CN102277800A - Inter-sleep grab bucket stone remover - Google Patents

Inter-sleep grab bucket stone remover Download PDF

Info

Publication number
CN102277800A
CN102277800A CN2011101098499A CN201110109849A CN102277800A CN 102277800 A CN102277800 A CN 102277800A CN 2011101098499 A CN2011101098499 A CN 2011101098499A CN 201110109849 A CN201110109849 A CN 201110109849A CN 102277800 A CN102277800 A CN 102277800A
Authority
CN
China
Prior art keywords
grab bucket
oil cylinder
grab
lifting
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101098499A
Other languages
Chinese (zh)
Other versions
CN102277800B (en
Inventor
于向军
胡季
孙中朝
王德武
南栋祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University
Original Assignee
Kunming University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University filed Critical Kunming University
Priority to CN 201110109849 priority Critical patent/CN102277800B/en
Publication of CN102277800A publication Critical patent/CN102277800A/en
Application granted granted Critical
Publication of CN102277800B publication Critical patent/CN102277800B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses an inter-sleep grab bucket stone remover, which consists of a track vehicle, a generator, an operation control box and a grab bucket stone removal device, wherein the generator, the operation control box and the grab bucket stone removal device are arranged on the track vehicle and can be pushed to move on a track by man power; the grab bucket stone removal device consists of a cross beam, a trolley, a rotary table, a hoisting basic arm, a hoisting telescopic arm, a hoisting arm variable-amplitude oil cylinder, a portal-type steel frame, a grab bucket opening and closing oil cylinder, a force application plate, a brace rod, two grab buckets, an oil cylinder for driving the trolley to move, a rotary steady bearing and a fan-shaped wheel group; the grab bucket stone removal device can move, rotate and rise and fall on the trolley; and opening and closing of the two grab buckets can release and hold stones. The inter-sleep grab bucket stone remover can quickly remove stones between two sides of the sleep, is convenient for operation, reliable in performance and high in mechanical working efficiency and has a simple structure; moreover, the inter-sleep grab bucket stone remover is so light that two workers can move the remover from the track conveniently; and the finite line repair 'skylight' working time can be used fully and rationally.

Description

轨枕间抓斗清石机Grab stone cleaning machine between sleepers

技术领域 technical field

本发明涉及一种铁路机械,特别涉及一种轨枕间抓斗清石机。The invention relates to a railway machine, in particular to a stone cleaning machine with a grab bucket between sleepers.

背景技术 Background technique

铁路轨枕在长时间的使用过程中,由于自然沉降和振动的原因,铁路局部轨枕下沉,需要进行维护,个别轨枕损坏,需要及时更换,在进行维护或轨枕更换的过程中,需要清理轨枕之间的路基碎石。以往都是人工清理路基碎石,费时费力,效率低,不能在有效的列车通行间隙(俗称:天窗)内完成工作。During the long-term use of railway sleepers, due to natural settlement and vibration, some railway sleepers sink and need to be maintained. Individual sleepers are damaged and need to be replaced in time. In the process of maintenance or sleeper replacement, it is necessary to clean the sleeper gravel between roadbeds. In the past, the subgrade rubble was manually cleaned, which was time-consuming and laborious, and the efficiency was low, and the work could not be completed within the effective train passage gap (commonly known as: skylight).

发明内容 Contents of the invention

本发明的目的是提供一种轨枕间抓斗清石机,使用该轨枕间抓斗清石机清理路基碎石,省时省力,工作效率高。The purpose of the present invention is to provide a grab stone cleaner between sleepers, using the grab stone cleaner between sleepers to clean roadbed gravel, saving time and labor, and high working efficiency.

本发明是由轨道车、发电机、操作控制箱(内装有油箱、油泵和各种控制阀)、抓斗清石装置组成,轨道车的四脚安装有脚轮,轨道车借助人力可以在轨道上行进,发电机、控制操作箱和抓斗清石装置设置在轨道车上,发电机为油泵提供动力,抓斗清石装置是由横梁、台车、回转台、起重基本臂、起重伸缩臂、起重臂变幅油缸、门式钢架、抓斗开合油缸、加力板、撑杆、抓斗、台车移动驱动油缸、回转支撑轴承和扇形齿轮组组成,横梁固定在轨道车上,横梁前后两侧设置导轨,台车位于横梁上,设置于台车上的脚轮置于横梁上的导轨内,横梁上面左侧设置有驱动台车的油缸,油缸的活塞杆外端与台车铰接,油缸的活塞杆伸缩实现台车移动,台车与回转台通过回转支撑轴承连接,油马达与回转支撑轴承上齿圈啮合实现回转台转动,回转台上铰接起重基本臂,起重基本臂的前端下面与回转台之间铰接起重臂变幅油缸,起重伸缩臂设置于起重基本臂中,起重伸缩臂借助铰接于起重伸缩臂和起重基本臂间的油缸活塞杆移动实现在起重基本臂中伸缩;起重伸缩臂的前端铰接门式钢架,门式钢架的两侧对称铰接一对抓斗开合油缸,固连于抓斗开合油缸活塞杆下端的加力板与抓斗两侧斗体铰接,撑杆分别与抓斗两侧斗体和门式钢架铰接,扇形齿轮组分别固连于抓斗两侧斗体上。The present invention is composed of a rail car, a generator, an operation control box (with a fuel tank, an oil pump and various control valves inside), and a grab stone cleaning device. Moving, the generator, control operation box and grab stone cleaning device are set on the rail car, the generator provides power for the oil pump, and the grab stone cleaning device is composed of a beam, trolley, rotary table, lifting basic arm, lifting telescopic Boom, jib luffing cylinder, portal steel frame, grab opening and closing cylinder, afterburner plate, strut, grab, trolley moving drive cylinder, slewing support bearing and sector gear set, the beam is fixed on the railcar Above, guide rails are set on the front and rear sides of the beam, the trolley is located on the beam, the casters set on the trolley are placed in the guide rails on the beam, and the oil cylinder driving the trolley is set on the left side of the beam, and the outer end of the piston rod of the cylinder is in contact with the platform. The car is hinged, the piston rod of the oil cylinder is stretched to realize the movement of the trolley, the trolley and the slewing table are connected through the slewing support bearing, the oil motor meshes with the upper ring gear of the slewing support bearing to realize the rotation of the slewing table, and the basic lifting arm is articulated on the slewing table to lift The jib luffing cylinder is hinged between the front end of the basic arm and the slewing table, the lifting telescopic arm is set in the lifting basic arm, and the lifting telescopic arm is hinged between the lifting telescopic arm and the lifting basic arm by the cylinder piston The movement of the rod realizes expansion and contraction in the basic lifting arm; the front end of the lifting telescopic arm is hinged to the door-type steel frame, and the two sides of the door-type steel frame are symmetrically hinged to a pair of grab opening and closing cylinders, which are fixed to the piston rod of the grab opening and closing cylinder The reinforcement plate at the lower end is hinged with the buckets on both sides of the grab, the struts are respectively hinged with the buckets and the door-type steel frame on both sides of the grab, and the sector gear sets are fixedly connected to the buckets on both sides of the grab.

本发明的工作过程和原理如下:Working process and principle of the present invention are as follows:

发电机为油泵提供电源,油泵提供高压油,借助人力推动轨道车可以在轨道上移动,设置在台车上的抓斗清石装置借助油缸的推拉实现横向自如运动;回转台通过油马达实现自如转动;回转台上的起重基本臂借助起重臂变幅油缸实现变幅,起重伸缩臂借助铰接于起重伸缩臂和起重基本臂间的油缸活塞杆移动实现在起重基本臂中伸缩;悬吊于门式钢架上的对称布置的双抓斗,通过抓斗开合油缸、加力板和撑杆的作用实现开合进行释放及抓取碎石,抓斗两侧斗体同步开合是由扇形齿轮组啮合实现的。The generator provides power for the oil pump, and the oil pump provides high-pressure oil. The rail car can be moved on the track with the help of manpower. The grab stone cleaning device installed on the trolley can move freely laterally by pushing and pulling the oil cylinder; the rotary table can move freely through the oil motor. Rotation; the lifting basic arm on the slewing table realizes the luffing by means of the lifting arm luffing cylinder, and the lifting telescopic arm moves in the lifting basic arm by means of the movement of the cylinder piston rod hinged between the lifting telescopic arm and the lifting basic arm. Telescopic: The symmetrically arranged double grab buckets suspended on the portal steel frame can be opened and closed through the action of the grab opening and closing cylinder, the afterburner plate and the support rod to release and grab gravel. Synchronous opening and closing is achieved by the meshing of sector gear sets.

本发明的有益效果是:抓斗清石装置可平移、升降和旋转,可快速清除轨枕双侧间石渣,不仅操作方便、性能可靠、机械化作业率高,而且结构简单,重量轻至两个人能方便将整机抬离轨道,可以充分、合理利用有限的线路修理“天窗”作业时间。The beneficial effects of the present invention are: the grab stone clearing device can be translated, lifted and rotated, and can quickly remove the gravel between the two sides of the sleeper. It is not only easy to operate, reliable in performance, high in mechanized operation rate, but also simple in structure and light in weight for two people. The complete machine can be lifted off the track conveniently, and the limited operating time for line repair "skylight" can be fully and rationally utilized.

附图说明 Description of drawings

图1为本发明实施例的立体示意图及工作状态示意图。FIG. 1 is a perspective view and a working state view of an embodiment of the present invention.

图2为本发明实施例的主视图。Fig. 2 is a front view of the embodiment of the present invention.

图3为本发明实施例的另一状态的主视图。Fig. 3 is a front view of another state of the embodiment of the present invention.

图4为本发明实施例的右视图。Fig. 4 is a right side view of the embodiment of the present invention.

图5为本发明实施例之抓斗部分的立体示意图。Fig. 5 is a three-dimensional schematic view of the grab bucket part of the embodiment of the present invention.

具体实施方式 Detailed ways

请参阅图1、图2、图3和图4所示,为本发明的实施例,该实施例是由轨道车1、发电机2、操作控制箱3(内装有油箱、油泵和各种控制阀)、抓斗清石装置4组成,轨道车1的四脚安装有脚轮11,轨道车1借助人力能在轨道上行进,发电机2、控制操作箱3和抓斗清石装置4设置在轨道车1上,发电机2为油泵提供动力,抓斗清石装置4是由横梁41、台车42、回转台43、起重基本臂44、起重伸缩臂45、起重臂变幅油缸46、门式钢架47、抓斗开合油缸48、加力板49、撑杆50、抓斗51、驱动台车移动的油缸52、回转支撑轴承53和扇形齿轮组54组成,横梁41固定在轨道车1上,横梁41前后两侧设置导轨,台车42位于横梁41上,设置于台车42上的脚轮置于横梁41上的导轨内,横梁41上面左侧设置有驱动台车的油缸52,油缸52的活塞杆外端与台车42铰接,油缸52的活塞杆伸缩实现台车42移动,台车42与回转台43通过回转支撑轴承53连接,油马达431与回转支撑轴承53上齿圈啮合实现回转台43转动,回转台43上铰接起重基本臂44,起重基本臂44的前端下面与回转台43之间铰接起重臂变幅油缸46,起重伸缩臂45设置于起重基本臂44中,起重伸缩臂45借助铰接于起重伸缩臂45和起重基本臂44间的油缸活塞杆移动实现在起重基本臂44中伸缩;起重伸缩臂45的前端铰接门式钢架47,配合图5所示,门式钢架47的两侧对称铰接一对抓斗开合油缸48,固连于抓斗开合油缸48活塞杆下端的加力板49与抓斗51两侧斗体铰接,撑杆50分别与抓斗51两侧斗体和门式钢架47铰接,扇形齿轮组54分别固连于抓斗51两侧斗体上。Please refer to Fig. 1, Fig. 2, shown in Fig. 3 and Fig. 4, be an embodiment of the present invention, this embodiment is by rail car 1, generator 2, operation control box 3 (fuel tank, oil pump and various controls are housed in it) valve), a grab stone clearing device 4, casters 11 are installed on the four legs of the rail car 1, and the rail car 1 can travel on the track by manpower, and the generator 2, the control operation box 3 and the grab stone clearing device 4 are arranged on On the rail car 1, the generator 2 provides power for the oil pump, and the grab stone cleaning device 4 is composed of a beam 41, a trolley 42, a rotary table 43, a lifting basic arm 44, a lifting telescopic arm 45, and a lifting arm luffing cylinder 46. Portal steel frame 47, grab opening and closing oil cylinder 48, afterburner plate 49, strut 50, grab bucket 51, oil cylinder 52 for driving trolley to move, slewing support bearing 53 and sector gear set 54, beam 41 is fixed On the railcar 1, guide rails are set on the front and rear sides of the crossbeam 41, the trolley 42 is located on the crossbeam 41, the casters arranged on the trolley 42 are placed in the guide rails on the crossbeam 41, and the left side of the crossbeam 41 is provided with a drive trolley. Oil cylinder 52, the outer end of the piston rod of oil cylinder 52 is hinged with trolley 42, the piston rod of oil cylinder 52 stretches to realize the movement of trolley 42, trolley 42 and rotary table 43 are connected through slewing support bearing 53, oil motor 431 and slewing support bearing 53 The meshing of the upper ring gear realizes the rotation of the turntable 43, the basic lifting arm 44 is articulated on the turntable 43, the jib luffing cylinder 46 is articulated between the front end of the lifting basic arm 44 and the turntable 43, and the lifting telescopic arm 45 is set In the lifting basic arm 44, the lifting telescopic arm 45 moves in the lifting basic arm 44 by means of the oil cylinder piston rod hinged between the lifting telescopic arm 45 and the lifting basic arm 44; the front end of the lifting telescopic arm 45 Hinged gantry steel frame 47, as shown in Fig. 5, a pair of grab opening and closing oil cylinders 48 are hinged symmetrically on both sides of gantry steel frame 47, and are fixedly connected to the force plate 49 at the lower end of the grab opening and closing oil cylinder 48 piston rods and The bucket bodies on both sides of the grab bucket 51 are hinged, the struts 50 are respectively hinged to the bucket bodies on both sides of the grab bucket 51 and the portal steel frame 47, and the sector gear sets 54 are fixedly connected to the bucket bodies on both sides of the grab bucket 51 respectively.

本实施例的工作过程和原理如下:The working process and principle of the present embodiment are as follows:

配合图1至图4所示,借助人力推动轨道车1在轨道上移动至抓斗位于待清石渣的轨枕间上方;发电机2为油泵提供电源,油泵提供高压油,油缸52的活塞杆伸出将设置在台车42上的抓斗清石装置4推至右端;抓斗51两侧斗体同步开合是由扇形齿轮组54啮合实现的;通过抓斗开合油缸48活塞杆回缩、加力板49和撑杆50的协调作用实现抓斗51张开,回转台43上的起重基本臂44借助起重臂变幅油缸46变幅使张开的抓斗51下降至其爪尖与石碴接触止,通过抓斗51开合油缸48活塞杆伸出、加力板49和撑杆50共同作用实现抓斗51闭合,回转台43上的起重基本臂44借助起重臂变幅油缸46变幅使闭合的抓斗51上升至其爪尖高出钢轨上表面止,油缸52的活塞杆缩回将设置在台车42上的抓斗清石装置4拉至左端,通过抓斗开合油缸48活塞杆回缩、加力板49和撑杆50的协调作用实现抓斗51张开,将石碴释放到路基旁,循环往复至轨枕间左边的石碴清完,油缸52的活塞杆缩回将设置在台车42上的抓斗清石装置4拉至左端,通过油马达431驱动抓斗清石装置4转动180°,重复前述清石动作,并循环往复至轨枕间右边的石碴清完。As shown in Fig. 1 to Fig. 4, the railcar 1 is moved on the track with the help of manpower until the grab bucket is located above the sleeper to be cleared of gravel; the generator 2 provides power for the oil pump, and the oil pump provides high-pressure oil. Stretch out and push the grab stone cleaning device 4 on the trolley 42 to the right end; the synchronous opening and closing of the bucket bodies on both sides of the grab bucket 51 is realized by the meshing of the sector gear set 54; The coordinated action of the shrinking and adding force plates 49 and the struts 50 realizes the opening of the grab bucket 51, and the lifting basic arm 44 on the turntable 43 lowers the opened grab bucket 51 to its lower limit by means of the jib luffing oil cylinder 46 luffing. The claw tip is in contact with the ballast, and the grab bucket 51 is closed through the joint action of the grab bucket 51 opening and closing oil cylinder 48 piston rod, the force plate 49 and the support rod 50, and the lifting basic arm 44 on the slewing table 43 is The luffing cylinder 46 is luffing so that the closed grab 51 rises until its claw tip is higher than the upper surface of the rail, and the piston rod of the oil cylinder 52 retracts to pull the grab stone cleaning device 4 on the trolley 42 to the left end. The bucket opening and closing oil cylinder 48 piston rod retracts, and the coordinated action of the afterburner plate 49 and the support rod 50 realizes the opening of the grab bucket 51, releases the ballast to the side of the roadbed, and reciprocates until the ballast on the left side between the sleepers is cleared, and the oil cylinder 52 The piston rod retracts and pulls the grab stone clearing device 4 on the trolley 42 to the left end, and the oil motor 431 drives the grab stone clearing device 4 to rotate 180°, repeats the aforementioned stone clearing action, and reciprocates between the sleepers. The ballast on the right is cleared.

本发明的有益效果是:抓斗清石装置可平移、升降和旋转,可快速清除轨枕双侧间石渣,不仅操作方便、性能可靠、机械化作业率高,而且结构简单,重量轻至两个人能方便将整机抬离轨道,可以充分、合理利用有限的线路修理“天窗”作业时间。The beneficial effects of the present invention are: the grab stone clearing device can be translated, lifted and rotated, and can quickly remove the gravel between the two sides of the sleeper. It is not only easy to operate, reliable in performance, high in mechanized operation rate, but also simple in structure and light in weight for two people. The complete machine can be lifted off the track conveniently, and the limited operating time for line repair "skylight" can be fully and rationally utilized.

Claims (1)

1. the derocker of grabbing bucket between a sleeper, it is characterized in that: be by railcar (1), generator (2), operation control box (3) and the clear stone device of grab bucket (4) are formed, four pin of railcar (1) are equipped with castor (11), railcar (1) can be advanced in orbit by manpower, generator (2), control operation case (3) and the clear stone device of grab bucket (4) are arranged on the railcar (1), generator (2) provides power for oil pump, the clear stone device (4) of grabbing bucket is by crossbeam (41), chassis (42), panoramic table (43), lifting basic arm (44), lifting telescopic arm (45), boom amplitude oil cylinder (46), portal frame (47), grab bucket folding oil cylinder (48), gusset (49), strut (50), grab bucket (51), oil cylinder (52), slewing bearing (53) and sector wheels (54) are formed, crossbeam (41) is fixed on the railcar (1), both sides are provided with guide rail before and after the crossbeam (41), chassis (42) is positioned on the crossbeam (41), being arranged at castor on the chassis (42) places in the guide rail on the crossbeam (41), crossbeam (41) is gone up left side of face and is provided with the oil cylinder (52) that drives chassis, the piston rod outer end of oil cylinder (52) and chassis (42) are hinged, the flexible chassis (42) of realizing of the piston rod of oil cylinder (52) moves, chassis (42) is connected by slewing bearing (53) with panoramic table (43), oil motor (431) realizes that with the engagement of slewing bearing (53) upper ring gear panoramic table (43) rotates, panoramic table (43) is gone up hinged lifting basic arm (44), hinged boom amplitude oil cylinder (46) below the front end of lifting basic arm (44) and between the panoramic table (43), lifting telescopic arm (45) is arranged in the lifting basic arm (44), lifting telescopic arm (45) by be articulated in oil cylinder piston bar between lifting telescopic arm (45) and lifting basic arm (44) move be implemented in the lifting basic arm (44) flexible; The front end hinged door steelframe (47) of lifting telescopic arm (45), the hinged a pair of grab bucket folding oil cylinder of the bilateral symmetry of portal frame (47) (48), the gusset (49) that is fixed on grab bucket folding oil cylinder (48) piston-rod lower end is hinged with grab bucket (51) both sides bucket body, strut (50) is hinged with grab bucket (51) both sides bucket body and portal frame (47) respectively, and sector wheels (54) are fixed on respectively on the bucket body of grab bucket (51) both sides.
CN 201110109849 2011-04-29 2011-04-29 Inter-sleep grab bucket stone remover Expired - Fee Related CN102277800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110109849 CN102277800B (en) 2011-04-29 2011-04-29 Inter-sleep grab bucket stone remover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110109849 CN102277800B (en) 2011-04-29 2011-04-29 Inter-sleep grab bucket stone remover

Publications (2)

Publication Number Publication Date
CN102277800A true CN102277800A (en) 2011-12-14
CN102277800B CN102277800B (en) 2012-11-28

Family

ID=45103513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110109849 Expired - Fee Related CN102277800B (en) 2011-04-29 2011-04-29 Inter-sleep grab bucket stone remover

Country Status (1)

Country Link
CN (1) CN102277800B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179082A (en) * 2014-09-04 2014-12-03 昆明学院 Traverse moving vibration rotary excavating stone discharging device
CN104195899A (en) * 2014-09-04 2014-12-10 昆明学院 Quick mechanical sleeper rotating machine
CN104594140A (en) * 2015-01-20 2015-05-06 中国铁路总公司 Rail-spanning stepping type ballast excavating machine
CN106283991A (en) * 2016-08-31 2017-01-04 昆明学院 A kind of mechanical-electrical-hydraulic integration changes pillow device
CN106283989A (en) * 2016-08-31 2017-01-04 昆明学院 A kind of swivel block and push-and-pull sleeper automation equipment
CN106283986A (en) * 2016-08-31 2017-01-04 昆明学院 There is the automatic exchange sleeper machine of tamping flat quarrel device
CN106283988A (en) * 2016-08-31 2017-01-04 昆明学院 One has the mechanical-electrical-hydraulic integration of traversing grab bucket clear stone device and changes pillow machine
CN106283977A (en) * 2016-08-31 2017-01-04 昆明学院 Arrange the quarrel small-sized maintenance of equipment of railway of rockfilling
CN106337332A (en) * 2016-08-31 2017-01-18 昆明学院 Sleeper replacing machine with reciprocating movement device
CN106337325A (en) * 2016-08-31 2017-01-18 昆明学院 Runway shoulder and track bed shaping device
CN106337326A (en) * 2016-08-31 2017-01-18 昆明学院 Automatic device for clearing aggregates at sleeper end
CN106381777A (en) * 2016-08-31 2017-02-08 南京工程学院 Sleeper replacing machine with tamping and ballasting device
CN106498819A (en) * 2016-11-06 2017-03-15 昆明学院 A kind of machine automates fast quick change and rests the head on device
CN106498817A (en) * 2016-11-05 2017-03-15 昆明学院 A kind of swivel block and push-and-pull sleeper automated machine
CN106498818A (en) * 2016-11-06 2017-03-15 昆明学院 What there is opposite crank mechanism rail-lifting equipment changes pillow machine
CN106818031A (en) * 2017-01-10 2017-06-13 广东金源农业机械制造股份有限公司 Sugar-cane cutting machine
CN106894301A (en) * 2015-12-17 2017-06-27 路行(北京)科技发展有限责任公司 A kind of ballast bed line construction and attending device and railcar
CN107287994A (en) * 2016-03-31 2017-10-24 路行(北京)科技发展有限责任公司 A kind of railway roadbed line construction and attending device and railcar
CN116289354A (en) * 2023-05-23 2023-06-23 石家庄铁道大学 Self-propelled railway rail and sleeper collection equipment

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3111909A (en) * 1958-10-30 1963-11-26 Plasser Franz Mobile track tamper assembly
DE3151777A1 (en) * 1981-05-15 1982-12-02 Franz Plasser Bahnbaumaschinen-Industriegesellschaft mbH, 1010 Wien TRACKABLE MACHINE, IN PARTICULAR TRACK MEASURING OR TRACKING MACHINE
ES8401167A1 (en) * 1981-12-10 1983-11-16 Sig Schweiz Industrieges Railway track tamper
CN2210918Y (en) * 1995-01-12 1995-10-25 唐山市铁路清筛机制造厂 Sleeper-bottom renewing and cleaning machine
CN2554217Y (en) * 2002-04-03 2003-06-04 中国铁道建筑总公司昆明机械厂 Multifunction sleeper ballast cleaning machine
CN2880891Y (en) * 2005-07-28 2007-03-21 襄樊金鹰轨道车辆有限责任公司 Railway switch ballast cleaning machine
CN201077940Y (en) * 2007-07-26 2008-06-25 昆明中铁大型养路机械集团有限公司 Harrow ballast device and railway harrow ballast vehicle
CN201162158Y (en) * 2007-12-25 2008-12-10 什邡瑞邦机械有限责任公司 Hydraulic slope ballast recollecting machine for railway road bed
CN201648892U (en) * 2010-02-01 2010-11-24 张忠海 Portable internal-combustion full hydraulic ramming machine
CN102011350A (en) * 2010-10-28 2011-04-13 张忠海 Hydraulic tamping machine

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3111909A (en) * 1958-10-30 1963-11-26 Plasser Franz Mobile track tamper assembly
DE3151777A1 (en) * 1981-05-15 1982-12-02 Franz Plasser Bahnbaumaschinen-Industriegesellschaft mbH, 1010 Wien TRACKABLE MACHINE, IN PARTICULAR TRACK MEASURING OR TRACKING MACHINE
ES8401167A1 (en) * 1981-12-10 1983-11-16 Sig Schweiz Industrieges Railway track tamper
CN2210918Y (en) * 1995-01-12 1995-10-25 唐山市铁路清筛机制造厂 Sleeper-bottom renewing and cleaning machine
CN2554217Y (en) * 2002-04-03 2003-06-04 中国铁道建筑总公司昆明机械厂 Multifunction sleeper ballast cleaning machine
CN2880891Y (en) * 2005-07-28 2007-03-21 襄樊金鹰轨道车辆有限责任公司 Railway switch ballast cleaning machine
CN201077940Y (en) * 2007-07-26 2008-06-25 昆明中铁大型养路机械集团有限公司 Harrow ballast device and railway harrow ballast vehicle
CN201162158Y (en) * 2007-12-25 2008-12-10 什邡瑞邦机械有限责任公司 Hydraulic slope ballast recollecting machine for railway road bed
CN201648892U (en) * 2010-02-01 2010-11-24 张忠海 Portable internal-combustion full hydraulic ramming machine
CN102011350A (en) * 2010-10-28 2011-04-13 张忠海 Hydraulic tamping machine

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179082A (en) * 2014-09-04 2014-12-03 昆明学院 Traverse moving vibration rotary excavating stone discharging device
CN104195899A (en) * 2014-09-04 2014-12-10 昆明学院 Quick mechanical sleeper rotating machine
CN104179082B (en) * 2014-09-04 2015-11-18 昆明学院 The row's of digging stone device is revolved in a kind of traversing vibration
CN104594140A (en) * 2015-01-20 2015-05-06 中国铁路总公司 Rail-spanning stepping type ballast excavating machine
CN106894301A (en) * 2015-12-17 2017-06-27 路行(北京)科技发展有限责任公司 A kind of ballast bed line construction and attending device and railcar
CN107287994B (en) * 2016-03-31 2019-03-01 一路行(北京)科技有限公司 A kind of railway roadbed line construction and maintenance device and railcar
CN107287994A (en) * 2016-03-31 2017-10-24 路行(北京)科技发展有限责任公司 A kind of railway roadbed line construction and attending device and railcar
CN106337325A (en) * 2016-08-31 2017-01-18 昆明学院 Runway shoulder and track bed shaping device
CN106283986A (en) * 2016-08-31 2017-01-04 昆明学院 There is the automatic exchange sleeper machine of tamping flat quarrel device
CN106337332A (en) * 2016-08-31 2017-01-18 昆明学院 Sleeper replacing machine with reciprocating movement device
CN106283988A (en) * 2016-08-31 2017-01-04 昆明学院 One has the mechanical-electrical-hydraulic integration of traversing grab bucket clear stone device and changes pillow machine
CN106337326A (en) * 2016-08-31 2017-01-18 昆明学院 Automatic device for clearing aggregates at sleeper end
CN106381777A (en) * 2016-08-31 2017-02-08 南京工程学院 Sleeper replacing machine with tamping and ballasting device
CN106283991A (en) * 2016-08-31 2017-01-04 昆明学院 A kind of mechanical-electrical-hydraulic integration changes pillow device
CN106283989A (en) * 2016-08-31 2017-01-04 昆明学院 A kind of swivel block and push-and-pull sleeper automation equipment
CN106283977A (en) * 2016-08-31 2017-01-04 昆明学院 Arrange the quarrel small-sized maintenance of equipment of railway of rockfilling
CN106498817A (en) * 2016-11-05 2017-03-15 昆明学院 A kind of swivel block and push-and-pull sleeper automated machine
CN106498818A (en) * 2016-11-06 2017-03-15 昆明学院 What there is opposite crank mechanism rail-lifting equipment changes pillow machine
CN106498819A (en) * 2016-11-06 2017-03-15 昆明学院 A kind of machine automates fast quick change and rests the head on device
CN106818031A (en) * 2017-01-10 2017-06-13 广东金源农业机械制造股份有限公司 Sugar-cane cutting machine
CN116289354A (en) * 2023-05-23 2023-06-23 石家庄铁道大学 Self-propelled railway rail and sleeper collection equipment
CN116289354B (en) * 2023-05-23 2023-08-08 石家庄铁道大学 Self-walking railway rail and sleeper collecting equipment

Also Published As

Publication number Publication date
CN102277800B (en) 2012-11-28

Similar Documents

Publication Publication Date Title
CN202030996U (en) Grab bucket stone remover among rail bearings
CN102277800A (en) Inter-sleep grab bucket stone remover
CN202081354U (en) Quick sleeper replacer
CN102261024B (en) Sleeper quick change machine
CN202030995U (en) Swivel-driven stone removing machine between rail bearings
CN102277801B (en) Rotary drilling stone-discharging machine between sleepers
CN202030998U (en) Rail lifting sleeper-changing machine
CN102433853B (en) Trailer type sand elimination machine for railway
CN209276922U (en) A kind of small-sized railway ballast smoothing machine
CN211571809U (en) Special excavator of unloading of train
CN204162959U (en) A kind of railway ballast road-sweeper
CN105584761A (en) Garbage collection device for pure electric garbage truck
CN202865706U (en) Railway sleeper replacing machine
CN106368718B (en) Subway deep tunnel reinforced concrete segment removes Operation Van
CN109437071B (en) Auxiliary device for manhole cover opening
CN212000405U (en) A kind of drainage ditch excavation device for railway bridge
CN205204284U (en) Shovel board -like unloader
CN206983939U (en) Railway carriage material descaling machine
CN212025792U (en) Track sleeper-changing digging machine
CN106223135A (en) Arrange the quarrel motorisation unit that rockfills
CN106283977A (en) Arrange the quarrel small-sized maintenance of equipment of railway of rockfilling
CN110104003B (en) Railroad Engineering Vehicle for Comprehensive Disposal of Dangerous Rock and Rockfall at the Slope of Railway Subgrade
CN204162960U (en) One carries rail swivel block machine
CN104787525A (en) Garbage dumping device for cleaning machine
CN204979943U (en) Rubbish dumping device for scavenging machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121128

Termination date: 20170429

CF01 Termination of patent right due to non-payment of annual fee