CN102087527A - 一种校验输电线路互投方式的备自投逻辑测试方法 - Google Patents
一种校验输电线路互投方式的备自投逻辑测试方法 Download PDFInfo
- Publication number
- CN102087527A CN102087527A CN 201010559021 CN201010559021A CN102087527A CN 102087527 A CN102087527 A CN 102087527A CN 201010559021 CN201010559021 CN 201010559021 CN 201010559021 A CN201010559021 A CN 201010559021A CN 102087527 A CN102087527 A CN 102087527A
- Authority
- CN
- China
- Prior art keywords
- relay
- circuit breaker
- contact
- terminal
- normally open
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 79
- 230000005540 biological transmission Effects 0.000 title claims abstract description 20
- 230000009471 action Effects 0.000 claims abstract description 83
- 238000002347 injection Methods 0.000 claims abstract description 48
- 239000007924 injection Substances 0.000 claims abstract description 48
- 238000002474 experimental method Methods 0.000 claims abstract description 8
- 238000010998 test method Methods 0.000 claims abstract description 6
- 230000005611 electricity Effects 0.000 claims description 52
- 238000000034 method Methods 0.000 claims description 7
- 238000004088 simulation Methods 0.000 claims description 7
- 230000008569 process Effects 0.000 claims description 4
- 238000001514 detection method Methods 0.000 claims description 2
- 230000007774 longterm Effects 0.000 claims 1
- 238000007689 inspection Methods 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 230000001419 dependent effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Landscapes
- Driving Mechanisms And Operating Circuits Of Arc-Extinguishing High-Tension Switches (AREA)
Abstract
本发明涉及变电站设备检验技术领域,公开一种校验输电线路互投方式的备自投逻辑测试方法,测试仪试验线接入:实验初始状态:设定模拟断路器模块1DL、2DL、4DL、5DL为合的状态:试验状态:将实验开关“AN3”推至断开位置,使模拟互感器模块3PT、4PT动作:无交流电;备自投装置动作:分模拟断路器模块1DL、3DL;使模拟互感器模块3PT:4PT动作:有交流电。被试备自投装置可以加入运行。本发明能够模拟备自投中输电线路互投备自投功能,方便的测试备自投保护装置的保护定值,操作方便、结果可靠;并满足电力系统内桥接线备自投装置的检验工作,极大地提供了测试灵活性,提高了生产效率。
Description
技术领域
本发明涉及变电站设备检验技术领域,尤其适用于在一条输电线路运行,另一条输电线路备用情况下,对备自投装置输电线路互投逻辑功能进行检验的一种校验输电线路互投方式的备自投逻辑测试方法。
背景技术
随着新技术的应用,社会生活对电力供应的依靠愈来愈强,电力系统供电可靠性已成为衡量电能质量的一个重要指标。为了提高供电可靠性,目前大多数110KV变电站常常采用内桥接线方式下,两条输电线路互为备用的供电方式,即一条输电线路运行,另一条输电线路备用的供电方式。备用电源自动投切装置得到广泛运用。然而由于110KV变电站输电线路全停机会很少,加之备自投装置工作时采集系统参数繁多、动作涉及断路器范围广、实际带开关传动实验风险隐患较大。目前针对采用输电线路互投功能的备自投装置校验较为复杂。
线路互投为:运行时,一条线路运行(1DL),另一条线路备用(3DL)。母联断路器合位。一条线路带全部高压侧压母线,如图1。
如果线路1发生故障,造成变电站高压侧母线电压消失,备自投装置将跳开线路1所连接断路器1DL,投入线路2,合断路器3DL。
发明内容
为解决现有技术存在的问题,本发明提供一种校验输电线路互投方式的备自投逻辑测试方法。
为实现上述发明目的,本发明采用如下技术方案:
一种校验输电线路互投方式的备自投逻辑测试方法,其步骤如下:
第一步:测试仪试验线接入:
1、将测试仪附带的试验线缆的航空插头一侧分别插入测试仪的断路器模拟单元1DL、3DL 、5DL的输入“操作” 插孔内,另一侧将模拟断路器模块1DL、3DL 、5DL的“DL1”、“DL3”、“DL33”分别接至备自投装置1#主变高压侧断路器操作端子的“公共端”、“合端”、“分端”; 附带的试验线缆的航空插头一侧分别插入断路器模拟单元1DL、3DL 、5DL的输出“信号”插孔内,另一侧将模拟断路器模块1DL、3DL 、5DL的“801Ⅰ端”、“802Ⅰ端”、“803Ⅰ端”分别接至备自投装置1#主变高压侧断路器信号端子的“公共端”、“合信号端”、“分信号端”;
使测试仪的模拟断路器模块1DL对应1#主变高压侧断路器,模拟断路器模块3DL对应2#主变高压侧断路器,模拟断路器模块5DL对应高压侧线路母联断路器;
第二步:实验初始状态:
将测试仪的模拟断路器模块1DL、3DL 、5DL的电源切换开关拨至“装置电源”档位,试验中使用测试仪提供的直流电源,并将测试仪上的直流空开“ZLKK”和交流空开“JLKK”推至导通位置;将实验开关“AN1”、“AN2”、“AN3”、“AN4”推至导通位置;
实验需要将模拟断路器模块1DL、模拟断路器模块2DL、模拟断路器模块4DL、模拟断路器模块5DL调整至合闸位置;
1、设定手动操作模拟断路器模块1DL为合的状态:
按模拟断路器模块1DL的合闸按钮HC,直流正电通过合闸按钮HC、模拟断路器模块1DL中的继电器1DL-SW常闭触点3-2端传输至连接继电器“1DL-SW”动作线圈正极的1端接点;继电器1DL-SW中的6端接点连接继电器“1DL-SW”动作线圈负极构成直流回路;继电器“1DL-SW”动作,继电器各开关触点通断翻转:继电器1DL-SW中的常闭触点3-2端断开;4-5端的常开触点导通;8-9端的常开触点导通;
直流正电通过空开“ZLKK”和继电器“1DL-SW中导通的4-5端触点传输至模拟断路器模块1DL的继电器“1DL-KⅠ”的端子1和继电器“1DL-KⅡ”线圈正极的端子1;继电器“1DL-KⅠ”和继电器“1DL-KⅡ”动作线圈负极带直流负电,通电继电器“1DL-KⅠ”和继电器“1DL-KⅡ”翻转:
继电器 1DL-KⅠ的a1-a2端的常开触点导通,继电器1DL-KⅠ的a1端所带直流正电连通至红灯D1,红灯D1由灭变亮;同时,绿灯D2由亮变灭;继电器1DL-KⅠ的b1-b2端的常开触点导通;b1端通过接线端子“1DL-GY1”连接实验开关“AN1”,b2端接线端子连接“1DL-GY2”;直流正电通过空开、实验开关“AN1”、模拟断路器模块1DL中的导通接线端子“1DL-GY1”与“1DL-GY2”传输至模拟断路器模块2DL中的接线端子“2DL-GY1”;
继电器1DL-KⅡ动作,继电器1DL-KⅡ的端子a1-a2的常开触点导通,端子a1与端子a2分别连接备自投装置接线端子1DL-801Ⅰ和1DL-802Ⅰ,备自投装置连接线“1DL-801Ⅰ”与“1DL-802Ⅰ”导通;
同时,继电器1DL-KⅡ的端子a1- a3之间的常闭触点断开,端子a3连接的备自投装置接线端子1DL-803Ⅰ与1DL-801Ⅰ断开;
同时,继电器1DL-KⅡ的端子b1-b2之间的常开触点导通,备自投装置连接线“1DL-801Ⅱ”与“1DL-802Ⅱ”导通;
同时,继电器1DL-KⅡ的端子b1-b3之间的常闭触点断开,备自投装置连接线“1DL-801Ⅱ”与“1DL-803Ⅱ”断开;
2、设定手动操作模拟断路器模块2DL为合的状态:
按模拟断路器模块2DL的合闸按钮HC,直流正电通过合闸按钮HC、模拟断路器模块2DL中的继电器2DL-SW常闭触点3-2端传输至连接继电器2DL-SW动作线圈正极的1端接点;继电器2DL-SW中的6端接点连接继电器1DL-SW动作线圈负极构成直流回路;继电器2DL-SW动作,继电器各开关触点通断翻转:继电器2DL-SW中的常闭触点3-2端断开;4-5端的常开触点导通;8-9端的常开触点导通;
直流正电通过空开“ZLKK”、模拟断路器模块2DL中继电器2DL-SW导通的4-5端触点传输至模拟断路器模块2DL的继电器2DL-KⅠ的端子1和继电器2DL-KⅡ的线圈正极端子1;继电器2DL-KⅠ和继电器2DL-KⅡ动作线圈负极端子2带直流负电,通电继电器2DL-KⅠ和继电器2DL-KⅡ翻转:
继电器 2DL-KⅠ的a1-a2端的常开触点导通,继电器2DL-KⅠ的a1端所带直流正电连通至红灯D1,红灯D1由灭变亮;同时,绿灯D2由亮变灭;同时,继电器2DL-KⅠ的b1-b2端的常开触点导通;b1端通过接线端子2DL-GY1连接模拟断路器模块1DL中“1DL-GY2”,b2端通过接线端子2DL-GY2、实验开关“AN3” 传输至模拟断路器模块5DL中接线端子5DL-GY1;模拟断路器模块1DL中继电器“1DL-GY2”端子传输的直流正电通过模拟断路器模块2DL中的导通接线端子“2DL-GY1”与“2DL-GY2”、实验开关“AN3”传输至模拟断路器模块5DL中“5DL-GY1”;
3、设定手动操作模拟断路器模块4DL为合的状态:
按模拟断路器模块4DL的合闸按钮HC,直流正电通过合闸按钮HC、模拟断路器模块4DL中的继电器4DL-SW常闭触点3-2端传输至连接继电器4DL-SW动作线圈正极的1端接点;继电器4DL-SW中的6端接点连接继电器4DL-SW动作线圈负极构成直流回路;继电器4DL-SW动作,继电器各开关触点通断翻转:继电器4DL-SW中的常闭触点3-2端断开;4-5端的常开触点导通;8-9端的常开触点导通;
直流正电通过空开“ZLKK”、模拟断路器模块4DL中继电器4DL-SW的4-5端导通触点传输至模拟断路器模块4DL的继电器4DL-KⅠ和继电器4DL-KⅡ的线圈正极端子1;继电器4DL-KⅠ和继电器4DL-KⅡ动作线圈负极端子2带直流负电,通电继电器4DL-KⅠ和继电器4DL-KⅡ翻转:
继电器 4DL-KⅠ的a1-a2端的常开触点导通,继电器4DL-KⅠ的a1端所带直流正电连通至红灯D1,红灯D1由灭变亮;同时,绿灯D2由亮变灭;继电器4DL-KⅠ的b1-b2端的常开触点导通;b1端通过接线端子4DL-GY1连接模拟断路器模块3DL中“3DL-GY2”,b2端通过接线端子4DL-GY2、实验开关“AN4” 传输至模拟断路器模块5DL中接线端子5DL-GY2;模拟断路器模块3DL中继电器“3DL-GY2”端子传输的直流正电通过模拟断路器模块4DL中的导通接线端子“4DL-GY1”与“4DL-GY2”、实验开关“AN4”传输至模拟断路器模块5DL中“5DL-GY2;
4、设定手动操作模拟断路器模块5DL为合的状态:
按模拟断路器模块5DL的合闸按钮HC,直流正电通过合闸按钮HC、模拟断路器模块5DL中的继电器5DL-SW常闭触点3-2端传输至继电器5DL-SW动作线圈正极的1端接点;继电器5DL-SW中的6端接点连接继电器5DL-SW动作线圈负极构成直流回路;继电器5DL-SW动作,继电器各开关触点通断翻转:继电器5DL-SW中的常闭触点3-2端断开;4-5端的常开触点导通;8-9端的常开触点导通;
直流正电通过空开“ZLKK”、模拟断路器模块5DL中继电器5DL-SW导通的4-5端触点传输至模拟断路器模块5DL的继电器5DL-KⅠ的端子1和继电器5DL-KⅡ的端子1;继电器5DL-KⅠ和继电器5DL-KⅡ动作线圈负极端子2带直流负电,通电继电器5DL-KⅠ和继电器5DL-KⅡ翻转:
继电器 5DL-KⅠ的a1-a2端的常开触点导通,继电器5DL-KⅠ的a1端所带直流正电连通至红灯D1,红灯D1由灭变亮;同时,绿灯D2由亮变灭;继电器5DL-KⅠ的b1-b2端的常开触点导通;b1端通过接线端子5DL-GY1连接实验开关“AN3”,b2端通过接线端子5DL-GY2、实验开关“AN4” 传输至模拟断路器模块4DL中接线端子4DL-GY2;由模拟断路器模块2DL中“2DL-GY2”端子传输的直流正电通过实验开关“AN3”、模拟断路器模块5DL中的导通接线端子“5DL-GY1”与“5DL-GY2”、实验开关“AN4”传输至模拟断路器模块4DL中“4DL-GY2”;
继电器5DL-KⅡ动作,继电器5DL-KⅡ的端子a1-a2的常开触点导通,端子a1与端子a2分别连接备自投装置接线端子5DL-801Ⅰ和5DL-802Ⅰ,测试仪与备自投装置的连接线5DL-801Ⅰ与5DL-802Ⅰ导通;
同时,继电器5DL-KⅡ的端子a1- a3之间的常闭触点断开,端子a3连接的备自投装置接线端子5DL-803Ⅰ与5DL-801Ⅰ断开;
同时,继电器5DL-KⅡ的端子b1-b2之间的常开触点导通,备自投装置连接线“5DL-801Ⅱ”与“5DL-802Ⅱ”导通;
同时,继电器5DL-KⅡ的端子b1-b3之间的常闭触点断开,备自投装置连接线“5DL-801Ⅱ”与“5DL-803Ⅱ”断开;
5、模拟互感器模块动作情况
1)、模拟互感器模块“1PT”:直流正电通过空开“ZLKK”、实验开关“AN1”进入模拟互感器模块“1PT”的继电器“1PT-Ⅰ”线圈正极和继电器“1PT-Ⅱ”线圈正极端子1;构成直流回路,模拟互感器模块“1PT”的中间继电器1PT-Ⅰ”和“1PT-Ⅱ”动作,继电器各触点通断情况翻转;继电器1PT-Ⅰ的a1-a2之间常开触点导通,黄灯“1PT-D3”由灭变亮;“1PT-Ⅰ的b1-b2之间常开触点导通,A相电压经试验线传输至备自投装置;“1PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“1PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
2)、模拟互感器模块“2PT”:直流正电通过空开“ZLKK”、实验开关“AN2”进入模拟互感器模块“2PT”的继电器“2PT-Ⅰ和继电器“2PT-Ⅱ”线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“2PT”的中间继电器2PT-Ⅰ”和“2PT-Ⅱ”动作,继电器各触点通断情况翻转;“2PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“2PT-D3”由灭变亮;“2PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“2PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“2PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
3)、模拟互感器模块“3PT”:直流正电通过空开“ZLKK”、实验开关“AN1”、模拟断路器模块1DL中“1DL-GY1”与“1DL-GY2”导通触点、模拟断路器模块2DL中“2DL-GY1”与“2DL-GY2” 导通触点、实验开关“AN3”进入模拟互感器模块“3PT”继电器“3PT-Ⅰ”线圈正极和继电器“3PT-Ⅱ”线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“3PT”的中间继电器3PT-Ⅰ”和“3PT-Ⅱ”动作,继电器各触点通断情况翻转;继电器“3PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“3PT-D3”由灭变亮;继电器“3PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“3PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“3PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
4)、模拟互感器模块“4PT”:直流正电通过空开“ZLKK”、实验开关“AN1”、模拟断路器模块1DL中“1DL-GY1”与“1DL-GY2”导通触点、模拟断路器模块2DL中“2DL-GY1”与“2DL-GY2”导通触点、实验开关“AN3”、模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”导通触点进入模拟互感器模块“4PT”的继电器“4PT-Ⅰ”线圈正极和继电器“4PT-Ⅱ”线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“4PT”的中间继电器4PT-Ⅰ”和“4PT-Ⅱ”动作,继电器各触点通断情况翻转;“4PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“4PT-D3”由灭变亮;“4PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“4PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“4PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
第三步:试验状态
1、将实验开关“AN3”推至断开位置,由实验开关“AN3”经过模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”之间触点、实验开关“AN4”至模拟断路器模块4DL中“4DL-GY2”正电消失;
2、模拟互感器模块“3PT”动作:直流正电通道断开,模拟互感器模块“3PT”无直流正电输入,模拟互感器模块“3PT”的中间继电器3PT-Ⅰ”和“3PT-Ⅱ”复归,继电器各触点通断情况翻转;黄灯“3PT-D3”由亮变灭;
“3PT-Ⅰ的b1-b2”之间常开触点断开,A相电压停止输出;
“3PT-Ⅱ的a1-a2”之间常开触点断开,B相电压停止输出;
“3PT-Ⅱ的b1-b2”之间常开触点断开,C相电压停止输出;
3、模拟互感器模块“4PT”动作:直流正电通道断开,模拟互感器模块“4PT”无直流正电输入,模拟互感器模块“4PT”的中间继电器4PT-Ⅰ”和“4PT-Ⅱ”复归,继电器各触点通断情况翻转;黄灯“4PT-D3”由亮变灭;
“4PT-Ⅰ的b1-b2”之间常开触点断开,A相电压停止输出;
“4PT-Ⅱ的a1-a2”之间常开触点断开,B相电压停止输出;
第四步:备自投装置动作过程:
1、检测备自投装置分模拟断路器模块1DL;
备自投装置通过试验线“1DL33”向测试仪发出直流正电信号,直流正电传输至模拟断路器模块1DL中继电器“1DL-SW端9”接点,通过动作闭合的继电器“1DL-SW的9-8常开触点传输至连接继电器“1DL-SW”复归线圈正极7接点,复归线圈负极12”接点带直流负电,构成直流回路,模拟断路器模块1DL中双位置继电器“1DL-SW”复归,继电器各触点通断情况翻转;模拟断路器模块1DL中继电器“1DL-SW” 失去直流正电,复位;继电器“1DL-KⅠ”和“1DL-KⅡ”复位;继电器各触点通断情况翻转;红灯“1DL-D1”由亮变灭;绿灯“1DL-D2”由灭变亮;测试仪与备自投装置的连接线“1DL-801Ⅰ”与“1DL-802Ⅰ”断开;测试仪与备自投装置的连接线“1DL-801Ⅰ”与“1DL-803Ⅰ”导通;备自投装置连接线“1DL-801Ⅱ”与“1DL-802Ⅱ”断开;备自投装置连接线“1DL-801Ⅱ”与“1DL-803Ⅱ”导通;
2、检测备自投装置合模拟断路器模块3DL;
备自投装置通过试验线“3DL3”向测试仪发出直流正电信号,直流正电通过模拟断路器模块3DL中继电器“3DL-SW的3-2”常闭触点传输至连接继电器“3DL-SW”动作线圈正极1接点,连接继电器“3DL-SW”动作线圈负极的6接点带直流负电,构成直流回路;模拟断路器模块3DL中双位置继电器“3DL-SW”动作,继电器各触点通断情况翻转;“3DL-SW的2-3”之间常闭触点断开;“3DL-SW的4-5”之间常开触点导通;“3DL-SW的8-9”之间常开触点导通;
直流正电通过空开“ZLKK”、“3DL-SW的4-5”导通触点传输至模拟断路器模块3DL的中间继电器“3DL-KⅠ”和“3DL-KⅡ”的线圈正极端子1,构成直流回路;同时,继电器3DL-KⅠ动作,继电器“3DL-KⅠ的a1-a2”之间常开触点导通,红灯“3DL-D1”由灭变亮;继电器“3DL-KⅠ的a1-a3”之间常闭触点断开,绿灯“3DL-D2”由亮变灭;“3DL-KⅠ的b1-b2”之间常开触点导通,直流正电通过空开、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点,传输至模拟断路器模块4DL中“4DL-GY1”;
同时,继电器3DL-KⅡ动作,继电器“3DL-KⅡ的a1-a2”之间常开触点导通,测试仪与备自投装置的连接线“3DL-801Ⅰ”与“3DL-802Ⅰ”导通;“3DL-KⅡ的a1-a3”之间常闭触点断开,备自投装置连接线“3DL-801Ⅰ”与“3DL-803Ⅰ”断开;“3DL-KⅡ的b1-b2”之间常开触点导通,备自投装置连接线“3DL-801Ⅱ”与“3DL-802Ⅱ”导通;“3DL-KⅡ的b1-b3”之间常闭触点断开,备自投装置连接线“3DL-801Ⅱ”与“3DL-803Ⅱ”断开;
3、模拟互感器模块的工作动作状态;
1)、模拟互感器模块“3PT”:直流正电通过空开“ZLKK”、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点、模拟断路器模块4DL中“4DL-GY1”与“4DL-GY2”之间触点、实验开关“AN4”、模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”之间触点进入模拟互感器模块“3PT”的端子“3PT-YCDY”,该端子连接继电器“3PT-Ⅰ”线圈正极和继电器“3PT-Ⅱ”线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“3PT”的中间继电器3PT-Ⅰ”和“3PT-Ⅱ”动作,继电器各触点通断情况翻转:“3PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“3PT-D3”由灭变亮;“3PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“3PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“3PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
2)、模拟互感器模块“4PT”:直流正电通过空开“ZLKK”、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点、模拟断路器模块4DL中“4DL-GY1”与“4DL-GY2”之间触点、实验开关“AN4”进入模拟互感器模块“4PT”继电器“4PT-Ⅰ和 4PT-Ⅱ的线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路;模拟互感器模块“4PT”的中间继电器4PT-Ⅰ”和“4PT-Ⅱ”动作,继电器各触点通断情况翻转;“4PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“4PT-D3”由灭变亮;“4PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“4PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“4PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
第五步:检测的备自投逻辑功能正确符合要求,被试备自投装置可以加入运行。
本发明采用上述技术方案,与现有技术相比具有如下优点:
1、避免了复杂的接线,使备自投校验装置的接线变的简单明了,能有效避免拆接线过程中安全上存在的较大风险。
2、有专门的控制程序,可以模拟备自投中输电线路互投备自投功能。
3、通过控制部分可方便的测试备自投保护装置的保护定值,操作方便、结果可靠。
4、能够满足电力系统内桥接线备自投装置的检验工作,极大地提供了测试灵活性,提高了生产效率。
附图说明
图1为输电线路互投电路图;
图2为便携式备自投校验仪的工作原理方框图;
图3为模拟断路器DL模块的工作原理电路图;
图4为模拟断路器PT模块的工作原理电路图;
图5为模拟一次系统管网的输变电路面板图。
具体实施方式
如图1、2、3、4、5所示:一种校验输电线路互投方式的备自投逻辑测试方法,其步骤如下:
第一步:测试仪试验线接入:
将测试仪试验线缆的航空插头侧分类插入各断路器模拟单元的“操作”和“信号”插孔内。另一侧将模拟断路器模块1DL的“DL1”、“DL3”、“DL33”分别接至备自投装置1#进线断路器操作端子的“公共端”、“合”、“分”;“801Ⅰ”、“802Ⅰ”、“803Ⅰ”分别接至备自投装置1#进线断路器信号端子的“公共端”、“合信号”、“分信号”。其余2个短路器模块同上,对应关系为模拟断路器模块3DL对应2#进线断路器,模拟断路器模块5DL对应线路母联断路器。
模拟断路器模块2DL,模拟断路器模块4DL不接入备自投装置。
第二步:实验初始状态:
将电源切换把手打至“装置电源”档位,试验中使用测试仪提供的直流电源。并将装置上的直流空开“ZLKK”和交流空开“JLKK”推至导通位置。
将实验开关“AN1”、“AN2”、“AN3”、“AN4”推至导通位置。
实验需要将模拟断路器模块1DL、模拟断路器模块2DL、模拟断路器模块4DL、模拟断路器模块5DL调整至合闸位置。
1、手动操作模拟断路器模块1DL为合位;
按模拟断路器模块1DL的合闸按钮“1DL-HC”,直流正电通过按钮“1DL-HC”至模拟断路器模块1DL中“1DL-SW:3”接点。模拟断路器模块1DL中“1DL-SW:3”接点与“1DL-SW:2”接点之间为常闭触点,直流正电通过,传输至模拟断路器模块1DL中“1DL-SW:1”接点,该接点连接继电器“1DL-SW”动作线圈正极。模拟断路器模块1DL中“1DL-SW:6”接点带直流负电,接点连接继电器“1DL-SW”动作线圈负极。构成直流回路,模拟断路器模块1DL中双位置继电器“1DL-SW”动作,继电器各触点通断情况翻转。“1DL-SW:2”与“1DL-SW:3”之间常闭触点断开;“1DL-SW:4”与“1DL-SW:5”之间常开触点导通;“1DL-SW:8”与“1DL-SW:9”之间常开触点导通。
模拟断路器模块1DL中“1DL-SW:4”与“1DL-SW:5”之间常开触点导通,直流正电通过空开“ZLKK”和“1DL-SW:4”与“1DL-SW:5”之间触点传输至模拟断路器模块1DL的中间继电器“1DL-KⅠ”的端子“1DL-KⅠ:1”和“1DL-KⅡ”的端子“1DL-KⅡ:1”。
模拟断路器模块1DL中“1DL-KⅠ:1”端子连接继电器“1DL-KⅠ”线圈正极。模拟断路器模块1DL中“1DL-KⅠ:2”接点带直流负电,接点连接继电器“1DL-KⅠ”动作线圈负极。构成直流回路,模拟断路器模块1DL中中间继电器“1DL-KⅠ”动作,继电器各触点通断情况翻转。“1DL-KⅠ:a1”与“1DL-KⅠ:a2”之间常开触点导通,“1DL-KⅠ:a1”所带直流正电连通至红灯“1DL-D1”,与直流负电形成回路,红灯“1DL-D1”由灭变亮;“1DL-KⅠ:a1”与“1DL-KⅠ:a3”之间常闭触点断开,“1DL-KⅠ:a3”失去直流正电,绿灯“1DL-D2”所在回路断裂,绿灯“1DL-D2”由亮变灭;“1DL-KⅠ:b1”与“1DL-KⅠ:b2”之间常开触点导通,直流正电通过空开、实验开关“AN1”、模拟断路器模块1DL中“1DL-GY1”与“1DL-GY2”之间触点,传输至模拟断路器模块2DL中“2DL-GY1”。
模拟断路器模块1DL中“1DL-KⅡ:1”端子连接继电器“1DL-KⅡ”线圈正极。模拟断路器模块1DL中“1DL-KⅡ:2”接点带直流负电,接点连接继电器“1DL-KⅡ”动作线圈负极。构成直流回路,模拟断路器模块1DL中中间继电器“1DL-KⅡ”动作,继电器各触点通断情况翻转。“1DL-KⅡ:a1”与“1DL-KⅡ:a2”之间常开触点导通,测试仪与备自投装置连接线“1DL-801Ⅰ”与“1DL-802Ⅰ”导通;“1DL-KⅡ:a1”与“1DL-KⅡ:a3”之间常闭触点断开,测试仪与备自投装置连接线“1DL-801Ⅰ”与“1DL-803Ⅰ”断开;“1DL-KⅡ:b1”与“1DL-KⅡ:b2”之间常开触点导通,测试仪与备自投装置连接线“1DL-801Ⅱ”与“1DL-802Ⅱ”导通;“1DL-KⅡ:b1”与“1DL-KⅡ:b3”之间常闭触点断开,测试仪与备自投装置连接线“1DL-801Ⅱ”与“1DL-803Ⅱ”断开。
2、手动操作模拟断路器模块2DL为合位;
按模拟断路器模块2DL的合闸按钮“2DL-HC”,直流正电通过按钮“2DL-HC”至模拟断路器模块2DL中“2DL-SW:3”接点。模拟断路器模块2DL中“2DL-SW:3”接点与“2DL-SW:2”接点之间为常闭触点,直流正电通过,传输至模拟断路器模块2DL中“2DL-SW:1”接点,该接点连接继电器“2DL-SW”动作线圈正极。模拟断路器模块2DL中“2DL-SW:6”接点带直流负电,接点连接继电器“2DL-SW”动作线圈负极。构成直流回路,模拟断路器模块2DL中双位置继电器“2DL-SW”动作,继电器各触点通断情况翻转。“2DL-SW:2”与“2DL-SW:3”之间常闭触点断开;“2DL-SW:4”与“2DL-SW:5”之间常开触点导通;“2DL-SW:8”与“2DL-SW:9”之间常开触点导通。
模拟断路器模块2DL中“2DL-SW:4”与“2DL-SW:5”之间常开触点导通,直流正电通过空开“ZLKK”和“2DL-SW:4”与“2DL-SW:5”之间触点传输至模拟断路器模块2DL的中间继电器“2DL-KⅠ”的端子“2DL-KⅠ:1”和“2DL-KⅡ”的端子“2DL-KⅡ:1”。
模拟断路器模块2DL中“2DL-KⅠ:1”端子连接继电器“2DL-KⅠ”线圈正极。模拟断路器模块2DL中“2DL-KⅠ:2”接点带直流负电,接点连接继电器“2DL-KⅠ”动作线圈负极。构成直流回路,模拟断路器模块2DL中中间继电器“2DL-KⅠ”动作,继电器各触点通断情况翻转。“2DL-KⅠ:a1”与“2DL-KⅠ:a2”之间常开触点导通,“2DL-KⅠ:a1”所带直流正电连通至红灯“2DL-D1”,与直流负电形成回路,红灯“2DL-D1”由灭变亮;“2DL-KⅠ:a1”与“2DL-KⅠ:a3”之间常闭触点断开,“2DL-KⅠ:a3”失去直流正电,绿灯“2DL-D2”所在回路断裂,绿灯“2DL-D2”由亮变灭;“2DL-KⅠ:b1”与“2DL-KⅠ:b2”之间常开触点导通,由模拟断路器模块1DL中“1DL-GY2”端子通过模拟断路器模块2DL中“2DL-GY1”与“2DL-GY2”之间触点、实验开关“AN3”,至模拟断路器模块5DL中“5DL-GY1”之间回路通畅。
3、手动操作模拟断路器模块4DL为合位;
按模拟断路器模块4DL的合闸按钮“4DL-HC”,直流正电通过按钮“4DL-HC”至模拟断路器模块4DL中“4DL-SW:3”接点。模拟断路器模块4DL中“4DL-SW:3”接点与“4DL-SW:2”接点之间为常闭触点,直流正电通过,传输至模拟断路器模块4DL中“4DL-SW:1”接点,该接点连接继电器“4DL-SW”动作线圈正极。模拟断路器模块4DL中“4DL-SW:6”接点带直流负电,接点连接继电器“4DL-SW”动作线圈负极。构成直流回路,模拟断路器模块4DL中双位置继电器“4DL-SW”动作,继电器各触点通断情况翻转。“4DL-SW:2”与“4DL-SW:3”之间常闭触点断开;“4DL-SW:4”与“4DL-SW:5”之间常开触点导通;“4DL-SW:8”与“4DL-SW:9”之间常开触点导通。
模拟断路器模块4DL中“4DL-SW:4”与“4DL-SW:5”之间常开触点导通,直流正电通过空开“ZLKK”和“4DL-SW:4”与“4DL-SW:5”之间触点传输至模拟断路器模块4DL的中间继电器“4DL-KⅠ”的端子“4DL-KⅠ:1”和“4DL-KⅡ”的端子“4DL-KⅡ:1”。
模拟断路器模块4DL中“4DL-KⅠ:1”端子连接继电器“4DL-KⅠ”线圈正极。模拟断路器模块4DL中“4DL-KⅠ:2”接点带直流负电,接点连接继电器“4DL-KⅠ”动作线圈负极。构成直流回路,模拟断路器模块4DL中中间继电器“4DL-KⅠ”动作,继电器各触点通断情况翻转。“4DL-KⅠ:a1”与“4DL-KⅠ:a2”之间常开触点导通,“4DL-KⅠ:a1”所带直流正电连通至红灯“4DL-D1”,与直流负电形成回路,红灯“4DL-D1”由灭变亮;“4DL-KⅠ:a1”与“4DL-KⅠ:a3”之间常闭触点断开,“4DL-KⅠ:a3”失去直流正电,绿灯“4DL-D2”所在回路断裂,绿灯“4DL-D2”由亮变灭;“4DL-KⅠ:b1”与“4DL-KⅠ:b2”之间常开触点导通,由模拟断路器模块3DL中“3DL-GY2”端子通过模拟断路器模块4DL中“4DL-GY1”与“4DL-GY2”之间触点、实验开关“AN4”,至模拟断路器模块5DL中“5DL-GY2”之间回路通畅。
4、手动操作模拟断路器模块5DL为合位;
按模拟断路器模块5DL的合闸按钮“5DL-HC”,直流正电通过按钮“5DL-HC”至模拟断路器模块5DL中“5DL-SW:3”接点。模拟断路器模块5DL中“5DL-SW:3”接点与“5DL-SW:2”接点之间为常闭触点,直流正电通过,传输至模拟断路器模块5DL中“5DL-SW:1”接点,该接点连接继电器“5DL-SW”动作线圈正极。模拟断路器模块5DL中“5DL-SW:6”接点带直流负电,接点连接继电器“5DL-SW”动作线圈负极。构成直流回路,模拟断路器模块5DL中双位置继电器“5DL-SW”动作,继电器各触点通断情况翻转。“5DL-SW:2”与“5DL-SW:3”之间常闭触点断开;“5DL-SW:4”与“5DL-SW:5”之间常开触点导通;“5DL-SW:8”与“5DL-SW:9”之间常开触点导通。
模拟断路器模块5DL中“5DL-SW:4”与“5DL-SW:5”之间常开触点导通,直流正电通过空开“ZLKK”和“5DL-SW:4”与“5DL-SW:5”之间触点传输至模拟断路器模块5DL的中间继电器“5DL-KⅠ”的端子“5DL-KⅠ:1”和“5DL-KⅡ”的端子“5DL-KⅡ:1”。
模拟断路器模块5DL中“5DL-KⅠ:1”端子连接继电器“5DL-KⅠ”线圈正极。模拟断路器模块5DL中“5DL-KⅠ:2”接点带直流负电,接点连接继电器“5DL-KⅠ”动作线圈负极。构成直流回路,模拟断路器模块5DL中中间继电器“5DL-KⅠ”动作,继电器各触点通断情况翻转。“5DL-KⅠ:a1”与“5DL-KⅠ:a2”之间常开触点导通,“5DL-KⅠ:a1”所带直流正电连通至红灯“5DL-D1”,与直流负电形成回路,红灯“5DL-D1”由灭变亮;“5DL-KⅠ:a1”与“5DL-KⅠ:a3”之间常闭触点断开,“5DL-KⅠ:a3”失去直流正电,绿灯“5DL-D2”所在回路断裂,绿灯“5DL-D2”由亮变灭;“5DL-KⅠ:b1”与“5DL-KⅠ:b2”之间常开触点导通,由模拟断路器模块2DL中“2DL-GY2”端子传输的直流正电通过模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”之间触点、实验开关“AN4”,传输至模拟断路器模块4DL中“4DL-GY2”。
模拟断路器模块5DL中“5DL-KⅡ:1”端子连接继电器“5DL-KⅡ”线圈正极。模拟断路器模块5DL中“5DL-KⅡ:2”接点带直流负电,接点连接继电器“5DL-KⅡ”动作线圈负极。构成直流回路,模拟断路器模块5DL中中间继电器“5DL-KⅡ”动作,继电器各触点通断情况翻转。“5DL-KⅡ:a1”与“5DL-KⅡ:a2”之间常开触点导通,测试仪与备自投装置连接线“5DL-801Ⅰ”与“5DL-802Ⅰ”导通;“5DL-KⅡ:a1”与“5DL-KⅡ:a3”之间常闭触点断开,测试仪与备自投装置连接线“5DL-801Ⅰ”与“5DL-803Ⅰ”断开;“5DL-KⅡ:b1”与“5DL-KⅡ:b2”之间常开触点导通,测试仪与备自投装置连接线“5DL-801Ⅱ”与“5DL-802Ⅱ”导通;“5DL-KⅡ:b1”与“5DL-KⅡ:b3”之间常闭触点断开,测试仪与备自投装置连接线“5DL-801Ⅱ”与“5DL-803Ⅱ”断开。
5、模拟互感器模块动作情况:
模拟互感器模块“1PT”:直流正电通过空开“ZLKK”、实验开关“AN1”进入模拟互感器模块“1PT”的端子“1PT-YCDY”,该端子连接继电器“1PT-Ⅰ”线圈正极和继电器“1PT-Ⅱ”线圈正极。两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“1PT”中中间继电器1PT-Ⅰ”和“1PT-Ⅱ”动作,继电器各触点通断情况翻转。“1PT-Ⅰ:a1”与“1PT-Ⅰ:a2”之间常开触点导通,“1PT-Ⅰ:a1”所带直流正电连通至黄灯“1PT-D3”,与直流负电形成回路,黄灯“1PT-D3”由灭变亮;“1PT-Ⅰ:b1”与“1PT-Ⅰ:b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“1PT-Ⅱ:a1”与“1PT-Ⅱ:a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“1PT-Ⅱ:b1”与“1PT-Ⅱ:b2”之间常开触点导通,C相电压经试验线传输至备自投装置。
模拟互感器模块“2PT”:直流正电通过空开“ZLKK”、实验开关“AN2”进入模拟互感器模块“2PT”的端子“2PT-YCDY”,该端子连接继电器“2PT-Ⅰ”线圈正极和继电器“2PT-Ⅱ”线圈正极。两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“2PT”中中间继电器2PT-Ⅰ”和“2PT-Ⅱ”动作,继电器各触点通断情况翻转。“2PT-Ⅰ:a1”与“2PT-Ⅰ:a2”之间常开触点导通,“2PT-Ⅰ:a1”所带直流正电连通至黄灯“2PT-D3”,与直流负电形成回路,黄灯“2PT-D3”由灭变亮;“2PT-Ⅰ:b1”与“2PT-Ⅰ:b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“2PT-Ⅱ:a1”与“2PT-Ⅱ:a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“2PT-Ⅱ:b1”与“2PT-Ⅱ:b2”之间常开触点导通,C相电压经试验线传输至备自投装置。
模拟互感器模块“3PT”:直流正电通过空开“ZLKK”、实验开关“AN1”、模拟断路器模块1DL中“1DL-GY1”与“1DL-GY2”之间触点、模拟断路器模块2DL中“2DL-GY1”与“2DL-GY2”之间触点、实验开关“AN3”进入模拟互感器模块“3PT”的端子“3PT-YCDY”,该端子连接继电器“3PT-Ⅰ”线圈正极和继电器“3PT-Ⅱ”线圈正极。两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“3PT”中中间继电器3PT-Ⅰ”和“3PT-Ⅱ”动作,继电器各触点通断情况翻转。“3PT-Ⅰ:a1”与“3PT-Ⅰ:a2”之间常开触点导通,“3PT-Ⅰ:a1”所带直流正电连通至黄灯“3PT-D3”,与直流负电形成回路,黄灯“3PT-D3”由灭变亮;“3PT-Ⅰ:b1”与“3PT-Ⅰ:b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“3PT-Ⅱ:a1”与“3PT-Ⅱ:a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“3PT-Ⅱ:b1”与“3PT-Ⅱ:b2”之间常开触点导通,C相电压经试验线传输至备自投装置。
模拟互感器模块“4PT”:直流正电通过空开“ZLKK”、实验开关“AN1”、模拟断路器模块1DL中“1DL-GY1”与“1DL-GY2”之间触点、模拟断路器模块2DL中“2DL-GY1”与“2DL-GY2”之间触点、实验开关“AN3”、模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”之间触点进入模拟互感器模块“4PT”的端子“4PT-YCDY”,该端子连接继电器“4PT-Ⅰ”线圈正极和继电器“4PT-Ⅱ”线圈正极。两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“4PT”中中间继电器4PT-Ⅰ”和“4PT-Ⅱ”动作,继电器各触点通断情况翻转。“4PT-Ⅰ:a1”与“4PT-Ⅰ:a2”之间常开触点导通,“4PT-Ⅰ:a1”所带直流正电连通至黄灯“4PT-D3”,与直流负电形成回路,黄灯“4PT-D3”由灭变亮;“4PT-Ⅰ:b1”与“4PT-Ⅰ:b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“4PT-Ⅱ:a1”与“4PT-Ⅱ:a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“4PT-Ⅱ:b1”与“4PT-Ⅱ:b2”之间常开触点导通,C相电压经试验线传输至备自投装置。
第三步:试验状态:
将实验开关“AN3”推至断开位置。实验开关“AN3”经过模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”之间触点、实验开关“AN4”至模拟断路器模块4DL中“4DL-GY2”正电消失。
模拟互感器模块“3PT”:直流正电通道断开,模拟互感器模块“3PT”的端子“3PT-YCDY”无直流正电输入,模拟互感器模块“3PT”中中间继电器3PT-Ⅰ”和“3PT-Ⅱ”复归,继电器各触点通断情况翻转。“3PT-Ⅰ:a1”与“3PT-Ⅰ:a2”之间常开触点断开,黄灯“3PT-D3”无直流正电输入,黄灯“3PT-D3”由亮变灭;“3PT-Ⅰ:b1”与“3PT-Ⅰ:b2”之间常开触点断开,A相电压停止输出;“3PT-Ⅱ:a1”与“3PT-Ⅱ:a2”之间常开触点断开,B相电压停止输出;“3PT-Ⅱ:b1”与“3PT-Ⅱ:b2”之间常开触点断开,C相电压停止输出。
模拟互感器模块“4PT”:直流正电通道断开,模拟互感器模块“4PT”的端子“4PT-YCDY”无直流正电输入,模拟互感器模块“4PT”中中间继电器4PT-Ⅰ”和“4PT-Ⅱ”复归,继电器各触点通断情况翻转。“4PT-Ⅰ:a1”与“4PT-Ⅰ:a2”之间常开触点断开,黄灯“4PT-D3”无直流正电输入,黄灯“4PT-D3”由亮变灭;“4PT-Ⅰ:b1”与“4PT-Ⅰ:b2”之间常开触点断开,A相电压停止输出;“4PT-Ⅱ:a1”与“4PT-Ⅱ:a2”之间常开触点断开,B相电压停止输出;
第四步:备自投装置动作过程:
1、备自投装置分模拟断路器模块1DL
备自投装置通过试验线“1DL33”向测试仪开出直流正电信号,直流正电传输至模拟断路器模块1DL中“1DL-SW:9”接点。模拟断路器模块1DL中“1DL-SW:9”接点与“1DL-SW:8”接点之间为常开触点,继电器动作时闭合,直流正电通过,传输至模拟断路器模块1DL中“1DL-SW:7”接点,该接点连接继电器“1DL-SW”复归线圈正极。模拟断路器模块1DL中“1DL-SW:12”接点带直流负电,接点连接继电器“1DL-SW”复归线圈负极。构成直流回路,模拟断路器模块1DL中双位置继电器“1DL-SW”复归,继电器各触点通断情况翻转。“1DL-SW:2”与“1DL-SW:3”之间常闭触点闭合;“1DL-SW:4”与“1DL-SW:5”之间常开触点断开;“1DL-SW:8”与“1DL-SW:9”之间常开触点断开。
模拟断路器模块1DL中“1DL-SW:4”与“1DL-SW:5”之间常开触点断开,模拟断路器模块1DL的中间继电器“1DL-KⅠ”的端子“1DL-KⅠ:1”和“1DL-KⅡ”的端子“1DL-KⅡ:1”失去直流正电,继电器复归,继电器各触点通断情况翻转。“1DL-KⅠ:a1”与“1DL-KⅠ:a2”之间常开触点断开,“1DL-KⅠ:a2”失去直流正电,红灯“1DL-D1”所在回路断裂,红灯“1DL-D1”由亮变灭;“1DL-KⅠ:a1”与“1DL-KⅠ:a3”之间常闭触点闭合,所带直流正电连通至绿灯“1DL-D2”,与直流负电形成回路,绿灯“1DL-D2”由灭变亮;“1DL-KⅠ:b1”与“1DL-KⅠ:b2”之间常开触点断开。“1DL-KⅡ:a1”与“1DL-KⅡ:a2”之间常开触点断开,测试仪与备自投装置连接线“1DL-801Ⅰ”与“1DL-802Ⅰ”断开;“1DL-KⅡ:a1”与“1DL-KⅡ:a3”之间常闭触点闭合,测试仪与备自投装置连接线“1DL-801Ⅰ”与“1DL-803Ⅰ”导通;“1DL-KⅡ:b1”与“1DL-KⅡ:b2”之间常开触点断开,测试仪与备自投装置连接线“1DL-801Ⅱ”与“1DL-802Ⅱ”断开;“1DL-KⅡ:b1”与“1DL-KⅡ:b3”之间常闭触点闭合,测试仪与备自投装置连接线“1DL-801Ⅱ”与“1DL-803Ⅱ”导通。
2、备自投装置合模拟断路器模块3DL
备自投装置通过试验线“3DL3”向测试仪开出直流正电信号,直流正电传输至模拟断路器模块3DL中“3DL-SW:3”接点。模拟断路器模块3DL中“3DL-SW:3”接点与“3DL-SW:2”接点之间为常闭触点,直流正电通过,传输至模拟断路器模块3DL中“3DL-SW:1”接点,该接点连接继电器“3DL-SW”动作线圈正极。模拟断路器模块3DL中“3DL-SW:6”接点带直流负电,接点连接继电器“3DL-SW”动作线圈负极。构成直流回路,模拟断路器模块3DL中双位置继电器“3DL-SW”动作,继电器各触点通断情况翻转。“3DL-SW:2”与“3DL-SW:3”之间常闭触点断开;“3DL-SW:4”与“3DL-SW:5”之间常开触点导通;“3DL-SW:8”与“3DL-SW:9”之间常开触点导通。
模拟断路器模块3DL中“3DL-SW:4”与“3DL-SW:5”之间常开触点导通,直流正电通过空开“ZLKK”和“3DL-SW:4”与“3DL-SW:5”之间触点传输至模拟断路器模块3DL的中间继电器“3DL-KⅠ”的端子“3DL-KⅠ:1”和“3DL-KⅡ”的端子“3DL-KⅡ:1”。
模拟断路器模块3DL中“3DL-KⅠ:1”端子连接继电器“3DL-KⅠ”线圈正极。模拟断路器模块3DL中“3DL-KⅠ:2”接点带直流负电,接点连接继电器“3DL-KⅠ”动作线圈负极。构成直流回路,模拟断路器模块3DL中中间继电器“3DL-KⅠ”动作,继电器各触点通断情况翻转。“3DL-KⅠ:a1”与“3DL-KⅠ:a2”之间常开触点导通,“3DL-KⅠ:a1”所带直流正电连通至红灯“3DL-D1”,与直流负电形成回路,红灯“3DL-D1”由灭变亮;“3DL-KⅠ:a1”与“3DL-KⅠ:a3”之间常闭触点断开,“3DL-KⅠ:a3”失去直流正电,绿灯“3DL-D2”所在回路断裂,绿灯“3DL-D2”由亮变灭;“3DL-KⅠ:b1”与“3DL-KⅠ:b2”之间常开触点导通,直流正电通过空开、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点,传输至模拟断路器模块4DL中“4DL-GY1”。
模拟断路器模块3DL中“3DL-KⅡ:1”端子连接继电器“3DL-KⅡ”线圈正极。模拟断路器模块3DL中“3DL-KⅡ:2”接点带直流负电,接点连接继电器“3DL-KⅡ”动作线圈负极。构成直流回路,模拟断路器模块3DL中中间继电器“3DL-KⅡ”动作,继电器各触点通断情况翻转。“3DL-KⅡ:a1”与“3DL-KⅡ:a2”之间常开触点导通,测试仪与备自投装置连接线“3DL-801Ⅰ”与“3DL-802Ⅰ”导通;“3DL-KⅡ:a1”与“3DL-KⅡ:a3”之间常闭触点断开,测试仪与备自投装置连接线“3DL-801Ⅰ”与“3DL-803Ⅰ”断开;“3DL-KⅡ:b1”与“3DL-KⅡ:b2”之间常开触点导通,测试仪与备自投装置连接线“3DL-801Ⅱ”与“3DL-802Ⅱ”导通;“3DL-KⅡ:b1”与“3DL-KⅡ:b3”之间常闭触点断开,测试仪与备自投装置连接线“3DL-801Ⅱ”与“3DL-803Ⅱ”断开。
3、模拟互感器模块动作情况
模拟互感器模块“3PT”:直流正电通过空开“ZLKK”、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点、模拟断路器模块4DL中“4DL-GY1”与“4DL-GY2”之间触点、实验开关“AN4”、模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”之间触点进入模拟互感器模块“3PT”的端子“3PT-YCDY”,该端子连接继电器“3PT-Ⅰ”线圈正极和继电器“3PT-Ⅱ”线圈正极。两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“3PT”中中间继电器3PT-Ⅰ”和“3PT-Ⅱ”动作,继电器各触点通断情况翻转。“3PT-Ⅰ:a1”与“3PT-Ⅰ:a2”之间常开触点导通,“3PT-Ⅰ:a1”所带直流正电连通至黄灯“3PT-D3”,与直流负电形成回路,黄灯“3PT-D3”由灭变亮;“3PT-Ⅰ:b1”与“3PT-Ⅰ:b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“3PT-Ⅱ:a1”与“3PT-Ⅱ:a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“3PT-Ⅱ:b1”与“3PT-Ⅱ:b2”之间常开触点导通,C相电压经试验线传输至备自投装置。
模拟互感器模块“4PT”:直流正电通过空开“ZLKK”、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点、模拟断路器模块4DL中“4DL-GY1”与“4DL-GY2”之间触点、实验开关“AN4”进入模拟互感器模块“4PT”的端子“4PT-YCDY”,该端子连接继电器“4PT-Ⅰ”线圈正极和继电器“4PT-Ⅱ”线圈正极。两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“4PT”中中间继电器4PT-Ⅰ”和“4PT-Ⅱ”动作,继电器各触点通断情况翻转。“4PT-Ⅰ:a1”与“4PT-Ⅰ:a2”之间常开触点导通,“4PT-Ⅰ:a1”所带直流正电连通至黄灯“4PT-D3”,与直流负电形成回路,黄灯“4PT-D3”由灭变亮;“4PT-Ⅰ:b1”与“4PT-Ⅰ:b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“4PT-Ⅱ:a1”与“4PT-Ⅱ:a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“4PT-Ⅱ:b1”与“4PT-Ⅱ:b2”之间常开触点导通,C相电压经试验线传输至备自投装置。
第五步:逻辑功能符合要求,被试装置可以加入运行。
测试仪各模拟模块动作逻辑要求,逻辑功能正确。
Claims (1)
1.一种校验输电线路互投方式的备自投逻辑测试方法,其特征在于:其步骤如下:
第一步:测试仪试验线接入:
将测试仪附带的试验线缆的航空插头一侧分别插入测试仪的断路器模拟单元1DL、3DL 、5DL的输入“操作” 插孔内,另一侧将模拟断路器模块1DL、3DL 、5DL的“DL1”、“DL3”、“DL33”分别接至备自投装置1#主变高压侧断路器操作端子的“公共端”、“合端”、“分端”; 附带的试验线缆的航空插头一侧分别插入断路器模拟单元1DL、3DL 、5DL的输出“信号”插孔内,另一侧将模拟断路器模块1DL、3DL 、5DL的“801Ⅰ端”、“802Ⅰ端”、“803Ⅰ端”分别接至备自投装置1#主变高压侧断路器信号端子的“公共端”、“合信号端”、“分信号端”;使测试仪的模拟断路器模块1DL对应1#主变高压侧断路器,模拟断路器模块3DL对应2#主变高压侧断路器,模拟断路器模块5DL对应高压侧线路母联断路器;
第二步:实验初始状态:
将测试仪的模拟断路器模块1DL、3DL 、5DL的电源切换开关拨至“装置电源”档位,试验中使用测试仪提供的直流电源,并将测试仪上的直流空开“ZLKK”和交流空开“JLKK”推至导通位置;将实验开关“AN1”、“AN2”、“AN3”、“AN4”推至导通位置;实验需要将模拟断路器模块1DL、模拟断路器模块2DL、模拟断路器模块4DL、模拟断路器模块5DL调整至合闸位置;
1)、设定手动操作模拟断路器模块1DL为合的状态:
按模拟断路器模块1DL的合闸按钮HC,直流正电通过合闸按钮HC、模拟断路器模块1DL中的继电器1DL-SW常闭触点3-2端传输至连接继电器“1DL-SW”动作线圈正极的1端接点;继电器1DL-SW中的6端接点连接继电器“1DL-SW”动作线圈负极构成直流回路;继电器“1DL-SW”动作,继电器各开关触点通断翻转:继电器1DL-SW中的常闭触点3-2端断开;4-5端的常开触点导通;8-9端的常开触点导通;
直流正电通过空开“ZLKK”和继电器“1DL-SW中导通的4-5端触点传输至模拟断路器模块1DL的继电器“1DL-KⅠ”的端子1和继电器“1DL-KⅡ”线圈正极的端子1;继电器“1DL-KⅠ”和继电器“1DL-KⅡ”动作线圈负极带直流负电,通电继电器“1DL-KⅠ”和继电器“1DL-KⅡ”翻转:
继电器 1DL-KⅠ的a1-a2端的常开触点导通,继电器1DL-KⅠ的a1端所带直流正电连通至红灯D1,红灯D1由灭变亮;同时,绿灯D2由亮变灭;继电器1DL-KⅠ的b1-b2端的常开触点导通;b1端通过接线端子“1DL-GY1”连接实验开关“AN1”,b2端接线端子连接“1DL-GY2”;直流正电通过空开、实验开关“AN1”、模拟断路器模块1DL中的导通接线端子“1DL-GY1”与“1DL-GY2”传输至模拟断路器模块2DL中的接线端子“2DL-GY1”;
继电器1DL-KⅡ动作,继电器1DL-KⅡ的端子a1-a2的常开触点导通,端子a1与端子a2分别连接备自投装置接线端子1DL-801Ⅰ和1DL-802Ⅰ,备自投装置连接线“1DL-801Ⅰ”与“1DL-802Ⅰ”导通;
同时,继电器1DL-KⅡ的端子a1- a3之间的常闭触点断开,端子a3连接的备自投装置接线端子1DL-803Ⅰ与1DL-801Ⅰ断开;
同时,继电器1DL-KⅡ的端子b1-b2之间的常开触点导通,备自投装置连接线“1DL-801Ⅱ”与“1DL-802Ⅱ”导通;
同时,继电器1DL-KⅡ的端子b1-b3之间的常闭触点断开,备自投装置连接线“1DL-801Ⅱ”与“1DL-803Ⅱ”断开;
2)、设定手动操作模拟断路器模块2DL为合的状态:
按模拟断路器模块2DL的合闸按钮HC,直流正电通过合闸按钮HC、模拟断路器模块2DL中的继电器2DL-SW常闭触点3-2端传输至连接继电器2DL-SW动作线圈正极的1端接点;继电器2DL-SW中的6端接点连接继电器1DL-SW动作线圈负极构成直流回路;继电器2DL-SW动作,继电器各开关触点通断翻转:继电器2DL-SW中的常闭触点3-2端断开;4-5端的常开触点导通;8-9端的常开触点导通;
直流正电通过空开“ZLKK”、模拟断路器模块2DL中继电器2DL-SW导通的4-5端触点传输至模拟断路器模块2DL的继电器2DL-KⅠ的端子1和继电器2DL-KⅡ的线圈正极端子1;继电器2DL-KⅠ和继电器2DL-KⅡ动作线圈负极端子2带直流负电,通电继电器2DL-KⅠ和继电器2DL-KⅡ翻转:
继电器 2DL-KⅠ的a1-a2端的常开触点导通,继电器2DL-KⅠ的a1端所带直流正电连通至红灯D1,红灯D1由灭变亮;同时,绿灯D2由亮变灭;同时,继电器2DL-KⅠ的b1-b2端的常开触点导通;b1端通过接线端子2DL-GY1连接模拟断路器模块1DL中“1DL-GY2”,b2端通过接线端子2DL-GY2、实验开关“AN3” 传输至模拟断路器模块5DL中接线端子5DL-GY1;模拟断路器模块1DL中继电器“1DL-GY2”端子传输的直流正电通过模拟断路器模块2DL中的导通接线端子“2DL-GY1”与“2DL-GY2”、实验开关“AN3”传输至模拟断路器模块5DL中“5DL-GY1”;
3)、设定手动操作模拟断路器模块4DL为合的状态:
按模拟断路器模块4DL的合闸按钮HC,直流正电通过合闸按钮HC、模拟断路器模块4DL中的继电器4DL-SW常闭触点3-2端传输至连接继电器4DL-SW动作线圈正极的1端接点;继电器4DL-SW中的6端接点连接继电器4DL-SW动作线圈负极构成直流回路;继电器4DL-SW动作,继电器各开关触点通断翻转:继电器4DL-SW中的常闭触点3-2端断开;4-5端的常开触点导通;8-9端的常开触点导通;
直流正电通过空开“ZLKK”、模拟断路器模块4DL中继电器4DL-SW的4-5端导通触点传输至模拟断路器模块4DL的继电器4DL-KⅠ和继电器4DL-KⅡ的线圈正极端子1;继电器4DL-KⅠ和继电器4DL-KⅡ动作线圈负极端子2带直流负电,通电继电器4DL-KⅠ和继电器4DL-KⅡ翻转:
继电器 4DL-KⅠ的a1-a2端的常开触点导通,继电器4DL-KⅠ的a1端所带直流正电连通至红灯D1,红灯D1由灭变亮;同时,绿灯D2由亮变灭;继电器4DL-KⅠ的b1-b2端的常开触点导通;b1端通过接线端子4DL-GY1连接模拟断路器模块3DL中“3DL-GY2”,b2端通过接线端子4DL-GY2、实验开关“AN4” 传输至模拟断路器模块5DL中接线端子5DL-GY2;模拟断路器模块3DL中继电器“3DL-GY2”端子传输的直流正电通过模拟断路器模块4DL中的导通接线端子“4DL-GY1”与“4DL-GY2”、实验开关“AN4”传输至模拟断路器模块5DL中“5DL-GY2;
4)、设定手动操作模拟断路器模块5DL为合的状态:
按模拟断路器模块5DL的合闸按钮HC,直流正电通过合闸按钮HC、模拟断路器模块5DL中的继电器5DL-SW常闭触点3-2端传输至继电器5DL-SW动作线圈正极的1端接点;继电器5DL-SW中的6端接点连接继电器5DL-SW动作线圈负极构成直流回路;继电器5DL-SW动作,继电器各开关触点通断翻转:继电器5DL-SW中的常闭触点3-2端断开;4-5端的常开触点导通;8-9端的常开触点导通;
直流正电通过空开“ZLKK”、模拟断路器模块5DL中继电器5DL-SW导通的4-5端触点传输至模拟断路器模块5DL的继电器5DL-KⅠ的端子1和继电器5DL-KⅡ的端子1;继电器5DL-KⅠ和继电器5DL-KⅡ动作线圈负极端子2带直流负电,通电继电器5DL-KⅠ和继电器5DL-KⅡ翻转:
继电器 5DL-KⅠ的a1-a2端的常开触点导通,继电器5DL-KⅠ的a1端所带直流正电连通至红灯D1,红灯D1由灭变亮;同时,绿灯D2由亮变灭;继电器5DL-KⅠ的b1-b2端的常开触点导通;b1端通过接线端子5DL-GY1连接实验开关“AN3”,b2端通过接线端子5DL-GY2、实验开关“AN4” 传输至模拟断路器模块4DL中接线端子4DL-GY2;由模拟断路器模块2DL中“2DL-GY2”端子传输的直流正电通过实验开关“AN3”、模拟断路器模块5DL中的导通接线端子“5DL-GY1”与“5DL-GY2”、实验开关“AN4”传输至模拟断路器模块4DL中“4DL-GY2”;
继电器5DL-KⅡ动作,继电器5DL-KⅡ的端子a1-a2的常开触点导通,端子a1与端子a2分别连接备自投装置接线端子5DL-801Ⅰ和5DL-802Ⅰ,测试仪与备自投装置的连接线5DL-801Ⅰ与5DL-802Ⅰ导通;
同时,继电器5DL-KⅡ的端子a1- a3之间的常闭触点断开,端子a3连接的备自投装置接线端子5DL-803Ⅰ与5DL-801Ⅰ断开;
同时,继电器5DL-KⅡ的端子b1-b2之间的常开触点导通,备自投装置连接线“5DL-801Ⅱ”与“5DL-802Ⅱ”导通;
同时,继电器5DL-KⅡ的端子b1-b3之间的常闭触点断开,备自投装置连接线“5DL-801Ⅱ”与“5DL-803Ⅱ”断开;
5)、模拟互感器模块动作情况
(1)、模拟互感器模块“1PT”:直流正电通过空开“ZLKK”、实验开关“AN1”进入模拟互感器模块“1PT”的继电器“1PT-Ⅰ”线圈正极和继电器“1PT-Ⅱ”线圈正极端子1;构成直流回路,模拟互感器模块“1PT”的中间继电器1PT-Ⅰ”和“1PT-Ⅱ”动作,继电器各触点通断情况翻转;继电器1PT-Ⅰ的a1-a2之间常开触点导通,黄灯“1PT-D3”由灭变亮;“1PT-Ⅰ的b1-b2之间常开触点导通,A相电压经试验线传输至备自投装置;“1PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“1PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
(2)、模拟互感器模块“2PT”:直流正电通过空开“ZLKK”、实验开关“AN2”进入模拟互感器模块“2PT”的继电器“2PT-Ⅰ和继电器“2PT-Ⅱ”线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“2PT”的中间继电器2PT-Ⅰ”和“2PT-Ⅱ”动作,继电器各触点通断情况翻转;“2PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“2PT-D3”由灭变亮;“2PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“2PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“2PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
(3)、模拟互感器模块“3PT”:直流正电通过空开“ZLKK”、实验开关“AN1”、模拟断路器模块1DL中“1DL-GY1”与“1DL-GY2”导通触点、模拟断路器模块2DL中“2DL-GY1”与“2DL-GY2” 导通触点、实验开关“AN3”进入模拟互感器模块“3PT”继电器“3PT-Ⅰ”线圈正极和继电器“3PT-Ⅱ”线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“3PT”的中间继电器3PT-Ⅰ”和“3PT-Ⅱ”动作,继电器各触点通断情况翻转;继电器“3PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“3PT-D3”由灭变亮;继电器“3PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“3PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“3PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
(4)、模拟互感器模块“4PT”:直流正电通过空开“ZLKK”、实验开关“AN1”、模拟断路器模块1DL中“1DL-GY1”与“1DL-GY2”导通触点、模拟断路器模块2DL中“2DL-GY1”与“2DL-GY2”导通触点、实验开关“AN3”、模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”导通触点进入模拟互感器模块“4PT”的继电器“4PT-Ⅰ”线圈正极和继电器“4PT-Ⅱ”线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“4PT”的中间继电器4PT-Ⅰ”和“4PT-Ⅱ”动作,继电器各触点通断情况翻转;“4PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“4PT-D3”由灭变亮;“4PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“4PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“4PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
第三步:试验状态:
1)、将实验开关“AN3”推至断开位置,由实验开关“AN3”经过模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”之间触点、实验开关“AN4”至模拟断路器模块4DL中“4DL-GY2”正电消失;
2)、模拟互感器模块“3PT”动作:直流正电通道断开,模拟互感器模块“3PT”无直流正电输入,模拟互感器模块“3PT”的中间继电器3PT-Ⅰ”和“3PT-Ⅱ”复归,继电器各触点通断情况翻转;黄灯“3PT-D3”由亮变灭;
“3PT-Ⅰ的b1-b2”之间常开触点断开,A相电压停止输出;
“3PT-Ⅱ的a1-a2”之间常开触点断开,B相电压停止输出;
“3PT-Ⅱ的b1-b2”之间常开触点断开,C相电压停止输出;
3、模拟互感器模块“4PT”动作:直流正电通道断开,模拟互感器模块“4PT”无直流正电输入,模拟互感器模块“4PT”的中间继电器4PT-Ⅰ”和“4PT-Ⅱ”复归,继电器各触点通断情况翻转;黄灯“4PT-D3”由亮变灭;
“4PT-Ⅰ的b1-b2”之间常开触点断开,A相电压停止输出;
“4PT-Ⅱ的a1-a2”之间常开触点断开,B相电压停止输出;
第四步:备自投装置动作过程:
1)、检测备自投装置分模拟断路器模块1DL;
备自投装置通过试验线“1DL33”向测试仪发出直流正电信号,直流正电传输至模拟断路器模块1DL中继电器“1DL-SW端9”接点,通过动作闭合的继电器“1DL-SW的9-8常开触点传输至连接继电器“1DL-SW”复归线圈正极7接点,复归线圈负极12”接点带直流负电,构成直流回路,模拟断路器模块1DL中双位置继电器“1DL-SW”复归,继电器各触点通断情况翻转;模拟断路器模块1DL中继电器“1DL-SW” 失去直流正电,复位;继电器“1DL-KⅠ”和“1DL-KⅡ”复位;继电器各触点通断情况翻转;红灯“1DL-D1”由亮变灭;绿灯“1DL-D2”由灭变亮;测试仪与备自投装置的连接线“1DL-801Ⅰ”与“1DL-802Ⅰ”断开;测试仪与备自投装置的连接线“1DL-801Ⅰ”与“1DL-803Ⅰ”导通;备自投装置连接线“1DL-801Ⅱ”与“1DL-802Ⅱ”断开;备自投装置连接线“1DL-801Ⅱ”与“1DL-803Ⅱ”导通;
2)、检测备自投装置合模拟断路器模块3DL;
备自投装置通过试验线“3DL3”向测试仪发出直流正电信号,直流正电通过模拟断路器模块3DL中继电器“3DL-SW的3-2”常闭触点传输至连接继电器“3DL-SW”动作线圈正极1接点,连接继电器“3DL-SW”动作线圈负极的6接点带直流负电,构成直流回路;模拟断路器模块3DL中双位置继电器“3DL-SW”动作,继电器各触点通断情况翻转;“3DL-SW的2-3”之间常闭触点断开;“3DL-SW的4-5”之间常开触点导通;“3DL-SW的8-9”之间常开触点导通;
直流正电通过空开“ZLKK”、“3DL-SW的4-5”导通触点传输至模拟断路器模块3DL的中间继电器“3DL-KⅠ”和“3DL-KⅡ”的线圈正极端子1,构成直流回路;同时,继电器3DL-KⅠ动作,继电器“3DL-KⅠ的a1-a2”之间常开触点导通,红灯“3DL-D1”由灭变亮;继电器“3DL-KⅠ的a1-a3”之间常闭触点断开,绿灯“3DL-D2”由亮变灭;“3DL-KⅠ的b1-b2”之间常开触点导通,直流正电通过空开、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点,传输至模拟断路器模块4DL中“4DL-GY1”;
同时,继电器3DL-KⅡ动作,继电器“3DL-KⅡ的a1-a2”之间常开触点导通,测试仪与备自投装置的连接线“3DL-801Ⅰ”与“3DL-802Ⅰ”导通;“3DL-KⅡ的a1-a3”之间常闭触点断开,备自投装置连接线“3DL-801Ⅰ”与“3DL-803Ⅰ”断开;“3DL-KⅡ的b1-b2”之间常开触点导通,备自投装置连接线“3DL-801Ⅱ”与“3DL-802Ⅱ”导通;“3DL-KⅡ的b1-b3”之间常闭触点断开,备自投装置连接线“3DL-801Ⅱ”与“3DL-803Ⅱ”断开;
3)、模拟互感器模块的工作动作状态;
(1)、模拟互感器模块“3PT”:直流正电通过空开“ZLKK”、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点、模拟断路器模块4DL中“4DL-GY1”与“4DL-GY2”之间触点、实验开关“AN4”、模拟断路器模块5DL中“5DL-GY1”与“5DL-GY2”之间触点进入模拟互感器模块“3PT”的端子“3PT-YCDY”,该端子连接继电器“3PT-Ⅰ”线圈正极和继电器“3PT-Ⅱ”线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路,模拟互感器模块“3PT”的中间继电器3PT-Ⅰ”和“3PT-Ⅱ”动作,继电器各触点通断情况翻转:“3PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“3PT-D3”由灭变亮;“3PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“3PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“3PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
(2)、模拟互感器模块“4PT”:直流正电通过空开“ZLKK”、实验开关“AN2”、模拟断路器模块3DL中“3DL-GY1”与“3DL-GY2”之间触点、模拟断路器模块4DL中“4DL-GY1”与“4DL-GY2”之间触点、实验开关“AN4”进入模拟互感器模块“4PT”继电器“4PT-Ⅰ和 4PT-Ⅱ的线圈正极;两继电器线圈负极长时带有直流负电,构成直流回路;模拟互感器模块“4PT”的中间继电器4PT-Ⅰ”和“4PT-Ⅱ”动作,继电器各触点通断情况翻转;“4PT-Ⅰ的a1-a2”之间常开触点导通,黄灯“4PT-D3”由灭变亮;“4PT-Ⅰ的b1-b2”之间常开触点导通,A相电压经试验线传输至备自投装置;“4PT-Ⅱ的a1-a2”之间常开触点导通,B相电压经试验线传输至备自投装置;“4PT-Ⅱ的b1-b2”之间常开触点导通,C相电压经试验线传输至备自投装置;
第五步:检测的备自投逻辑功能正确符合要求,被试备自投装置可以加入运行。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105590219A CN102087527B (zh) | 2010-11-25 | 2010-11-25 | 一种校验输电线路互投方式的备自投逻辑测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105590219A CN102087527B (zh) | 2010-11-25 | 2010-11-25 | 一种校验输电线路互投方式的备自投逻辑测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102087527A true CN102087527A (zh) | 2011-06-08 |
CN102087527B CN102087527B (zh) | 2012-11-14 |
Family
ID=44099366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105590219A Expired - Fee Related CN102087527B (zh) | 2010-11-25 | 2010-11-25 | 一种校验输电线路互投方式的备自投逻辑测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102087527B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107942228A (zh) * | 2017-11-20 | 2018-04-20 | 国网山东省电力公司泗水县供电公司 | 基于模拟断路器的备自投装置实验仪器和实验方法 |
CN110794247A (zh) * | 2019-08-08 | 2020-02-14 | 天生桥二级水力发电有限公司天生桥水力发电总厂 | 自动装置检验平台 |
CN112510642A (zh) * | 2020-12-23 | 2021-03-16 | 广东电网有限责任公司佛山供电局 | 配网自动化终端继电保护基础逻辑功能快速测试的方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2266144Y (zh) * | 1996-04-27 | 1997-10-29 | 张永祥 | 一种便携式断路器分合闸时间测定装置 |
CN2473730Y (zh) * | 2001-04-29 | 2002-01-23 | 马涛 | 仿真开关 |
EP1309059A2 (en) * | 2001-10-30 | 2003-05-07 | The Boeing Company | Automatic voltage source selector for circuit breakers utilizing electronics |
CN101430359A (zh) * | 2008-12-12 | 2009-05-13 | 宁夏电力公司吴忠供电局 | 备用电源自动投入设备试验开关模拟装置 |
CN201392370Y (zh) * | 2009-03-13 | 2010-01-27 | 江苏省电力公司常州供电公司 | 保护测试仪的模拟断路器 |
-
2010
- 2010-11-25 CN CN2010105590219A patent/CN102087527B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2266144Y (zh) * | 1996-04-27 | 1997-10-29 | 张永祥 | 一种便携式断路器分合闸时间测定装置 |
CN2473730Y (zh) * | 2001-04-29 | 2002-01-23 | 马涛 | 仿真开关 |
EP1309059A2 (en) * | 2001-10-30 | 2003-05-07 | The Boeing Company | Automatic voltage source selector for circuit breakers utilizing electronics |
CN101430359A (zh) * | 2008-12-12 | 2009-05-13 | 宁夏电力公司吴忠供电局 | 备用电源自动投入设备试验开关模拟装置 |
CN201392370Y (zh) * | 2009-03-13 | 2010-01-27 | 江苏省电力公司常州供电公司 | 保护测试仪的模拟断路器 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107942228A (zh) * | 2017-11-20 | 2018-04-20 | 国网山东省电力公司泗水县供电公司 | 基于模拟断路器的备自投装置实验仪器和实验方法 |
CN110794247A (zh) * | 2019-08-08 | 2020-02-14 | 天生桥二级水力发电有限公司天生桥水力发电总厂 | 自动装置检验平台 |
CN110794247B (zh) * | 2019-08-08 | 2024-06-25 | 天生桥二级水力发电有限公司天生桥水力发电总厂 | 自动装置检验平台 |
CN112510642A (zh) * | 2020-12-23 | 2021-03-16 | 广东电网有限责任公司佛山供电局 | 配网自动化终端继电保护基础逻辑功能快速测试的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102087527B (zh) | 2012-11-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102072997B (zh) | 一种校验主变互投方式的备自投逻辑测试方法 | |
CN102023271B (zh) | 一种校验高压侧母联开关自投方式的备自投逻辑测试方法 | |
CN102033181B (zh) | 便携式备自投校验仪 | |
CN204065268U (zh) | 一种用于实验室的备自投装置检测模块 | |
CN101109787B (zh) | 断路器欠压脱扣器智能检测装置 | |
CN105334417A (zh) | 一种便携式备自投校验装置 | |
CN102087527B (zh) | 一种校验输电线路互投方式的备自投逻辑测试方法 | |
CN110333410B (zh) | 一种备自投测试装置 | |
CN201392392Y (zh) | 备自投装置的试验测试仪 | |
CN110031756B (zh) | 一种直流接触器性能测试转换电路及寿命试验的方法 | |
CN102364350A (zh) | 备自投切换整组试验方法及其装置 | |
CN202548291U (zh) | 柱上真空自动配电开关机械特性测试专用控制器 | |
CN104360183A (zh) | 一种智能变电站仿真二次回路的异常检测方法 | |
CN102095951B (zh) | 一种校验低压侧分段开关自投方式的备自投逻辑测试方法 | |
CN201251605Y (zh) | 备自投装置校验仪 | |
CN202918048U (zh) | 一种双电源自动转换开关 | |
CN201392370Y (zh) | 保护测试仪的模拟断路器 | |
CN105529698A (zh) | 一种带自检功能的智能电气柜 | |
CN203927005U (zh) | 电动阀门控制电路以及包括该电路的电动阀门操作工具 | |
CN203337814U (zh) | 电能表接线装置 | |
CN203352275U (zh) | 备用电源自动投入装置传动试验仪 | |
CN201600421U (zh) | 开关保护器的测试装置以及开关保护器 | |
CN205941814U (zh) | 一种隔离开关短路接通试验辅助装置 | |
CN211348448U (zh) | 一种总降压变电所电流回路检测装置 | |
CN204256082U (zh) | 一种高压断路器模拟器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121114 Termination date: 20161125 |
|
CF01 | Termination of patent right due to non-payment of annual fee |