CN102366971A - 混凝土管桩张拉系统 - Google Patents
混凝土管桩张拉系统 Download PDFInfo
- Publication number
- CN102366971A CN102366971A CN2011102789314A CN201110278931A CN102366971A CN 102366971 A CN102366971 A CN 102366971A CN 2011102789314 A CN2011102789314 A CN 2011102789314A CN 201110278931 A CN201110278931 A CN 201110278931A CN 102366971 A CN102366971 A CN 102366971A
- Authority
- CN
- China
- Prior art keywords
- plate
- draw
- stretch
- stretching
- interior
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011148 porous material Substances 0.000 claims description 9
- 230000008878 coupling Effects 0.000 claims description 7
- 238000010168 coupling process Methods 0.000 claims description 7
- 238000005859 coupling reaction Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 229910000831 Steel Inorganic materials 0.000 abstract 3
- 239000010959 steel Substances 0.000 abstract 3
- 238000005516 engineering process Methods 0.000 description 4
- 238000000465 moulding Methods 0.000 description 2
- FGRBYDKOBBBPOI-UHFFFAOYSA-N 10,10-dioxo-2-[4-(N-phenylanilino)phenyl]thioxanthen-9-one Chemical compound O=C1c2ccccc2S(=O)(=O)c2ccc(cc12)-c1ccc(cc1)N(c1ccccc1)c1ccccc1 FGRBYDKOBBBPOI-UHFFFAOYSA-N 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明涉及一种混凝土管桩张拉系统,包括管桩模具,以及设在管桩模具内的钢丝笼,所述钢丝笼的两端分别为首端头板和尾端头板,其创新点在于:所述管桩模具的首端固定有外张拉板,所述首端头板连接有内张拉板,所述内张拉板中心固定有一锁紧螺杆,所述锁紧螺杆向外伸出外张拉板后与锁紧螺母螺纹锁紧。内张拉板与首端头板连接,采用锁紧螺母和外张拉板配合对锁紧螺杆施加拉力,通过与锁紧螺杆连接的内张拉板来拉动首端头板,钢丝笼受力均匀,保证成型后管桩质量,且张拉系统组件少,制作成本低。
Description
技术领域
本发明涉及一种混凝土管桩张拉系统,特别涉及一种张拉效果好的混凝土管桩张拉系统。
背景技术
随着混凝土技术的发展,混凝土管桩的技术也日趋成熟,除应用于工业、民用建筑外,还广泛应用于桥梁、港口、铁路或水利工程等各领域。
在进行混凝土管桩的生产时,需要对管桩模具内的钢丝笼进行预应力张拉,目前的张拉系统中张拉力直接传递到端头板上,其受力不均,易产生偏心,成型后钢丝笼PC棒的预应力不一致,管桩的抗拉、抗压能力以及抗剪能力均受到影响。
专利申请号201020003653.2公开了一种管桩预应力张拉装置,其在钢丝笼的端头板上通过螺栓固定有联接板,而联接板的另一端联接有联接头,通过联接头内置的内螺母与锁紧螺杆联接。张拉时由锁紧螺杆通过内螺母和联接头配合对联接板施加拉力,使得张拉力均匀传递到端头板上,各点预应力基本一致,成型质量较好。其缺点是:锁紧螺杆通过联接头、内螺母、联接板与端头板连接,零部件多,制造成本较高,管径较大的管桩尤为明显。另外,联接板和端头板之间采用螺栓螺纹锁紧,放张时需要拆卸下来,比较费时,影响整体的放张效率。
发明内容
本发明要解决的技术问题是提供一种张拉效果好的混凝土管桩张拉系统。
为解决上述技术问题,本发明的技术方案为:一种混凝土管桩张拉系统,包括管桩模具,以及设在管桩模具内的钢丝笼,所述钢丝笼的两端分别为首端头板和尾端头板,其创新点在于:所述管桩模具的首端固定有外张拉板,所述首端头板连接有内张拉板,所述内张拉板中心固定有一锁紧螺杆,所述锁紧螺杆向外伸出外张拉板后与锁紧螺母螺纹锁紧。
进一步的,所述首端头板通过快速拆卸结构与内张拉板连接,其具体结构为:所述首端头板上连接有若干内张拉板螺栓,所述内张拉板上均匀分布有若干与内张拉板螺栓对应的连接孔,所述连接孔由连通过渡孔和锁紧孔组成,所述过渡孔的孔径大于内张拉板螺栓的端部外径,所述锁紧孔的孔径大于内张拉板螺栓的杆体外径且小于内张拉板螺栓的端部外径。
本发明的优点在于:内张拉板与首端头板连接,采用锁紧螺母和外张拉板配合对锁紧螺杆施加拉力,通过与锁紧螺杆连接的内张拉板来拉动首端头板,钢丝笼受力均匀,保证成型后管桩质量,且张拉系统组件少,制作成本低。
首端头板通过快速拆卸结构与内张拉板连接,使用时,内张拉板螺栓螺纹锁紧在首端头板上,内张拉板的过渡孔对准内张拉板螺栓,使得内张拉板螺栓的端部伸出过渡孔,再转动内张拉板可使得内张拉板螺栓转移至锁紧孔内,利用锁紧孔的孔径大于内张拉板螺栓的杆体外径且小于内张拉板螺栓的端部外径实现首端头板与内张拉板的连接固定。拆卸时只需反转即可即可使得首段头板和内张拉板脱离,无需拆卸螺栓,可提高了放张效率。
附图说明
图1为本发明混凝土管桩张拉系统结构示意图。
图2为本发明中内张拉板结构示意图。
具体实施方式
如图1、2所示,包括管桩模具1、钢丝笼2、首端头板3、尾端头板4、内张拉板5、内张拉板螺栓6、过渡孔71、锁紧孔72、外张拉板8、锁紧螺杆9、锁紧螺母10。
上述管桩模具1内设有钢丝笼2,钢丝笼2的两端中靠近管桩模具1首端的一端设有首端头板3,靠近管桩模具1尾端的一端设有尾端头板4。若混凝土管桩为双节桩或多节桩,其钢丝笼为两套或两套以上,则相邻的钢丝笼之间通过张拉接头器11连接。
首端头板3上连接有内张拉板5,该内张拉板5通过快速拆卸结构与首端头板3连接,其具体结构为:首端头板3上连接有若干内张拉板螺栓6,内张拉板5上均匀分布有若干与内张拉板螺栓6对应的连接孔,该连接孔由连通过渡孔71和锁紧孔72组成,过渡孔71的孔径大于内张拉板螺栓6的端部外径,锁紧孔72的孔径大于内张拉板螺栓6的杆体外径且小于内张拉板螺栓6的端部外径。
管桩模具1的首端固定有外张拉板8,该外张拉板8为中心开孔的法兰结构,其通过螺栓与管桩模具1的首端法兰面连接锁紧。
管桩模具1的尾端法兰面固定有尾板12,尾板12上开有两圈法兰孔,其分别通过螺栓与管桩模具1的尾端法兰面以及尾端头板4连接锁紧。尾端头板4与尾板12之间固定有蒙板。
内张拉板5中心设有一锁紧螺杆9,该锁紧螺杆9一端通过内张拉板5中心的内螺纹结构与内张拉板5锁紧固定,锁紧螺杆9的另一端向外伸出外张拉板8中心的孔后螺纹滑配一锁紧螺母10。
锁紧螺杆9长度不够时,可通过螺母套连接另一端锁紧螺杆来实现加长。
使用时,旋转锁紧螺母10,锁紧螺母10与外张拉板8配合对锁紧螺杆9施加拉力,通过与锁紧螺杆9连接的内张拉板5来拉动首端头板3,钢丝笼2受力均匀。
Claims (2)
1.一种混凝土管桩张拉系统,包括管桩模具,以及设在管桩模具内的钢丝笼,所述钢丝笼的两端分别为首端头板和尾端头板,其特征在于:所述管桩模具的首端固定有外张拉板,所述首端头板连接有内张拉板,所述内张拉板中心固定有一锁紧螺杆,所述锁紧螺杆向外伸出外张拉板后与锁紧螺母螺纹锁紧。
2.根据权利要求1所述的混凝土管桩张拉系统,其特征在于:所述首端头板通过快速拆卸结构与内张拉板连接,其具体结构为:所述首端头板上连接有若干内张拉板螺栓,所述内张拉板上均匀分布有若干与内张拉板螺栓对应的连接孔,所述连接孔由连通过渡孔和锁紧孔组成,所述过渡孔的孔径大于内张拉板螺栓的端部外径,所述锁紧孔的孔径大于内张拉板螺栓的杆体外径且小于内张拉板螺栓的端部外径。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102789314A CN102366971A (zh) | 2011-09-20 | 2011-09-20 | 混凝土管桩张拉系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102789314A CN102366971A (zh) | 2011-09-20 | 2011-09-20 | 混凝土管桩张拉系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102366971A true CN102366971A (zh) | 2012-03-07 |
Family
ID=45759583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102789314A Pending CN102366971A (zh) | 2011-09-20 | 2011-09-20 | 混凝土管桩张拉系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102366971A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102672821A (zh) * | 2012-05-24 | 2012-09-19 | 宁波浙东新冈建材设备有限公司 | 同时制造多根预应力混凝土管桩的张拉工具 |
CN103552150A (zh) * | 2013-09-29 | 2014-02-05 | 国鼎(南通)管桩有限公司 | 预应力组合支护桩钢模结构 |
CN105235065A (zh) * | 2014-05-31 | 2016-01-13 | 北票电力电杆制造有限公司 | 部分预应力电杆张拉连接锚固设备及锚固方法 |
CN106426543A (zh) * | 2016-11-30 | 2017-02-22 | 如皋市中正机械有限公司 | 轻型张拉装置 |
CN108312326A (zh) * | 2018-01-09 | 2018-07-24 | 国鼎(南通)管桩有限公司 | 一种预应力混凝土钢管桩及其生产工艺 |
CN111764381A (zh) * | 2020-05-30 | 2020-10-13 | 徐东新 | 一种预应力高强混凝土管桩桩身的钢结构 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2016433A6 (es) * | 1989-01-11 | 1990-11-01 | Tecnipost Sa | Procedimiento para la fabricacion de postes sustentadores y un poste fabricado segun dicho procedimiento. |
CN1446677A (zh) * | 2002-03-21 | 2003-10-08 | 金承洙 | 制造电杆的方法和装置 |
CN202241581U (zh) * | 2011-09-20 | 2012-05-30 | 国鼎(南通)管桩有限公司 | 混凝土管桩张拉系统 |
-
2011
- 2011-09-20 CN CN2011102789314A patent/CN102366971A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2016433A6 (es) * | 1989-01-11 | 1990-11-01 | Tecnipost Sa | Procedimiento para la fabricacion de postes sustentadores y un poste fabricado segun dicho procedimiento. |
CN1446677A (zh) * | 2002-03-21 | 2003-10-08 | 金承洙 | 制造电杆的方法和装置 |
CN202241581U (zh) * | 2011-09-20 | 2012-05-30 | 国鼎(南通)管桩有限公司 | 混凝土管桩张拉系统 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102672821A (zh) * | 2012-05-24 | 2012-09-19 | 宁波浙东新冈建材设备有限公司 | 同时制造多根预应力混凝土管桩的张拉工具 |
CN103552150A (zh) * | 2013-09-29 | 2014-02-05 | 国鼎(南通)管桩有限公司 | 预应力组合支护桩钢模结构 |
CN105235065A (zh) * | 2014-05-31 | 2016-01-13 | 北票电力电杆制造有限公司 | 部分预应力电杆张拉连接锚固设备及锚固方法 |
CN105235065B (zh) * | 2014-05-31 | 2017-04-26 | 北票电力电杆制造有限公司 | 部分预应力电杆张拉连接锚固设备及锚固方法 |
CN106426543A (zh) * | 2016-11-30 | 2017-02-22 | 如皋市中正机械有限公司 | 轻型张拉装置 |
CN108312326A (zh) * | 2018-01-09 | 2018-07-24 | 国鼎(南通)管桩有限公司 | 一种预应力混凝土钢管桩及其生产工艺 |
CN111764381A (zh) * | 2020-05-30 | 2020-10-13 | 徐东新 | 一种预应力高强混凝土管桩桩身的钢结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111058440B (zh) | 一种混凝土预制桩的机械连接装置及制作方法 | |
CN102366971A (zh) | 混凝土管桩张拉系统 | |
CN101413397A (zh) | 自钻孔岩石锚杆 | |
CN202241581U (zh) | 混凝土管桩张拉系统 | |
CN204370701U (zh) | 用于装配式混凝土建筑结构中的钢筋机械连接装置 | |
CN106626045A (zh) | 一种预应力混凝土电杆及其模具和制造方法 | |
CN107419809A (zh) | 一种装配式建筑连接件 | |
CN203510449U (zh) | 一种用于管桩生产中的新型张拉装置 | |
CN211735370U (zh) | 一种混凝土预制桩的机械连接装置 | |
CN203782982U (zh) | 预制件钢筋的连接组件 | |
CN103469967B (zh) | 钢筋砼构件装配式建筑构件钢筋连接套筒 | |
CN102672821B (zh) | 同时制造多根预应力混凝土管桩的张拉工具 | |
CN202611109U (zh) | 钢绞线连接器 | |
CN202622987U (zh) | 同时制造多根预应力混凝土管桩的张拉工具 | |
CN204431470U (zh) | 一种混凝土管桩张拉系统 | |
CN102490266A (zh) | 与基础承台非焊接连接的先张法预应力混凝土桩的制备方法 | |
CN102561599A (zh) | 钢绞线与精轧螺纹钢筋连接器 | |
CN210828316U (zh) | 带圆柱剪力墙模板交接加固固定装置 | |
CN104989106A (zh) | 全预应力张拉板套件 | |
CN102366970A (zh) | 一种混凝土管桩整体放张装置 | |
CN103266668A (zh) | 一种竹结构转换接头 | |
CN202391018U (zh) | 钢绞线与精轧螺纹钢筋连接器 | |
CN105114412B (zh) | 采用预应力索的复合材料管连接接头及其使用方法 | |
CN214520982U (zh) | 一种混凝土管桩止浆张拉板的张拉系统 | |
CN204960340U (zh) | 全预应力张拉板套件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20120307 |