一种加固饱和流塑淤泥软土地基的施工方法 Download PDFInfo
- Publication number
- CN102383413B CN102383413B CN2011102542398A CN201110254239A CN102383413B CN 102383413 B CN102383413 B CN 102383413B CN 2011102542398 A CN2011102542398 A CN 2011102542398A CN 201110254239 A CN201110254239 A CN 201110254239A CN 102383413 B CN102383413 B CN 102383413B
- Authority
- CN
- China
- Prior art keywords
- main
- silt
- construction
- ditch
- trench
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102542398A CN102383413B (zh) | 2011-08-31 | 2011-08-31 | 一种加固饱和流塑淤泥软土地基的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102542398A CN102383413B (zh) | 2011-08-31 | 2011-08-31 | 一种加固饱和流塑淤泥软土地基的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102383413A CN102383413A (zh) | 2012-03-21 |
CN102383413B true CN102383413B (zh) | 2013-11-20 |
Family
ID=45823214
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102542398A Active CN102383413B (zh) | 2011-08-31 | 2011-08-31 | 一种加固饱和流塑淤泥软土地基的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102383413B (zh) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103031838B (zh) * | 2012-12-07 | 2014-10-08 | 中铁四局集团第三建设有限公司 | 一种桥位深层挤淤方法 |
CN103850239B (zh) * | 2014-04-01 | 2015-08-05 | 兰州理工大学 | 引导式水冲削山造地及泥浆固化处理施工方法 |
CN104358245B (zh) * | 2014-11-12 | 2016-06-29 | 中国电建集团华东勘测设计研究院有限公司 | 一种水工建筑物软基处理的方法 |
CN104895111B (zh) * | 2015-06-16 | 2016-09-28 | 中建五局土木工程有限公司 | 软土地中综合管沟的施工方法 |
CN105297700B (zh) * | 2015-10-15 | 2018-06-29 | 中国建筑第八工程局有限公司 | 一种淤泥、流砂地基处理方法 |
CN105735245B (zh) * | 2016-03-17 | 2018-05-01 | 上海交通大学 | 海边吹填泥层地层中成槽施工的土体加固方法 |
CN106284283A (zh) * | 2016-08-12 | 2017-01-04 | 马鞍山十七冶工程科技有限责任公司 | 一种软基处理换填天然砂砾控制压实方法 |
CN107460866B (zh) * | 2017-09-01 | 2019-02-05 | 东南大学 | 一种深大泥浆坑原位分步固化处理方法 |
CN108457277A (zh) * | 2018-03-01 | 2018-08-28 | 中国水利水电第十工程局有限公司 | 一种大范围深厚淤泥开挖施工方法 |
CN108797759B (zh) * | 2018-06-15 | 2020-06-16 | 中国一冶集团有限公司 | 沉管下方悬空软基水下抛石压浆加固方法 |
CN110029626B (zh) * | 2019-03-20 | 2020-12-01 | 中电建十一局工程有限公司 | 一种软地层边坡上的护岸基础加固处理方法 |
CN110080233A (zh) * | 2019-04-08 | 2019-08-02 | 上海宝冶集团有限公司 | 软弱地基的处理方法 |
CN110862210A (zh) * | 2019-11-26 | 2020-03-06 | 中国二十冶集团有限公司 | 淤泥高效快速无害化还原素土的方法 |
CN111472359A (zh) * | 2020-03-19 | 2020-07-31 | 中国二十冶集团有限公司 | 一种用于泥炭土软基箱涵基础换填施工的方法 |
CN111455969A (zh) * | 2020-03-24 | 2020-07-28 | 中国五冶集团有限公司 | 一种超厚泥炭质土及饱和粉砂地基处理方法 |
CN111894025A (zh) * | 2020-07-28 | 2020-11-06 | 中交路桥华南工程有限公司 | 水下承台的施工方法及围堰结构 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101302757A (zh) * | 2008-03-07 | 2008-11-12 | 张伯谦 | 一种快速处理厚层软土地基的方法 |
CN101761065A (zh) * | 2009-12-17 | 2010-06-30 | 上海岩土工程勘察设计研究院有限公司 | 软土地基处理方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0820941A (ja) * | 1994-07-05 | 1996-01-23 | Yojiro Uike | 含水軟弱地盤の改良工法 |
JP2933901B2 (ja) * | 1997-12-17 | 1999-08-16 | 太平工業株式会社 | スラグを用いた軟弱地盤の強化方法 |
-
2011
- 2011-08-31 CN CN2011102542398A patent/CN102383413B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101302757A (zh) * | 2008-03-07 | 2008-11-12 | 张伯谦 | 一种快速处理厚层软土地基的方法 |
CN101761065A (zh) * | 2009-12-17 | 2010-06-30 | 上海岩土工程勘察设计研究院有限公司 | 软土地基处理方法 |
Non-Patent Citations (4)
Title |
---|
抛石挤淤地基承载力的试验方法;靳九贵;《河南科技》;20040115(第01期);第32页 * |
抛石挤淤综合法及其在加固浅层淤泥质地基中的应用;朱逢春等;《治淮》;20010630(第06期);第26-27页 * |
朱逢春等.抛石挤淤综合法及其在加固浅层淤泥质地基中的应用.《治淮》.2001,(第06期),第26-27页. |
靳九贵.抛石挤淤地基承载力的试验方法.《河南科技》.2004,(第01期),第32页. |
Also Published As
Publication number | Publication date |
---|---|
CN102383413A (zh) | 2012-03-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102383413B (zh) | 一种加固饱和流塑淤泥软土地基的施工方法 | |
CN104131575B (zh) | 一种岩溶高度发育地层坝基的堵漏排水方法 | |
CN105178125B (zh) | 一种湖区高填路基吹沙路堤施工方法和路堤结构 | |
CN103283335B (zh) | 黄河泥沙复垦采煤沉陷地的充填复耕方法 | |
CN102995599B (zh) | 湿陷性黄土输水渠道的抗冻防渗导水治理方法 | |
CN104514216A (zh) | 一种填方渠道抗冻胀防渗结构及施工方法 | |
CN110424421A (zh) | 废弃矿山台田围护生态修复方法 | |
CN100570077C (zh) | 用于岩溶地区赤泥堆场的水平防渗结构 | |
CN112663558B (zh) | 一种内河港池中风化岩开挖施工工艺 | |
CN212801395U (zh) | 一种城区泥石流沟道型弃渣场综合治理系统 | |
CN101029490B (zh) | 一种岩/土体边坡的防护与治理方法 | |
CN102518136A (zh) | 一种防治软岩强风化带湿化破坏的柔性加筋组合防护结构 | |
CN2908612Y (zh) | 用于岩溶地区赤泥堆场的水平防渗结构 | |
CN116516898B (zh) | 一种高地下水挖方渠道边坡排水体系及施工方法 | |
CN110804994B (zh) | 一种水库大坝施工方法 | |
CN104164883A (zh) | 一种松散非饱和土边坡浅层再压实结合植被覆盖防护方法 | |
CN103276717A (zh) | 复合土工合成材料加筋垫层处理软土地基的方法 | |
CN102425179A (zh) | 一种微型钢管灌注桩支撑加筋土渗沟结构 | |
CN205062597U (zh) | 一种湖区高填路基吹沙路堤结构 | |
CN108547281A (zh) | 加快放淤固堤工程淤背体固结的排水结构及其施工方法 | |
CN111335290B (zh) | 适用于淤泥质地基的海上人工岛结构及施工方法 | |
CN111827198A (zh) | 一种潮汐湖水环境生态修复中控水换填的施工方法 | |
CN217055164U (zh) | 一种富水砂层盾构下穿水利构筑物加固结构 | |
CN118327032B (zh) | 一种高寒区含大冲沟边坡的挡土排水系统及其实施方法 | |
CN219604401U (zh) | 一种适用于软弱回填区的重力式挡土墙排水结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 412004 No. 1308, No. 158, Zhongyi Road, Yuhua District, Hunan, Changsha Applicant after: CCFEB Civil Engineering Co., Ltd. Applicant after: Northeastern University Address before: 110819 Heping Road, Heping District, Liaoning, Shenyang, Lane No. 11, No. 3 Applicant before: Northeastern University Applicant before: CCFEB Civil Engineering Co., Ltd. |
|
CB03 | Change of inventor or designer information |
Inventor after: Li Zhihua Inventor after: Sun Jie Inventor after: Wang Shuhong Inventor after: Liu Xiangyuan Inventor after: Chen Wenhui Inventor before: Chen Wenhui Inventor before: Sun Jie Inventor before: Wang Shuhong Inventor before: Liu Xiangyuan Inventor before: Yu Zhihua |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: CHEN WENHUI SUN KAI WANG SHUHONG LIU XIANGYUAN YU ZHIHUA TO: LI ZHIHUA SUNKAI WANG SHUHONG LIU XIANGYUAN CHEN WENHUI Free format text: CORRECT: APPLICANT; FROM: NORTHEAST UNIV. TO: THE CIVIL ENGINEERING COMPANY OF CHINA FIFTH ENGINEERING BUREAU LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |