Help medium-length hole blasting to handle the method on outstanding top up and down
Technical field
The invention belongs to the mining technique field, relate in particular to a kind of method of helping medium-length hole blasting to handle outstanding top up and down.
Background technology
At present the main mining methods of high-dipping ore block are sublevel caving method without sill pillar, and this mining methods are to tunnel mining tunnel in ore body, in the utilization to the scallop hole explosion method that the ore deposit digs up mine that falls.But this mining methods are sometimes because drawing is inaccurate, or construction location is inaccurate, cause that hole depth design is not in place, the position is not got in the hole, or powder charge does not install to the position, causes demolition effect bad, and the top is not put down, Here it is outstanding top.Behind the outstanding top, not only influence output, and if handle and ought just become potential safety hazard, in case get off, just very dangerous.Original outstanding top processing method is to help or help down gallery of pick on forklift ore removal tunnel, upwards dig a courtyard again, after arriving outstanding top bit, driving chamber master lane, driving carries out Chamber Construction after finishing in the entity of outstanding top, as shown in Figure 1, the operation of need manually slagging tap, the excavation work amount is very big, and labour intensity is big, long in time limit, and the workman constructs abnormally dangerous in the entity of outstanding top.The loss of mineral resources is not only caused on outstanding top, mining cost is strengthened, the more important thing is and stay potential safety hazard, directly threaten cutter's life security, therefore, no matter the actual needs from producing is still considered from security standpoint, outstanding top all must be well solved, and 1 is that outstanding top bit, 2 is that chamber master lane, 3 is that courtyard, 4 is forklift ore removal tunnel among Fig. 1.
Summary of the invention
The object of the present invention is to provide a kind of efficiency of construction that improves, reduce labour intensity, guarantee the double entry road of job safety, help medium-length hole blasting to handle the method on outstanding top up and down.
The objective of the invention is to realize by following technical proposals:
The method of helping medium-length hole blasting to handle outstanding top up and down of the present invention, it is characterized in that: it is characterized in that: vertical rock drilling of wearing two of arteries and veins drivings joins the lane when helping under the tunnel in power shovel ore removal tunnel group and tunnel, after mineral ore is passed in this rock drilling connection lane, again towards outstanding top bit direction and two of the parallel drivings in power shovel ore removal tunnel, and with described rock drilling connection long and medium hole drilling connected vertically tunnel, lane, and this long and medium hole drilling tunnelling surpasses outstanding top bit, in this two drilling drift, press array pitch 1-1.5 rice to outstanding top bit respectively then, carry out the medium-length hole construction apart from the ore deposit parameter that falls of 1-1.5 rice at the bottom of the hole, every row's perforation, with explosive loader blasting charge in the medium-length hole, with the short-delay blasting of millisecond detonator, onepull will be hanged the top avalanche.
Advantage of the present invention is: utilize this said method to handle outstanding top technology, level is carried out lane construction in the ore removal tunnel, driving, medium-length hole construction, bursting work are all a level, need not upwards construct, construction organization is simple, utilize the power shovel operation of slagging tap, labour intensity is little, the efficiency of construction height; Maximum benefit is not at the dead zone operation at top, has guaranteed being perfectly safe of operation.
Description of drawings
Fig. 1 is the structural representation of original outstanding top processing method.
Fig. 2 is the structural representation of the outstanding top of the present invention processing method.
Fig. 3 is the A-A sectional view of Fig. 2.
Fig. 4 is the A-A sectional view of Fig. 2.
The specific embodiment
Below in conjunction with description of drawings the specific embodiment of the present invention.
As Fig. 2, Fig. 3, shown in Figure 4: the method for helping medium-length hole blasting to handle outstanding top up and down of the present invention, it is characterized in that: vertical rock drilling of wearing two of arteries and veins drivings joins the lane when helping under the tunnel in power shovel ore removal tunnel group and tunnel, after mineral ore is passed in this rock drilling connection lane, again towards outstanding top bit direction and two of the parallel drivings in power shovel ore removal tunnel, and with described rock drilling connection long and medium hole drilling connected vertically tunnel, lane, and this long and medium hole drilling tunnelling surpasses outstanding top bit, in this two drilling drift, press array pitch 1-1.5 rice to outstanding top bit respectively then, carry out the medium-length hole construction apart from the ore deposit parameter that falls of 1-1.5 rice at the bottom of the hole, every row's perforation is used
Explosive loader blasting charge in the medium-length hole, with the short-delay blasting of millisecond detonator, onepull will be hanged the top avalanche.
The present invention is in the vertical rock drilling connection lanes 6 of wearing two 3m * 3m of arteries and veins driving with 10 whiles of group under the tunnel of the tunnel in described power shovel ore removal tunnel 4 group 9, after 6 meters of mineral ores are passed in this rock drilling connection lane 6, again towards two 3m * 3m of outstanding top bit 1 direction and power shovel ore removal tunnel 4 parallel drivings, and with described rock drilling connection 6 long and medium hole drilling connected vertically tunnels 5, lane, these long and medium hole drilling tunnel 5 drivings surpass outstanding top bit 2-3m, leave enough spaces like this, guarantee medium-length hole all outstanding top bit of can constructing.In this two drilling drift 5, carry out medium-length hole 12 constructions apart from 1 meter the ore deposit parameter that falls to outstanding top bit 1 at the bottom of by 1 meter of array pitch, hole respectively then, every row makes a call to 4 holes, row's number of construction medium-length hole 12 is determined by outstanding top bit length, with BQF100 type explosive loader blasting charge in the medium-length hole, with I section, III section, V section, VII section 18m millisecond detonator line, as shown in Figure 4, the I section is detonated earlier, be III section, V section successively, be that the VII section is detonated at last, like this, towards the Xuan Ding scope of freedom 13 directions, but not the covering of the fan direction is carried out short-delay blasting by row, and onepull will be hanged the top avalanche.
Number in the figure 7 is that armor rock on the ore body, 8 is that ore body boundary line, 11 is ore body lower wall country rock.The present invention carries out lane construction in ore removal tunnel level, and driving, medium-length hole construction, bursting work all a level, need not upwards be constructed, and construction is simple, utilizes the power shovel operation of slagging tap, and labour intensity is little, the efficiency of construction height; Maximum benefit is not at the dead zone operation at top, and this safety in production hidden danger of outstanding top is eliminated substantially.
Handle the scheme of outstanding top problem with the prior art medium-length hole and compare, this scheme is to help two drilling drifts of new pick up and down, carrying out double treatment, and maneuverability is arranged in the tunnel, does not disturb mutually, has a style of one's own.If carry out the single face explosion in segmentation lower wall connection lane, not only the rock drilling hole depth is big, easy sideslip, and precision is difficult to control, and treatment effect is undesirable.And charge explosion destroy easily the connection lane, to thousand one-tenth influences of subsequent production.