CN102375105A - Simulation test system of substation equipment relay protection system - Google Patents
Simulation test system of substation equipment relay protection system Download PDFInfo
- Publication number
- CN102375105A CN102375105A CN2011101781372A CN201110178137A CN102375105A CN 102375105 A CN102375105 A CN 102375105A CN 2011101781372 A CN2011101781372 A CN 2011101781372A CN 201110178137 A CN201110178137 A CN 201110178137A CN 102375105 A CN102375105 A CN 102375105A
- Authority
- CN
- China
- Prior art keywords
- relay
- protection
- tested
- terminal
- protection system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Emergency Protection Circuit Devices (AREA)
Abstract
The invention relates to a substation protection system, in particular to a test system of a substation equipment protection system. The simulation test system of the substation equipment protection system comprises a tested protection device, a relay protection tester, a junction box, a terminal and a programmable controller, wherein the junction box is used for connecting the tested protection device and the relay protection tester through a wiring cable; the terminal is preassembled with related test software; the terminal is connected with the relay protection tester through a superoxide five wire; and the programmable controller is connected with the terminal through a field bus, is connected with the junction box through a wiring cable and is connected with the tested protection device through a field bus and a wiring cable. The test system disclosed by the invention can be used for carrying out simulation test on the protection system in advance and has the capability of finishing upgrading of the protection system under the condition of not powering off.
Description
Technical field
The present invention relates to the substation protection system, relate in particular to the test macro of substation facilities protection system.
Background technology
The large-scale transformer and distribution station of China is built in the eighties in last century more, can not satisfy the needs of modern power systems management mode far away to its means of relay protection now, therefore must upgrade to original protective device.Be because the power supply object of large-scale electric substation all is some important production unit and places; For the economic loss that house of correction is produced minimizes; Just must in that do not have a power failure or short as far as possible power-off time, upgrade to protective relay; Otherwise just necessary power down process will cause very big influence to worker, civilian electricity.
Summary of the invention
The present invention is intended to address the aforementioned drawbacks, and a kind of substation facilities relay protection system simulated testing system is provided.The present invention can carry out simulation test to protection system in advance, can not accomplish the upgrading of protection system with cutting off the power supply.
A kind of substation facilities relay protection system simulated testing system; It comprises protective device to be tested, relay-protection tester and one couple together protective device to be tested and relay-protection tester through the wire harness cable junction box, and said test macro also comprises:
A prepackage has the terminal of dependence test software, and this terminal connects said relay-protection tester through CAT5E UTP cable;
A Programmable Logic Controller, it is connected with described terminal through fieldbus, is connected with the wire harness cable with the junction box, is connected with the wire harness cable through fieldbus with protective device to be tested.
The present invention can simulate the practical operation situation behind the protective device upgrading truly, be convenient to find in advance to design and equipment in the problem that exists, and solve.
Description of drawings
Below, in conjunction with accompanying drawing, the present invention is further described
Fig. 1 is a synoptic diagram of the present invention.
Embodiment
As shown in Figure 1; A kind of substation facilities relay protection system of the present invention simulated testing system; It comprises protective device to be tested 1, relay-protection tester 2 and one couple together protective device 1 to be tested and relay-protection tester 2 through wire harness cable 10 junction box 3, and said test macro also comprises:
A prepackage has the terminal 4 of dependence test software, and this terminal connects said relay-protection tester 2 through CAT5E UTP cable 11; A Programmable Logic Controller 5, it is connected with described terminal 4 through fieldbus 12, is connected with wire harness cable 10 with junction box 3, is connected with wire harness cable 10 through fieldbus 12 with protective device 1 to be tested.Described test macro also comprises a power supply of supplying power to test macro incessantly.
Embodiment
Simulator program is write
Combined floodgate logic and the separating brake logic of using Programmable Logic Controller (S7-300) to come analog switch; According to actual switch once with secondary hardware device, and its branch, closing locking condition; Establishment one cover soft logic program, thus reach purpose to the emulation of relay protection logic testing signal system.Below provided " branch, the combined floodgate logical design thinking of isolating switch commonly used ".
The establishment of MI picture
Through Siemens SIMATIC WINCC human interface software; Write the pictures such as status surveillance, fault alarm, Data Detection of cover electric substation each equipment in conjunction with electric substation's actual motion state, simulation realizes internal data communication tests such as the remote control, remote measurement, remote signalling of electric substation.
Analogue means inserts
After having accomplished work such as programming in logic and the establishment of HMI picture, just can carry out the access test of analogue means, whether the test simulation loop can true(-)running, and detects the degree of compatibility of tested device for original system.Fig. 4 is the line chart of analogue means.
Realistic simulation signal for high-voltage switch gear one action condition, secondary singal and operating power etc. passes through the simulation test junction box, realizes the switching value simulation.Each section busbar voltage, line voltage distribution, electric current and signals such as meritorious and reactive power are realized the analog quantity simulation through the relay protection tester.
The network signal test
Through the S7-300 programming software, detect the correctness of protective relay to HMI picture signal, and the consistance of each protective relay terminal address and the corresponding station of picture.
The present invention improves substation protection system update upgrading safety of construction; Substation protection system upgrade in the past; Only do the monomer test of protection equipment early stage; Chain and internal data communication all must be tested after equipment replacement to the logic between the protection system, if run into design mistake or with the unmatched situation of legacy system interface signal, very easily cause electric substation's tripping operation accident.Our this cover simulation device; Can under off-line case, accomplish complete analog simulation test to protection equipment; And all signal transfer of the device that can be replaced needs through the bypass switching way can improve online construction to greatest extent and transform accuracy and safety coefficient to the model test device.
The present invention shortens the power off time that substation protection system update upgrading construction is transformed; Because signal testing must carry out at the construction field (site) in the past; The transformation time of such covering device need be used 3~5 days; Use the analogue means test signal, the renewal update time of single cover facility only just can be accomplished with 2~3 days at present.
Claims (2)
1. substation facilities relay protection system simulated testing system; It comprises protective device to be tested, relay-protection tester and one couple together protective device to be tested and relay-protection tester through the wire harness cable junction box; Said test macro also comprises: a prepackage has the terminal of dependence test software, and this terminal connects said relay-protection tester through CAT5E UTP cable; A Programmable Logic Controller, it is connected with described terminal through fieldbus, is connected with the wire harness cable with the junction box, is connected with the wire harness cable through fieldbus with protective device to be tested.
2. substation facilities relay protection system simulated testing system as claimed in claim 1 is characterized in that, described test macro also comprises a power supply of supplying power to test macro incessantly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011101781372A CN102375105A (en) | 2010-07-22 | 2011-06-29 | Simulation test system of substation equipment relay protection system |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202680990U CN201892726U (en) | 2010-07-22 | 2010-07-22 | Simulation test system for protective relaying system of electric power substation equipment |
CN201020268099.0 | 2010-07-22 | ||
CN2011101781372A CN102375105A (en) | 2010-07-22 | 2011-06-29 | Simulation test system of substation equipment relay protection system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102375105A true CN102375105A (en) | 2012-03-14 |
Family
ID=44222198
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202680990U Expired - Lifetime CN201892726U (en) | 2010-07-22 | 2010-07-22 | Simulation test system for protective relaying system of electric power substation equipment |
CN2011101781372A Pending CN102375105A (en) | 2010-07-22 | 2011-06-29 | Simulation test system of substation equipment relay protection system |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202680990U Expired - Lifetime CN201892726U (en) | 2010-07-22 | 2010-07-22 | Simulation test system for protective relaying system of electric power substation equipment |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN201892726U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103364663A (en) * | 2013-07-16 | 2013-10-23 | 上海毅昊自动化有限公司 | Intelligent device for simulating transformer substation primary equipment behavior |
CN104467182A (en) * | 2014-12-05 | 2015-03-25 | 国家电网公司 | Substation control layer device non-power-outage remote control system and method |
CN105548742A (en) * | 2015-12-04 | 2016-05-04 | 国家电网公司华东分部 | Remote relay protection test system |
CN109541353A (en) * | 2018-11-30 | 2019-03-29 | 广州供电局有限公司 | Power distribution automation detection system |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103544104B (en) * | 2013-10-22 | 2017-01-11 | 珠海许继电气有限公司 | Testing method for power distribution terminal remote control functional software module |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0365664A (en) * | 1989-08-02 | 1991-03-20 | Kansai Electric Power Co Inc:The | Apparatus and method for testing transformer protecting relay apparatus |
US20060014585A1 (en) * | 2004-07-15 | 2006-01-19 | Raja Neogi | Dynamic insertion of personalized content in online game scenes |
CN2826453Y (en) * | 2004-11-30 | 2006-10-11 | 湖南大学 | Multifunctional microcomputer protection and converting station integrated automation experiment training system |
CN101482602A (en) * | 2008-11-25 | 2009-07-15 | 甘肃电力科学研究院 | Detection analysis system of relay-protection tester |
CN201319063Y (en) * | 2008-11-25 | 2009-09-30 | 甘肃电力科学研究院 | Detecting and analyzing device of relay protection testing device |
CN201449436U (en) * | 2009-06-08 | 2010-05-05 | 南京工业职业技术学院 | Fault Diagnosis and Location System of Grounding Grid in Electric Power System |
CN201518052U (en) * | 2009-10-26 | 2010-06-30 | 江西省电力科学研究院 | Portable all-digital relay protection transient closed-loop tester |
-
2010
- 2010-07-22 CN CN2010202680990U patent/CN201892726U/en not_active Expired - Lifetime
-
2011
- 2011-06-29 CN CN2011101781372A patent/CN102375105A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0365664A (en) * | 1989-08-02 | 1991-03-20 | Kansai Electric Power Co Inc:The | Apparatus and method for testing transformer protecting relay apparatus |
US20060014585A1 (en) * | 2004-07-15 | 2006-01-19 | Raja Neogi | Dynamic insertion of personalized content in online game scenes |
CN2826453Y (en) * | 2004-11-30 | 2006-10-11 | 湖南大学 | Multifunctional microcomputer protection and converting station integrated automation experiment training system |
CN101482602A (en) * | 2008-11-25 | 2009-07-15 | 甘肃电力科学研究院 | Detection analysis system of relay-protection tester |
CN201319063Y (en) * | 2008-11-25 | 2009-09-30 | 甘肃电力科学研究院 | Detecting and analyzing device of relay protection testing device |
CN201449436U (en) * | 2009-06-08 | 2010-05-05 | 南京工业职业技术学院 | Fault Diagnosis and Location System of Grounding Grid in Electric Power System |
CN201518052U (en) * | 2009-10-26 | 2010-06-30 | 江西省电力科学研究院 | Portable all-digital relay protection transient closed-loop tester |
Non-Patent Citations (3)
Title |
---|
张沛云等: "继电保护的模拟试验", 《电气应用》, vol. 25, no. 07, 31 July 2006 (2006-07-31) * |
王力军等: "数字仿真系统振荡在继电保护测试中的应用", 《湖北电力》, vol. 23, no. 04, 31 December 1999 (1999-12-31) * |
陈振宇等: "数字仿真技术在继电保护测试中的应用", 《河南电力》, no. 03, 31 March 1997 (1997-03-31) * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103364663A (en) * | 2013-07-16 | 2013-10-23 | 上海毅昊自动化有限公司 | Intelligent device for simulating transformer substation primary equipment behavior |
CN103364663B (en) * | 2013-07-16 | 2015-06-17 | 上海毅昊自动化有限公司 | Intelligent device for simulating transformer substation primary equipment behavior |
CN104467182A (en) * | 2014-12-05 | 2015-03-25 | 国家电网公司 | Substation control layer device non-power-outage remote control system and method |
CN105548742A (en) * | 2015-12-04 | 2016-05-04 | 国家电网公司华东分部 | Remote relay protection test system |
CN105548742B (en) * | 2015-12-04 | 2018-11-09 | 国家电网公司华东分部 | System is tested in a distant place for relay protection |
CN109541353A (en) * | 2018-11-30 | 2019-03-29 | 广州供电局有限公司 | Power distribution automation detection system |
Also Published As
Publication number | Publication date |
---|---|
CN201892726U (en) | 2011-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103123758B (en) | A kind of dispatching automation numeral physical mixed simulation training system | |
CN104505941B (en) | The monitoring system and the simulative running system of intelligent substation network | |
CN202159106U (en) | Intelligent tester with intelligent power grid self-healing control technology | |
CN102447305B (en) | Topological anti-misoperation system for power grid | |
CN103713214A (en) | Intelligent transformer station relay protection closed loop test system | |
CN101465563A (en) | Integrated automation integration protection method and system | |
CN104242472B (en) | A kind of railway station low buckling distribution intelligent monitor system | |
CN102375105A (en) | Simulation test system of substation equipment relay protection system | |
CN104076807B (en) | The adjustment method of the automated system of intelligent substation | |
CN105548742A (en) | Remote relay protection test system | |
CN102426309A (en) | Method for testing area spare power automatic switching system in engine room environment of master station | |
CN103236362A (en) | PLC-based (programmable logic controller-based) knife switch control method and system | |
CN104701979A (en) | Protective measurement and control integrated device and protective measurement and control method | |
CN201374500Y (en) | Intelligent power distribution cabinet | |
CN103746304A (en) | Reconstruction method of intelligent transformer station | |
CN103746454B (en) | A kind of monitoring of the ship power distribution based on PSCAD and PLC and director method | |
CN109374994A (en) | A detection system suitable for relay protection device | |
CN104569686B (en) | A kind of intelligent substation and its intelligent secondary device test system | |
CN205484589U (en) | Overload protection device checkback auxiliary and monitoring system | |
CN113990132A (en) | Power transformation and distribution operation and maintenance integrated practical training system and practical training method | |
CN101651361A (en) | Integrated automation system of substation | |
CN109270379B (en) | In-situ relay protection embedded test method capable of switching protection function | |
CN102508052A (en) | Test method for field band channel operation of automatic bus transfer system of area network | |
CN206020546U (en) | Distribution power automation terminal O&M test system | |
CN103077644B (en) | Split-phase breaker hydraulic operation mechanism training device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C05 | Deemed withdrawal (patent law before 1993) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120314 |