[go: up one dir, main page]

CN102268963A - 基岩裂隙地层混合钻进成井工艺 - Google Patents

基岩裂隙地层混合钻进成井工艺 Download PDF

Info

Publication number
CN102268963A
CN102268963A CN201110167688A CN201110167688A CN102268963A CN 102268963 A CN102268963 A CN 102268963A CN 201110167688 A CN201110167688 A CN 201110167688A CN 201110167688 A CN201110167688 A CN 201110167688A CN 102268963 A CN102268963 A CN 102268963A
Authority
CN
China
Prior art keywords
drilling
water
well
bedrock
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110167688A
Other languages
English (en)
Other versions
CN102268963B (zh
Inventor
冯红喜
阴文行
冯永军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Weiye Geothermal New Energy Technology Co.,Ltd.
Original Assignee
HANDAN WEIYE UNDERGROUND HEAT DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANDAN WEIYE UNDERGROUND HEAT DEVELOPMENT Co Ltd filed Critical HANDAN WEIYE UNDERGROUND HEAT DEVELOPMENT Co Ltd
Priority to CN 201110167688 priority Critical patent/CN102268963B/zh
Publication of CN102268963A publication Critical patent/CN102268963A/zh
Application granted granted Critical
Publication of CN102268963B publication Critical patent/CN102268963B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

基岩裂隙地层混合钻进成井工艺,本发明的工艺步骤为:①上部松散层至基岩层一定深度使用泥浆正循环工艺钻进,钻孔后下入表层套管并用水泥封固,②基岩层使用空气潜孔锤反循环工艺钻进,③钻至含水层后,至孔内水柱对潜孔锤产生背压影响钻进效率时,改用气举反循环工艺钻进,直到目的层,④酸化洗井,⑤活塞洗井,⑥空气洗井,⑦水泵抽水完井,即空气洗井结束后立刻下潜水泵抽水,直到抽水试验完成为止。本发明的优点是:1、避免或减少干钻孔的出现,降低施工风险。2、缩短建井周期,减少不必要的投资,降低生产成本。3、不使用泥浆,节约淡水资源,避免泥浆施工或排放造成的环境污染。4、最大限度使每条裂隙都成为汇水通道,以实现单孔最大出水量。

Description

基岩裂隙地层混合钻进成井工艺
技术领域
本发明涉及一种钻井工艺,尤其是一种基岩裂隙地层混合钻进成井工艺。
背景技术
基岩裂隙水的含水层岩性以侵入岩类、火山岩、火山溶岩为主,地下水赋存在节理、构造裂隙、风化裂隙和张裂隙发育的断裂破碎带。一般裂隙宽度2~3毫米,大者10~20毫米,长数米至十余米,地下水相对富集在南北向、北西向张性或张扭性裂隙内,以潜水为主,断裂破碎带局部有脉状承压水。富水性不均,水量贫乏,泉水流量一般0.008~0.4升/秒,民井出水量3~12吨/日,钻井单孔涌水量3~200吨/日。
利用常规钻井工艺施工时,由于泥浆携带钻屑能力与其粘度(粘度越高泥饼堵塞越严重)和切力相关,往往造成钻屑在井底重复破碎,重复破碎的同时会将部分钻屑碾入到井壁裂隙中,形成人为堵塞,影响出水量。另外,泥浆中的膨润土或粘土颗粒常常渗透到基岩裂隙中,在压差作用下形成坚硬的泥饼也会堵塞裂隙。
基岩裂隙地层原本裂隙较小,水量贫乏,在钻进过程中又常常诱发泥浆和钻屑堵塞。又因常规工艺钻井周期长,成井后钻屑、泥饼和充填物不易洗出来,导致单孔出水量较小或无水成为干孔,使钻井失去意义。为避免堵塞造成的出水量较小或无水结果,因此,研究一种避免人为堵塞裂隙,同时还要尽最大可能加大裂隙的通透性的基岩裂隙地层混合钻进成井工艺,是目前需要解决的技术问题。
发明内容
本发明所要解决的技术问题是提供一种基岩裂隙地层混合钻进成井工艺。
本发明解决其技术问题的技术方案是:
基岩裂隙地层混合钻进成井工艺,其工艺步骤为:①上部松散层至基岩层一定深度使用泥浆正循环工艺钻进,钻孔后下入表层套管并用水泥封固,②基岩层使用空气潜孔锤反循环工艺钻进,③钻至含水层后,至孔内水柱对潜孔锤产生背压影响钻进效率时,改用气举反循环工艺钻进,直到目的层,④酸化洗井, ⑤活塞洗井,⑥空气洗井, ⑦水泵抽水完井,即空气洗井结束后立刻下潜水泵抽水,直到抽水试验完成为止。
优选的,所述的酸化洗井即钻井工作结束后,先进行电测判层,根据电测结果和钻屑录井资料确定目的层的裂隙位置,然后计算盐酸用量,确定盐酸浓度,再使用泥浆泵注酸,注酸后静止一定时间,使盐酸与裂隙填充物充分发生化学反应,分解或软化填充物,然后自孔口向孔中注入与盐酸量同体积的清水。
优选的,注酸时先将注酸钻具下到孔底,注水试压检查注酸管线密闭性,然后开始注水,测量注入清水量和孔口翻出水量是否一致,若翻出水量与注入清水量采用孔底一次性注酸,若不一致,采用自孔底第一个裂隙层位开始依次向上在每个裂隙层位分别注酸,注酸结束后,提出孔中钻具。
优选的,盐酸浓度为15%~30%,盐酸浓度一般为20%左右,若裂隙中填充物较多可以多次注酸或加大盐酸浓度,但浓度不能超过30%,静止时间为4~8小时。
优选的,所述的活塞洗井即注完清水后向孔内下活塞,活塞下入深度保证拉活塞时活塞上起点在静水位以下,连续拉活塞或间歇拉活塞均可,活塞升降速度为1~3米/秒,拉活塞累计时间不低于12小时。
优选的,活塞下入深度为静水位以下30米~50米。
优选的,所述的空气洗井即在活塞洗井结束后,采用下入普通钻具空压机洗井或下入双臂钻具和普通钻具采用气举反循环洗井,在水量较小的孔中可采用泡沫封堵配合空气洗井,以形成较大抽吸力,洗井持续时间以孔口出水达到“水清沙净”为原则。
本发明的技术原理:
基岩裂隙水赋存在节理、构造裂隙、风化裂隙和张裂隙发育的断裂破碎带。一般裂隙宽度2~3毫米,大者10~20毫米,长数米至十余米,富水性不均,水量贫乏。裂隙中常常充填一些裂隙填充物,影响或堵塞汇水通道,造成单井出水量较小。
基岩裂隙地层原本裂隙较小,水量贫乏,在利用常规钻井工艺施工时常常诱发泥浆和钻屑堵塞,又因常规工艺钻井周期长,成井后钻屑、泥饼和充填物不易洗出来,导致单孔出水量较小或无水成为干孔,使钻井失去意义。为避免堵塞造成的出水量较小或无水的结果,只有研究一套新型钻进工艺,避免人为堵塞裂隙,同时还要尽最大可能加大裂隙的通透性。
方法就是:基岩裂隙地层水井防堵增产技术(采用空气反循环钻进,钻到目的层后酸化洗井、活塞洗井、气举反循环洗井或空压机洗井)。
采用空气反循环钻进,可以避免泥饼堵塞;采用空气反循环钻进还可以保证钻屑在第一时间离开孔底,避免重复破碎将部分钻屑碾入到井壁裂隙中;采用空气反循环钻进还可以冲洗、携带出裂隙中的充填物,以增大裂隙透水面积。最大限度使每条裂隙都成为汇水通道,以实现单孔最大出水量,降低施工风险,减少不必要的投资,避免泥浆造成的环境污染,节约淡水资源。
酸化洗井是增产的有效措施,特别是碳酸盐地层效果十分显著。利用盐酸对地层和裂隙填充物的化学作用,形成一种延伸裂隙和加大裂隙,以达到增加出水量的目的。酸化洗井应结合注水工作效果更好。
活塞洗井是打通裂隙通道的有效措施,特别是填充物较多的裂隙地层。活塞洗井可以将裂隙中的填充物或钻进时掉入裂隙中的钻屑抽出来,以打通裂隙通道达到增加出水量的目的。
气举反循环洗井、空压机洗井,可以将钻孔中的沉淀物排出井孔,以保证有效钻进深度,避免影响出水量。
    基岩裂隙地层水防堵增产技术注意事项和技术要点:
①上部松散层或不整合的基岩层,一定要下入表层套管或泵室管,并用水泥浆固定牢靠。
②空气潜孔锤反循环钻进只能在无水孔段或出少量水段的地层使用。如果地层出水量较大,反循环又不能把出水排到孔外,当孔内积水淹埋潜孔锤一定高度时,潜孔锤工作效率降低,当潜孔锤钻进效率低于2米/小时,要起钻改用气举反循环工艺继续钻进。
③气举反循环钻进,气水混合器的沉没比不能小于1/5(沉没比:指气水混合器埋入水下的深度与气水混合器至气水龙头顶端出口距离的比值,沉没比越大,产生压差形成反循环的能力越大)。及时向孔内回灌清水,使孔口水位平稳,保证较大的沉没比。
气水混合器以下至钻头的钻具长度一般为气水混合器沉没深度的3~4倍,一般不超过7倍。
④酸化洗井。注酸量为2倍的目的层孔段体积。
计算盐酸用量:Q=r2Π2H,
    式中Q——盐酸量(m3)
    r——钻孔半径(m)
    Π——圆周率
    H——需要注酸孔段长度(m)
     确定盐酸浓度。为保证安全注酸,盐酸浓度一般为20%左右,若裂隙中填充物较多可以多次注酸或加大盐酸浓度,但浓度不能超过30%。
    使用泥浆泵注酸,先将注酸钻具(或油管)下到孔底,注水试压(试压压力应高于替换盐酸时压力的50%),检查注酸管线密闭性。然后开始注水,测量注入清水量和孔口翻出水量是否一致。若不一致,注酸不能在孔底一次性住完,应该自孔底第一个裂隙层位开始注入盐酸,依次向上在每个裂隙层位分别注酸。
注酸结束后,提出孔中钻具(或油管),静止4~8小时,使盐酸与裂隙填充物充分发生化学反应,分解或软化填充物。然后自孔口向孔中注入与盐酸量同体积的清水。注完清水后向孔内下活塞。
    5、活塞洗井。活塞下入深度在静水位以下30米~50米(以拉活塞时活塞上起点在静水位以下即可)。活塞升降速度为1~3米/秒。拉活塞累计时间不低于12小时。
6、气举反循环洗井、空压机洗井。采用气举反循环洗井,钻具进水口要位于裂隙层,并自最上裂隙层向下依次洗井,直到孔底洗净为止。
下入普通钻具空压机洗井,钻具下入深度根据空压机承受能力确定,只要能形成上翻气水柱,产生抽吸力即可。在水量较小的孔中可采用泡沫封堵配合空气洗井,已形成较大抽吸力。洗井持续时间以孔口出水达到“水清沙净”为原则。
气举反循环洗井、空压机洗井,可以将钻孔中的沉淀物排出井孔,以保证有效钻进深度,避免影响出水量。
与现有技术相比,具有以下优点:
1、避免或减少干钻孔的出现,降低施工风险。
2、缩短建井周期,减少不必要的投资,降低生产成本。
3、不使用泥浆,节约淡水资源,避免泥浆施工或排放造成的环境污染。
4、最大限度使每条裂隙都成为汇水通道,以实现单孔最大出水量。
具体实施方式
基岩裂隙地层混合钻进成井工艺,其工艺步骤为:①上部松散层至基岩层一定深度使用泥浆正循环工艺钻进,钻孔后下入表层套管并用水泥封固,②基岩层使用空气潜孔锤反循环工艺钻进,③钻至含水层后,至孔内水柱对潜孔锤产生背压影响钻进效率时,改用气举反循环工艺钻进,直到目的层,④酸化洗井, ⑤活塞洗井,⑥空气洗井,⑦水泵抽水完井,即空气洗井结束后立刻下潜水泵抽水,直到抽水试验完成为止。
所述的酸化洗井即钻井工作结束后,先进行电测判层,根据电测结果和钻屑录井资料确定目的层的裂隙位置,然后计算盐酸用量,确定盐酸浓度,再使用泥浆泵注酸,注酸后静止一定时间,使盐酸与裂隙填充物充分发生化学反应,分解或软化填充物,然后自孔口向孔中注入与盐酸量同体积的清水。
注酸时先将注酸钻具下到孔底,注水试压检查注酸管线密闭性,然后开始注水,测量注入清水量和孔口翻出水量是否一致,若翻出水量与注入清水量采用孔底一次性注酸,若不一致,采用自孔底第一个裂隙层位开始依次向上在每个裂隙层位分别注酸,注酸结束后,提出孔中钻具。
盐酸浓度为15%~30%,盐酸浓度一般为20%左右,若裂隙中填充物较多可以多次注酸或加大盐酸浓度,但浓度不能超过30%,静止时间为4~8小时。
所述的活塞洗井即注完清水后向孔内下活塞,活塞下入深度保证拉活塞时活塞上起点在静水位以下,连续拉活塞或间歇拉活塞均可,活塞升降速度为1~3米/秒,拉活塞累计时间不低于12小时。
活塞下入深度为静水位以下30米~50米。
所述的空气洗井即在活塞洗井结束后,采用下入普通钻具空压机洗井或下入双臂钻具和普通钻具采用气举反循环洗井,在水量较小的孔中可采用泡沫封堵配合空气洗井,以形成较大抽吸力,洗井持续时间以孔口出水达到“水清沙净”为原则。

Claims (7)

1.基岩裂隙地层混合钻进成井工艺,其特征在于:其工艺步骤为:①上部松散层至基岩层一定深度使用泥浆正循环工艺钻进,钻孔后下入表层套管并用水泥封固,②基岩层使用空气潜孔锤反循环工艺钻进,③钻至含水层后,至孔内水柱对潜孔锤产生背压影响钻进效率时,改用气举反循环工艺钻进,直到目的层,④酸化洗井,                                                
Figure 665071DEST_PATH_IMAGE001
 活塞洗井,
Figure 700371DEST_PATH_IMAGE002
空气洗井, 
Figure 429293DEST_PATH_IMAGE003
水泵抽水完井,即空气洗井结束后立刻下潜水泵抽水,直到抽水试验完成为止。
2.根据权利要求1所述的基岩裂隙地层混合钻进成井工艺,其特征在于:所述的酸化洗井即钻井工作结束后,先进行电测判层,根据电测结果和钻屑录井资料确定目的层的裂隙位置,然后计算盐酸用量,确定盐酸浓度,再使用泥浆泵注酸,注酸后静止一定时间,使盐酸与裂隙填充物充分发生化学反应,分解或软化填充物,然后自孔口向孔中注入与盐酸量同体积的清水。
3.根据权利要求2所述的基岩裂隙地层混合钻进成井工艺,其特征在于:注酸时先将注酸钻具下到孔底,注水试压检查注酸管线密闭性,然后开始注水,测量注入清水量和孔口翻出水量是否一致,若翻出水量与注入清水量采用孔底一次性注酸,若不一致,采用自孔底第一个裂隙层位开始依次向上在每个裂隙层位分别注酸,注酸结束后,提出孔中钻具。
4.根据权利要求2所述的基岩裂隙地层混合钻进成井工艺,其特征在于:盐酸浓度为15%~30%,盐酸浓度一般为20%左右,若裂隙中填充物较多可以多次注酸或加大盐酸浓度,但浓度不能超过30%,静止时间为4~8小时。
5.根据权利要求2所述的基岩裂隙地层混合钻进成井工艺,其特征在于:所述的活塞洗井即注完清水后向孔内下活塞,活塞下入深度保证拉活塞时活塞上起点在静水位以下,连续拉活塞或间歇拉活塞均可,活塞升降速度为1~3米/秒,拉活塞累计时间不低于12小时。
6.根据权利要求5所述的基岩裂隙地层混合钻进成井工艺,其特征在于:活塞下入深度为静水位以下30米~50米。
7.根据权利要求1所述的基岩裂隙地层混合钻进成井工艺,其特征在于:所述的空气洗井即在活塞洗井结束后,采用下入普通钻具空压机洗井或下入双臂钻具和普通钻具采用气举反循环洗井,在水量较小的孔中可采用泡沫封堵配合空气洗井,以形成较大抽吸力,洗井持续时间以孔口出水达到“水清沙净”为原则。
CN 201110167688 2011-06-21 2011-06-21 基岩裂隙地层混合钻进成井工艺 Active CN102268963B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110167688 CN102268963B (zh) 2011-06-21 2011-06-21 基岩裂隙地层混合钻进成井工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110167688 CN102268963B (zh) 2011-06-21 2011-06-21 基岩裂隙地层混合钻进成井工艺

Publications (2)

Publication Number Publication Date
CN102268963A true CN102268963A (zh) 2011-12-07
CN102268963B CN102268963B (zh) 2013-05-22

Family

ID=45051390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110167688 Active CN102268963B (zh) 2011-06-21 2011-06-21 基岩裂隙地层混合钻进成井工艺

Country Status (1)

Country Link
CN (1) CN102268963B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161405A (zh) * 2013-03-03 2013-06-19 中国矿业大学 矿用井下探放高压岩溶水钻孔施工的套管隔离地层破碎带方法
CN103867119A (zh) * 2014-02-27 2014-06-18 中国石油天然气股份有限公司 煤储层完井改造方法
US10337249B2 (en) 2017-02-04 2019-07-02 Jason A Hatfield Drilling wells with air
CN114541960A (zh) * 2022-01-08 2022-05-27 贵州煤田新锐地质勘查有限公司 正、反循环空气潜孔锤钻井工艺

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4237974A (en) * 1978-05-09 1980-12-09 The Dow Chemical Company Method of controlling fluid loss in acidizing treatment of a subterranean formation
US20030164252A1 (en) * 2002-02-26 2003-09-04 Rae Philip J. Chemically enhanced drilling methods
US20090151938A1 (en) * 2007-12-18 2009-06-18 Don Conkle Stimulation through fracturing while drilling
CN101718184A (zh) * 2009-12-15 2010-06-02 中国石油大学(华东) 水平井泡沫酸洗工艺方法
CN101929309A (zh) * 2010-08-16 2010-12-29 邯郸市伟业地热开发有限公司 气举反循环钻进工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4237974A (en) * 1978-05-09 1980-12-09 The Dow Chemical Company Method of controlling fluid loss in acidizing treatment of a subterranean formation
US20030164252A1 (en) * 2002-02-26 2003-09-04 Rae Philip J. Chemically enhanced drilling methods
US20090151938A1 (en) * 2007-12-18 2009-06-18 Don Conkle Stimulation through fracturing while drilling
CN101718184A (zh) * 2009-12-15 2010-06-02 中国石油大学(华东) 水平井泡沫酸洗工艺方法
CN101929309A (zh) * 2010-08-16 2010-12-29 邯郸市伟业地热开发有限公司 气举反循环钻进工艺

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161405A (zh) * 2013-03-03 2013-06-19 中国矿业大学 矿用井下探放高压岩溶水钻孔施工的套管隔离地层破碎带方法
CN103161405B (zh) * 2013-03-03 2015-07-29 中国矿业大学 矿用井下探放高压岩溶水钻孔施工的套管隔离地层破碎带方法
CN103867119A (zh) * 2014-02-27 2014-06-18 中国石油天然气股份有限公司 煤储层完井改造方法
US10337249B2 (en) 2017-02-04 2019-07-02 Jason A Hatfield Drilling wells with air
CN114541960A (zh) * 2022-01-08 2022-05-27 贵州煤田新锐地质勘查有限公司 正、反循环空气潜孔锤钻井工艺

Also Published As

Publication number Publication date
CN102268963B (zh) 2013-05-22

Similar Documents

Publication Publication Date Title
CN109723404B (zh) 煤系气探井裸眼堵漏装置及方法
CN107722954A (zh) 一种用于钻井裂缝性漏失的堵漏剂、堵漏浆液及堵漏施工方法
CN105332684A (zh) 一种高压水爆与co2压裂相结合的煤层气驱替抽采工艺
CN116816439A (zh) 一种利用煤矿废弃矿井采空区封存co2的方法
CN102493831B (zh) 地面压裂井下水平钻孔抽放煤层气方法
CN110318674B (zh) 一种巷道顶板致裂防突的方法
CN105781499A (zh) 一种海洋天然气水合物降压开采的多级防砂方法
CN104832149A (zh) 一种电脉冲辅助水力压裂的非常规天然气储层增透方法
CN104508079A (zh) 改进水力裂缝网络的方法
CN105604534A (zh) 用于煤层气储层增产的水力波及压裂工艺方法
RU2460875C1 (ru) Способ гидравлического разрыва карбонатного пласта
CN104653148A (zh) 废弃油井井群改造综合利用方法
CN102011591A (zh) 深井工作面注浆工艺
CN102268963B (zh) 基岩裂隙地层混合钻进成井工艺
CN114542164A (zh) 一种深部煤层流态化煤与煤层气共采及co2储集一体化方法
Xiumin et al. Research and application of gas-lift reverse circulation drilling technology to geothermal well construction in Dalian Jiaoliu Island
CN110886594B (zh) 开采煤层气的方法
CN203960941U (zh) 一种承压水取水井
CN114622874B (zh) 一种煤层气开发井注液态二氧化碳解堵增产的方法
CN105756591A (zh) 煤层气井完井方法
CN113006755A (zh) 一种sagd开采方式中隔夹层压裂改造的方法
CN108442895B (zh) 一种强漏失油气井冲砂方法
CN115419434B (zh) 一种煤层顶板脉冲式高压注浆工作面防突水工艺
RU2273722C2 (ru) Способ изоляции притока вод в необсаженном горизонтальном участке ствола добывающей скважины
CN107882544A (zh) 一种针对碳酸盐胶结型砂岩稠油井的混合释热解堵方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Hybrid drilling technology for bedrock fracture formation

Effective date of registration: 20220920

Granted publication date: 20130522

Pledgee: Guangping County Rural Credit Cooperative

Pledgor: HANDAN WEIYE GEOTHERMAL DEVELOPMENT CO.,LTD.

Registration number: Y2022130000073

PE01 Entry into force of the registration of the contract for pledge of patent right
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 057651 North side of the middle section of Jin Guangyuan Road, Guangping County, Handan City, Hebei Province

Patentee after: Hebei Weiye Geothermal New Energy Technology Co.,Ltd.

Address before: 057650 South of Renmin Road East Section, Guangping County, Handan City, Hebei Province

Patentee before: HANDAN WEIYE GEOTHERMAL DEVELOPMENT CO.,LTD.

PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20130522

Pledgee: Guangping County Rural Credit Cooperative

Pledgor: HANDAN WEIYE GEOTHERMAL DEVELOPMENT CO.,LTD.

Registration number: Y2022130000073

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Mixed drilling technology for well formation in fractured rock formations

Granted publication date: 20130522

Pledgee: Guangping County Rural Credit Cooperative

Pledgor: Hebei Weiye Geothermal New Energy Technology Co.,Ltd.

Registration number: Y2024130000025

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20130522

Pledgee: Guangping County Rural Credit Cooperative

Pledgor: Hebei Weiye Geothermal New Energy Technology Co.,Ltd.

Registration number: Y2024130000025

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Mixed drilling technology for well formation in fractured rock formations

Granted publication date: 20130522

Pledgee: Guangping County Rural Credit Cooperative

Pledgor: Hebei Weiye Geothermal New Energy Technology Co.,Ltd.

Registration number: Y2024980046823

PE01 Entry into force of the registration of the contract for pledge of patent right