CN102212991A - Method for modifying surface of hard smooth bank protection body - Google Patents

Method for modifying surface of hard smooth bank protection body Download PDF

Info

Publication number
CN102212991A
CN102212991A CN2011100436888A CN201110043688A CN102212991A CN 102212991 A CN102212991 A CN 102212991A CN 2011100436888 A CN2011100436888 A CN 2011100436888A CN 201110043688 A CN201110043688 A CN 201110043688A CN 102212991 A CN102212991 A CN 102212991A
Authority
CN
China
Prior art keywords
revetment
smooth
hard
shore protection
lake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100436888A
Other languages
Chinese (zh)
Inventor
王超
王沛芳
侯俊
钱进
敖燕辉
彭志诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN2011100436888A priority Critical patent/CN102212991A/en
Publication of CN102212991A publication Critical patent/CN102212991A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Revetment (AREA)
  • Artificial Fish Reefs (AREA)

Abstract

本发明涉及一种硬质光滑护岸体表面改造方法。本发明预制人工仿制块石,将人工仿制块石放置在河湖硬质光滑护岸表面上,将多个人工仿制块石有序排列,布满河湖硬质光滑护岸表面,用膨胀螺栓将人工仿制块石固定在河湖硬质光滑护岸表面上。本发明避免了对已经建设好的钢筋混凝土硬质光滑硬质护岸拆除重新构筑新的护岸所带来的极大的人力、物力和财力浪费和工程量浩大,费神费时等缺陷。本发明避免拆除原有的光滑护岸,并在一定程度上模仿了天然护岸的环境条件,在节约成本的同时实现了近自然化的工程改造,增加了护岸的糙率,缓解了水流对于护岸的冲刷,有利于小型螺贝和小型鱼类的栖息,为水生生物提供近自然化的生存场所,质量得到有效控制。

Figure 201110043688

The invention relates to a method for modifying the surface of a hard and smooth revetment body. The invention prefabricates the artificial imitation block stone, places the artificial imitation block stone on the hard and smooth revetment surface of the river and lake, arranges a plurality of artificial imitation block stones in an orderly manner, and covers the hard and smooth revetment surface of the river and lake, and uses expansion bolts to artificially The imitation block stone is fixed on the hard and smooth revetment surface of the river and lake. The invention avoids the great waste of manpower, material and financial resources, huge project volume, time-consuming and labor-intensive defects caused by dismantling the already built reinforced concrete hard and smooth revetment and rebuilding a new revetment. The invention avoids dismantling the original smooth revetment, and imitates the environmental conditions of the natural revetment to a certain extent, realizes near-natural engineering transformation while saving costs, increases the roughness of the revetment, and alleviates the impact of water flow on the revetment Scouring is conducive to the habitat of small snail shells and small fish, providing a near-natural living place for aquatic organisms, and the quality is effectively controlled.

Figure 201110043688

Description

The smooth shore protection of hard surface remodeling method
Technical field
The present invention relates to a kind of method of improving the riverbank bank protection, the smooth shore protection of particularly a kind of hard surface remodeling method.
Background technology
In the training works in lake, river, often construct the smooth concrete revetment of standardized hard rectilinear or ramp type.Such bank protection work for control flood and drain flooded fields, the water and soil conservation aspect played energetically effect, but this hard shore protection itself has isolated getting in touch between shore protection and the aquatic ecosystem fully, originally depending on the animals and plants and the microorganism that grow with water bank band can't survive, cause the biological chain of rivers and lakes to be destroyed, thereby cause the deterioration of whole aquatic ecosystem, deteriorating water quality.Such as a large amount of construction of the smooth shore protection of Taihu Lake Huan Hu embankment hard, destroyed original lakeside, Taihu Lake band ecosystem, also be simultaneously the major incentive that Taihu Lake water quality sharply worsens.
At present, people no longer only emphasize that the antiscour power, wind and wave resistance of shore protection washes in a pan erosion intensity etc. in the bank protection work construction of lake, river.Utilize the material of natural materials as bank protection; carry out the ecology typed bank revetment construction in conjunction with engineering, biological and ecological idea, emphasize that safety, stability, view, ecological property, naturality and the hydrophilic perfect adaptation of lake, river shore protection have become water conservancy and environmentalist's common recognition.
But before the present invention, the steel concrete hard smooth hard shore protection of having built well exists in a large number, and lack respond well to its remodeling method, again construct new shore protection if remove, be undoubtedly waste for resource, and need great human and material resources of cost and financial resources, engineering quantity is great, takes great energy time-consuming.
Summary of the invention
Purpose of the present invention just is to overcome above-mentioned defective, proposes the smooth shore protection of hard surface remodeling method.
Technical scheme of the present invention is:
The smooth shore protection of hard surface remodeling method, its major technique step is:
(1) prefabricated artificial imitated piece stone;
(2) will manually copy piece stone is placed on the smooth shore protection of the hard surface, lake, river;
(3) a plurality of artificial imitated piece stones are arranged in order, be covered with the smooth shore protection of hard surface, lake, river;
(4) will manually copy piece stone with expansion bolt is fixed on the smooth shore protection of the hard surface, lake, river.
The invention has the advantages that:
(1) method of the present invention can avoid removing original smooth shore protection, and has imitated the habitat conditions of natural shore protection to a certain extent, has realized near naturalized engineered when saving cost.
(2) method of the present invention is after transforming shore protection, makes original smooth shore protection surface irregularity, increased the roughness of shore protection, alleviated current washing away for shore protection.
(3) recess that forms between piece crack of stone crack of method of the present invention helps perching of small-sized spiral shell and small fishes, for aquatile provides nearly naturalized existence place.
(4) method of the present invention has been saved building stones owing to do not remove original shore protection, is specially adapted to the shore protection improvement project in the area of building stones shortage.
(5) method of the present invention is constructed very convenient simply, only needs in the punching of the surface of smooth shore protection, will manually copy piece stone body and function expansion bolt again and fix and get final product easy operating.
(6) the piece stone among the present invention can be by prefabrication and batch process, and quality can be effectively controlled.
Other advantages of the present invention and effect will go on to say below.
Description of drawings
Fig. 1---the present invention is the facade structures schematic diagram of imitated piece stone body manually.
Fig. 2---the present invention is the plane structure schematic diagram of imitated piece stone body manually.
Fig. 3---the present invention is the side structure schematic diagram of imitated piece stone body manually.
Fig. 4---the present invention is the side cross-sectional schematic of imitated piece stone body manually.
Number in the figure is represented:
Artificial imitated piece stone 1, rivet hole 2.
The specific embodiment
The present invention proposes the smooth shore protection of a kind of hard surface remodeling method, and its technical thought is by artificial imitated piece stone being installed in the smooth shore protection of hard surface, being increased the specific surface of the smooth shore protection of hard, for adhering to of river microorganism provides bigger space.Simultaneously, the convex-concave surface of imitated piece stone can change the water flow structure of shore protection near surface, for aquatic animal particularly mollusk such as fish and spiral shell streamy habitat conditions is provided and has perched the breeding space.
Mode below by embodiment is elaborated to technical solution of the present invention, but protection scope of the present invention is not limited to described embodiment.
As Fig. 1, Fig. 2, Fig. 3, shown in Figure 4:
Artificial imitated piece stone 1 customizes in factory in advance, and its surface is concaveconvex shape, and average distance is greater than 8cm between convex peak and the spill minimum point; Be drilled with rivet hole 2 on 1 four jiaos in the artificial imitated piece stone.
At the smooth shore protection of hard scene according to the size of artificial imitated piece stone 1 at the shore protection surface drilling, pass rivet hole 2 on the artificial imitated piece stone 1 by expansion bolt by rivet again, will manually copy piece stone 1 and be fixed on the surface, hard concrete riverbank; Artificial imitated piece stone 1 can be built by eco-concrete and be formed, and its length of side size is according to the characteristics determined of the smooth shore protection of hard surface, generally can make 50X50cm square of standard.
Use procedure declaration of the present invention:
When current flow through, by the smooth shore protection body of the transformed hard of this method, having a large amount of microorganisms behind certain hour adheres at the recess of the concaveconvex shape on artificial imitated piece stone 1 surface, average distance is greater than the shape of 8cm between artificial imitated piece stone 1 rugged irregular surface and convex peak and the spill minimum point, can perch to all kinds of little mollusks the habitat is provided, comprise that mollusks such as attracting part small fishes and spiral shell perches, improved the ecological functions of original shore protection, the reparation of going down for a long time for water bank band has positive effect.
The present invention increases the specific surface of the smooth shore protection of hard, for adhering to of river microorganism provides bigger space.The convex-concave surface of artificial imitated piece stone 1 changes the water flow structure of shore protection near surface, for aquatic animal particularly mollusk such as fish and spiral shell streamy habitat conditions is provided and has perched the breeding space.

Claims (3)

1. the smooth shore protection of hard surface remodeling method, its step is:
(1) prefabricated artificial imitated piece stone;
(2) will manually copy piece stone is placed on the smooth shore protection of the hard surface, lake, river;
(3) a plurality of artificial imitated piece stones are arranged in order, be covered with the smooth shore protection of hard surface, lake, river;
(4) will manually copy piece stone with expansion bolt is fixed on the smooth shore protection of the hard surface, lake, river one by one.
2. the smooth shore protection of hard according to claim 1 surface remodeling method is characterized in that described artificial imitated piece stone planar profile is square, and the imitative nature piece stone in surface presents concaveconvex shape, rivet hole is set on its four jiaos.
3. the smooth shore protection of hard according to claim 1 surface remodeling method is characterized in that average distance is greater than 8cm between described artificial imitated piece stone convex peak and the spill minimum point.
CN2011100436888A 2011-02-23 2011-02-23 Method for modifying surface of hard smooth bank protection body Pending CN102212991A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100436888A CN102212991A (en) 2011-02-23 2011-02-23 Method for modifying surface of hard smooth bank protection body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100436888A CN102212991A (en) 2011-02-23 2011-02-23 Method for modifying surface of hard smooth bank protection body

Publications (1)

Publication Number Publication Date
CN102212991A true CN102212991A (en) 2011-10-12

Family

ID=44744505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100436888A Pending CN102212991A (en) 2011-02-23 2011-02-23 Method for modifying surface of hard smooth bank protection body

Country Status (1)

Country Link
CN (1) CN102212991A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11210003A (en) * 1998-01-23 1999-08-03 Kfc Ltd Linear-element mooring anchor and connecting fixing construction method of fieldstone using the same
KR100503878B1 (en) * 2002-02-26 2005-07-27 주식회사 우일 이알에스 Ecological block and method for building bank protection of river using the same
KR100543100B1 (en) * 2005-09-08 2006-01-20 고민관 Vegetation shorebank using waste
CN1760461A (en) * 2004-10-15 2006-04-19 崔琼文 Water-breaking block and fabricating method and construction method thereof
KR100778372B1 (en) * 2007-08-30 2007-11-22 주식회사 한국종합기술 Easy block positioning
CN101235631A (en) * 2008-03-12 2008-08-06 河海大学 Porous concrete ecological bag slope protection method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11210003A (en) * 1998-01-23 1999-08-03 Kfc Ltd Linear-element mooring anchor and connecting fixing construction method of fieldstone using the same
KR100503878B1 (en) * 2002-02-26 2005-07-27 주식회사 우일 이알에스 Ecological block and method for building bank protection of river using the same
CN1760461A (en) * 2004-10-15 2006-04-19 崔琼文 Water-breaking block and fabricating method and construction method thereof
KR100543100B1 (en) * 2005-09-08 2006-01-20 고민관 Vegetation shorebank using waste
KR100778372B1 (en) * 2007-08-30 2007-11-22 주식회사 한국종합기술 Easy block positioning
CN101235631A (en) * 2008-03-12 2008-08-06 河海大学 Porous concrete ecological bag slope protection method

Similar Documents

Publication Publication Date Title
Perricone et al. Nature-based and bioinspired solutions for coastal protection: an overview among key ecosystems and a promising pathway for new functional and sustainable designs
CN204090769U (en) A kind of marine organisms of artificial input are lived device
Chou Artificial reefs of Southeast Asia-do they enhance or degrade the marine environment?
CN103960179A (en) Artificial ecological barrier reef
CN104430078B (en) A kind of littoral zone marine site oyster young enhancement releasing adhesive substrate device and construction method
CN109169459B (en) Ecological friendly artificial mimicry coral reef body
CN103314889B (en) Construction method for enclosure structure unit of water-area ecological breeding pasture as well as enclosure structure unit and application thereof
CN109868784A (en) A kind of Ecosystem restoration system in moisturizing type river
CN108668957B (en) A construction method of ecological island reef type marine ranch
CN110528457B (en) An optimized form of a straight river channel based on the layout of aquatic plants
CN107751071B (en) Round platform type mudflat construction reef and construction method thereof
CN104891664A (en) Water ecological restoration method for compounding artificial fish reefs and artificial water plants
CN102212991A (en) Method for modifying surface of hard smooth bank protection body
CN109113032B (en) Ecological movable river sand blocking weir
CN100539830C (en) Artificial fishing bank made of waste tyre
KR20140048170A (en) An eco-friendly construction method that constructs an eco-friendly ecological corridor that facilitates escape when all animals, including amphibians, are in or out of waterways
CN108658239B (en) Bionic submersed plant community and its water ecology improvement method
CN203233885U (en) Surrounding body structure unit of water area ecological breeding pasture and concrete tubular pile for same
CN107907627A (en) A kind of controlled experiment device and construction method for simulating beach fish habitat habitat
CN102613116A (en) Artificial low-tide elevation device for protecting islands
CN201577407U (en) Sea Cucumber Yujiao
JP6497847B2 (en) A cultivator that enables activation of large ponds, lakes, and entering the sea
CN212379375U (en) Multifunctional ecological channel simulation test pool
CN213719402U (en) Assembled deep sea fish reef and combined fish reef
Wolanski et al. Great Barrier Reef Biophysics: A Synthesis of Challenges and Opportunities

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111012