[go: up one dir, main page]

CN102108843A - Coiled tubing unit - Google Patents

Coiled tubing unit Download PDF

Info

Publication number
CN102108843A
CN102108843A CN2010105992607A CN201010599260A CN102108843A CN 102108843 A CN102108843 A CN 102108843A CN 2010105992607 A CN2010105992607 A CN 2010105992607A CN 201010599260 A CN201010599260 A CN 201010599260A CN 102108843 A CN102108843 A CN 102108843A
Authority
CN
China
Prior art keywords
injection head
guider
coiled tubing
blowout preventer
carrier loader
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105992607A
Other languages
Chinese (zh)
Inventor
狄丽莉
樊岩松
张延忠
徐连会
赵京坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
Liaohe Petroleum Exploration Bureau
Original Assignee
China National Petroleum Corp
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, Liaohe Petroleum Exploration Bureau filed Critical China National Petroleum Corp
Priority to CN2010105992607A priority Critical patent/CN102108843A/en
Publication of CN102108843A publication Critical patent/CN102108843A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention belongs to the field of oil-field workover operation equipment and in particular relates to a coiled tubing unit, which comprises a roller (3), an injection head (4), a blowout preventer unit (8), a guider (9) and a continuous tube (10), wherein the guider (9) is fixedly connected with a port of the injection head (4); the injection head (4) is fixedly connected with the blowout preventer unit (8); the continuous tube (10) is wound on the roller (3), and one end part of the continuous tube (10) extends into the injection head (4) through the guider (9); the coiled tubing unit is provided with a carrier loader (1), a liftable control room (2) arranged on the carrier loader (1), and a foldable arm type lorry-mounted crane (5); the guider (9) is a goose neck guider; and the bottom of the injection head (4) is fixed with an injection head leg. The coiled tubing unit is low in labor intensity during workover operation, convenient to operate and high in work efficiency.

Description

Manage working rig continuously
Technical field
The invention belongs to the oil well repairing operation apparatus field, relate in particular to a kind of continuous pipe working rig, be applicable to each stage of drilling well, oil recovery, can carry out operations such as sand washing, well workover, cementing, salvaging, well logging, reaming hole, scale removal, completion and drilling well.
Background technology
The oil well repairing operation machine is subjected to foreign technology and price fixing all the time, has limited its application of petroleum well workover industry at home to a certain extent, influences the development of China Petroleum.
Increasing along with special well heads such as China's horizontal well, fishbone well, extended reach wells, a lot of operations adopt conventional workover rig can't finish, and the work pattern that existing working rig mostly adopts individual tubes to connect, labor intensity of operating personnel is big when workover treatment, and operating efficiency is low.
Summary of the invention
The present invention is intended to overcome the deficiencies in the prior art part and provides a kind of workover treatment labour intensity low, and is easy to operate, the continuous pipe working rig of high efficiency.
For achieving the above object, the present invention is achieved in that
A kind of continuous pipe working rig, it comprises cylinder, injection head, blowout preventer set, guider and manages continuously; The port of described guider and injection head is fixedly connected; Described injection head and blowout preventer set are fixedly connected; Described continuous pipe is wound on the cylinder, and the one end seals in injection head through guider.
As a kind of preferred version, the present invention also is provided with carrier loader, places liftable control room and folding arm lorry-mounted crane on the carrier loader.
Further, guider of the present invention can adopt the gooseneck guider.
Further, the present invention is fixed with the injection head supporting leg in the bottom of described injection head.
The present invention is described as " omnipotent implement ", is applicable to each stage of drilling well, oil recovery, can carry out operations such as sand washing, well workover, cementing, salvaging, well logging, reaming hole, scale removal, completion and drilling well.The present invention is owing to adopt the work pattern of continuous pipe, so need not in the operation process to have alleviated working strength of workers to making up a joint, and improved operating efficiency.
Description of drawings
The invention will be further described below in conjunction with the drawings and specific embodiments.
Fig. 1 is the structural representation under the complete machine movement state of the present invention;
Fig. 2 is the vertical view of Fig. 1 of the present invention.
Among the figure: 1 is carrier loader; 2 is the liftable control room; 3 is cylinder; 4 is injection head; 5 are folding arm lorry-mounted crane; 6 is the injection head supporting leg; 7 is the sebific duct cylinder; 8 is blowout preventer set; 9 is the gooseneck guider; 10 is continuously pipe.
The specific embodiment
As shown in the figure, a kind of continuous pipe working rig, it comprises cylinder 3, injection head 4, blowout preventer set 8, guider 9 and manages 10 continuously; Described guider 9 is fixedly connected with the port of injection head 4; Described injection head 4 is fixedly connected with blowout preventer set 8; Described continuous pipe 10 is wound on the cylinder 3, and the one end seals in injection head 4 through guider 9.
The present invention also is provided with carrier loader 1, places liftable control room 2 and folding arm lorry-mounted crane 5 on the carrier loader 1.
For strengthening guide effect, guider 9 of the present invention can be selected the gooseneck guider.
For making the injection head monolithic stability, the present invention can be fixed with the injection head supporting leg in the bottom of described injection head 4.
It shown in the figure movement state of this equipment.Carrier loader 1 is the delivery unit of complete machine and for whole working provides power, and all the other each parts all are fixed on the carrier loader 1.The present invention is in working order the time, can operate folding arm lorry-mounted crane 5, at first folding arm lorry-mounted crane 5 is sling blowout preventer set 8 and is linked to each other with well head from carrier loader 1, again with gooseneck guider 9 with after injection head 4 is connected, slinging links to each other with blowout preventer set 8, and injection head supporting leg 6 is supported on four angles of injection head 4, plays the supplemental support effect, in the course of the work, folding arm lorry-mounted crane 5 hangs injection head 4 all the time.Be raised up to duty by 3 transpositions of hydraulic control cylinder and liftable control room 2, operation in liftable control room 2, cylinder 3 cantilevers are risen rise to duty, index drum 3 will be managed 10 continuously and be passed injection head 4, in addition can be by injection head 4 and cylinder 3 synchro switches, control injection head 4 can be realized the synchronization action of injection head 4 and cylinder 3, finishes continuous pipe and is lowered to and trips out in the well.Realize pumping into of liquid or gas by the pipeline interface on the cylinder 3 at last, realize operation.
The pipe working rig adopts single vehicular structure continuously, a continuous pipe of rigidity that is fit to well depth is wrapped on the working drum, by the centralized Control in the control room, adopt hydraulic system to realize the coordination of cylinder and injection head, well head is sent into or tripped out to continuous pipe, finish well workover and other operations, realize the real-time demonstration and the storage of parameter simultaneously by the signal of telecommunication.
Its technical parameter:
The maximum pipe amount of holding: 5000m (1 1/ 4"), 4000m (1 1/ 2")
Maximum working pressure (MWP): 70MPa
Maximum removes speed: 60m/min
Maximum injection force: the 70kN of injection head
Maximum upper lifting force: the 140kN of injection head
Lorry-mounted crane lifting maximum weight: 12t
Be suitable for caliber: 1 ", 1 1/ 4" and 1 1/ 2"
Gooseneck guider radius of curvature: 72 "
Machine shape size: 12.2m * 2.7m * 4.353m
Maximum travelling speed: 45km/h
Min. turning radius: 35m
Be with being appreciated that, more than about specific descriptions of the present invention, only be used to the present invention is described and be not to be subject to the described technical scheme of the embodiment of the invention, those of ordinary skill in the art is to be understood that, still can make amendment or be equal to replacement the present invention, to reach identical technique effect; Use needs as long as satisfy, all within protection scope of the present invention.

Claims (4)

1. manage working rig continuously for one kind, it is characterized in that, comprise cylinder (3), injection head (4), blowout preventer set (8), guider (9) and manage (10) continuously; Described guider (9) is fixedly connected with the port of injection head (4); Described injection head (4) is fixedly connected with blowout preventer set (8); Described continuous pipe (10) is wound on the cylinder (3), and the one end seals in injection head (4) through guider (9).
2. continuous pipe working rig according to claim 1 is characterized in that: also be provided with carrier loader (1), place liftable control room (2) and folding arm lorry-mounted crane (5) on the carrier loader (1).
3. continuous pipe working rig according to claim 2 is characterized in that: described guider (9) is the gooseneck guider.
4. continuous pipe working rig according to claim 3 is characterized in that: the bottom at described injection head (4) is fixed with the injection head supporting leg.
CN2010105992607A 2010-12-22 2010-12-22 Coiled tubing unit Pending CN102108843A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105992607A CN102108843A (en) 2010-12-22 2010-12-22 Coiled tubing unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105992607A CN102108843A (en) 2010-12-22 2010-12-22 Coiled tubing unit

Publications (1)

Publication Number Publication Date
CN102108843A true CN102108843A (en) 2011-06-29

Family

ID=44173114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105992607A Pending CN102108843A (en) 2010-12-22 2010-12-22 Coiled tubing unit

Country Status (1)

Country Link
CN (1) CN102108843A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103247220A (en) * 2013-05-27 2013-08-14 烟台杰瑞石油装备技术有限公司 Coiled tubing operation equipment simulator
CN104100217A (en) * 2013-04-03 2014-10-15 中国石油天然气股份有限公司 Flexible composite oil pipe column tripping device
CN104420843A (en) * 2013-09-03 2015-03-18 四川宏华石油设备有限公司 Continuous tubing machine
CN104533287A (en) * 2014-11-20 2015-04-22 西南石油大学 Drilling and completion and production increasing system for shale gas reservoir of multilateral fishbone horizontal well
CN104533288A (en) * 2014-11-20 2015-04-22 西南石油大学 Drilling and completion and production increasing method for shale gas reservoir of multilateral fishbone horizontal well
CN110148328A (en) * 2019-04-11 2019-08-20 西南石油大学 Coiled tubing simulation system consing method
CN115012855A (en) * 2022-05-30 2022-09-06 中国石油天然气集团有限公司 Continuous pipe operation machine and using method and application thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2292214A1 (en) * 1999-12-06 2001-06-06 Plains Energy Services Ltd. Coiled tubing drilling rig
US20080251248A1 (en) * 2005-10-03 2008-10-16 Xtreme Coil Drilling Corp. Lubricator For Use With Coiled Tubing Apparatus And Universal Rig Having Coiled Tubing And Top Drive Capability
CN101382069A (en) * 2007-09-04 2009-03-11 中国石油天然气集团公司 Continuous tube horizontal borehole process and device
CN201310342Y (en) * 2008-12-02 2009-09-16 中国石油天然气集团公司 Continuous-tube well logging machine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2292214A1 (en) * 1999-12-06 2001-06-06 Plains Energy Services Ltd. Coiled tubing drilling rig
US20080251248A1 (en) * 2005-10-03 2008-10-16 Xtreme Coil Drilling Corp. Lubricator For Use With Coiled Tubing Apparatus And Universal Rig Having Coiled Tubing And Top Drive Capability
CN101382069A (en) * 2007-09-04 2009-03-11 中国石油天然气集团公司 Continuous tube horizontal borehole process and device
CN201310342Y (en) * 2008-12-02 2009-09-16 中国石油天然气集团公司 Continuous-tube well logging machine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
贺会群等: "CT38连续管作业车研制与应用", 《石油机械》 *
高霞等: "连续管低周疲劳试验装置方案分析", 《石油矿场机械》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100217A (en) * 2013-04-03 2014-10-15 中国石油天然气股份有限公司 Flexible composite oil pipe column tripping device
CN104100217B (en) * 2013-04-03 2016-08-03 中国石油天然气股份有限公司 Flexible composite oil pipe column tripping device
CN103247220A (en) * 2013-05-27 2013-08-14 烟台杰瑞石油装备技术有限公司 Coiled tubing operation equipment simulator
CN103247220B (en) * 2013-05-27 2015-07-01 烟台杰瑞石油装备技术有限公司 Coiled tubing operation equipment simulator
CN104420843A (en) * 2013-09-03 2015-03-18 四川宏华石油设备有限公司 Continuous tubing machine
CN104533287A (en) * 2014-11-20 2015-04-22 西南石油大学 Drilling and completion and production increasing system for shale gas reservoir of multilateral fishbone horizontal well
CN104533288A (en) * 2014-11-20 2015-04-22 西南石油大学 Drilling and completion and production increasing method for shale gas reservoir of multilateral fishbone horizontal well
CN110148328A (en) * 2019-04-11 2019-08-20 西南石油大学 Coiled tubing simulation system consing method
CN115012855A (en) * 2022-05-30 2022-09-06 中国石油天然气集团有限公司 Continuous pipe operation machine and using method and application thereof

Similar Documents

Publication Publication Date Title
CN102108843A (en) Coiled tubing unit
CN109750976A (en) Fully hydraulic deep well drilling rig
CN201554369U (en) Fast-transported petroleum drilling rig capable of transporting large module integrally and automatically traveling
CN103821464B (en) Tubing string vertical vehicular full-automatic smart hydraulic workover rig
CN103437724A (en) Pipe column supporting device for drilling platform
CN105507833A (en) Derrick lifting type coiled tubing operation device
CN203614056U (en) Automatic operation system of drilling tubular column
CN102518396A (en) Automatic drilling machine
CN103696700A (en) Well drilling device for double-wellhead operation
CN201391252Y (en) Hose drilling and workover rig
CN204782747U (en) A complete set of pipe full -rotating drill
CN207609392U (en) A kind of full-automatic petroleum well workover rod tube operation industrial robot
CN205591850U (en) Full -automatic oil pipe post calandria moves a tub device
CN110185458B (en) Bidirectional shield launching method
CN203114335U (en) Marching type moving device for fully-mechanized face equipment vehicle
CN217872684U (en) Environment-friendly intelligent wellhead operation platform for drilling/workover operation
CN206888934U (en) A kind of self-travel type dynamic catwalk
CN207312995U (en) One kind self-control bridge-collision-avoidance wall form hanging device
CN203475594U (en) Sewer cleaning dredging vehicle
CN204299483U (en) Folding open stair rig structure
CN201786293U (en) SMD-full automatic hydraulic tube replacement system
CN201687395U (en) Gate-type derrick of coiled tubing drilling machine
CN101881037A (en) Water pumping device for flushing well
CN205078198U (en) Truck -mounted drilling rig promotes pressure device
CN210152576U (en) Dual-power-head drilling tool continuous connection structure for ultra-deep operation and drilling machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110629