CN102392642A - 一种无煤柱回采工作面的巷道布置方法 - Google Patents
一种无煤柱回采工作面的巷道布置方法 Download PDFInfo
- Publication number
- CN102392642A CN102392642A CN2011103421013A CN201110342101A CN102392642A CN 102392642 A CN102392642 A CN 102392642A CN 2011103421013 A CN2011103421013 A CN 2011103421013A CN 201110342101 A CN201110342101 A CN 201110342101A CN 102392642 A CN102392642 A CN 102392642A
- Authority
- CN
- China
- Prior art keywords
- face
- tunnel
- coal
- roadway
- working face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000009423 ventilation Methods 0.000 claims abstract description 18
- 238000005065 mining Methods 0.000 claims abstract description 11
- 238000010276 construction Methods 0.000 claims abstract description 4
- 238000000605 extraction Methods 0.000 claims description 12
- 238000004519 manufacturing process Methods 0.000 claims description 9
- 239000003245 coal Substances 0.000 abstract description 10
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 abstract 2
- 238000009412 basement excavation Methods 0.000 abstract 1
- 230000009977 dual effect Effects 0.000 abstract 1
- 230000037361 pathway Effects 0.000 abstract 1
- 230000000717 retained effect Effects 0.000 abstract 1
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000005641 tunneling Effects 0.000 description 1
Images
Landscapes
- Ventilation (AREA)
Abstract
本发明公开了一种无煤柱回采工作面的巷道布置方法,具体为每个工作面布置两条巷道,一条为新掘巷道,另一条为上工作面的沿空留巷或掘巷,本工作面回采前,其相邻的接替工作面的巷道和切眼预先掘出,切眼与本工作面的新掘巷相联,沿空留巷时接替工作面的新掘巷道和切眼作为本工作面的边界回风巷,沿空掘巷时其作为沿空掘进巷道的施工通路,实现无煤柱开采并在留巷时形成本工作面两进一回“Y+L”型通风系统的巷道布置方法。本发明使接替工作面的新掘巷道和切眼既作为本工作面的回风巷,又作为接替工作面的一条巷道,一巷两用,少掘一条巷道,且避开了压力峰值区,可多回收煤柱、解决瓦斯超限并缓解采掘紧张关系,广泛用于煤矿、冶金矿山等行业。
Description
技术领域
本发明涉及回采工作面巷道布置方法,具体涉及一种无煤柱回采工作面的巷道布置方法。
背景技术
传统的留煤柱回采工作面巷道布置一般分两种:其一是布置两条巷道,一条运输巷,一条回风巷;一种是布置三条巷道,即回风巷、运输巷和辅运巷;对于高瓦斯留煤柱工作面则有回风巷、运输巷和瓦斯尾巷。实现无煤柱开采后,回采工作面一般为两条,其中一条为沿空保留巷道或沿空掘巷,对高瓦斯矿而言沿空留巷时须在边界设置回风巷,形成“Y”型通风,这样就增加了掘进一条边界回风巷的工程量,相应增加工作面准备时间;沿空掘巷则需在工作面回采完毕并且采空区顶板冒落稳定后进行,一般需要一年以上时间,严重影响采掘接续。
发明内容
本发明的目的是提供一种可缓解采掘紧张关系、减少巷道掘进量、实现无煤柱开采、留巷时实现“Y+L”型通风系统,解决瓦斯超限的一种无煤柱回采工作面的巷道布置方法。
为了克服现有技术的不足,本发明的技术方案是这样解决的:一种无煤柱回采工作面的巷道布置方法,按下述步骤进行:
1)、在采煤工作面两侧布置两条巷道,其中一条为现采煤工作面一侧新掘进巷道,另一条为已采工作面的沿空巷道作为进风巷道;
2)、接替采煤工作面在回采前,在接替工作面的一侧再预先掘进一条巷道作为回风巷道,巷道的一端预先掘进一条切眼;
3)、切眼与现采煤工作面的新掘进巷道相通;
4)、现采煤工作面回采时设有沿空保留巷道;
5)、接替工作面的巷道和切眼作为现采煤工作面的边界回风巷,沿空掘巷时巷道和切眼作为沿空掘进巷道的施工通路;
6)、沿空巷道、新掘进巷道、保留巷道、切眼、巷道构成现采煤工作面的两进一回“Y+L”型通风系统或一进两回“U+L”型通风系统;
7)、沿空巷道、新掘进巷道、巷道另一端分别分与运输大巷及回风大巷连通;
8)、通风系统上连接有局扇;
9)、现采煤工作面、接替工作面的一端设有停采线。
本发明的有益效果是:预先掘进接替工作面的一条巷道作为本工作面的瓦斯尾巷并兼做接替工作面的进风巷,与传统的“U+尾巷”通风系统相比,每个工作面减少了一条巷道并多回收一个煤柱;与“Y”型通风相比,少掘进一条边界回风巷;无煤柱回采工作面的巷道布置方法在留巷难度较大时可进行沿空掘巷,掘巷距回采工作面100-200m,比本工作面全部回采完毕再等采空区顶板冒落稳定后沿空掘巷形成新的工作面要提前一年以上时间;前述留巷与掘巷方式均能缓解采掘紧张关系;留巷时可实现两进一回“Y+L”通风系统,解决瓦斯超限问题,可广泛用于煤矿、冶金矿山等行业。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明沿空留巷的无煤柱回采工作面的巷道布置示意图;
图2是本发明沿空掘巷的无煤柱回采工作面的巷道布置示意图;
图中:1-现采煤工作面,2-已采工作面,3-接替工作面,4-新掘巷道,5-作为皮带巷的沿空巷道,5-1-沿空保留巷道,5-2-沿空掘进巷道,6-切眼,7-接替工作面一巷两用的巷道,8-采空区,9-运输大巷,10-回风大巷,11-停采线,12-局扇。
具体实施方式
下面结合附图对发明内容进一步说明:
实施例1:
参照图1所示:一种无煤柱回采工作面的巷道布置方法,按下述步骤进行:
1)、在采煤工作面两侧布置两条巷道,其中一条为现采煤工作面1一侧新掘进巷道4,另一条为已采工作面2的沿空巷道5作为进风巷道;
2)、接替采煤工作面3在回采前,在接替工作面3的一侧再预先掘进一条巷道7作为回风巷道,巷道7的一端预先掘进一条切眼6;
3)、切眼6与现采煤工作面1的新掘进巷道4相通;
4)、现采煤工作面回采时设有保留巷道5-1;
5)、接替工作面3的巷道7和切眼6作为本工作面1的边界回风巷,沿空掘巷时巷道7和切眼6作为沿空掘进巷道5-2的施工通路;
6)、沿空巷道5、新掘进巷道4、保留巷道5-1、切眼6、巷道7构成现采煤工作面1的两进一回“Y+L”型通风系统或一进两回“U+L”型通风系统;
7)、沿空巷道5、新掘进巷道4、巷道7另一端分别分与运输大巷9及回风大巷10连通;
8)、通风系统上连接有局扇12;
9)、现采煤工作面、接替工作面3的一端设有停采线11。
形成沿空巷道5与现采煤工作面1的巷道4进风,沿空保留巷道5-1、切眼6及接替工作面的巷道7回风的两进一回“Y+L”型通风系统,或形成沿空巷道5进风,现采煤工作面1的巷道4回风,沿空保留巷道5-1、切眼6及接替工作面的巷道7回风的一进两回“U+L”型通风系统,接替工作面3回采时巷道7作为进风巷,巷道7一巷两用,为现采煤工作面1与接替工作面3服务,并实现无煤柱开采,用于高瓦斯、沿空留巷难度较小的矿井。
实施例2:
参照图2所示:运输大巷9及回风大巷10的一侧布置有三个平行的回采工作面,即现采煤工作面1、已采工作面2、接替工作面3,现采煤工作面1有两条巷道即新掘巷道4和沿空巷道5,现采煤工作面1回采前,与现采煤工作面1相邻的接替工作面3预先掘出切眼6、巷道7,沿空巷道5、新掘巷4与接替工作面的巷道7分别与运输大巷9及回风大巷10相交,现采煤工作面1回采时提前对现采煤工作面1新掘巷道4贴副帮浇筑一道混凝土墙,并滞后本工作面100-300m贴混凝土墙在接替工作面3内沿空掘巷形成沿空掘进巷道5-2,现采煤工作面1采用“U”型通风,沿空掘进巷道5-2施工时采用局扇12进行压入式通风,实现无煤柱开采,用于低瓦斯、沿空留巷难度较大的矿井。
Claims (1)
1.一种无煤柱回采工作面的巷道布置方法,按下述步骤进行:
1)、在采煤工作面两侧布置两条巷道,其中一条为现采煤工作面(1)一侧新掘进巷道(4),另一条为已采工作面(2)的沿空巷道(5);
2)、接替采煤工作面(3)在回采前,在接替工作面(3)的一侧再预先掘进一条巷道(7)作为进风巷道,巷道(7)的一端预先掘进一条切眼(6);
3)、切眼(6)与现采煤工作面(1)的新掘进巷道(4)相通;
4)、现采煤工作面(1)回采时设有沿空保留巷道(5-1);
5)、接替采煤工作面(3)的巷道(7)和切眼(6)作为本工作面(1)的边界回风巷,沿空掘巷时巷道(7)和切眼(6)作为沿空掘进巷道(5-2)的施工通路;
6)、沿空巷道(5)、新掘进巷道(4)、保留巷道(5-1)、切眼(6)、巷道(7)构成现采煤工作面(1)的两进一回“Y+L”型通风系统或一进两回“U+L”型通风系统;
7)、沿空巷道(5)、新掘进巷道(4)、巷道(7)另一端分别与运输大巷(9)及回风大巷(10)连通;
8)、通风系统上连接有局扇(12);
9)、现采煤工作面(1)、接替工作面(3)的一端设有停采线(11)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103421013A CN102392642A (zh) | 2011-11-02 | 2011-11-02 | 一种无煤柱回采工作面的巷道布置方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103421013A CN102392642A (zh) | 2011-11-02 | 2011-11-02 | 一种无煤柱回采工作面的巷道布置方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102392642A true CN102392642A (zh) | 2012-03-28 |
Family
ID=45860012
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103421013A Pending CN102392642A (zh) | 2011-11-02 | 2011-11-02 | 一种无煤柱回采工作面的巷道布置方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102392642A (zh) |
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102606171A (zh) * | 2012-03-29 | 2012-07-25 | 王晓利 | 超前采矿工作面巷内浇筑间隔式混凝土墙沿空留巷的方法 |
CN102865092A (zh) * | 2012-09-22 | 2013-01-09 | 山西晋城无烟煤矿业集团有限责任公司 | 回采工作面u+u型巷道通风系统 |
CN104975857A (zh) * | 2015-05-21 | 2015-10-14 | 中国矿业大学(北京) | 全井工区段无煤柱无沿空平巷的采煤方法 |
CN105178962A (zh) * | 2015-06-24 | 2015-12-23 | 何满潮 | 长壁开采110工法 |
CN105275487A (zh) * | 2015-10-27 | 2016-01-27 | 何满潮 | 长臂开采n00工法通风系统 |
CN105971648A (zh) * | 2015-09-30 | 2016-09-28 | 北京中矿创新联盟能源环境科学研究院 | 一种无巷道无煤柱自留巷开采工法的端头支架及装备系统 |
WO2016206618A1 (zh) * | 2015-06-24 | 2016-12-29 | 何满潮 | 长壁开采n00工法 |
WO2016206616A1 (zh) * | 2015-06-24 | 2016-12-29 | 何满潮 | 无巷道无煤柱自留巷开采工法的装备系统 |
CN106869932A (zh) * | 2017-03-15 | 2017-06-20 | 河南理工大学 | 一种三软煤层采空区内回采巷道布置方法 |
CN107725097A (zh) * | 2017-10-31 | 2018-02-23 | 中国矿业大学(北京) | 一种切顶成巷无煤柱开采瓦斯与煤自燃共治方法 |
CN108979658A (zh) * | 2018-07-20 | 2018-12-11 | 淮阴工学院 | 一种适用于智能化无人工作面的t型巷道布局 |
CN109057794A (zh) * | 2018-08-13 | 2018-12-21 | 中煤能源研究院有限责任公司 | 一种大煤柱掘进无煤柱开采的采煤方法 |
CN109209428A (zh) * | 2018-08-13 | 2019-01-15 | 中煤能源研究院有限责任公司 | 一种可实现巷间煤柱回采的工作面巷道布置结构 |
CN109441451A (zh) * | 2018-10-29 | 2019-03-08 | 山西晋城无烟煤矿业集团有限责任公司 | 一种台阶开采工作面巷道布置方法 |
CN110130899A (zh) * | 2019-07-09 | 2019-08-16 | 北京中矿创新联盟能源环境科学研究院 | 全矿区无煤柱留设无巷道掘进采煤方法 |
CN110454187A (zh) * | 2019-07-04 | 2019-11-15 | 内蒙古科技大学 | 一种提高平硐开拓矿井煤炭资源采出率的巷道布置方法 |
CN110886611A (zh) * | 2019-12-06 | 2020-03-17 | 河南力行科创矿山技术开发有限公司 | 一种高瓦斯大采高工作面沿空掘巷工艺 |
CN111577281A (zh) * | 2020-05-22 | 2020-08-25 | 中国矿业大学 | 一种高瓦斯煤层无煤柱开采及瓦斯治理的方法 |
RU2736107C1 (ru) * | 2020-06-29 | 2020-11-11 | федеральное государственное бюджетное образовательное учреждение высшего образования «Санкт-Петербургский горный университет» | Способ подземной разработки пластов полезных ископаемых |
US11008860B2 (en) | 2015-06-24 | 2021-05-18 | Manchao He | Equipment system for no-roadway no-coal-pillar retained roadway mining method |
CN114961728A (zh) * | 2022-06-20 | 2022-08-30 | 太原理工大学 | 一种冲击地压与瓦斯综合防治的采区无煤柱开采方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10300387A1 (de) * | 2003-01-09 | 2004-07-22 | Udo Adam | Verfahren zum Langfrontabbau von Flözflächen im Steinkohlenbergbau |
CN101033689A (zh) * | 2007-04-10 | 2007-09-12 | 闫振东 | 一种煤矿井下无煤柱回收方法 |
CN101526001A (zh) * | 2008-11-26 | 2009-09-09 | 枣庄矿业(集团)有限责任公司滨湖煤矿 | 薄煤层综采对拉工作面采煤工艺 |
CN101718208A (zh) * | 2009-12-17 | 2010-06-02 | 山西晋城无烟煤矿业集团有限责任公司 | 煤矿井下“u+h”型布置的通风系统 |
CN102031972A (zh) * | 2009-09-25 | 2011-04-27 | 中国矿业大学(北京) | 露井联采的l型开采方法 |
CN102071958A (zh) * | 2011-01-21 | 2011-05-25 | 中国矿业大学 | 采煤工作面反y型通风方法 |
-
2011
- 2011-11-02 CN CN2011103421013A patent/CN102392642A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10300387A1 (de) * | 2003-01-09 | 2004-07-22 | Udo Adam | Verfahren zum Langfrontabbau von Flözflächen im Steinkohlenbergbau |
CN101033689A (zh) * | 2007-04-10 | 2007-09-12 | 闫振东 | 一种煤矿井下无煤柱回收方法 |
CN101526001A (zh) * | 2008-11-26 | 2009-09-09 | 枣庄矿业(集团)有限责任公司滨湖煤矿 | 薄煤层综采对拉工作面采煤工艺 |
CN102031972A (zh) * | 2009-09-25 | 2011-04-27 | 中国矿业大学(北京) | 露井联采的l型开采方法 |
CN101718208A (zh) * | 2009-12-17 | 2010-06-02 | 山西晋城无烟煤矿业集团有限责任公司 | 煤矿井下“u+h”型布置的通风系统 |
CN102071958A (zh) * | 2011-01-21 | 2011-05-25 | 中国矿业大学 | 采煤工作面反y型通风方法 |
Non-Patent Citations (1)
Title |
---|
张兆庚: "回采工作面偏Y型通风系统巷道布置的改进", 《煤炭工程》, no. 4, 15 April 2010 (2010-04-15), pages 1 - 2 * |
Cited By (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102606171A (zh) * | 2012-03-29 | 2012-07-25 | 王晓利 | 超前采矿工作面巷内浇筑间隔式混凝土墙沿空留巷的方法 |
CN102865092A (zh) * | 2012-09-22 | 2013-01-09 | 山西晋城无烟煤矿业集团有限责任公司 | 回采工作面u+u型巷道通风系统 |
CN104975857A (zh) * | 2015-05-21 | 2015-10-14 | 中国矿业大学(北京) | 全井工区段无煤柱无沿空平巷的采煤方法 |
WO2016206618A1 (zh) * | 2015-06-24 | 2016-12-29 | 何满潮 | 长壁开采n00工法 |
CN107905790B (zh) * | 2015-06-24 | 2019-05-31 | 何满潮 | 长壁开采n00工法 |
US11008860B2 (en) | 2015-06-24 | 2021-05-18 | Manchao He | Equipment system for no-roadway no-coal-pillar retained roadway mining method |
WO2016206616A1 (zh) * | 2015-06-24 | 2016-12-29 | 何满潮 | 无巷道无煤柱自留巷开采工法的装备系统 |
CN105178962A (zh) * | 2015-06-24 | 2015-12-23 | 何满潮 | 长壁开采110工法 |
EA037982B1 (ru) * | 2015-06-24 | 2021-06-18 | Маньчао Хэ | Способ бесцеликовой разработки с самосохраняющейся подготовительной выработкой без проходки подготовительной выработки на участке горных работ |
EA035591B1 (ru) * | 2015-06-24 | 2020-07-13 | Маньчао Хэ | Способ разработки длинными забоями |
CN107905790A (zh) * | 2015-06-24 | 2018-04-13 | 何满潮 | 长壁开采n00工法 |
US10494924B2 (en) | 2015-06-24 | 2019-12-03 | Manchao He | Longwall mine construction method N00 |
CN105971648A (zh) * | 2015-09-30 | 2016-09-28 | 北京中矿创新联盟能源环境科学研究院 | 一种无巷道无煤柱自留巷开采工法的端头支架及装备系统 |
CN105971648B (zh) * | 2015-09-30 | 2018-07-06 | 北京中矿创新联盟能源环境科学研究院 | 一种无巷道无煤柱自留巷开采工法的端头支架及装备系统 |
CN105275487A (zh) * | 2015-10-27 | 2016-01-27 | 何满潮 | 长臂开采n00工法通风系统 |
CN105275487B (zh) * | 2015-10-27 | 2017-07-18 | 何满潮 | 长臂开采n00工法通风系统 |
CN106869932A (zh) * | 2017-03-15 | 2017-06-20 | 河南理工大学 | 一种三软煤层采空区内回采巷道布置方法 |
CN106869932B (zh) * | 2017-03-15 | 2019-03-19 | 河南理工大学 | 一种三软煤层采空区内回采巷道布置方法 |
CN107725097A (zh) * | 2017-10-31 | 2018-02-23 | 中国矿业大学(北京) | 一种切顶成巷无煤柱开采瓦斯与煤自燃共治方法 |
CN108979658A (zh) * | 2018-07-20 | 2018-12-11 | 淮阴工学院 | 一种适用于智能化无人工作面的t型巷道布局 |
CN109209428A (zh) * | 2018-08-13 | 2019-01-15 | 中煤能源研究院有限责任公司 | 一种可实现巷间煤柱回采的工作面巷道布置结构 |
CN109057794A (zh) * | 2018-08-13 | 2018-12-21 | 中煤能源研究院有限责任公司 | 一种大煤柱掘进无煤柱开采的采煤方法 |
CN109441451A (zh) * | 2018-10-29 | 2019-03-08 | 山西晋城无烟煤矿业集团有限责任公司 | 一种台阶开采工作面巷道布置方法 |
CN110454187A (zh) * | 2019-07-04 | 2019-11-15 | 内蒙古科技大学 | 一种提高平硐开拓矿井煤炭资源采出率的巷道布置方法 |
CN110454187B (zh) * | 2019-07-04 | 2021-08-24 | 内蒙古科技大学 | 一种提高平硐开拓矿井煤炭资源采出率的巷道布置方法 |
CN110130899A (zh) * | 2019-07-09 | 2019-08-16 | 北京中矿创新联盟能源环境科学研究院 | 全矿区无煤柱留设无巷道掘进采煤方法 |
US11578598B2 (en) | 2019-07-09 | 2023-02-14 | Beijing Zhongkuang Innovation Alliance Energy Environment Science Academy | Method for coal mining without reserving coal pillar and tunneling roadway in whole mining area |
CN110886611A (zh) * | 2019-12-06 | 2020-03-17 | 河南力行科创矿山技术开发有限公司 | 一种高瓦斯大采高工作面沿空掘巷工艺 |
CN110886611B (zh) * | 2019-12-06 | 2020-12-25 | 河南力行科创矿山技术开发有限公司 | 一种高瓦斯大采高工作面沿空掘巷工艺 |
CN111577281A (zh) * | 2020-05-22 | 2020-08-25 | 中国矿业大学 | 一种高瓦斯煤层无煤柱开采及瓦斯治理的方法 |
CN111577281B (zh) * | 2020-05-22 | 2021-07-30 | 中国矿业大学 | 一种高瓦斯煤层无煤柱开采及瓦斯治理的方法 |
RU2736107C1 (ru) * | 2020-06-29 | 2020-11-11 | федеральное государственное бюджетное образовательное учреждение высшего образования «Санкт-Петербургский горный университет» | Способ подземной разработки пластов полезных ископаемых |
CN114961728A (zh) * | 2022-06-20 | 2022-08-30 | 太原理工大学 | 一种冲击地压与瓦斯综合防治的采区无煤柱开采方法 |
CN114961728B (zh) * | 2022-06-20 | 2022-12-13 | 太原理工大学 | 一种冲击地压与瓦斯综合防治的采区无煤柱开采方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102392642A (zh) | 一种无煤柱回采工作面的巷道布置方法 | |
CN105240013B (zh) | 长壁开采n00工法 | |
CN103089266B (zh) | 露天转地下过渡期无底柱分段空场崩落采矿方法 | |
CN101749018B (zh) | 煤柱直接回收采煤法 | |
CN101864956A (zh) | 一种区段无煤柱开采方法 | |
CN105089668A (zh) | 一种长壁工作面无煤柱开采方法 | |
CN102953732A (zh) | 房柱式大直径深孔倒台阶状分段侧向崩矿嗣后充填采矿法 | |
CN103953345B (zh) | 一种沿空小断面留巷开采方法 | |
CN102352769A (zh) | 高突矿井煤与瓦斯共采一体化开采方法 | |
CN103410515A (zh) | 一种三软煤层往复式无煤柱综采方法 | |
CN104481536A (zh) | 控制覆岩裂隙与地表沉陷的掘采充平行作业的采煤方法 | |
CN109630112B (zh) | 一种切顶充填的n00采矿法 | |
CN109252860B (zh) | 一种薄煤层连采机高度机械化开采方法 | |
CN105275487B (zh) | 长臂开采n00工法通风系统 | |
CN100590294C (zh) | 一种矸石充填薄煤层掘巷方法 | |
CN109209382A (zh) | 无煤柱无掘巷z型工作面回采方法 | |
CN110410076A (zh) | 一种用于老房柱采空区遗留煤柱回收的充填开采方法 | |
CN102979526B (zh) | 中深孔分段采矿出矿堑沟充填法构筑工艺 | |
CN102031972B (zh) | 露井联采的l型开采方法 | |
CN103470286A (zh) | 一种采用条带钢筋网拦截自溜矸石支护的沿空留巷方法 | |
CN102011610B (zh) | 一种用于中厚煤层无煤柱开采模式的支护方法 | |
CN110644993B (zh) | 一种z型条带工作面开采方法 | |
CN102425431B (zh) | 一种极近距离煤层开采巷道布置方法 | |
CN110388210B (zh) | 适于缓倾斜中厚矿体组合分段开采的采场结构布置方式 | |
CN103850690A (zh) | 一种用于无煤柱开采的混凝土砌块配合锚索切顶沿空留巷方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120328 |