CN102196488A - 一种载波切换方法 - Google Patents
一种载波切换方法 Download PDFInfo
- Publication number
- CN102196488A CN102196488A CN2010101158207A CN201010115820A CN102196488A CN 102196488 A CN102196488 A CN 102196488A CN 2010101158207 A CN2010101158207 A CN 2010101158207A CN 201010115820 A CN201010115820 A CN 201010115820A CN 102196488 A CN102196488 A CN 102196488A
- Authority
- CN
- China
- Prior art keywords
- efach
- user
- rnc
- carrier wave
- measurement result
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
本发明公开了一种载波切换方法,包括:无线网络控制器(RNC)通知基站(NodeB)测量EFACH用户的高速下行链路共享信道(HSDSCH)或增强专用信道(EDCH)的块误码率(BLER);所述基站根据所述通知测量所述HSDSCH或EDCH的BLER,并将所述测量结果上报给所述RNC;所述RNC判断所述测量结果是否大于对应的预设阈值,如果是,则为所述EFACH用户确定切换的目标EFACH载波,并通知所述EFACH用户切换到所述目标EFACH载波上;所述EFACH用户根据所述通知切换到所述目标EFACH载波上。采用本发明,能有效节省空口资源的开销,提高载波切换的有效性。
Description
技术领域
本发明涉及移动通信系统中的载波切换技术,特别是涉及针对EFACH用户的载波切换方法。
背景技术
目前,当EFACH用户在FACH态时,其载波的切换过程通常是基于用户的业务量触发完成的,即,由基站通知用户设备(UE)进行业务量的测量与上报,之后再由基站根据UE所上报的业务量判断是否需要进行载波的切换,并在判定需要时通知UE进行载波的切换。
由于上述方法中,UE需要按照预设的方式(周期上报或事件上报的方式),将所测量的结果上报给基站,因此,在空口资源的开销方面较大。
并且,由于基站所获得的测量结果的准确性受限于空口资源的信道环境质量,而与其他有线传输媒介相比,在实际应用中空口信道环境复杂,信道质量受干扰、噪声的影响较大,因此,依据该测量结果所进行的载波切换判断的有效性也会受到信道环境质量的较大影响。
发明内容
有鉴于此,本发明的主要目的在于提供一种载波方法。该方法能实现EFACH用户的载波切换,且,能有效节省空口资源的开销,确保载波切换的质量。
为了达到上述目的,本发明提出的技术方案为:
一种载波切换方法,该方法包括以下步骤:
a、无线网络控制器(RNC)通知基站(NodeB)测量EFACH用户的高速下行链路共享信道(HSDSCH)或增强专用信道(EDCH)的块误码率(BLER);
b、所述基站根据所述通知测量所述HSDSCH或EDCH的BLER,并将所述测量结果上报给所述RNC;
c、所述RNC判断所述测量结果是否大于对应的预设阈值,如果是,则为所述EFACH用户确定切换的目标EFACH载波,并通知所述EFACH用户切换到所述目标EFACH载波上;
d、所述EFACH用户根据所述通知切换到所述目标EFACH载波上。
综上所述,本发明提出的载波切换方法中,由RNC根据基站处测量的EFACH用户的HSPA调度资源的信号质量,来判断是否需要进行载波间切换,如此,可节省现有切换方案中UE上报测量结果所需要的空口资源的开销,并且由于RNC与基站之间是通过光纤进行数据的传输,相对于空口传输而言,传输的可靠性高,因此,可以确保载波切换的质量。
附图说明
图1为本发明实施例一的流程图。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面将结合附图及具体实施例对本发明作进一步地详细描述。
随着高速分组接入的向下演进版本(HSPA+)作为一种用于增强上下行能力的技术的引入,处于FACH态用户可以使用高速分组接入(HSPA)调度资源来提高数据速率、降低信令延迟,改善其用户体验。
基于此,本发明的核心思想是:由无线网络控制器(RNC)利用基站(NodeB)处测量的EFACH用户的HSPA调度资源的信号质量,来判断是否需要进行载波间切换。如此,便可节省现有切换方案中UE上报测量结果所需要的空口资源的开销,并且由于RNC与基站之间是通过光纤进行数据的传输,相对于空口传输而言,传输的可靠性高,因此,可以确保载波切换的质量。
图1为本发明实施例一的流程图
步骤101、RNC通知基站测量EFACH用户的高速下行链路共享信道(HSDSCH)或增强专用信道(EDCH)的块误码率(BLER)。
本步骤中,由RNC通过测量控制消息通知基站测量EFACH用户的HSDSCH或E-DCH的BLER,这样,在本发明中利用基站对HSPA调度资源的测量替代了现有技术方案中UE侧所进行的用于载波切换的测量,从而可以节省UE上报测量结果时对空口资源的开销。
较佳地,RNC可以通过测量控制请求消息进行所述通知。
步骤102、所述基站根据所述通知测量所述HSDSCH或EDCH的BLER,并将所述测量结果上报给所述RNC。
本步骤中,所述HSDSCH或E-DCH的BLER的具体测量方法为本领域人员所掌握,在此不再赘述。
当步骤101中利用测量控制请求消息进行所述通知时,则本步骤中可相应地采用测量控制响应消息上报所述测量结果。
步骤103、所述RNC判断所述测量结果是否大于对应的预设阈值,如果是,则为所述EFACH用户确定切换的目标EFACH载波,并通知所述EFACH用户切换到所述目标EFACH载波上。
本步骤中,RNC通过将接收到的HSDSCH或E-DCH的BLER测量结果与相应的预设阈值进行比较,来判断是否需要进行载波切换,当测量结果大于相应的阈值时,则判定需要进行EFACH载波间的切换,从而执行后续的切换操作,触发UE切换到新的载波上。
这里,RNC可采用已有方法为所述EFACH用户确定目标EFACH载波,在此不再赘述。
本步骤中的所述预设阈值有两个,一个对应于HSDSCH的BLER,另一个对应于EDCH的BLER。
较佳地,所述RNC通过无线承载重配置消息通知所述EFACH用户切换到目标EFACH载波上;
进一步地,所述EFACH用户收到所述无线承载重配置消息后,返回无线承载重配置完成消息给所述RNC,以提高载波切换的可靠性。
通过上述技术方案可以看出,上述实施例利用HSPA调度资源实现了对EFACH用户的载波切换过程,该过程中,UE不需要在空口上传输用于进行载波切换判断的测量结果,因此,可以避免空口信道质量对切换质量的影响,并能节省宝贵的空口资源。
综上所述,以上仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (3)
1.一种载波切换方法,其特征在于,该方法包括以下步骤:
a、无线网络控制器(RNC)通知基站(NodeB)测量EFACH用户的高速下行链路共享信道(HSDSCH)或增强专用信道(EDCH)的块误码率(BLER);
b、所述基站根据所述通知测量所述HSDSCH或EDCH的BLER,并将所述测量结果上报给所述RNC;
c、所述RNC判断所述测量结果是否大于对应的预设阈值,如果是,则为所述EFACH用户确定切换的目标EFACH载波,并通知所述EFACH用户切换到所述目标EFACH载波上;
d、所述EFACH用户根据所述通知切换到所述目标EFACH载波上。
2.根据权利要求1所述的方法,其特征在于,步骤a中所述RNC通过测量控制请求消息进行所述通知;
步骤b中基站通过测量控制响应消息进行所述测量结果的上报。
3.根据权利要求1或2所述的方法,其特征在于,步骤c中所述RNC通过无线承载重配置消息,通知所述EFACH用户切换到所述目标EFACH载波上;
步骤d之后还进一步包括:
所述EFACH用户返回无线承载重配置完成消息给所述RNC。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101158207A CN102196488A (zh) | 2010-03-01 | 2010-03-01 | 一种载波切换方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101158207A CN102196488A (zh) | 2010-03-01 | 2010-03-01 | 一种载波切换方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102196488A true CN102196488A (zh) | 2011-09-21 |
Family
ID=44603708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101158207A Pending CN102196488A (zh) | 2010-03-01 | 2010-03-01 | 一种载波切换方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102196488A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1678115A (zh) * | 2004-04-01 | 2005-10-05 | 大唐移动通信设备有限公司 | Td-scdma移动通信系统中的接力切换方法 |
WO2006126921A1 (en) * | 2005-05-26 | 2006-11-30 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and arrangement in a telecommunication system |
CN101635971A (zh) * | 2009-08-28 | 2010-01-27 | 华为技术有限公司 | 软切换方法及系统、无线网络控制器、基站 |
-
2010
- 2010-03-01 CN CN2010101158207A patent/CN102196488A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1678115A (zh) * | 2004-04-01 | 2005-10-05 | 大唐移动通信设备有限公司 | Td-scdma移动通信系统中的接力切换方法 |
WO2006126921A1 (en) * | 2005-05-26 | 2006-11-30 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and arrangement in a telecommunication system |
CN101635971A (zh) * | 2009-08-28 | 2010-01-27 | 华为技术有限公司 | 软切换方法及系统、无线网络控制器、基站 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2156681B1 (en) | A method and a user equipment in a telecommunications system | |
CA2598372C (en) | Mobile communication system, core network node selection method, and base station and mobile station used therefor | |
CA2595650C (en) | Method and arrangement for improved handover by muting interfering nodes | |
EP2563065B1 (en) | Method and device for updating coordinated multi-point transmission set | |
CN101854684B (zh) | 无线蜂窝通信系统中基于切换类型的优化切换参数的方法 | |
JP6736483B2 (ja) | 無線通信システムでセル間の負荷分散方法及び装置 | |
EP2351422B1 (en) | Inter- plmn handover in a shared radio network | |
CN102724719B (zh) | 一种高速铁路移动通信系统中的切换方法 | |
CN102572983B (zh) | 一种移动终端进行网络切换的方法、系统及装置 | |
EP2412183B1 (en) | Method and arrangement in wireless communications network | |
KR20110088005A (ko) | 이동통신 시스템에서 핸드오버 결정 방법 및 장치 | |
KR20090122272A (ko) | 이동성을 지원하는 측정 갭 패턴 스케쥴링 | |
GB2454872A (en) | Performing serving cell management in a base station by determining backhaul loading | |
KR20120032577A (ko) | 부하 분산을 위한 기지국들 간 자원 상태 정보의 시그널링 | |
CN103428796B (zh) | 切换过程中确定目标基站的方法及装置 | |
JP6249305B2 (ja) | 無線ベアラ制御方法、デバイス、およびシステム | |
CN108347745B (zh) | 一种移动负载均衡方法及装置 | |
CN103167423A (zh) | 集群系统中监听用户终端的小区切换方法、设备和系统 | |
EP2891360A1 (en) | Methods and nodes for fast handover using pre-allocation of resources in target nodes | |
CN101094482B (zh) | 邻区信道参数测量的方法及其系统 | |
CN103428720A (zh) | 确定不必要切换的方法和基站 | |
EP3002972B1 (en) | Handover processing method, device and system | |
CN106792557B (zh) | 一种lte轨道交通场景下数据调度方法 | |
CN102325354B (zh) | 一种进行移动健壮性的方法、系统和设备 | |
CN103118408B (zh) | 小区测量方法、小区测量和切换的方法、装置及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110921 |
|
WD01 | Invention patent application deemed withdrawn after publication |