CN102358579A - Base-tower combined mechanism of tower crane - Google Patents

Base-tower combined mechanism of tower crane Download PDF

Info

Publication number
CN102358579A
CN102358579A CN2011102719909A CN201110271990A CN102358579A CN 102358579 A CN102358579 A CN 102358579A CN 2011102719909 A CN2011102719909 A CN 2011102719909A CN 201110271990 A CN201110271990 A CN 201110271990A CN 102358579 A CN102358579 A CN 102358579A
Authority
CN
China
Prior art keywords
pulley
tower
steel rope
otic placode
stock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102719909A
Other languages
Chinese (zh)
Other versions
CN102358579B (en
Inventor
刘晓胜
王伟琦
樊滨
黄春元
张良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HARBIN DONGJIAN MACHINERY MANUFACTURING Co Ltd
Original Assignee
HARBIN DONGJIAN MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HARBIN DONGJIAN MACHINERY MANUFACTURING Co Ltd filed Critical HARBIN DONGJIAN MACHINERY MANUFACTURING Co Ltd
Priority to CN 201110271990 priority Critical patent/CN102358579B/en
Publication of CN102358579A publication Critical patent/CN102358579A/en
Application granted granted Critical
Publication of CN102358579B publication Critical patent/CN102358579B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention discloses a base-tower combined mechanism of a tower crane, and relates to the tower crane. The base-tower combined mechanism solves the problem that erection and dismantlement of the existing tower crane are very trouble so that a construction period of constructional engineering is delayed. The base-tower combined mechanism is characterized in that a casing frame is rotatingly connected to a support frame through a rotating shaft; the casing frame is located at the exterior of a standard joint and is slideably coupled to the standard joint; a hanger plate is installed at the bottom of the interior of the standard joint; an output terminal of a fast cradle motor is connected to one end of a first steel wire rope; the other end of the first steel wire rope orderly rounds a tenth pulley, an eleventh pulley and a sixth pulley, then rounds upward a first pulley, enters downward into the hanger plate, rounds a fourth pulley, returns upward, rounds a second pulley, turns downward, rounds a fifth pulley, returns upward, rounds a third pulley, turns downward, rounds a ninth pulley, and is connected to a fixing ear plate; and a first connecting ear plate is connected to an end of a second first steel wire rope. The base-tower combined mechanism is utilized for a tower crane.

Description

The pedestal of tower crane and body of the tower combination mechanism
Technical field
The present invention relates to a kind of tower crane.
Background technology
At present, the employed tower crane majority of China's construction trade is old-fashioned conventional fixed arm type tower machine, its arm and body of the tower all be as an integral installation on the tower machine.In some crowded occasion, old-fashioned conventional fixed arm type tower machine building operation used often seem clumsy, there is series of malpractice, set up and remove cumbersome, delayed the construction period of building engineering, use extremely not convenient.Domestic tower machine exists bigger gap with international similar advanced product.
Summary of the invention
The pedestal and the body of the tower combination mechanism that the purpose of this invention is to provide a kind of tower crane, with solve present tower machine set up and dismounting is full of trouble, delayed the problem of the construction period of building engineering.
The present invention solves the problems of the technologies described above the technical scheme of taking to be: said combination mechanism comprises that bracing frame, stock, standard knot, S. A., fast suspension bracket are established motor, fixedly otic placode, first connects otic placode, the second connection otic placode, first steel rope, second steel rope, the 3rd steel rope, boatswain chair, first pulley, second pulley, the 3rd pulley, the 4th pulley, the 5th pulley, the 6th pulley, the 7th pulley, the 8th pulley, the 9th pulley, the tenth pulley, the 11 pulley and two permanent seats; Stock is rotationally connected through S. A. and bracing frame; Stock is sleeved on the two sliding block joint of outside of standard knot; First pulley, second pulley, the 3rd pulley all are contained in the top of stock,, second pulley 14 is between first pulley 13 and the 3rd pulley 15; Boatswain chair is contained in the bottom in the standard knot; Be fixed with the 4th pulley, the 5th pulley and two permanent seats on the boatswain chair, the 6th pulley, the 7th pulley, the 8th pulley and the 9th pulley coaxle are packed in the stock bottom, and fast suspension bracket is established motor, fixedly otic placode, the first connection otic placode, second connect otic placode, the 9th pulley and the tenth pulley and be packed on the bracing frame; The mouth that fast suspension bracket is established motor is connected with an end of first steel rope; The other end of first steel rope upwards gets into boatswain chair downwards after pile warp is crossed the tenth pulley, the 11 pulley and the 6th pulley successively behind pile warp first pulley, upwards return behind pile warp the 4th pulley; Switching-over downwards behind pile warp second pulley; Through upwards returning behind the 5th pulley, behind pile warp the 3rd pulley switching-over downwards, through being connected with fixing otic placode behind the 9th pulley; First connects otic placode is connected with an end of second steel rope; Other end pile warp the 8th pulley of second steel rope is connected with corresponding permanent seat, and second connects otic placode is connected with an end of the 3rd steel rope, and other end pile warp the 7th pulley of the 3rd steel rope is connected with corresponding permanent seat.
The present invention has following beneficial effect: setting up of 1 body of the tower of the present invention is movable by single motor-driven; Led by 11 pulleys, 3 cover steel wire cables connect, and the operational tower machine is accomplished folding and upright action and acted freely; Through pulley and the unique design of climbing pawl mechanism; Effectively slow down the heavy burden pulling force that steel rope bears, prolonged steel rope service life, improved the safe reliability of whole mechanism.2. this is simple in structure, and is with low cost, easy to operate, has taken into account the safety and the flexible adaptation ability of tower machine, is easy to promote.
Description of drawings
Integral structure scheme drawing when the integral structure scheme drawing when Fig. 1 is the vertical state of body of the tower of the present invention, Fig. 2 are body of the tower folded states of the present invention, Fig. 3 is first steel rope, second steel rope and the 3rd steel rope cabling mode scheme drawing.
The specific embodiment
The specific embodiment one: combine Fig. 1-Fig. 3 that this embodiment is described; The combination mechanism of this embodiment comprises that bracing frame 1, stock 2, standard knot 3, S. A. 4, fast suspension bracket are established motor 5, fixedly otic placode 6, first connects otic placode 7, the second connection otic placode 8, first steel rope 9, second steel rope 10, the 3rd steel rope 11, boatswain chair 12, first pulley 13, second pulley 14, the 3rd pulley 15, the 4th pulley 16, the 5th pulley 17, the 6th pulley 18, the 7th pulley 19, the 8th pulley 20, the 9th pulley 21, the tenth pulley the 22, the 11 pulley 23 and two permanent seats 24; Stock 2 is rotationally connected through S. A. 4 and bracing frame 1; Stock 2 is sleeved on the two sliding block joint of outside of standard knot 3; First pulley 13, second pulley 14, the 3rd pulley 15 all are contained in the top of stock 2; Second pulley 14 is between first pulley 13 and the 3rd pulley 15, and boatswain chair 12 is contained in the bottom in the standard knot 3, is fixed with the 4th pulley 16, the 5th pulley 17 and two permanent seats 24 on the boatswain chair 12; The 6th pulley 18, the 7th pulley 19, the 8th pulley 20 and the 9th pulley 21 coaxial stock 2 bottoms that are packed in; Fast suspension bracket is established motor 5, fixedly otic placode 6, first connects otic placode 7, second and connects otic placode 8, the 9th pulley 21 and the tenth pulley 22 and be packed on the bracing frame, and the suspension bracket mouth of establishing motor 5 is connected with an end of first steel rope 9 soon, and the other end of first steel rope 9 is after pile warp is crossed the tenth pulley the 22, the 11 pulley 23 and the 6th pulley 18 successively; Upwards pile warp first pulley 13 backs get into boatswain chair 12 downwards; Upwards return behind pile warp the 4th pulley 16, the 14 back switching-overs of pile warp second pulley are downward, through upwards returning behind the 5th pulley 17; The 15 back switching-overs of pile warp the 3rd pulley downwards; Be connected with fixing otic placode 6 through the 9th pulley 21 back, the first connection otic placode 7 is connected with an end of second steel rope 10, and other end pile warp the 8th pulley 20 of second steel rope 10 is connected with corresponding permanent seat 24; Second connects otic placode 8 is connected with an end of the 3rd steel rope 11, and other end pile warp the 7th pulley 19 of the 3rd steel rope 11 is connected with corresponding permanent seat 24.
The specific embodiment two: combine Fig. 3 that this embodiment is described, second pulley 14 of this embodiment and the 13 vertical settings of first pulley, first pulley 13 and the 3rd pulley 15 laterally arrange.Other composition and annexation are identical with the specific embodiment one.
The specific embodiment three: combine Fig. 1 that this embodiment is described, the combination mechanism of this embodiment also comprises rotary support 25 and axis of revolution 26, and rotary support 25 is connected with bracing frame 1 through axis of revolution 26.Other composition and annexation are identical with the specific embodiment one.
The specific embodiment four: combine Fig. 1 that this embodiment is described, the combination mechanism of this embodiment also comprise have a spring auto-lock function climb pawl 27, climb the top that pawl 27 is packed in stock 2.In the process that standard knot 3 rises,, climb pawl 27 and just can collude the horizontal steelframe of catching on the standard knot 3 whenever arriving certain altitude.This structure makes standard knot 3 after rise, can't fall voluntarily, thereby has guaranteed the safe reliability that the tower frame is established.Other composition and annexation are identical with the specific embodiment one.
Principle of work: folding, the upright and work of hoisting of body of the tower (stock 2 and standard knot 3) is to rely on fast suspension bracket to establish motor 5 to accomplish.When body of the tower folded accumbency, the triangle end of stock 2 leant out rotary support 25 under the effect of S. A. 4, and standard knot 3 is near stock 2 bottoms.Connect otic placode 7 from first and be connected otic placode 8 with second via the 6th pulley 18 and the 9th pulley 21, second steel rope 10 and the 3rd steel rope 13 that finally are fixed in two permanent seats 24 are in tensioned state.At this moment; Use fast suspension bracket to establish motor 5 and carry out the take-up operation; Then first steel rope 9 can be moved to the left by traction standard knot 3 interior boatswain chairs 12; Under second steel rope 10 before and 11 effects of the 3rd steel rope, the triangle shaped tip of stock 2 can be taken in rotary support 25, and body of the tower slowly erects simultaneously.After treating that body of the tower is upright, insert set pin 28, stock 2 and S. A. 4 are pinned, body of the tower is kept upright, break off second steel rope 10 and the 3rd steel rope 11 then, standard knot 3 is risen from stock 2.
Along with fast suspension bracket is established motor 5 soon and further carried out take-up action, first steel rope 9 drives standard knot 3 and rises overally through first pulley 13, second pulley 14 and the 3rd pulley 15 traction boatswain chairs 12.The mobile up-down of standard knot 3 is to rely on fast suspension bracket to establish motor 5 to accomplish through the traction of 9 pairs of boatswain chairs 12 of first steel rope.
When the tower machine need be operated opposite with said process when mode of operation returns to folded state.The fast suspension bracket of tower machine is established motor 5 and is worked in the unwrapping wire state, before standard knot 3 is packed up, at first will draw back and climb pawl 27, makes between stock 2 and the standard knot 3 to be separated.The effect of establishing motor 5 unwrapping wire and standard knot 3 self gravitations through too fast suspension bracket, but the inside of standard knot 3 at high speed retraction stocks 2.When standard knot 3 during near the bottom part of stock 2, connect second steel rope 10 and the 3rd steel rope 11 again this moment, extracts set pin 28; Then under motor 5 unwrapping wire effects; Rotary support 25 tilts to drop to the ground, and in this stage, stock 2 begins to tilt to drop to the ground to rotary support 25.Finally, fast suspension bracket is established motor 5 unwrapping wire and is finished, and body of the tower is lying on the rotary support 25, and the 7th pulley 19 and the 8th pulley 20 lean out, and standard knot 3 arrives at the bottom of stock 2, and whole tower machine folding movement is accomplished.

Claims (4)

1. the pedestal of a tower crane and body of the tower combination mechanism; It is characterized in that said combination mechanism comprises that bracing frame (1), stock (2), standard knot (3), S. A. (4), fast suspension bracket are established motor (5), fixedly otic placode (6), first connects otic placode (7), the second connection otic placode (8), first steel rope (9), second steel rope (10), the 3rd steel rope (11), boatswain chair (12), first pulley (13), second pulley (14), the 3rd pulley (15), the 4th pulley (16), the 5th pulley (17), the 6th pulley (18), the 7th pulley (19), the 8th pulley (20), the 9th pulley (21), the tenth pulley (22), the 11 pulley (23) and two permanent seats (24); Stock (2) is rotationally connected through S. A. (4) and bracing frame (1); Stock (2) is sleeved on the two sliding block joint of outside of standard knot (3); First pulley (13), second pulley (14), the 3rd pulley (15) all are contained in the top of stock (2); Second pulley (14) is positioned between first pulley (13) and the 3rd pulley (15); Boatswain chair (12) is contained in the bottom in the standard knot (3); Be fixed with the 4th pulley (16), the 5th pulley (17) and two permanent seats (24) on the boatswain chair (12); Coaxial stock (2) bottom that is packed in of the 6th pulley (18), the 7th pulley (19), the 8th pulley (20) and the 9th pulley (21); Fast suspension bracket is established motor (5), fixedly otic placode (6), first connects otic placode (7), second and connects otic placode (8), the 9th pulley (21) and the tenth pulley (22) and be packed on the bracing frame, and the suspension bracket mouth of establishing motor (5) is connected with an end of first steel rope (9) soon, and the other end of first steel rope (9) is after pile warp is crossed the tenth pulley (22), the 11 pulley (23) and the 6th pulley (18) successively; Upwards pile warp first pulley (13) back gets into boatswain chair (12) downwards; Upwards return behind pile warp the 4th pulley (16), the switching-over of pile warp second pulley (14) back is downward, through upwards returning behind the 5th pulley (17); The switching-over of pile warp the 3rd pulley (15) back downwards; Be connected with fixing otic placode (6) through the 9th pulley (21) back, the first connection otic placode (7) is connected with an end of second steel rope (10), and other end pile warp the 8th pulley (20) of second steel rope (10) is connected with corresponding permanent seat (24); Second connects otic placode (8) is connected with an end of the 3rd steel rope (11), and other end pile warp the 7th pulley (19) of the 3rd steel rope (11) is connected with corresponding permanent seat (24).
2. according to the pedestal and the body of the tower combination mechanism of the said tower crane of claim 1, it is characterized in that second pulley (14) and the vertical setting of first pulley (13), first pulley (13) laterally arranges with the 3rd pulley (15).
3. according to the pedestal and the body of the tower combination mechanism of claim 1 or 2 said tower cranes, it is characterized in that said combination mechanism also comprises rotary support (25) and axis of revolution (26), rotary support (25) is connected with bracing frame (1) through axis of revolution (26).
4. according to the pedestal and the body of the tower combination mechanism of the said tower crane of claim 3, it is characterized in that said combination mechanism also comprise have a spring auto-lock function climb pawl (27), climb the top that pawl (27) is packed in stock (2).
CN 201110271990 2011-09-14 2011-09-14 Base-tower combined mechanism of tower crane Expired - Fee Related CN102358579B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110271990 CN102358579B (en) 2011-09-14 2011-09-14 Base-tower combined mechanism of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110271990 CN102358579B (en) 2011-09-14 2011-09-14 Base-tower combined mechanism of tower crane

Publications (2)

Publication Number Publication Date
CN102358579A true CN102358579A (en) 2012-02-22
CN102358579B CN102358579B (en) 2013-03-20

Family

ID=45583969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110271990 Expired - Fee Related CN102358579B (en) 2011-09-14 2011-09-14 Base-tower combined mechanism of tower crane

Country Status (1)

Country Link
CN (1) CN102358579B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU850559A1 (en) * 1979-10-15 1981-07-30 Центральное Конструкторское Бюро"Строймаш" Tower crane
DE3433117A1 (en) * 1984-09-08 1986-03-20 Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier Tower crane with three-piece jib
CN2032611U (en) * 1987-10-15 1989-02-15 中国建筑科学研究院建筑机械化研究所 Folding type fast erecting tower crane
CN201567163U (en) * 2009-12-25 2010-09-01 安徽顺达电力设备制造有限公司 Tower crane
CN202208611U (en) * 2011-09-14 2012-05-02 哈尔滨东建机械制造有限公司 Base and tower body combined mechanism of tower crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU850559A1 (en) * 1979-10-15 1981-07-30 Центральное Конструкторское Бюро"Строймаш" Tower crane
DE3433117A1 (en) * 1984-09-08 1986-03-20 Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier Tower crane with three-piece jib
CN2032611U (en) * 1987-10-15 1989-02-15 中国建筑科学研究院建筑机械化研究所 Folding type fast erecting tower crane
CN201567163U (en) * 2009-12-25 2010-09-01 安徽顺达电力设备制造有限公司 Tower crane
CN202208611U (en) * 2011-09-14 2012-05-02 哈尔滨东建机械制造有限公司 Base and tower body combined mechanism of tower crane

Also Published As

Publication number Publication date
CN102358579B (en) 2013-03-20

Similar Documents

Publication Publication Date Title
CN201578771U (en) Hand controllable urgent escape appliance
CN104109969A (en) Automatic lift type clothes hanger
CN203998705U (en) Single arm frame steel wire rope luffing stationary crane
CN102220938B (en) Umbrella type wind power device and wind power system
CN201650088U (en) Pulling-rope-free suspended curtain mechanism
CN202208611U (en) Base and tower body combined mechanism of tower crane
CN216997387U (en) Crane with movable balancing weight mechanism
CN201236114Y (en) Small-sized swing machine
CN110498350A (en) A kind of multifunctional safe building tower crane
CN101195061A (en) Multifunctional rescuing device for building
CN215905766U (en) Automatic safety protection lifting system for tower crane
CN107720570B (en) Tower crane buttress auxiliary device of tower mast mechanism
CN102358579B (en) Base-tower combined mechanism of tower crane
CN106946173A (en) A kind of hydrology box lowering or hoisting gear of energy adjust automatically box level
CN205604697U (en) Hook type high -place operation hanging basket
CN117163848B (en) Anti-backward tilting device of crane
CN204057804U (en) The two hoisting-point electric cucurbit of unit that a kind of electromagnetic braking is slowed down
CN201363084Y (en) Folding ladder
CN208361756U (en) A kind of crane hoisting mechanism safety guard
CN203923735U (en) A kind of automatic lifting airer
CN105271022A (en) Quick-assembly tower crane
CN203529757U (en) Civil crane
CN212522998U (en) Lifting swing
CN104740877B (en) Traction lifting device and entertainment rotary glider device
CN204265305U (en) Family expenses hang fixed type suspension transferring machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130320

CF01 Termination of patent right due to non-payment of annual fee