CN102261041A - End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge - Google Patents
End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge Download PDFInfo
- Publication number
- CN102261041A CN102261041A CN2011101344173A CN201110134417A CN102261041A CN 102261041 A CN102261041 A CN 102261041A CN 2011101344173 A CN2011101344173 A CN 2011101344173A CN 201110134417 A CN201110134417 A CN 201110134417A CN 102261041 A CN102261041 A CN 102261041A
- Authority
- CN
- China
- Prior art keywords
- big nut
- screw thread
- post
- tube
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 210000003101 oviduct Anatomy 0.000 claims description 6
- 230000000694 effects Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 abstract description 4
- 239000011148 porous material Substances 0.000 abstract 3
- 230000003014 reinforcing effect Effects 0.000 description 6
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000000465 moulding Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention provides an end part fixing device of a pre-buried rubber tube of a post-tensioned prestressed bridge for solving the problem of forming quality of a prestressed steel bar pore canal of the post-tensioned prestressed bridge. The end part fixing device comprises an upper sleeve, a lower sleeve, a big nut and a clamping piece, wherein the lower half part of the upper sleeve is a steel tube, the upper half part of the upper sleeve is a flared tube and a screw thread in reverse direction is arranged on the surface at the front end of the steel tube; the upper half part of the lower sleeve is the steel tube, the lower part of the lower sleeve is the flared tube and the screw thread in positive direction is arranged on the surface at the front end of the steel tube; the screw thread in the position direction is arranged at one end on the inner side of the big nut and the screw thread in the reverse direction is arranged on the other side of the big nut; and the section of the clamping piece is in the shape of a wedge and four circular holes are formed on the side surface of the big nut. Through the method of rotating the screw threads in the position direction and the reverse direction of the big nut, the upper sleeve and the lower sleeve, the sleeves can drive the rubber tube to tension, thereby achieving the desired fixing effect, preventing the pre-buried rubber tube from deforming and displacing during pouring of concrete, enabling the formed pore canal to be straight and ensuring that the friction resistance of the pore canal is in line with design requirements.
Description
Technical field
The present invention relates to a kind of fastening devices, be specially the pre-buried sebific duct of a kind of post-tensioned prestressing bridge end fastening devices.
Background technology
The post-tensioned prestressing bridge is the bridge that adopts post-tensioned construction, therefore need form the duct of prestressed reinforcing bar on concrete beam body.Method commonly used is a pre-buried sebific duct before concreting, extracts sebific duct after concreting is solidified.But pre-buried in the past sebific duct is installed and is put laying along cage of reinforcement, constraint is unfixing reliably, so when concreting, because the shock and vibration that concrete falls rod is inserted crowded the bumping when smashing, pre-buried sebific duct often is out of shape displacement, thereby make the duct of moulding also just not straight, caused the duct frictional resistance to strengthen the unmanageable adverse consequences of prestressed stretch-draw value.
Summary of the invention
For solving the problem of post-tensioned prestressing bridge prestress reinforcing bar duct Forming Quality, the invention provides the pre-buried sebific duct of a kind of post-tensioned prestressing bridge end fastening devices.
For addressing the above problem, the pre-buried sebific duct of a kind of post-tensioned prestressing bridge of the present invention end fastening devices comprises sleeve pipe, setting of casing, big nut and intermediate plate, and the Lower Half of last sleeve pipe is a steel pipe, the first half is an oviduct, and the steel pipe front end surface is provided with reverse screw thread; The cased first half is a steel pipe, and Lower Half is an oviduct, and the steel pipe front end surface is provided with the forward screw thread; Inboard one end of big nut is provided with the forward screw thread, and opposite side is provided with reverse screw thread; The cross section of intermediate plate is a wedge shape.
During use, the effective big nut of upper and lower sleeve is assembled into integral body, be enclosed within on the pre-buried sebific duct, setting of casing is pushed into anchor recess, withstand on the anchor recess end face, between last sleeve pipe horn mouth and sebific duct, insert intermediate plate and wedging, the rotation big nut, effect by positive and negative screw thread is outwards moved sleeve pipe, makes it tensioning by intermediate plate drive sebific duct and fixes.
For the ease of the rotation big nut, have four circular holes in the side of big nut, in circular hole, insert reinforcing bar and just can rotate big nut.
The present invention has following beneficial effect:
(1) novel, initiative has designed the pre-buried sebific duct of post-tensioned prestressing bridge end fastening devices, has solved a post-tensioned prestressing bridge prestress reinforcing bar duct Forming Quality control difficult problem.
(2) design is ingenious, has adopted the method for placing the wedge type intermediate plate between last sleeve pipe horn mouth and sebific duct, has both solved the problem that clamps sebific duct, the unlikely again sebific duct surface damage that causes; By turn big nut and the positive and negative screw thread method between sleeve pipe up and down, make sleeve pipe drive the sebific duct tensioning, reached the fixed effect of expection.
(3) use this device after, can make the indeformable displacement when concreting of pre-buried sebific duct, the moulding duct is straight, has guaranteed that the duct frictional resistance adheres to specification, and has improved the prestressed stretch-draw quality.
(4) use this device after because pre-buried sebific duct does not produce distortion displacement when concreting, the difficulty when also having reduced to extract sebific duct has been accelerated the tube drawing progress, has improved operating efficiency.
(5) simple in structure, make easily, load and unload easyly, cost is lower.
Description of drawings
Fig. 1 is the structural representation after the aggregate erection of the present invention.
Fig. 2 is last sleeve pipe.
Fig. 3 is a setting of casing.
Fig. 4 is a big nut.
Fig. 5 is the lateral view of Fig. 5.
Fig. 6 is an intermediate plate.
Among the figure, the last sleeve pipe of 1-, 2-setting of casing, 3-big nut, 4-intermediate plate, 5-circular hole, 6-sebific duct, 7-anchor recess.
The specific embodiment
The present invention will be further described below in conjunction with accompanying drawing.
The pre-buried sebific duct of a kind of post-tensioned prestressing bridge of the present invention end fastening devices, comprise sleeve pipe 1, setting of casing 2, big nut 3 and intermediate plate 4, the Lower Half of last sleeve pipe 1 is a steel pipe, pipe diameter is slightly larger than pre-buried sebific duct external diameter, the first half is an oviduct, the horn mouth diameter is according to the design of self-locking angle needs, and the steel pipe front end surface is provided with reverse screw thread; The first half of setting of casing 2 is a steel pipe, and pipe diameter is identical with last sleeve pipe 1 pipe diameter, and Lower Half is an oviduct, and the horn mouth diameter is greater than Circularhole diameter on the anchor recess, so that be supported on the anchor recess bottom surface, the steel pipe front end surface is provided with the forward screw thread; Inboard one end of big nut 2 is provided with the forward screw thread, and opposite side is provided with reverse screw thread; Big nut 3 is a steel component, and the processing of screw thread is to match with sleeve pipe male thread up and down in it.The cross section of intermediate plate 4 is a wedge shape, is steel component, and the gap between size and last sleeve pipe horn mouth and the sebific duct external diameter adapts, and uses for convenient, can be designed as two lobes.
The side of big nut 3 has four circular holes 5.Four circular holes 5 are used to insert reinforcing bar rotation big nut 3, and inciting somebody to action up and down by big nut 3, sleeve pipe is assembled into integral body.
During use, two fastening devicess are a cover, are used for the two ends of a sebific duct 6, earlier the effective big nut 3 of upper and lower sleeve are assembled into integral body, are enclosed within on the pre-buried sebific duct 6, and assembly is pushed in the anchor recess, withstand on anchor recess 7 end faces, and every 6 one of sebific duct is installed one.Between last sleeve pipe 1 horn mouth and sebific duct, insert intermediate plate 4, and wedging.Insert reinforcing bar to inner rotary big nut 3 in big nut 3 circular holes, the effect by positive and negative screw thread is outwards moved sleeve pipe 1, makes it tensioning by intermediate plate 4 drive sebific ducts 6 and fixes.
Claims (2)
1. the pre-buried sebific duct of post-tensioned prestressing bridge end fastening devices, it is characterized in that: comprise sleeve pipe (1), setting of casing (2), big nut (3) and intermediate plate (4), the Lower Half of last sleeve pipe (1) is a steel pipe, the first half is an oviduct, and the steel pipe front end surface is provided with reverse screw thread; The first half of setting of casing (2) is a steel pipe, and Lower Half is an oviduct, and the steel pipe front end surface is provided with the forward screw thread; Inboard one end of big nut (2) is provided with the forward screw thread, and opposite side is provided with reverse screw thread; The cross section of intermediate plate (4) is a wedge shape.
2. the pre-buried sebific duct of a kind of post-tensioned prestressing bridge according to claim 1 end fastening devices, it is characterized in that: the side of big nut (3) has four circular holes (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110134417 CN102261041B (en) | 2011-05-24 | 2011-05-24 | End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110134417 CN102261041B (en) | 2011-05-24 | 2011-05-24 | End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102261041A true CN102261041A (en) | 2011-11-30 |
CN102261041B CN102261041B (en) | 2013-07-17 |
Family
ID=45007859
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110134417 Active CN102261041B (en) | 2011-05-24 | 2011-05-24 | End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102261041B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102817315A (en) * | 2012-05-22 | 2012-12-12 | 北京交通大学 | Support flexible anchoring system |
CN102995556A (en) * | 2012-12-04 | 2013-03-27 | 北京交通大学 | Support for straddle-type monorail traffic track beam |
CN105889625A (en) * | 2016-04-13 | 2016-08-24 | 中国科学院武汉岩土力学研究所 | Combined type steel tube intermediate jacking station equipment for jacking pipe construction and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2739290Y (en) * | 2004-09-18 | 2005-11-09 | 柳州欧维姆机械股份有限公司 | Steel strand vertical prestress anchoring system |
JP2007254975A (en) * | 2006-03-20 | 2007-10-04 | Dps Bridge Works Co Ltd | Steel-concrete composite girder and method of manufacturing this composite girder |
JP2008231700A (en) * | 2007-03-16 | 2008-10-02 | Anderson Technology Kk | Flat anchorage device for post-tensioned type prestressed concrete floor slab, post-tensioned type prestressed concrete floor slab using the anchorage device, and construction method for the post-tensioned type prestressed concrete floor slab |
CN101736701A (en) * | 2009-12-15 | 2010-06-16 | 中交路桥华北工程有限公司 | Bridge steel and concrete mixing section constructing method |
CN201704628U (en) * | 2010-03-16 | 2011-01-12 | 中国建筑土木建设有限公司 | Box girder end anchor recess plugging template |
CN202073042U (en) * | 2011-05-24 | 2011-12-14 | 中铁三局集团有限公司 | End fixing device of pre-embedded hose of post-tensioning pre-stressed bridge |
-
2011
- 2011-05-24 CN CN 201110134417 patent/CN102261041B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2739290Y (en) * | 2004-09-18 | 2005-11-09 | 柳州欧维姆机械股份有限公司 | Steel strand vertical prestress anchoring system |
JP2007254975A (en) * | 2006-03-20 | 2007-10-04 | Dps Bridge Works Co Ltd | Steel-concrete composite girder and method of manufacturing this composite girder |
JP2008231700A (en) * | 2007-03-16 | 2008-10-02 | Anderson Technology Kk | Flat anchorage device for post-tensioned type prestressed concrete floor slab, post-tensioned type prestressed concrete floor slab using the anchorage device, and construction method for the post-tensioned type prestressed concrete floor slab |
CN101736701A (en) * | 2009-12-15 | 2010-06-16 | 中交路桥华北工程有限公司 | Bridge steel and concrete mixing section constructing method |
CN201704628U (en) * | 2010-03-16 | 2011-01-12 | 中国建筑土木建设有限公司 | Box girder end anchor recess plugging template |
CN202073042U (en) * | 2011-05-24 | 2011-12-14 | 中铁三局集团有限公司 | End fixing device of pre-embedded hose of post-tensioning pre-stressed bridge |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102817315A (en) * | 2012-05-22 | 2012-12-12 | 北京交通大学 | Support flexible anchoring system |
CN102817315B (en) * | 2012-05-22 | 2015-04-08 | 北京交通大学 | Support flexible anchoring system |
CN102995556A (en) * | 2012-12-04 | 2013-03-27 | 北京交通大学 | Support for straddle-type monorail traffic track beam |
CN102995556B (en) * | 2012-12-04 | 2014-11-05 | 北京交通大学 | Support for straddle-type monorail traffic track beam |
CN105889625A (en) * | 2016-04-13 | 2016-08-24 | 中国科学院武汉岩土力学研究所 | Combined type steel tube intermediate jacking station equipment for jacking pipe construction and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN102261041B (en) | 2013-07-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235779B (en) | Full-grouting sleeve structure capable of realizing self-centering of reinforcing steel bars and manufacturing method | |
CN202519884U (en) | Composite anchor for FRP (fiber reinforce plastic) rib | |
CN102261041B (en) | End part fixing device of pre-buried rubber tube of post-tensioned prestressed bridge | |
US10024051B2 (en) | Embedded concrete anchor system | |
CN102661056A (en) | Apparatus for underpinning reinforced concrete column by adopting prestress technology | |
CN109235781B (en) | Self-centering structure and method for connecting prefabricated part steel bars through grouting sleeve | |
CN108797897A (en) | Prefabricated components self-locking reinforcing bar connector | |
CN203669900U (en) | Grouting anchor cable device | |
CN211524173U (en) | Aluminum alloy template screw hole shutoff composite set | |
CN108331263B (en) | Self-locking mechanical coupling sleeve | |
CN202073042U (en) | End fixing device of pre-embedded hose of post-tensioning pre-stressed bridge | |
CN114319867A (en) | Novel aluminum alloy template adopting opposite pull rods | |
CN202284329U (en) | Concrete embedded part | |
CN201671232U (en) | Large-diameter steel strand anchoring device | |
CN204509986U (en) | A kind of joint bearing type comb plate bridge expansion device | |
CN111331711A (en) | A kind of tunnel pre-embedded groove mould locking device | |
CN108442699B (en) | A pair of pull bolts for pouring miniature underground comprehensive pipe gallery | |
CN201671339U (en) | Fixing device for wall bodies and beam column templates of buildings | |
KR102528443B1 (en) | Clamp bar for the temporary installation ash support of the construction structure | |
CN203066473U (en) | Device for fixing formwork | |
KR102096802B1 (en) | Apparatus and Method for the penetration sleeve for the wall retaining wall having multiple thread acid with a cap and a cylindrical members is integrally formed | |
CN211447799U (en) | Formwork opposite-pulling device for concrete structure pouring | |
CN218990145U (en) | Reinforcement device for building and civil construction | |
JP5002085B2 (en) | Induction embedding material and crack induction structure using the same | |
CN105463995A (en) | Formwork for bridge pier seam construction and use method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |