CN102354932B - Unfolded-type insulation platform for hot-line work - Google Patents

Unfolded-type insulation platform for hot-line work Download PDF

Info

Publication number
CN102354932B
CN102354932B CN 201110307605 CN201110307605A CN102354932B CN 102354932 B CN102354932 B CN 102354932B CN 201110307605 CN201110307605 CN 201110307605 CN 201110307605 A CN201110307605 A CN 201110307605A CN 102354932 B CN102354932 B CN 102354932B
Authority
CN
China
Prior art keywords
platform
supporting bracket
support plate
insulating
support shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110307605
Other languages
Chinese (zh)
Other versions
CN102354932A (en
Inventor
陈伟明
王顺年
周生法
张锦秀
吴才彪
孙雅云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Electric Porcelain Works Co Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
SHANGHAI ELECTRIC-PORCELAIN WORKS
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ELECTRIC-PORCELAIN WORKS, State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical SHANGHAI ELECTRIC-PORCELAIN WORKS
Priority to CN 201110307605 priority Critical patent/CN102354932B/en
Publication of CN102354932A publication Critical patent/CN102354932A/en
Application granted granted Critical
Publication of CN102354932B publication Critical patent/CN102354932B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本发明公开了输电线路维护领域的一种展开式带电作业用绝缘平台,所述绝缘平台包括基础平台,绝缘踏板、第一支撑板,所述基础平台具有中部镂空结构,所述中部镂空结构底面水平横向的中部设置中心支撑轴,所述绝缘踏板和第一支撑板在所述基础平台水平横向两侧是成对设置的;所述绝缘平台还包括成对设置的第二支撑板,所述第二支撑板的中点枢接在所述中心支撑轴上,所述第二支撑板沿所述中心支撑轴的轴向排列;所述第二支撑板分为约束端和自由端,所述绝缘平台合拢,所述第二支撑板保持水平,所述绝缘平台展开,且所述第二支撑板的约束端与所述第一支撑板的第一端相互卡接,所述第二支撑板的自由端与所述中部镂空结构的底面接触。

The invention discloses an unfolded insulation platform for live work in the field of transmission line maintenance. The insulation platform includes a base platform, an insulation pedal, and a first support plate. The base platform has a hollow structure in the middle, and the bottom surface of the hollow structure in the middle A central support shaft is set in the middle of the horizontal horizontal direction, and the insulating pedal and the first supporting plate are arranged in pairs on both sides of the horizontal horizontal direction of the foundation platform; the insulating platform also includes a pair of second supporting plates, the The midpoint of the second support plate is pivotally connected to the central support shaft, and the second support plate is arranged along the axial direction of the central support shaft; the second support plate is divided into a constraining end and a free end, and the The insulation platform is closed, the second support plate is kept horizontal, the insulation platform is unfolded, and the restraint end of the second support plate is engaged with the first end of the first support plate, and the second support plate The free end is in contact with the bottom surface of the hollow structure in the middle.

Description

一种展开式带电作业用绝缘平台A deployable insulating platform for live work

技术领域 technical field

本发明涉及输电线路维护领域的一种展开式带电作业用绝缘平台。The invention relates to a deployable insulating platform for live work in the field of transmission line maintenance.

背景技术 Background technique

随着近年来地区经济快速发展和大规模的城市建设,电力负荷需求持续大幅增长,同时用户对供电的质量和可靠性提出了更高的要求,普遍希望减少停电时间和次数。为了确保满足用户对电力的需求,开展了带电施工作业,以减少停电范围和停电时间成了必然要求。With the rapid development of regional economy and large-scale urban construction in recent years, the demand for power load has continued to increase significantly. At the same time, users have put forward higher requirements for the quality and reliability of power supply, and generally hope to reduce the time and frequency of power outages. In order to ensure that the user's demand for electricity is met, live construction operations have been carried out to reduce the scope and duration of power outages, which has become an inevitable requirement.

目前,能快速到达事故地点的带电施工作业工具主要是10kV绝缘斗臂车,然而10kV绝缘斗臂车不能进入窄小街道、里弄、居住区、农田等地方,因而无法开展带电作业;即使能进入这些地方,也往往阻塞交通、引起社会不良反响。另外一方面,10kV绝缘斗臂车价格昂贵,配备数量有限,不能长期占用。At present, the live construction tools that can quickly reach the accident site are mainly 10kV insulated bucket trucks. However, 10kV insulated bucket trucks cannot enter narrow streets, lanes, residential areas, farmland, etc. These places also often block traffic and cause adverse social repercussions. On the other hand, 10kV insulated arm trucks are expensive, and the number of equipment is limited, so they cannot be used for a long time.

综上所述,研制出适应上述环境的载人带电作业绝缘操作工具是必要的。这种带电作业绝缘操作工具的顶端通常设置可升降的绝缘平台,该绝缘平台必须具有可靠的绝缘性能,特别是在三相间的穿档时底面积要小,以便使操作平台能在仅60cm的相间穿过。但一旦穿过以后,施工的操作平台又要希望大,使带电作业人员对三相间进行操作时,有足够的自由度。目前可折叠的绝缘平台可以解决这一对矛盾,但是这种可折叠的绝缘平台在实际使用过程中存在重心不稳的技术问题,带电作业人员的人身安全存在隐患。In summary, it is necessary to develop insulation operation tools for manned live working that are suitable for the above-mentioned environment. The top of the insulating operation tool for live work is usually equipped with a liftable insulating platform. The insulating platform must have reliable insulation performance, especially when the three-phase transmission is carried out. Alternate through. But once it passes through, the construction operation platform should be large, so that live workers can have enough freedom when operating the three-phase room. At present, the foldable insulating platform can solve this pair of contradictions, but this kind of foldable insulating platform has a technical problem of unstable center of gravity in the actual use process, and there are hidden dangers to the personal safety of live workers.

发明内容 Contents of the invention

本发明的目的是为了克服现有技术的不足,提供一种可折叠的绝缘平台,该绝缘平台合拢时,能在相间安全地穿过,展开时,又能保证带电作业人员对三相间进行操作时,有足够的自由度,而且重心稳定,保证了带电作业人员的人身安全。The purpose of the present invention is to overcome the deficiencies of the prior art and provide a foldable insulating platform, which can pass through phases safely when closed, and can ensure that live workers can operate between the three phases when unfolded. There is enough freedom and the center of gravity is stable, which ensures the personal safety of live working personnel.

实现上述目的的一种技术方案是:一种展开式带电作业用绝缘平台,A technical solution to achieve the above purpose is: an unfolded insulating platform for live work,

包括基础平台,绝缘踏板和第一支撑板,所述绝缘踏板和第一支撑板在所述基础平台水平横向两侧是成对设置的;It includes a foundation platform, an insulating pedal and a first support plate, and the insulation pedal and the first support plate are arranged in pairs on both horizontal and lateral sides of the foundation platform;

所述绝缘踏板通过旋转轴枢接在所述基础平台水平横向两侧的顶端;The insulating pedal is pivotally connected to the top ends of the horizontal and lateral sides of the foundation platform through a rotating shaft;

所述第一支撑板的第一端通过支撑轴枢接在所述基础平台水平横向两侧的底端,所述第一支撑板的第二端与所述绝缘踏板活动连接;The first end of the first support plate is pivotally connected to the bottom ends of the horizontal lateral sides of the foundation platform through a support shaft, and the second end of the first support plate is movably connected to the insulating pedal;

所述基础平台具有中部镂空结构,所述中部镂空结构的底面设置中心支撑轴,所述中心支撑轴位于所述底面水平横向的中部,且所述中心支撑轴平行于所述支撑轴;The base platform has a hollow structure in the middle, a central support shaft is arranged on the bottom surface of the hollow structure in the middle, the central support shaft is located in the horizontal middle of the bottom surface, and the central support shaft is parallel to the support shaft;

所述绝缘平台还包括成对设置的第二支撑板,所述第二支撑板的中点枢接在所述中心支撑轴上,且所述第二支撑板是沿所述中心支撑轴轴向排列的;The insulating platform also includes a pair of second support plates, the midpoints of the second support plates are pivotally connected to the central support shaft, and the second support plates are axially connected to the central support shaft. arranged;

所述第二支撑板分为约束端和自由端,The second support plate is divided into a constrained end and a free end,

所述绝缘平台合拢,所述第二支撑板保持水平,所述绝缘平台展开,且所述第二支撑板的约束端与所述第一支撑板的第一端相互卡接,所述第二支撑板的自由端与所述基础平台的中部镂空结构的底面接触。The insulating platform is closed, the second supporting plate is kept horizontal, the insulating platform is unfolded, and the restraining end of the second supporting plate is engaged with the first end of the first supporting plate, and the second supporting plate is The free end of the support plate is in contact with the bottom surface of the hollow structure in the middle of the foundation platform.

进一步的,所述绝缘踏板上设置与所述旋转轴垂直的导轨槽;所述第一支撑板的第二端通过移动轴与所述导轨槽活动连接。Further, the insulating pedal is provided with a guide rail groove perpendicular to the rotation axis; the second end of the first support plate is movably connected with the guide rail groove through a moving shaft.

进一步的,所述绝缘踏板的顶面上设置中心支撑孔。Further, a central support hole is provided on the top surface of the insulating pedal.

进一步的,所述绝缘平台合拢,所述绝缘平台的顶面尺寸60×40cm,所述绝缘平台展开,所述绝缘平台的顶面尺寸为60×180cm。Further, when the insulation platform is closed, the top surface of the insulation platform has a size of 60×40 cm, and when the insulation platform is unfolded, the top surface of the insulation platform has a size of 60×180 cm.

采用了本发明的一种展开式带电作业用绝缘平台的技术方案,即在所述绝缘平台上设置中部镂空结构,所述中部镂空结构的底面上设置重心支撑轴,成对设置的第二支撑板的中点枢接在中心支撑轴上,且所述第二支撑板沿所述中心支撑轴的轴向排列,在所述绝缘平台展开时,所述第二支撑板的约束端于第一支撑板的第一端相互卡接,所述第二支撑板的自由端与所述基础平台的中部镂空结构的底面接触。其技术效果是:所述绝缘平台合拢时,能在相间安全地穿过。所述绝缘平台展开,所述绝缘平台的面积足以保证带电作业人员对三相间进行操作时有足够的自由度;同时在带电作业人员在绝缘平台上进行带电操作过程中,所述绝缘平台的重心能够保持稳定,保证了带电作业人员的人身安全。A technical solution of the unfolded insulation platform for live work of the present invention is adopted, that is, a middle hollow structure is set on the insulation platform, a center of gravity support shaft is set on the bottom surface of the middle hollow structure, and the second support set in pairs The midpoint of the plate is pivotally connected to the central support shaft, and the second support plate is arranged along the axial direction of the central support shaft. When the insulating platform is unfolded, the constraint end of the second support plate The first ends of the support plates are engaged with each other, and the free ends of the second support plates are in contact with the bottom surface of the hollow structure in the middle of the foundation platform. Its technical effect is: when the insulating platform is closed, it can safely pass through between phases. The insulating platform is unfolded, and the area of the insulating platform is sufficient to ensure that the live workers have enough freedom when operating the three phases; at the same time, when the live workers are performing live operations on the insulating platform, the center of gravity of the insulating platform It can be kept stable to ensure the personal safety of live working personnel.

附图说明 Description of drawings

图1为本发明的一种展开式带电作业用绝缘平台合拢时的结构示意图;Fig. 1 is a structural schematic diagram of an unfolded insulating platform for live work of the present invention when it is closed;

图2为本发明的一种展开式带电作业用绝缘平台展开时的结构示意图。Fig. 2 is a structural schematic diagram of an unfolded insulating platform for live working according to the present invention when it is unfolded.

图3为本发明的一种展开式带电作业用绝缘平台的安装护栏后的结构示意图;Fig. 3 is a structural schematic diagram of a deployable insulating platform for live work after installation of guardrails;

图4为本发明的一种展开式带电作业用绝缘平台的受力原理示意图;Fig. 4 is a schematic diagram of the stress principle of an unfolded insulating platform for live work of the present invention;

图5为的本发明的一种展开式带电作业用绝缘平台的立体结构示意图。Fig. 5 is a three-dimensional structural schematic diagram of an unfolded insulating platform for live working according to the present invention.

具体实施方式 Detailed ways

请参阅图1至图5,本发明的为了能更好地对本发明的技术方案进行理解,下面通过具体的实施例,并结合附图进行详细地说明:Please refer to Fig. 1 to Fig. 5, in order to better understand the technical solution of the present invention, the present invention will be described in detail below through specific embodiments in conjunction with the accompanying drawings:

请参阅图1和图2,本发明的一种展开式带电作业用绝缘平台,包括基础平台11,绝缘踏板12、第一支撑板13和第二支撑板14,其中所述绝缘踏板12、第一支撑板13在所述基础平台11的水平横向两侧是成对设置的;Please refer to Fig. 1 and Fig. 2, a kind of unfolding insulation platform for live work of the present invention, comprises base platform 11, insulation pedal 12, first support board 13 and second support board 14, wherein said insulation pedal 12, the first A support plate 13 is provided in pairs on both horizontal and lateral sides of the foundation platform 11;

所述绝缘踏板12通过旋转轴15枢接在所述基础平台11水平横向两侧的顶端;The insulating pedal 12 is pivotally connected to the top ends of the horizontal and lateral sides of the foundation platform 11 through a rotating shaft 15;

所述第一支撑板13的第一端通过支撑轴16枢接在所述基础平台11水平横向两侧的底端,所述第一支撑板13的第二端与所述绝缘踏板12活动连接;The first end of the first support plate 13 is pivotally connected to the bottom ends of the horizontal lateral sides of the foundation platform 11 through the support shaft 16, and the second end of the first support plate 13 is movably connected to the insulating pedal 12 ;

所述第一支撑板13的第二端与所述绝缘踏板12活动连接之间的活动连接是可以这样实现的:所述绝缘踏板12上设置与所述旋转轴15垂直的导轨槽18;所述第一支撑板13的第二端通过移动轴19与所述导轨槽18活动连接,即所述移动轴19能在所述导轨槽18内沿所述导轨槽18的轴向滑动。The flexible connection between the second end of the first support plate 13 and the flexible connection of the insulating pedal 12 can be realized in this way: the insulating pedal 12 is provided with a guide rail groove 18 perpendicular to the rotating shaft 15; The second end of the first support plate 13 is movably connected with the guide rail groove 18 through a moving shaft 19 , that is, the moving shaft 19 can slide in the guide rail groove 18 along the axial direction of the guide rail groove 18 .

所述绝缘平台合拢,移动轴19滑向所述导轨槽18上靠近所述旋转轴15的一侧;所述绝缘平台展开,移动轴19滑向导轨槽18上远离所述旋转轴15的一侧。The insulating platform is closed, and the moving shaft 19 slides to the side of the guide rail groove 18 close to the rotating shaft 15; side.

所述基础平台11具有中部镂空结构,所述中部镂空结构的底面设置中心支撑轴17,所述中心支撑轴17位于所述底面水平横向的中部,且所述中心支撑轴17平行于所述支撑轴16;The base platform 11 has a hollow structure in the middle, the bottom surface of the hollow structure in the middle is provided with a central support shaft 17, the central support shaft 17 is located in the horizontal middle of the bottom surface, and the central support shaft 17 is parallel to the support axis 16;

所述绝缘平台的第二支撑板14也是成对设置的,所述第二支撑板14的中点枢接在所述中心支撑轴17上,且所述第二支撑板14是沿所述中心支撑轴17的轴向排列的;The second support plates 14 of the insulating platform are also provided in pairs, and the midpoints of the second support plates 14 are pivotally connected to the central support shaft 17, and the second support plates 14 are arranged along the center the axial alignment of the support shaft 17;

所述第二支撑板14分为约束端和自由端,所述绝缘平台合拢,所述第二支撑板14保持水平;所述绝缘平台展开,所述第二支撑板14的约束端与所述第一支撑板13的第一端相互卡接,所述第二支撑板14的自由端与所述基础平台11的中部镂空结构的底面接触。The second support plate 14 is divided into a constraining end and a free end. When the insulating platform is closed, the second support plate 14 remains horizontal; The first ends of the first support plates 13 are engaged with each other, and the free ends of the second support plates 14 are in contact with the bottom surface of the hollow structure in the middle of the foundation platform 11 .

这样设计的目的在于通过第一支撑板13的第一端和第二支撑板14约束端的卡接以及第二支撑板14的自由端与基础平台11的中部镂空结构的底面的接触,能将所述施加在绝缘踏板12上的人的重力传递到基础平台11上,保证本发明的一种展开式带电作业用绝缘平台重心的稳定,在使用过程中不发生侧翻,从而保证了作业人员的人身安全。The purpose of this design is to connect the first end of the first support plate 13 with the constrained end of the second support plate 14 and the contact between the free end of the second support plate 14 and the bottom surface of the hollow structure in the middle of the foundation platform 11. The gravity of the person applied on the insulating pedal 12 is transmitted to the foundation platform 11, which ensures the stability of the center of gravity of the unfolded insulating platform for live work of the present invention, and does not roll over during use, thus ensuring the safety of the workers. Personal safety.

为了保证所述绝缘平台展开时,所述第二支撑板14的约束端与所述第一支撑板13的第一端之间能够正确地卡接,所述绝缘平台合拢,所述第二支撑板14保持水平的同时,成对设置的第二支撑板14中的两块第二支撑板14还应分别与位于所述基础平台11两侧的第一支撑板13的第一端之间保持接触。In order to ensure that when the insulating platform is unfolded, the binding end of the second support plate 14 and the first end of the first support plate 13 can be correctly clamped, the insulating platform is closed, and the second support While the plate 14 is kept horizontal, two second support plates 14 in the paired second support plates 14 should also be kept between the first ends of the first support plates 13 on both sides of the foundation platform 11 respectively. touch.

在图1中,所述绝缘平台合拢,位于前侧的第二支撑板14的约束端与位于所述基础平台11右侧的第一支撑板13的第一端接触,位于后侧的第二支撑板14的约束端与位于所述基础平台11左侧的第一支撑板13的第一端接触。In Fig. 1, the insulating platform is closed, the binding end of the second support plate 14 on the front side is in contact with the first end of the first support plate 13 on the right side of the base platform 11, and the second support plate 14 on the rear side The constraining end of the support plate 14 is in contact with the first end of the first support plate 13 located on the left side of the foundation platform 11 .

在图2中,所述绝缘平台展开,位于前侧的第二支撑板14的约束端与位于所述基础平台11右侧的第一支撑板13的第一端卡接,位于后侧的第二支撑板14的约束端与位于所述基础平台11左侧的第一支撑板13的第一端卡接。In Fig. 2, the insulating platform is unfolded, the binding end of the second support plate 14 on the front side is engaged with the first end of the first support plate 13 on the right side of the base platform 11, and the first end of the first support plate 13 on the right side of the base platform 11 is engaged. The constraining ends of the two support plates 14 are engaged with the first end of the first support plate 13 on the left side of the foundation platform 11 .

为了进一步保证带电作业人员的人身安全,本发明的一种展开式带电作业用绝缘平台的绝缘踏板12的顶面上设置若干中心支撑孔110,请参阅图3,位于基础平台11的水平横向两侧的绝缘踏板12的顶面上一共设置了八个中心支撑孔110,用以安装护栏,所述护栏的竖杆111插接在所述绝缘踏板12上的顶面上的中心支撑孔110内,所述护栏的围杆112通过T形三通管113和转角三通管114与所述竖杆111连接,所述围栏安装完成后,作业人员的人身安全有了进一步保证。In order to further ensure the personal safety of live workers, a number of central support holes 110 are provided on the top surface of the insulating platform 12 of the unfolded live working insulating platform of the present invention. Please refer to FIG. 3 . A total of eight central support holes 110 are provided on the top surface of the insulation pedal 12 on the side to install the guardrail, and the vertical rods 111 of the guardrail are plugged into the center support holes 110 on the top surface of the insulation pedal 12. , the fence 112 of the guardrail is connected with the vertical bar 111 through the T-shaped tee pipe 113 and the corner tee pipe 114. After the fence is installed, the personal safety of the workers is further guaranteed.

下面通过附图4来说明所述本发明的一种展开式带电作业用绝缘平台,图4只以位于所述基础平台11左侧的绝缘踏板12、第一支撑板13、和第二支撑板14为例,来对原理进行说明。The following is a description of a deployable insulating platform for live working according to the present invention by means of accompanying drawing 4. Fig. 4 only shows the insulating pedal 12, the first supporting plate 13, and the second supporting plate located on the left side of the basic platform 11 14 as an example to illustrate the principle.

带电作业人员站在绝缘踏板12上,并将自身的重力G施加在所述绝缘踏板12上,然后绝缘踏板12将所述重力G传递给第一支撑板13的第二端,为了保持以支撑轴16为中心的第一支撑板13的力矩的平衡,所述第一支撑板13的第一端受到一个下压力F1,该下压力F1来自第二支撑板14的约束端,而第二支撑板14的约束端也受到为下压力F1的反作用力,该反作用力为弹力N1;为了保持以中心支撑轴17为中心的第二支撑板14的力矩的平衡,所述第二支撑板14的自由端也受到另外一个向上的弹力N2,由于所述第二支撑板14的自由端与所述基础平台11的中部镂空结构的底面接触,所以所述弹力N2的施力者为基础平台11,相应地,所述基础平台11的底面也受到弹力N2的反作用力,该反作用力为下压力F。综上所述,通过第一支撑板13和第二支撑板14杠杆结构的传递,带电作业人员的重力G传递了基础平台11上,变成了对于基础平台11的下压力F,这样所述绝缘平台重心能够保持稳定,从而保证带电作业人员的人身安全。Live workers stand on the insulating pedal 12, and apply their own gravity G on the insulating pedal 12, and then the insulating pedal 12 transmits the gravity G to the second end of the first support plate 13, in order to maintain and support The moment balance of the first support plate 13 centered on the axis 16, the first end of the first support plate 13 is subjected to a downward force F1, the downward force F1 comes from the restraint end of the second support plate 14, and the second support The constraint end of the plate 14 is also subjected to the reaction force of the downward force F1, which is the elastic force N1; in order to maintain the balance of the moment of the second support plate 14 centered on the central support shaft 17, the second support plate 14 The free end is also subjected to another upward elastic force N2. Since the free end of the second support plate 14 is in contact with the bottom surface of the hollow structure in the middle of the base platform 11, the forcer of the elastic force N2 is the base platform 11. Correspondingly, the bottom surface of the base platform 11 is also subjected to the reaction force of the elastic force N2, and the reaction force is the downward force F. To sum up, through the transmission of the lever structure of the first support plate 13 and the second support plate 14, the gravity G of the live operator is transmitted to the foundation platform 11, and becomes the downward force F on the foundation platform 11, thus the The center of gravity of the insulating platform can be kept stable, thereby ensuring the personal safety of live working personnel.

同时,为了保证所述绝缘平台能安全地从相间穿过,其尺寸也是有讲究的。比如说,目前10kV供电线路两相间的距离为60cm,所以所述绝缘平台合拢,所述绝缘平台的顶面尺寸60×40cm,所述绝缘平台展开,所述绝缘平台的顶面尺寸为60×180cm。在对其它规格的供电线路进行带电操作时,所述绝缘平台的尺寸应做出相应调整。At the same time, in order to ensure that the insulating platform can pass through the phases safely, its size is also particular. For example, at present, the distance between two phases of a 10kV power supply line is 60cm, so the insulation platform is closed, and the top surface size of the insulation platform is 60×40cm, and the insulation platform is unfolded, and the top surface size of the insulation platform is 60×40cm. 180cm. When performing live operation on power supply lines of other specifications, the size of the insulating platform should be adjusted accordingly.

同时为了使本发明的一种展开式带电作业用绝缘平台安全地越相间穿过,同时质量较轻,采用长方形玻璃纤维管、玻璃纤维棒及玻璃纤维层压板等绝缘材料作为基本材料,通过镶嵌、孔轴连接等工艺拼装而成。请参阅图5,图5中所述基础平台11是由两块平行设置的玻璃纤维层压板和位于所述玻璃纤维层压板之间的四根玻璃纤维管或者玻璃纤维棒所组成,以形成所述基础平台11的中部镂空结构。所述绝缘踏板12的材料为玻璃纤维层压板,所述绝缘踏板12上沿所述旋转轴15的轴向设置了六个与旋转轴15垂直的导轨槽18,所述导轨槽18的材质为尼龙;对应的所述绝缘平台沿中心支撑轴17的轴向设置了六对第一支撑板13和第二支撑板14,所述第一支撑板13的第二端通过移动轴19与所述绝缘踏板12活动连接。其中第一支撑板13和第二支撑板14的材质为玻璃纤维管或者玻璃纤维棒,本发明的一种展开式带电作业用绝缘平台沿所述中心支撑轴17的轴向设置多对第一支撑板13和第二支撑板14的目的在于增强展开式带电作业用绝缘平台的结构强度。当然,导轨槽18、第一支撑板13和第二支撑板14的数量是可以根据对于所述绝缘平台强度的要求进行调整的。At the same time, in order to make the insulating platform for unfolding live work of the present invention pass through the phases safely, and at the same time have a lighter weight, insulating materials such as rectangular glass fiber tubes, glass fiber rods, and glass fiber laminates are used as basic materials. , hole shaft connection and other processes assembled. Please refer to Fig. 5, the foundation platform 11 described in Fig. 5 is made up of two glass fiber laminated boards arranged in parallel and four glass fiber tubes or glass fiber rods positioned between the glass fiber laminated boards to form the The hollow structure in the middle of the base platform 11 is described. The material of the insulating pedal 12 is a glass fiber laminate. The insulating pedal 12 is provided with six guide rail grooves 18 perpendicular to the rotating shaft 15 along the axial direction of the rotating shaft 15. The material of the guide rail grooves 18 is Nylon; the corresponding insulating platform is provided with six pairs of the first support plate 13 and the second support plate 14 along the axial direction of the central support shaft 17, and the second end of the first support plate 13 is connected to the described first support plate 13 by the moving shaft 19 The insulating pedal 12 is flexibly connected. The materials of the first support plate 13 and the second support plate 14 are glass fiber tubes or glass fiber rods, and a kind of unfolded insulating platform for live work of the present invention is provided with multiple pairs of first support plates along the axial direction of the central support shaft 17. The purpose of the support plate 13 and the second support plate 14 is to enhance the structural strength of the unfolded insulating platform for live work. Of course, the numbers of the guide rail grooves 18, the first support plates 13 and the second support plates 14 can be adjusted according to the requirements for the strength of the insulating platform.

经过检测,采用玻璃纤维材质的一种展开式带电作业用绝缘平台可以耐受1min工频50kV,雷电冲击80kV,但是本发明的一种展开式带电作业用绝缘平台采用其他材质也是能达到相同技术指标的。After testing, a deployable insulating platform for live work made of glass fiber can withstand 1min power frequency of 50kV and lightning impact of 80kV, but a deployable insulating platform for live work of the present invention can also achieve the same technology using other materials indicator.

本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本发明,而并非用作为对本发明的限定,只要在本发明的实质精神范围内,对以上所述实施例的变化、变型都将落在本发明的权利要求书范围内。Those of ordinary skill in the art should recognize that the above embodiments are only used to illustrate the present invention, rather than as a limitation to the present invention, as long as within the scope of the spirit of the present invention, the above-described embodiments Changes and modifications will fall within the scope of the claims of the present invention.

Claims (4)

1. expansion live line working insulated platform, comprise basic platform (11), insulation footboard (12) and first supporting bracket (13), described insulation footboard (12) and first supporting bracket (13) are to arrange in pairs in described basic platform (11) horizontal cross both sides;
Described insulation footboard (12) is articulated in the top of described basic platform (11) horizontal cross both sides by rotating shaft (15);
First end of described first supporting bracket (13) is articulated in the bottom of described basic platform (11) horizontal cross both sides by back shaft (16), and second end of described first supporting bracket (13) and described insulation footboard (12) flexibly connect;
Described basic platform (11) has the middle part engraved structure, the bottom surface of described middle part engraved structure arranges central support shaft (17), described central support shaft (17) is positioned at the middle part of described bottom surface horizontal cross, and described central support shaft (17) is parallel to described back shaft (16); It is characterized in that:
Described insulated platform also comprises second supporting bracket (14) of paired setting, and the mid point of described second supporting bracket (14) is articulated on the described central support shaft (17), and described second supporting bracket (14) is along described central support shaft (17) axially-aligned;
Described second supporting bracket (14) is divided into restrained end and free end, described insulated platform closes up, described second supporting bracket (14) maintenance level, described insulated platform launches, the mutual clamping of first end of the restrained end of described second supporting bracket (14) and described first supporting bracket (13), the free end of described second supporting bracket (14) contacts with the bottom surface of the middle part engraved structure of described basic platform (11).
2. insulated platform according to claim 1 is characterized in that: the last setting of described insulation footboard (12) guide-track groove (18) vertical with described rotating shaft (15); Second end of described first supporting bracket (13) flexibly connects by shifting axle (19) and described guide-track groove (18).
3. insulated platform according to claim 1 and 2 is characterized in that: central supported hole (110) is set on the end face of described insulation footboard (12).
4. insulated platform according to claim 1 and 2, it is characterized in that: when described insulated platform closed up, the end face of described insulated platform was of a size of 60 * 40cm, and when described insulated platform launched, the end face of described insulated platform was of a size of 60 * 180cm.
CN 201110307605 2011-10-12 2011-10-12 Unfolded-type insulation platform for hot-line work Active CN102354932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110307605 CN102354932B (en) 2011-10-12 2011-10-12 Unfolded-type insulation platform for hot-line work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110307605 CN102354932B (en) 2011-10-12 2011-10-12 Unfolded-type insulation platform for hot-line work

Publications (2)

Publication Number Publication Date
CN102354932A CN102354932A (en) 2012-02-15
CN102354932B true CN102354932B (en) 2013-07-17

Family

ID=45578456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110307605 Active CN102354932B (en) 2011-10-12 2011-10-12 Unfolded-type insulation platform for hot-line work

Country Status (1)

Country Link
CN (1) CN102354932B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107453272B (en) * 2017-08-09 2020-12-15 国网山东省电力公司青岛供电公司 A transmission line aerial work platform

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2669474B1 (en) * 1990-11-19 1993-06-18 Electricite De France MODULAR HELICOPTERED PLATFORM, INTENDED TO BE DEPOSITED ON AERIAL CABLES.
CN101847844A (en) * 2010-05-14 2010-09-29 何姗姗 Intelligent spanning frame with uninterrupted operation
CN202282575U (en) * 2011-10-12 2012-06-20 上海电瓷厂 Insulation platform for expansion type live-line work

Also Published As

Publication number Publication date
CN102354932A (en) 2012-02-15

Similar Documents

Publication Publication Date Title
CN203967625U (en) A kind of overhead facility crossing frame
CN102354931B (en) Hot-line insulation tool consisting of multifunctional components
CN201149744Y (en) Soldering training operation device
CN106950027A (en) The device of horizontal impact experiment can be carried out
CN102354932B (en) Unfolded-type insulation platform for hot-line work
CN205691411U (en) A kind of railway concrete simply supported beam static test reaction frame
CN202268637U (en) Special-purpose maintenance platform for 3AH type handcart type breaker
CN102896623B (en) Maintenance support
CN205634763U (en) Safe work platform of last use of power maintenance
CN209780432U (en) Baffle is enclosed in collapsible assembled construction
CN104934900B (en) A kind of electric power apparatus examination device
CN102570346B (en) Pole-mounted live-line work platform formed by multifunctional members
CN216959176U (en) Detection auxiliary device for improving adaptability of load model
CN201906933U (en) Ready-package spark splash prevention device
CN202282575U (en) Insulation platform for expansion type live-line work
CN204570755U (en) Concrete pipe pile antibending performance test apparatus
CN202384693U (en) Multifunctional member formed on-pole live-line operation platform
CN109412059B (en) Disconnecting switch overhaul training platform
CN107895628A (en) A kind of moveable electric power facility device
CN209838270U (en) Movable folding cable gap bridge
CN206316579U (en) A kind of railway contact line H profile steel mat jig
CN207144429U (en) A kind of engineering building construction scaffold
CN206509709U (en) Enter axle rotor bearing erecting device
CN213071934U (en) Movable multifunctional insulating stool
CN202059079U (en) Transformer station 10 kV outgoing line wall bushing troubleshooting special isolation rack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY STATE EL

Free format text: FORMER OWNER: SHANGHAI MUNICIPAL ELECTRIC POWER COMPANY

Effective date: 20121012

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121012

Address after: 200241 No. 4299, Lane 1, Long Wu Road, Shanghai, Minhang District

Applicant after: Shanghai Electric-Porcelain Works

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Address before: 200241 No. 4299, Lane 1, Long Wu Road, Shanghai, Minhang District

Applicant before: Shanghai Electric-Porcelain Works

Applicant before: Shanghai Electric Power Corporation

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 200241 No. 4299, Lane 1, Long Wu Road, Shanghai, Minhang District

Patentee after: SHANGHAI ELECTRIC PORCELAIN WORKS CO., LTD.

Patentee after: Shanghai Electric Power Corporation

Patentee after: State Grid Corporation of China

Address before: 200241 No. 4299, Lane 1, Long Wu Road, Shanghai, Minhang District

Patentee before: Shanghai Electric-Porcelain Works

Patentee before: Shanghai Electric Power Corporation

Patentee before: State Grid Corporation of China