[go: up one dir, main page]

CN102383598A - Method for section construction of building project constructional column - Google Patents

Method for section construction of building project constructional column Download PDF

Info

Publication number
CN102383598A
CN102383598A CN2011102859232A CN201110285923A CN102383598A CN 102383598 A CN102383598 A CN 102383598A CN 2011102859232 A CN2011102859232 A CN 2011102859232A CN 201110285923 A CN201110285923 A CN 201110285923A CN 102383598 A CN102383598 A CN 102383598A
Authority
CN
China
Prior art keywords
template
constructional column
back cord
concrete
hypomere
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011102859232A
Other languages
Chinese (zh)
Inventor
南勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2011102859232A priority Critical patent/CN102383598A/en
Publication of CN102383598A publication Critical patent/CN102383598A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for section construction of a building project constructional column, which is characterized in that firstly, technical parameters of horizontal back arris of a template, vertical back arris of the template, an opposite-pull screw and a concrete chute are determined according to materials and size of the building project constructional column; and after a wall body is built, the template of the constructional column can be installed by sections from bottom to top and cast by the concrete. The method for the section construction of the building project constructional column is carried out according to the following steps: 1 manufacturing the template back arris, the opposite-pull screw and the concrete chute; 2 installing the upper-section template of the constructional column and the back arris and performing concrete casting; 3 installing the lower-section template of the constructional column, the back arris and the concrete chute and performing the concrete casting; and 4 removing the template. The method for the section construction of the building project constructional column is suitable for the building project constructional column with a reinforced concrete frame structure and a masonry concrete structure, not only protects a formed wall body, but reduces construction cost and difficulty in supporting and removing the template.

Description

A kind of masonry project constructional column section construction method
Technical field
The present invention relates to a kind of construction techniques, is a kind of masonry project constructional column section construction method specifically, is applied in the construction of Industrial and Civil Engineering building structure post.
Background technology
Along with the continuous development of building construction technology, to the building wall Forming Quality require increasingly high.Existing wall structure post construction adopts a formwork to the top; Once accomplish concrete and build, in work progress, usually will on body of wall, stay and establish many holes through walls, even the later stage is pounded the hole; Not only trouble is installed, removed to template; Waste of manpower, material resources, and influence molded wall quality, the later stage is probably because not stifled real hollowing and the infiltration phenomenon of occurring in hole.
Summary of the invention
The object of the invention; Be exactly the above-mentioned shortcoming that exists to prior art, a kind of masonry project constructional column section construction method be provided, from bottom to top the segmentation formwork construction; Not only protected molded body of wall, and reduced construction cost and template and installed, remove difficulty.
A kind of masonry project constructional column section construction method provided by the invention; It is realized like this: the technical data of confirming the horizontal back cord of template and vertical back cord, Screw arbor with nut at both-ends, concrete chute according to the material and the size of masonry project constructional column earlier; Carry out the processing and fabricating of back cord, Screw arbor with nut at both-ends, concrete chute then; After treating that building wall is accomplished, carry out constructional column template segmentation installation and concrete from bottom to top again and build.Masonry project constructional column section construction method is carried out as follows:
1, makes template back arris, Screw arbor with nut at both-ends, concrete chute
Confirm the technical data of the horizontal back cord of template and vertical back cord, Screw arbor with nut at both-ends, concrete chute according to the material of masonry project constructional column and size, carry out the processing and fabricating of back cord, Screw arbor with nut at both-ends, concrete chute then.
2, constructional column hypomere template installation, concrete are built
After building wall is accomplished; In the first mounting template of constructional column hypomere (≤2 meters); The middle vertical back cord of 2 hypomere templates and 2 vertical back cords in hypomere template both sides are installed again, 1 hypomere template lower horizontal back cord and 1 hypomere template upper level back cord are installed then.Each passes hole to be provided and the horizontal back cord tension of body of wall opposite side with 1 Screw arbor with nut at both-ends hypomere template lower horizontal back cord two ends, and hole through walls is stayed in advance and is located at the second skin levelling brick perpends position.Strain with a Screw arbor with nut at both-ends and the horizontal back cord of body of wall opposite side in the middle of the hypomere template upper level back cord.Template install and check and accept through after can build concrete.
3, constructional column epimere template installation, concrete are built
After constructional column hypomere concrete is built completion, can installation constitution post epimere template.Constructional column epimere elder generation mounting template, the panel of epimere template docks with the panel of hypomere template.2 vertical back cords in epimere template both sides are installed again, are connected through latch with the vertical back cord in hypomere template both sides.The middle vertical back cord of 2 epimere templates is installed then, and the lower end of this back cord has groove, in the gap of the panel of bevel end insertion hypomere template upper level back cord and hypomere template, and chucking.1 epimere template upper level back cord is installed at last, and with 2 Screw arbor with nut at both-ends and the horizontal back cord tension of body of wall opposite side.Template install and check and accept through after can build concrete.When concrete structure influence concrete pouring construction such as beam, plate is arranged when top, wall top; Reserve the high gap of 50mm between wall top and structure; Punch so that the concrete chute to be installed at the panel top of epimere template; Epimere template upper level back cord is processed into two sections, in the middle of the concrete chute is stuck in, strains with the horizontal back cord of body of wall opposite side respectively with 2 Screw arbor with nut at both-ends.Screw arbor with nut at both-ends is located in the gap between wall top and the Vierendeel girder.
4, stripping
Concrete is built and finished, and after intensity reaches requirement, can remove template, and the order during stripping is: what installed the back removes earlier, the back dismounting of installing earlier.
Compared with prior art, advantage of the present invention is: be applicable to the construction of the masonry project constructional column of reinforced concrete frame structure and brick mix structure, not only protected molded body of wall, and reduced construction cost and template and installed, remove difficulty.
Description of drawings
Fig. 1 constructional column segmentation formwork sketch map.
Fig. 2 concrete chute structure chart.
Vertical back cord 13, epimere template upper level back cord 14, concrete chute 15, concrete structure 16, gap in the middle of the vertical back cord of the vertical back cord of vertical back cord 5 among the figure 1, in the middle of the hypomere template lower horizontal back cord 2, Screw arbor with nut at both-ends 3, levelling brick 4, hypomere template, hypomere template both sides 6, body of wall 7, the panel 8 of hypomere template, latch 9, hypomere template upper level back cord 10, the panel 11 of epimere template, epimere template both sides 12, the epimere template.
The specific embodiment
For further describing the present invention, the present invention's a kind of masonry project constructional column section construction method is further described below in conjunction with accompanying drawing.
The first step is made template back arris, Screw arbor with nut at both-ends, concrete chute.
Confirm the technical data of the horizontal back cord of template (1,9,13) and vertical back cord (4,5,11,12), Screw arbor with nut at both-ends (2), concrete chute (14) according to the material of masonry project constructional column and size, carry out the processing and fabricating of back cord, Screw arbor with nut at both-ends, concrete chute then.
In second step, constructional column hypomere template is installed, concrete is built.
As shown in Figure 1; After body of wall (6) is built completion by laying bricks or stones; In the first mounting template of constructional column hypomere (≤2 meters); The middle vertical back cord (4) of 2 hypomere templates and 2 vertical back cords in hypomere template both sides (5) are installed again, 1 hypomere template lower horizontal back cord (1) and 1 hypomere template upper level back cord (9) are installed then.Each passes hole to be provided and the horizontal back cord tension of body of wall opposite side with 1 Screw arbor with nut at both-ends (2) hypomere template lower horizontal back cord (1) two ends, and hole through walls is stayed in advance and is located at second skin levelling brick (3) the perpends position.Strain with the horizontal back cord of 1 Screw arbor with nut at both-ends (2) and body of wall opposite side in the middle of the hypomere template upper level back cord (9).Template install and check and accept through after can build concrete.
In the 3rd step, constructional column epimere template is installed, concrete is built.
As shown in Figure 1, after constructional column hypomere concrete is built completion, can installation constitution post epimere template.Constructional column epimere elder generation mounting template, the panel of epimere template (10) docks with the panel (7) of hypomere template.2 vertical back cords in epimere template both sides (11) are installed again, are connected through latch (8) with the vertical back cords in hypomere template both sides (5).The middle vertical back cord (12) of 2 epimere templates is installed then, and the lower end of this back cord (12) has groove, in the gap of the panel (7) of bevel end insertion hypomere template upper level back cord (9) and hypomere template, and chucking.1 epimere template upper level back cord (13) is installed at last, and with the horizontal back cord tension of 2 Screw arbor with nut at both-ends (2) and body of wall opposite side.Template install and check and accept through after can build concrete.When top, wall top has concrete structures (15) such as beam, plate to influence the concrete pouring construction; Reserve the high gap (16) of 50mm between wall top and structure; Punch so that concrete chute (14) to be installed at the panel top of epimere template; Epimere template upper level back cord (13) is processed into two sections, in the middle of concrete chute (14) is stuck in, strains with the horizontal back cord of body of wall opposite side respectively with 2 Screw arbor with nut at both-ends (2).Screw arbor with nut at both-ends (2) is located at the lining, gap (16) between wall top and the Vierendeel girder.
The 4th step, stripping.
Concrete is built and finished, and after intensity reaches requirement, can remove template, and the order during stripping is: what installed the back removes earlier, the back dismounting of installing earlier.

Claims (7)

1. masonry project constructional column section construction method; It is characterized in that the technical data that elder generation confirms the horizontal back cord of template and vertical back cord, Screw arbor with nut at both-ends, concrete chute according to the material and the size of masonry project constructional column; Carry out the processing and fabricating of back cord, Screw arbor with nut at both-ends, concrete chute then; After treating that building wall is accomplished, carry out segmentation installation from bottom to top of constructional column template and concrete again and build, masonry project constructional column section construction method is carried out as follows:
(1). make template back arris, Screw arbor with nut at both-ends, concrete chute, comprise the technical data and the processing and fabricating of definite back cord, Screw arbor with nut at both-ends, concrete chute
(2). constructional column epimere template is installed, concrete is built, and comprises constructional column hypomere (≤2 meters) mounting template, 2 hypomere templates middle vertical back cord, the 2 vertical back cords in hypomere template both sides, 1 hypomere template lower horizontal back cord, 1 hypomere template upper level back cord and builds concrete;
(3). constructional column epimere template is installed, concrete is built, and comprises constructional column epimere mounting template, the 2 vertical back cords in epimere template both sides, 2 epimere templates middle vertical back cord, the 1 horizontal back cord of epimere template, concrete chutes and builds concrete;
(4). stripping comprises the dismounting earlier that install the back, the back dismounting of installing earlier.
2. the described a kind of masonry project constructional column section construction method of claim 1; Each passes hole to be provided and the horizontal back cord tension of body of wall opposite side with 1 Screw arbor with nut at both-ends to it is characterized in that (2) said hypomere template lower horizontal back cord two ends, and hole through walls is stayed in advance and is located at the second skin levelling brick perpends position.
3. the described a kind of masonry project constructional column section construction method of claim 1 is characterized in that straining with 1 Screw arbor with nut at both-ends and the horizontal back cord of body of wall opposite side in the middle of (2) said hypomere template upper level back cord.
4. the described a kind of masonry project constructional column section construction method of claim 1 is characterized in that (3) said 2 vertical back cords in epimere template both sides, is connected through latch with the vertical back cord in hypomere template both sides.
5. the described a kind of masonry project constructional column section construction method of claim 1; The lower end that it is characterized in that the middle vertical back cord of (3) said 2 epimere templates has groove; In the gap of the panel of bevel end insertion hypomere template upper level back cord and hypomere template, chucking.
6. right is wanted 1 described a kind of masonry project constructional column section construction method, it is characterized in that the horizontal back cord of (3) said epimere template is with 2 Screw arbor with nut at both-ends and the horizontal back cord tension of body of wall opposite side.
7. the described a kind of masonry project constructional column section construction method of claim 1; It is characterized in that (3) said concrete chute; When concrete structure influence concrete pouring construction such as beam, plate is arranged when top, wall top, be installed in the hole, panel top of epimere template, the horizontal back cord of epimere template is processed into two sections; In the middle of the concrete chute is stuck in, strain with the horizontal back cord of body of wall opposite side respectively with 2 Screw arbor with nut at both-ends.
CN2011102859232A 2011-09-23 2011-09-23 Method for section construction of building project constructional column Pending CN102383598A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102859232A CN102383598A (en) 2011-09-23 2011-09-23 Method for section construction of building project constructional column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102859232A CN102383598A (en) 2011-09-23 2011-09-23 Method for section construction of building project constructional column

Publications (1)

Publication Number Publication Date
CN102383598A true CN102383598A (en) 2012-03-21

Family

ID=45823398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102859232A Pending CN102383598A (en) 2011-09-23 2011-09-23 Method for section construction of building project constructional column

Country Status (1)

Country Link
CN (1) CN102383598A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113797A (en) * 2015-09-23 2015-12-02 新七建设集团有限公司 Pouring device and method for constructional columns connected with ring beam
CN106760503A (en) * 2016-11-22 2017-05-31 江苏大学 A kind of constructional column based on standard knot combination is poured uses template
CN108547453A (en) * 2018-05-22 2018-09-18 中国矿业大学 A kind of straight type wall structure column constructing device
CN108661240A (en) * 2018-05-22 2018-10-16 中国矿业大学 A kind of straight type wall structure column construction method
CN110821176A (en) * 2018-08-07 2020-02-21 中国水利水电第十六工程局有限公司 Construction method of temporary house for construction site
CN111441589A (en) * 2020-04-01 2020-07-24 中建四局第六建设有限公司 Secondary pouring concrete combined type launder

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2706548Y (en) * 2004-04-29 2005-06-29 蒋次杰 Mould for moulding column
CN101139849A (en) * 2006-09-07 2008-03-12 张兴汉 Modular building component and on-site hoisting building method
KR100827782B1 (en) * 2007-01-10 2008-05-07 주식회사 스마텍엔지니어링 Wall using U-shaped hollow communication block
CN101429803A (en) * 2008-12-05 2009-05-13 重庆大学 Construction column used for masonry structure and its production method and special precast segment
CN201581634U (en) * 2009-12-10 2010-09-15 山西四建集团有限公司 Tool for casting concrete for template used in supporting constructional column of filler wall
CN102003069A (en) * 2010-11-24 2011-04-06 温州中城建设集团有限公司 Construction method and pouring device for framework masonry infill wall structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2706548Y (en) * 2004-04-29 2005-06-29 蒋次杰 Mould for moulding column
CN101139849A (en) * 2006-09-07 2008-03-12 张兴汉 Modular building component and on-site hoisting building method
KR100827782B1 (en) * 2007-01-10 2008-05-07 주식회사 스마텍엔지니어링 Wall using U-shaped hollow communication block
CN101429803A (en) * 2008-12-05 2009-05-13 重庆大学 Construction column used for masonry structure and its production method and special precast segment
CN201581634U (en) * 2009-12-10 2010-09-15 山西四建集团有限公司 Tool for casting concrete for template used in supporting constructional column of filler wall
CN102003069A (en) * 2010-11-24 2011-04-06 温州中城建设集团有限公司 Construction method and pouring device for framework masonry infill wall structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
金克文: "论砖砌体混凝土构造柱的施工要点", 《经营管理者》 *
金鑫: "如何保证构造柱的施工质量", 《黑龙江科技信息》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105113797A (en) * 2015-09-23 2015-12-02 新七建设集团有限公司 Pouring device and method for constructional columns connected with ring beam
CN106760503A (en) * 2016-11-22 2017-05-31 江苏大学 A kind of constructional column based on standard knot combination is poured uses template
CN108547453A (en) * 2018-05-22 2018-09-18 中国矿业大学 A kind of straight type wall structure column constructing device
CN108661240A (en) * 2018-05-22 2018-10-16 中国矿业大学 A kind of straight type wall structure column construction method
CN108661240B (en) * 2018-05-22 2019-06-28 中国矿业大学 A kind of straight type wall structure column construction method
CN108547453B (en) * 2018-05-22 2019-06-28 中国矿业大学 A kind of straight type wall structure column constructing device
CN110821176A (en) * 2018-08-07 2020-02-21 中国水利水电第十六工程局有限公司 Construction method of temporary house for construction site
CN110821176B (en) * 2018-08-07 2024-02-27 中国水利水电第十六工程局有限公司 Method for constructing temporary house for construction site
CN111441589A (en) * 2020-04-01 2020-07-24 中建四局第六建设有限公司 Secondary pouring concrete combined type launder

Similar Documents

Publication Publication Date Title
CN102383598A (en) Method for section construction of building project constructional column
CN103924711B (en) Construction Technology of Prefabricated Grid Shear Wall Structural System
KR100937745B1 (en) Constructing method using precast concrete column
CN101858119B (en) Reinforced concrete hollow floor slab and construction method
CN205857530U (en) Joint bar positioner
CN107083804B (en) A kind of wall structure column joint bar construction method
CN102535849B (en) Constructional column top concreting method
CN109487955A (en) A kind of precast concrete column in-situ cast-in-place construction method
CN106400982A (en) Stirrup-densified splicing joint for fabricated reinforced concrete columns
CN106113230B (en) The non-type prefabricated for bench, template system and its construction method can be had enough to meet the need
CN103711065B (en) Cantilever construction Composite Steel-Concrete Bridges and construction method thereof
CN104131700B (en) A kind of door and window Cast-in-situ Beam casting method and mould
CN103741944B (en) Fixation kit, template system containing this fixation kit and body of wall casting method
CN213390464U (en) Gutter inlet forming tool
CN212742938U (en) Pre-buried subassembly of constructional column top reinforcing bar steel construction
CN105064500A (en) Balcony beam slab inner side filling wall body and main body structure integral casting construction method
CN107152112A (en) A kind of modularization Prefabricated stacking floor and its construction method for being used to drop plate region
CN104164882A (en) Construction method for building support structural beam foundation on slope and structure thereof
CN105804396A (en) Precast stair flight manufactured by non-established and circularly-used template system and construction method
CN205476468U (en) Non - design, can all rotary die plate bodys be prefabricated staircase bench template
CN211736514U (en) Interior landing stage board construction system that supports
CN112482636B (en) A formwork-free structure for cast-in-place beams of underground assembled station and its construction method
CN111677000B (en) Method for simultaneously removing multiple connection parts of side wall of new and old subway station
CN204001713U (en) V-type cylinder oblique line section concrete is built mould
CN203145461U (en) Reinforcing steel bar drawing wire

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120321