES机制为:In the ES mechanism, only capacity boost cells can be switched off/activated. The currently adopted signaling-based ES mechanisms are:

关断由容量提升小区基于负荷判断,满足条件后将本小区的用户切换到覆盖小区,向邻基站发送配置更新消息(休眠通知消息),进入休眠状态。Shutting down the capacity-enhanced cell is judged based on the load. After the conditions are met, the users in this cell are switched to the coverage cell, and a configuration update message (sleep notification message) is sent to the neighboring base station to enter the dormant state.

激活由覆盖小区基于负荷判断,满足条件后向容量提升小区发送激活请求,容量提升小区回复激活响应,并用配置更新消息通知其它邻基站。The activation is judged by the coverage cell based on the load. After the condition is satisfied, an activation request is sent to the capacity enhancement cell. The capacity enhancement cell replies with an activation response and notifies other neighboring base stations with a configuration update message.

图3为一简单的应用ES机制的网络示意图,在图3中,小区1是覆盖小区,小区2和小区3是容量提升小区。下面以图3为例,对目前ES机制的具体实现进行说明。FIG. 3 is a schematic diagram of a simple network applying the ES mechanism. In FIG. 3 , Cell 1 is a coverage cell, and Cell 2 and Cell 3 are capacity enhancement cells. The following uses FIG. 3 as an example to describe the specific implementation of the current ES mechanism.

小区2的关断流程如图4示,主要包括:小区2根据自己以及小区1的负荷判断是否应该进行关断,满足下列条件后启动ES。The shutdown process of Cell 2 is shown in Figure 4, which mainly includes: Cell 2 judges whether to shut down according to its own load and that of Cell 1, and starts ES after the following conditions are met.

Loadload 22 << LL Loadload 11 ++ Loadload 22 << Hh

其中,Load i为小区i的负荷,L为小区最低负荷阈值,H为重新激活负荷阈值。Among them, Load i is the load of cell i, L is the minimum load threshold of the cell, and H is the reactivation load threshold.

根据上述条件,当小区2的负荷低于阈值L,并且当其将负荷切换到小区1时不满足重新激活条件H时进行关断,即决定进入休眠状态,然后通过向小区1发送原因为“准备关断”(switch off ongoing)的切换请求,将小区2的用户切换到小区1,切换完成后通知小区1进入休眠状态,并进入休眠状态。According to the above conditions, when the load of cell 2 is lower than the threshold L, and the reactivation condition H is not satisfied when it switches the load to cell 1, it will be shut down, that is, it will decide to enter the dormant state, and then send the reason to cell 1 by " Prepare to switch off" (switch off ongoing) handover request, switch the users in cell 2 to cell 1, notify cell 1 to enter the dormant state after the handover is completed, and enter the dormant state.

小区2的激活流程如图5所示,该激活过程主要包括:小区1根据监控到的负荷信息决定激活小区2,通知小区2激活,小区2根据该通知进入激活状态,并向小区1发送激活小区响应。The activation process of cell 2 is shown in Figure 5. The activation process mainly includes: cell 1 decides to activate cell 2 according to the monitored load information, notifies cell 2 of activation, cell 2 enters the activation state according to the notification, and sends an activation message to cell 1. Community response.

采用上述ES方案,当多个容量提升小区同时关断时可能会导致ES失败问题,进而导致用户的乒乓切换问题。如图3所示,假设小区2与小区3都满足了关断条件,即:Using the above-mentioned ES solution, when multiple capacity enhancement cells are shut down at the same time, ES failure may occur, which in turn leads to user ping-pong handover. As shown in Figure 3, it is assumed that cell 2 and cell 3 both meet the shutdown conditions, that is:

Loadload 22 << LL Loadload 11 ++ Loadload 22 << Hh

Loadload 33 << LL Loadload 11 ++ Loadload 33 << Hh

则两小区先后向小区1切换用户,并进入关断状态。然而小区2与小区3都将负荷切换到小区1后,小区1的负载可能又满足了激活条件,即:Then the two cells hand over users to cell 1 successively, and enter the shutdown state. However, after both cell 2 and cell 3 switch the load to cell 1, the load of cell 1 may meet the activation condition again, that is:

Load1+Load2+Load3>HLoad1+Load2+Load3>H

则当小区2和小区3关断之后,小区1不得不重新启动激活过程,这样导致了关断的失败和用户的乒乓切换。Then when cell 2 and cell 3 are shut down, cell 1 has to restart the activation process, which results in the failure of shutting down and the ping-pong handover of users.

发明内容 Contents of the invention

有鉴于此,本发明的主要目的在于提供一种关断小区的方法,该方法能避免多个小区同时关断所致的关断失败问题。In view of this, the main purpose of the present invention is to provide a method for shutting down a cell, which can avoid the problem of shutting down failure caused by simultaneous shutting down of multiple cells.

为了达到上述目的,本发明提出的技术方案为:In order to achieve the above object, the technical scheme proposed by the present invention is:

一种关断小区的方法,该方法包括以下步骤:A method for shutting down a cell, the method comprising the following steps:

当容量提升小区判决需要关断本小区并将本小区用户切换至覆盖小区时,向所述覆盖小区发送原因为准备关断的切换请求;When the capacity boosting cell judges that the cell needs to be shut down and the users in the cell are switched to the coverage cell, a handover request is sent to the coverage cell because the reason is preparation for shutdown;

所述覆盖小区收到所述切换请求时,判断当前是否处于能量节约阶段;When the coverage cell receives the handover request, it judges whether it is currently in the energy saving stage;

如果处于所述能量节约阶段,则所述覆盖小区通知发送所述切换请求的容量提升小区所述切换请求被拒绝,所述容量提升小区自收到所述通知时的预设时间T后,重新触发关断小区的判决及相关处理过程;If it is in the energy saving stage, the coverage cell notifies the capacity improvement cell that sent the handover request that the handover request is rejected, and the capacity improvement cell restarts after a preset time T when receiving the notification. Trigger the decision to shut down the cell and related processing procedures;

如果没有处于所述能量节约阶段,则所述覆盖小区向发送所述切换请求的容量提升小区发送切换请求响应消息,所述容量提升小区根据所述切换请求响应消息,继续完成本小区用户切换以及相应的休眠过程;If it is not in the energy saving stage, the coverage cell sends a handover request response message to the capacity enhancement cell that sent the handover request, and the capacity enhancement cell continues to complete user handover in the cell and The corresponding sleep process;

所述能量节约阶段包括覆盖小区自收到一个原因为准备关断的切换请求开始,到收到发送该切换请求的容量提升小区的休眠通知消息之时为止的时间段。The energy saving stage includes the time period from when the covered cell receives a handover request whose reason is to prepare for shutting down to when it receives a dormancy notification message from the capacity improvement cell sending the handover request.

综上所述,本发明提出的关断小区的方法,通过限制覆盖小区在从收到一容量提升小区发送的切换请求开始到收到该小区发送的休眠通知消息为止这一时间段,接受其他容量提升小区用于进行小区关断的切换请求,能避免多个小区同时关断所致的关断失败问题。To sum up, the method for shutting down the cell proposed by the present invention limits the coverage cell to accept other The capacity boosting cell is used for the handover request for cell shutdown, which can avoid the problem of shutdown failure caused by simultaneous shutdown of multiple cells.

附图说明 Description of drawings

图1为inter-RAT ES场景;Figure 1 shows the inter-RAT ES scenario;

图2为inter-eNB ES场景;Figure 2 is an inter-eNB ES scenario;

图3为现有的一简单的应用ES机制的网络示意图;FIG. 3 is a schematic diagram of an existing simple network applying the ES mechanism;

图4为现有的小区关断流程示意图;FIG. 4 is a schematic diagram of an existing cell shutdown process;

图5为现有的小区激活流程示意图;FIG. 5 is a schematic diagram of an existing cell activation process;

图6为本发明的主要流程示意图;Fig. 6 is a schematic flow diagram of the main process of the present invention;

图7为本发明实施例一的流程示意图。FIG. 7 is a schematic flowchart of Embodiment 1 of the present invention.

具体实施方式 Detailed ways

为使本发明的目的、技术方案和优点更加清楚,下面将结合附图及具体实施例对本发明作进一步地详细描述。In order to make the purpose, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

本发明的核心思想是:当有容量提升小区进行关断时,定义覆盖小区从收到切换请求开始,到收到发送切换请求的小区发送的休眠通知消息为止这一时间段为能量节约阶段,在该能量节约阶段,覆盖小区不能接纳其他小区的关断请求,即当再次收到其他小区发来的原因为“准备关断”(switch offongoing)的切换请求时,应拒绝其请求。被拒绝的小区需等待一段时间再触发关断。这样,即可防止多个小区同时关断,从而也可以避免由同时关断所致的关断失败问题。The core idea of the present invention is: when a cell with a capacity boost is turned off, define the time period from when the covered cell receives the handover request to when it receives the dormancy notification message sent by the cell sending the handover request as the energy saving stage, In this energy saving stage, the covered cell cannot accept the switch off request from other cells, that is, when it receives another handover request from another cell with the reason of "switch offongoing", it should reject the request. Rejected cells need to wait for a period of time before triggering shutdown. In this way, multiple cells can be prevented from being shut down at the same time, so that the problem of failure to shut down caused by simultaneous shutoff can also be avoided.

图6为本发明的主要流程示意图。如图6所示,本发明的关断小区的方法主要包括以下步骤:Fig. 6 is a schematic diagram of the main flow of the present invention. As shown in Figure 6, the method for shutting down the cell of the present invention mainly includes the following steps:

步骤601、当容量提升小区判决需要关断本小区并将本小区用户切换至覆盖小区时,向所述覆盖小区发送原因为准备关断的切换请求。Step 601. When the capacity enhancement cell decides that the cell needs to be shut down and the users in the cell are handed over to the coverage cell, a handover request is sent to the coverage cell because the reason is preparation for shutdown.

具体地,本步骤可以采用现有系统中的方法实现,在此不再赘述。Specifically, this step can be implemented by using a method in an existing system, which will not be repeated here.

需要说明的是,在实际应用中,如果容量提升小区判决需要关断本小区,但是本小区当前没有用户,则进行关断小区的处理中不需要进行用户的切换,直接发送休眠通知,并进入休眠状态即可,这样,由于不需要进行用户的切换,也就不会存在与其他容量提升小区同时进行关断小区时所存在的关断失败问题。It should be noted that, in practical applications, if the capacity enhancement cell decides that the cell needs to be shut down, but there are currently no users in the cell, the process of shutting down the cell does not need to perform user handover, and directly sends a dormancy notification and enters the The dormant state is enough. In this way, since there is no need for user handover, there will be no problem of failure to shut down when shutting down the cell at the same time as other capacity-enhancing cells.

步骤602、所述覆盖小区收到所述切换请求时,判断当前是否处于能量节约阶段。Step 602. When the covered cell receives the handover request, it judges whether it is currently in the energy saving stage.

所述能量节约阶段包括覆盖小区自收到一个原因为准备关断的切换请求开始,到收到发送该切换请求的容量提升小区发送的休眠通知消息之时为止的时间段。The energy saving stage includes a time period from when the covered cell receives a handover request whose reason is to prepare for shutdown to when it receives a dormancy notification message sent by the capacity improvement cell that sent the handover request.

这里,通过上述能量节约阶段,来确保覆盖小区在处理一个容量提升小区的所有用户切换过程中,仅处理该容量提升小区的用户切换。这样,就会有效避免多个小区同时进行关断小区而致的关断失败问题。Here, through the above energy saving stage, it is ensured that when the covered cell handles all user handovers of a capacity-improved cell, only the user handover of the capacity-improved cell is processed. In this way, the problem of shutdown failure caused by simultaneous shutdown of multiple cells can be effectively avoided.

进一步的,为了避免容量提升小区因为某些原因不再继续ES流程导致其他小区无法进行ES,可以设置一个等待阈值,覆盖小区自收到一个原因为准备关断的切换请求后的时间间隔达到该等待阈值,则结束能量节约阶段。Furthermore, in order to prevent other cells from being unable to perform ES due to some reasons that the capacity upgrading cell does not continue the ES process, a waiting threshold can be set. Waiting for the threshold, the energy saving phase ends.

为了实现上述目的,具体地,所述能量节约阶段还可以包括:覆盖小区自收到一个原因为准备关断的切换请求开始,到此后的时间长度达到预设的等待阈值但未接收到发送该切换请求的容量提升小区发送的休眠通知消息之时为止的时间段。In order to achieve the above purpose, specifically, the energy saving stage may further include: starting from receiving a handover request whose reason is that the covered cell is ready to be shut down, and then reaching a preset waiting threshold but not receiving the request to send the The time period until the capacity of the handover request is boosted by the dormancy notification message sent by the cell.

所述等待阈值的设置应大于一个小区完成所有用户切换所需的时间,具体可由本领域人员根据实际应用场景,通过仿真设置合适取值。The setting of the waiting threshold should be greater than the time required for a cell to complete all user handovers. Specifically, a person skilled in the art can set an appropriate value through simulation according to an actual application scenario.

步骤603、如果处于所述能量节约阶段,则所述覆盖小区通知发送所述切换请求的容量提升小区所述切换请求被拒绝,所述容量提升小区自收到所述通知时的预设时间T后,重新触发关断小区的判决及相关处理过程。Step 603: If it is in the energy saving stage, the coverage cell notifies the capacity improvement cell that sent the handover request that the handover request is rejected, and the capacity improvement cell has a preset time T since receiving the notification. After that, the decision to shut down the cell and related processing procedures are retriggered.

本步骤中,当覆盖小区处于能量节约阶段,则拒绝其他容量提升小区用于进行关断的切换请求,即隐式拒绝关断请求,通知发送该切换请求的其他容量提升小区其切换请求被拒绝,被拒绝的小区则可以过一段时间后再重新触发关断小区的判决及处理流程。如此,可有效避免两个容量提升小区同时进行关断所导致的诸多问题。In this step, when the covered cell is in the energy saving stage, reject the handover request of other capacity boosting cells for shutting down, that is, implicitly reject the shutting down request, and notify other capacity boosting cells that send the handover request that their handover request is rejected , the rejected cell can re-trigger the judgment and processing flow of shutting down the cell after a period of time. In this way, many problems caused by simultaneous shutdown of two capacity enhancement cells can be effectively avoided.

这里,被拒绝切换的容量提升小区需要等待时间T后再重新触发关断小区的判决及处理过程,以避免出现现有系统的关断失败问题。Here, the capacity enhancement cell whose handover is rejected needs to wait for a time T before re-triggering the judgment and processing process of shutting down the cell, so as to avoid the shutdown failure problem of the existing system.

对于该时间T,如果设置的过小会导致正在进行关断的小区不能完成所有用户的切换,这样就会导致被拒绝的小区频繁的发送切换请求,造成信令资源的浪费,为了使容量提升小区了解覆盖小区接纳其他小区用户之后的资源状态变化,T至少应该大于覆盖小区进行资源状态报告的周期的时间长度;反之,如果设置的过大,则会导致其他请求关断小区等待的时间过长,影响小区关断的效果,进而降低系统性能,在实际应用中,本领域技术人员可以根据实际应用场景,通过仿真确定一个能确保当前关断小区完成所有用户切换的合适取值。For this time T, if it is set too small, the cells that are being shut down will not be able to complete the handover of all users, which will cause the rejected cells to frequently send handover requests, resulting in waste of signaling resources. In order to improve the capacity The cell understands the resource status change after the coverage cell accepts users from other cells. T should be at least longer than the period of resource status reporting by the coverage cell; otherwise, if it is set too large, it will cause other requests to shut down the cell waiting time Long, affecting the effect of cell shutdown, thereby reducing system performance. In practical applications, those skilled in the art can determine an appropriate value through simulation that can ensure that all user handovers in the current shutdown cell are completed according to the actual application scenario.

具体的,所述关断本小区的判决及相关处理过程同现有系统,即包括:Specifically, the judgment and related processing procedures for shutting down the cell are the same as those of the existing system, including:

所述容量提升小区判断当前是否满足预设的关断条件,如果不满足所述关断条件,则退出所述方法,如果满足所述关断条件,则判断本小区当前的用户数是否为零,如果所述用户数为零,则向所述覆盖小区发送休眠通知消息,并进入休眠状态,如果所述用户数不为零,则向所述覆盖小区发送原因为准备关断的切换请求。The capacity boosting cell judges whether the preset shutdown condition is currently met, and if the shutdown condition is not met, then exit the method, and if the shutdown condition is met, then judge whether the current number of users in the cell is zero , if the number of users is zero, send a dormancy notification message to the covered cell and enter a dormant state, and if the number of users is not zero, send a handover request to the covered cell because the reason is preparation for shutdown.

这里,所述覆盖小区可以通过向发送所述切换请求的容量提升小区,发送原因为“目标小区没有可用无线资源”(No Radio Resources Available in TargetCell)的切换准备失败消息,来通知所述切换请求被拒绝。Here, the coverage cell may notify the handover request by sending a handover preparation failure message whose reason is "No Radio Resources Available in Target Cell" to the capacity boosting cell that sends the handover request be rejected.

步骤604、如果没有处于所述能量节约阶段,则所述覆盖小区向发送所述切换请求的容量提升小区发送切换请求响应消息,所述容量提升小区根据所述切换请求响应消息,继续完成本小区用户切换以及相应的休眠过程。Step 604: If not in the energy saving stage, the coverage cell sends a handover request response message to the capacity enhancement cell that sent the handover request, and the capacity enhancement cell continues to complete the cell according to the handover request response message User switching and the corresponding hibernation process.

本步骤,当覆盖小区当前没有处在能量节约阶段,则和现有系统一样,继续完成关断发送所述切换请求的容量提升小区的过程。本步骤的具体实现方法为本领域技术人员所已知,在此不再赘述。In this step, when the covered cell is not currently in the energy saving stage, the same as the existing system, continue to complete the process of shutting down the capacity improvement cell that sends the handover request. The specific implementation method of this step is known to those skilled in the art and will not be repeated here.

本发明实施例一将以图3所示的场景为例,对本发明的具体实现进行详细说明。该场景中,小区2和小区3处于激活状态。Embodiment 1 of the present invention will take the scene shown in FIG. 3 as an example to describe the specific implementation of the present invention in detail. In this scenario, cell 2 and cell 3 are active.

图7为该实施例的主要流程示意图。如图7所示,该实施例包括:Fig. 7 is a schematic flow diagram of the main process of this embodiment. As shown in Figure 7, this embodiment includes:

步骤701-702、小区2满足关断条件,向小区1发送切换请求;Steps 701-702, cell 2 meets the shutdown condition, and sends a handover request to cell 1;

步骤703、小区1向小区2发送切换请求响应;Step 703, cell 1 sends a handover request response to cell 2;

步骤704、小区2向小区1切换其他用户;Step 704, Cell 2 handovers other users to Cell 1;

步骤705-706、小区2向小区1发送休眠通知消息,通知进入休眠状态,之后小区2进入休眠状态;Steps 705-706, cell 2 sends a dormancy notification message to cell 1, notifying to enter the dormant state, and then cell 2 enters the dormant state;

步骤707-708、小区1从收到切换请求开始,到收到休眠通知消息为止是ES阶段。在这个阶段小区3也满足了关断条件,向小区1发送切换请求,小区1向小区3发送原因为″No Radio Resources Available in Target Cell″的切换准备失败消息;In steps 707-708, cell 1 is in the ES stage from receiving the handover request to receiving the dormancy notification message. At this stage, cell 3 also meets the shutdown condition, and sends a handover request to cell 1, and cell 1 sends to cell 3 a handover preparation failure message whose reason is "No Radio Resources Available in Target Cell";

步骤709-710、小区3等待一段时间后再次判断,如果仍满足关断条件则向小区1发送切换请求;Steps 709-710, cell 3 judges again after waiting for a period of time, and sends a handover request to cell 1 if the shutdown condition is still met;

步骤711、这时小区1已经结束了ES阶段,向小区3发送切换请求响应;Step 711, at this time cell 1 has finished the ES phase, and sends a handover request response to cell 3;

步骤712、小区3向小区1切换其他用户;Step 712, cell 3 switches other users to cell 1;

步骤713-714、小区3向小区1发送休眠通知消息,通知进入休眠状态,之后小区3进入休眠状态。In steps 713-714, cell 3 sends a dormancy notification message to cell 1, notifying the cell 1 of entering the dormancy state, and then cell 3 enters the dormancy state.

上述过程中,小区1(覆盖小区)的处理具体包括以下步骤:In the above process, the processing of cell 1 (coverage cell) specifically includes the following steps:

覆盖小区保存“ES小区”这个变量,初始化时将该变量置为无效,该变量用于记录ES阶段以及触发ES的小区;The coverage cell saves the variable "ES cell", which is set to invalid during initialization. This variable is used to record the ES stage and the cell that triggers ES;

当收到切换请求消息时,如果其切换原因为″switch off ongoing″,并且“ES小区”变量无效,则认为进入了ES阶段,将“ES小区”变量赋值为发送切换请求的小区,同时启动定时器TESWhen receiving the switching request message, if the switching reason is "switch off ongoing" and the "ES cell" variable is invalid, it is considered to have entered the ES stage, and the "ES cell" variable is assigned to the cell that sent the switching request, and at the same time, it starts Timer TES ;

此后,当收到切换请求消息时,如果其切换原因为″switch off ongoing″,并且“ES小区”变量有效,则认为两个小区要同时进行关断,为了避免这种情况,需要拒绝该切换请求;Afterwards, when a switch request message is received, if the switch reason is "switch off ongoing" and the "ES cell" variable is valid, it is considered that the two cells will be switched off at the same time. In order to avoid this situation, the switch needs to be rejected ask;

当收到“ES小区”发来的休眠通知消息时,认为ES阶段结束。将“ES小区”变量置为无效,停止TESWhen receiving the dormancy notification message from the "ES cell", it is considered that the ES phase is over. Set the "ES Cell" variable to invalid, and stop T ES .

上述过程中,TES定义了ES过程的最长时间,作用是避免发起ES的小区因为某些原因不再继续ES流程导致其他小区无法进行ES,当TES超时时应将“ES小区”变量置为无效。In the above process, T ES defines the maximum time of the ES process. Its function is to prevent the cell that initiates ES from not continuing the ES process for some reason, causing other cells to be unable to perform ES. When T ES times out, the "ES cell" variable should be set to deactivated.

容量提升小区(小区2和3)侧的方法为:The method to increase the capacity of the cells (cells 2 and 3) is as follows:

容量提升小区判断当前是否满足预设的关断条件;如果不满足所述关断条件,则退出;如果满足所述关断条件,则判断本小区当前的用户数是否为零;如果所述用户数为零,则向所述覆盖小区发送休眠通知消息,并进入休眠状态;如果所述用户数不为零,则向所述覆盖小区发送原因为准备关断的切换请求,之后如果收到了原因为″No Radio Resources Available in TargetCell″的切换准备失败消息,则等待时间T后再转入判断当前是否满足预设的关断条件步骤,否则继续按现有方法处理,完成后续关断本小区的流程。The capacity boosting cell judges whether the preset shutdown condition is currently met; if the shutdown condition is not met, exit; if the shutdown condition is met, then judge whether the current number of users in the cell is zero; if the user number is zero, then send a dormancy notification message to the covered cell, and enter the dormant state; if the number of users is not zero, then send a handover request that the reason is to be turned off to the covered cell, and then if the reason is received Prepare the failure message for the handover of "No Radio Resources Available in TargetCell", then wait for T and then turn to the step of judging whether the preset shutdown conditions are met, otherwise continue to process according to the existing method to complete the subsequent shutdown of the cell process.

综上所述,以上仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。To sum up, the above are only preferred embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (3)

1. a method for shutting off cells, is characterized in that, the method comprises the following steps:
In the time that capacity lifting community judgement need to be turn-offed this community and this community user is switched to coverage cell, sending reason to described coverage cell is to prepare the handover request of shutoff;
When described handover request is received in described coverage cell, judge current whether in the energy saving stage;
If in the described energy saving stage, described in the capacity lifting community of the described handover request of described coverage cell notice transmission, handover request is rejected, described capacity promotes after the preset time T of community in the time receiving described notice, again triggers judgement and the correlation procedure of turn-offing this community;
If not in the described energy saving stage, described coverage cell promotes community to the capacity that sends described handover request and sends handover request ack message, described capacity promotes community according to described handover request ack message, has continued the switching of this community user and corresponding sleep procedure;
The described energy saving stage comprises that coverage cell is from receiving that a reason is the handover request of preparing to turn-off, to the time period of receiving in the dormancy notification message of the capacity lifting community that sends this handover request;
Judgement and the correlation procedure of this community of described shutoff comprise:
Described capacity promotes community and judges the current default turn-off criterion that whether meets, if do not meet described turn-off criterion, exit described method, if meet described turn-off criterion, judge whether the current number of users in this community is zero, if described number of users is zero, send dormancy notification message to described coverage cell, and enter resting state, if described number of users is non-vanishing, sending reason to described coverage cell is to prepare the handover request of shutoff.
2. method according to claim 1, it is characterized in that, the described energy saving stage further comprises: coverage cell is from receiving that a reason is the handover request of preparing to turn-off, and does not receive the time period in the dormancy notification message of the capacity lifting community that sends this handover request till time span after this reaches default wait threshold value.
3. method according to claim 1, it is characterized in that, described coverage cell, by promoting community to the capacity that sends described handover request, sends the former switching preparation failed message that there is no available Radio Resource because of Target cell, notifies described handover request to be rejected.
CN201110373355.1A 2011-11-22 2011-11-22 Method for shutting off cells Expired - Fee Related CN102438287B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110373355.1A CN102438287B (en) 2011-11-22 2011-11-22 Method for shutting off cells

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110373355.1A CN102438287B (en) 2011-11-22 2011-11-22 Method for shutting off cells

Publications (2)

Publication Number Publication Date
CN102438287A CN102438287A (en) 2012-05-02
CN102438287B true CN102438287B (en) 2014-07-30

Family

ID=45986112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110373355.1A Expired - Fee Related CN102438287B (en) 2011-11-22 2011-11-22 Method for shutting off cells

Country Status (1)

Country Link
CN (1) CN102438287B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102238595A (en) * 2010-04-30 2011-11-09 华为技术有限公司 Method and equipment for processing cell outage
CN102238560A (en) * 2010-05-06 2011-11-09 中兴通讯股份有限公司 Method and system for processing cell dormancy

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010105677A1 (en) * 2009-03-18 2010-09-23 Nokia Siemens Networks Oy Method and device for data processing in a mobile communication network

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102238595A (en) * 2010-04-30 2011-11-09 华为技术有限公司 Method and equipment for processing cell outage
CN102238560A (en) * 2010-05-06 2011-11-09 中兴通讯股份有限公司 Method and system for processing cell dormancy

Also Published As

Publication number Publication date
CN102438287A (en) 2012-05-02

Similar Documents

Publication Publication Date Title
CN101959292B (en) Method, equipment and system for saving energy for base station
US9521594B2 (en) Method and device for notifying handover failure indication information
JP5758387B2 (en) Power saving mechanism in heterogeneous wireless communication networks
WO2018113661A1 (en) User mobility method and equipment
JP5585970B2 (en) Method and system for managing base station energy savings, and method and apparatus for saving base station energy
CN102396257B (en) Method, system and device of energy saving for base stations
CN105814950B (en) Heterogeneous network energy saving method and device
CN107211469A (en) Method for efficient connected mode cell reselection
CN101883407B (en) Method and device for activating cells accessing different radio access technology (RAT)
WO2012092876A1 (en) Method and device for compensation and restoring of coverage area
CN104186011A (en) Method and system for minimizing power consumption of user equipment during cell detection
CN102695248B (en) Communication means under multi-mode networks, the network equipment and communication system
US20150173017A1 (en) Communication system
CN105532032B (en) Energy saving function for small cells in E-UTRA and E-UTRAN
CN102378238B (en) Method for selecting activation cell
CN102932822B (en) Discontinuous receiving method and device in a kind of mobile management
WO2020253228A1 (en) Method and device for cell management
CN114040477B (en) Base station energy saving method, device, equipment and product
CN101772055A (en) Adjustment method of cell reselection parameter and device thereof
CN102307375A (en) Method and system for switching between different networks and eHRPD network
CN103369639A (en) Base-station control method, device and system
CN103096402A (en) Cell reselection method and cell changing-over method
CN102781076B (en) Different system small area energy-saving control method and equipment
CN113938989B (en) Cell dormancy control method, device, equipment, terminal and storage medium
CN104918287A (en) Load balancing method and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170829

Address after: 100070, No. 188, building 25, No. eighteen, South Fourth Ring Road, Fengtai District, Beijing, 1, 101

Patentee after: Beijing Haiyun Technology Co.,Ltd.

Address before: 510663, No. 3, color road, Science City, Guangzhou Development Zone, Guangdong

Patentee before: NEW POSTCOM EQUIPMENT Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730