CN102071958A - Inverse Y-shaped ventilation method for coal mining working face - Google Patents

Inverse Y-shaped ventilation method for coal mining working face Download PDF

Info

Publication number
CN102071958A
CN102071958A CN 201110028792 CN201110028792A CN102071958A CN 102071958 A CN102071958 A CN 102071958A CN 201110028792 CN201110028792 CN 201110028792 CN 201110028792 A CN201110028792 A CN 201110028792A CN 102071958 A CN102071958 A CN 102071958A
Authority
CN
China
Prior art keywords
roadway
lane
return air
coal mining
working face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110028792
Other languages
Chinese (zh)
Other versions
CN102071958B (en
Inventor
张农
袁亮
韩昌良
李桂臣
刘冠学
阚甲广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Huainan Mining Group Co Ltd
Original Assignee
China University of Mining and Technology CUMT
Huainan Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT, Huainan Mining Group Co Ltd filed Critical China University of Mining and Technology CUMT
Priority to CN201110028792XA priority Critical patent/CN102071958B/en
Publication of CN102071958A publication Critical patent/CN102071958A/en
Application granted granted Critical
Publication of CN102071958B publication Critical patent/CN102071958B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The invention relates to an inverse Y-shaped ventilation method for a coal mining working face. In the method, a transportation roadway is arranged on one side of the coal mining working face; a railway roadway and a return air roadway are sequentially arranged on the other side of the coal mining working face; coal pillars are positioned between the railway roadway and the return air roadway; contact roadways are formed at certain intervals; sealed partition walls are arranged among the contact roadways; before the working face is actually mined, the contact roadways near the working face are communicated so as to form a return air contact roadway; a beside-roadway wall body is built along the border of a gob, which is close to the back of the working face; a sealing wall is constructed at the position which is 1 to 2m away from the back of the return air contact roadway so as to seal a gob-side entry and the return air roadway; when the working face is actually mined, air flow passes through the railway roadway and the transportation roadway to enter the coal mining work face and returns to the return air roadway through the gob-side entry and the return air contact roadway; and the stroke of the air flow forms an inverse Y shape. The ventilation method is characterized by simple structure and stable air flow, solves the problem of gas accumulation at the upper corner of an actual mining working face and the problem that the god-side entry is difficult to maintain, and has obvious social and economic benefits.

Description

The anti-Y type of coal-face method of ventilation
Technical field
The present invention relates to the coal mine work area aeration technology, the anti-Y type of especially a kind of coal-face method of ventilation.
Background technology
The ventilation system of coal-face is the important composition unit of mine ventilation system, its safety in production and economic benefit that directly has influence on full mine whether reasonable in design.Especially gaseous mine, the selection of rational ventilation mode can obviously reduce the gas density of work plane, and can effectively control the gas density of return aircourse, and the safe and efficient production of safeguard work face is had great importance.In fact, be subjected to the influence of mine pressure, roadway workface is arranged and the selection of draft type is not to follow one's bent, the domestic U type ventilation system that generally adopts, this draft type is simple in structure, unstable airflow, the roadway maintenance engineering quantity is little, inleakage is low, but its maximum shortcoming is a face upper corner angle occurs gas exceeding limit easily, and therefore 80% face gas explosion accident takes place according to statistics.
China's mine of western adopts work plane three lanes to arrange " U+L " type draft type mostly, work plane one side is arranged two tunnels, be provided with connection roadway between the tunnel, this draft type can solve upper corner methane accumulation problem to a certain extent, but return enters the return aircourse through the goaf, do not isolate between false lane of return air and the goaf, directly be communicated with, belonging to the goaf ventilates, the serious regulation of violating " safety regulations in coal mine " 116 " air intake of getting working face and return air must not through goaf or roof fall district ", gas density in the connection roadway of tunnel is uncontrollable simultaneously, still is easy to generate gas exceeding limit.
The mode of gob side entry retaining is taked in the working face extraction tunnel, return enters the return aircourse through gob side entry retaining, forms Y type ventilation system, makes main flow direction of leaking out of work plane and goaf stay the lane, fundamentally solve a upper corner methane accumulation difficult problem, significantly reduced the face gas accident that transfinites.The disadvantage of this mode is that to protect the lane difficulty along sky bigger, the stope of large-scale advanced mine advances length often to reach km even reaches two over thousands of rice, stope drift active workings are longer service time, under the influence of the long-term aggravating activities of top board, implement gob side entry retaining and objectively have a bigger difficult problem, for example can not effectively solve the large deformation of gob side entry retaining country rock problem, stay the lane later stage to need bigger tunnel to expand brush reinstatement works amount etc.
Summary of the invention
In order to solve the problem that exists in the coal-face ventilation system, the present invention proposes the anti-Y type of coal-face method of ventilation.
For achieving the above object, the present invention adopts following technical scheme: the anti-Y type of this coal-face method of ventilation, and it has designed a kind of tunnel of realizing that anti-Y type ventilates, and comprises gob side entry retaining, transportation lane, track lane, return airway, connection roadway and return air connection roadway; Side at coal-face is provided with a transportation lane; The opposite side of coal-face is disposed in order track lane and the return airway that is parallel to each other; Track lane and transportation lane be the double as intake simultaneously; Be coal column between track lane and the return airway, and open a connection roadway, track lane and return airway are communicated with every a segment distance; Have the partition wall of sealing in the middle of the connection roadway, prevent to leak out; Before the working face extraction, near the connection roadway the work plane is got through, formed the return air connection roadway; During working face extraction,, construct the other body of wall in lane along the edge, goaf, make the track lane that is in the work plane rear become gob side entry retaining immediately following the rear of work plane; At return air connection roadway rear 1~2m construction fire dam that gob side entry retaining and return airway is airtight; During working face extraction, distinguished and admirable process track lane and transportation lane enter coal-face, flow in the return airway again by gob side entry retaining, return air connection roadway, distinguished and admirable stroke forms anti-Y type, when work plane is pushed into next connection roadway, this connection roadway is opened return air, and at its rear construction envelope wall, the rest may be inferred, finishes until working face extraction.
The spacing of connection roadway presses rule to determine according to the interim ore deposit of gob side entry retaining, is 1/4~1/2 of coal-face (4) width.
Track lane and return airway spacing are 20~40m.
The length maximum of gob side entry retaining is no more than the spacing of connection roadway.
The width of the other body of wall in lane is 0.8~1.2 times of mining height, and height is identical with mining height.
The invention has the beneficial effects as follows: the anti-Y type of this coal-face method of ventilation has fundamentally solved the difficult problem of stope upper corner methane accumulation.By the anti-Y type draft type of gob-side entry retaining method realization work plane, simple in structure, unstable airflow has realized that the gas density of return aircourse is controlled, can effectively control return airway gas exceeding limit phenomenon; Solved the problem of the maintenance difficulty of gob side entry retaining, because staying the lane to remain at the ore deposit pressure manifests the unconspicuous stage, avoided staying lane surrouding rock deformation peak region fully, can significantly reduce the maintenance difficulties and the support cost that stay the lane, innovated original work plane gob-side entry retaining Y-type ventilation technology, generally adopting the work plane of one side three lanes " U+L " type ventilation system and deep-well or soft rock condition to stay difficulty big work plane in lane to adopt the Y type to ventilate to administer coal-bed gas for China western part provides new way, new method, has remarkable social benefit and economic benefit.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples.
Accompanying drawing 1 is the example structure schematic diagram of the anti-Y type of this coal-face method of ventilation.
Among the figure, the 1. other body of wall in lane, 2. gob side entry retaining, 3. goaf, 4. coal-face, 5. transportation lane, 6. track lane, 7. return airway, 8. connection roadway, 9. coal column, 10. pressure bulkhead, 11. return air connection roadways, 12. fire dams.
The specific embodiment
In accompanying drawing 1, the anti-Y type of this coal-face method of ventilation, it has designed a kind of tunnel of realizing that anti-Y type ventilates, and comprises gob side entry retaining 2, transportation lane 5, track lane 6, return airway 7, connection roadway 8 and return air connection roadway 11; Side at coal-face 4 is provided with a transportation lane 5; The opposite side of coal-face 4 is disposed in order track lane 6 and the return airway 7 that is parallel to each other; Track lane 6 and transportation lane 5 be the double as intake simultaneously; Be coal column 9 between track lane 6 and the return airway 7, and open a connection roadway 8, track lane 6 and return airway 7 are communicated with every a segment distance; Have pressure bulkhead 10 in the middle of the connection roadway 8, prevent to leak out; Before the working face extraction, near the connection roadway 8 the coal-face 4 is got through, formed return air connection roadway 11; Immediately following the rear of coal-face 4, the other body of wall 1 in lane is constructed at 3 edges along the goaf, makes the track lane 6 that is in the work plane rear become gob side entry retaining 2; At return air connection roadway 11 rears 1~2m construction fire dam 12 that gob side entry retaining 2 and return airway 7 is airtight; During working face extraction, distinguished and admirable process track lane 6 and transportation lane 5 enter coal-face 4, flow into again in the return airway 7 by gob side entry retaining 2, return air connection roadway 11, distinguished and admirable stroke forms anti-Y type, when work plane is pushed into next connection roadway 8, this connection roadway 8 is opened formation return air connection roadway 11 return air, and at its rear construction fire dam 12, the rest may be inferred, finishes until working face extraction.
The interval S of connection roadway 8 presses rule to determine according to the interim ore deposit of gob side entry retaining 2, is 1/4~1/2 of coal-face 4 width, i.e. S=(1/4~1/2) L.
Track lane 6 is 20~40m with the spacing B of return airway 7.
The length maximum of gob side entry retaining 2 is no more than the interval S of connection roadway 8.
The width of the other body of wall 1 in lane is 0.8~1.2 times of mining height, and height is identical with mining height.The step that realizes the anti-Y type of this coal-face method of ventilation is as follows:
When (1) preparing this section coal-face 4, in coal seam, coal-face 4 both sides, arrange three tunnels, wherein the return side arrangement pitch is a track lane 6 and return airway 7 of 20~40m, and arrange a connection roadway 8 every certain distance, connection roadway 8 connects track lane 6 and return airway 7, opposite side is arranged transportation lane 5, track lane 6 and transportation lane 5 double as intakes;
(2) before the working face extraction, keep return air connection roadway 11 unimpeded, remaining connection roadway 8 usefulness pressure bulkheads 10 sealing, prevent to leak out, distinguished and admirablely enter coal-face 4 by track lane 6 and transportation lane 5, flow in the return airways 7 through return air connection roadway 11, distinguished and admirable flow process forms instead " Y " type.
When (3) work plane normally advances back production, immediately following the work plane rear along the goaf 3 edge, the employing building block is piled up or the other body of wall 1 in lane is constructed in the ointment material filling, make the track lane 6 at work plane rear become gob side entry retaining 2, with goaf 3 seal isolation, prevent that the goaf from leaking out, can effectively avoid in the return aircourse problem of gas exceeding limit easily.
(4) along with the propelling of work plane, the length of gob side entry retaining 2 constantly increases, but its maximum length is no more than the spacing of connection roadway 8, when the advance of the face during to next connection roadway 8, the enclosing wall 10 of new connection roadway 8 is opened, and the connection roadway 8 after opening promptly becomes new return air connection roadway 11, and is at 1~2m place, rear of new return air connection roadway 11 construction fire dam 12 that gob side entry retaining 2 is airtight simultaneously, and, prevent to leak out to the rear, tunnel at the correspondence position of return airway 7 fire dam 12 of also constructing.
(5) along with coal-face 4 is constantly pushed ahead, continuous repeating step (4), finish until working face extraction, work plane dirty distinguished and admirable through gob side entry retaining 2, return air connection roadway 11, enter return airway 7 then, because the length of gob side entry retaining 2 is little, the ore deposit pressure manifests acutely, surrouding rock deformation is little, does not need to expand brush again.

Claims (5)

1.一种采煤工作面反Y型通风方法,它设计了一种可实现反Y型通风的巷道,包括沿空留巷(2)、运输巷(5)、轨道巷(6)、回风巷(7)、联络巷(8)和回风联络巷(11);其特征是:在采煤工作面(4)的一侧设有一条运输巷(5);采煤工作面(4)的另一侧顺序布置有相互平行的轨道巷(6)和回风巷(7);轨道巷(6)和运输巷(5)同时兼作进风巷道;轨道巷(6)与回风巷(7)之间为煤柱(9),且每隔一段距离开通一条联络巷(8),将轨道巷(6)和回风巷(7)连通;联络巷(8)中间建有密封隔墙(10),防止漏风;工作面回采前,将采煤工作面(4)附近的联络巷(8)打通,形成回风联络巷(11);紧跟采煤工作面(4)的后方,沿采空区(3)边缘构筑巷旁墙体(1),使处于工作面后方的轨道巷(6)成为沿空留巷(2);在回风联络巷(11)后方1~2m施工密闭墙(12)将沿空留巷(2)及回风巷(7)密闭;工作面回采时,风流经过轨道巷(6)和运输巷(5)进入采煤工作面(4),通过沿空留巷(2)、回风联络巷(11)再流入回风巷(7)中,风流的行程形成反Y型,当工作面推至下一联络巷(8)时,将该联络巷(8)打开形成回风联络巷(11)回风,并在其后方施工密闭墙(12),依此类推,直至工作面回采完毕。1. A reverse Y-type ventilation method for a coal mining face, which designs a roadway that can realize reverse Y-type ventilation, including gob-side retaining roadway (2), transport roadway (5), track roadway (6), return roadway Wind lane (7), connection lane (8) and return air connection lane (11); it is characterized in that: a transport lane (5) is provided on one side of the coal mining face (4); the coal mining face (4) ) on the other side of the track lane (6) and air return lane (7) parallel to each other; (7) are coal pillars (9), and a connecting lane (8) is opened at intervals to connect the track lane (6) and the return air lane (7); a sealed partition is built in the middle of the connecting lane (8). wall (10) to prevent air leakage; before the working face is recovered, the connection roadway (8) near the coal mining face (4) is opened to form a return air connection roadway (11); closely following the rear of the coal mining face (4) , build the roadside wall (1) along the edge of the goaf (3), so that the track roadway (6) behind the working face becomes a gobside roadway (2); 1-2m behind the return air connection roadway (11) The construction airtight wall (12) seals the gob-side entry (2) and the air return entry (7); when the working face is mined, the wind flows into the coal mining face (4) through the track entry (6) and the transport entry (5), Through the gob-side retaining alley (2), the return air connection alley (11) and then flows into the return air alley (7), the stroke of the wind flow forms a reverse Y shape. When the working face is pushed to the next connection alley (8), the The connection roadway (8) is opened to form the air return connection roadway (11) return air, and the airtight wall (12) is constructed behind it, and so on, until the mining of the working face is completed. 2.根据权利要求1所述一种采煤工作面反Y型通风方法,其特征是:联络巷(8)的间距为采煤工作面(4)宽度的1/4~1/2。2. A reverse Y-shaped ventilation method for a coal mining face according to claim 1, characterized in that: the distance between the connecting lanes (8) is 1/4 to 1/2 of the width of the coal mining face (4). 3.根据权利要求1所述一种采煤工作面反Y型通风方法,其特征是:轨道巷(6)与回风巷(7)的间距为20~40m。3. A reverse Y-shaped ventilation method for coal mining face according to claim 1, characterized in that: the distance between the track lane (6) and the return air lane (7) is 20-40m. 4.根据权利要求1所述一种采煤工作面反Y型通风方法,其特征是:沿空留巷(2)的长度最大不超过联络巷(8)的间距。4. A reverse Y-shaped ventilation method for a coal mining face according to claim 1, characterized in that: the length of the gob-side retaining entry (2) does not exceed the distance between the contact entry entry (8). 5.根据权利要求1所述一种采煤工作面反Y型通风方法,其特征是:巷旁墙体(1)的宽度为采高的0.8~1.2倍,高度与采高相同。5. A reverse Y-shaped ventilation method for a coal mining face according to claim 1, characterized in that: the width of the roadside wall (1) is 0.8 to 1.2 times the mining height, and the height is the same as the mining height.
CN201110028792XA 2011-01-21 2011-01-21 Inverse Y-shaped ventilation method for coal mining working face Expired - Fee Related CN102071958B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110028792XA CN102071958B (en) 2011-01-21 2011-01-21 Inverse Y-shaped ventilation method for coal mining working face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110028792XA CN102071958B (en) 2011-01-21 2011-01-21 Inverse Y-shaped ventilation method for coal mining working face

Publications (2)

Publication Number Publication Date
CN102071958A true CN102071958A (en) 2011-05-25
CN102071958B CN102071958B (en) 2012-07-25

Family

ID=44030694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110028792XA Expired - Fee Related CN102071958B (en) 2011-01-21 2011-01-21 Inverse Y-shaped ventilation method for coal mining working face

Country Status (1)

Country Link
CN (1) CN102071958B (en)

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287212A (en) * 2011-09-09 2011-12-21 贾民 Y-shaped ventilation method
CN102392642A (en) * 2011-11-02 2012-03-28 王晓利 Method for arranging roadways on coal-pillar-free stope
CN102410040A (en) * 2011-12-06 2012-04-11 中国神华能源股份有限公司 Gas control method for return air corner of coal mining working face
CN102425431A (en) * 2011-11-14 2012-04-25 新汶矿业集团有限责任公司 Extremely-close coal seam mining roadway arrangement method
CN102797494A (en) * 2012-08-22 2012-11-28 山西晋城无烟煤矿业集团有限责任公司 Method for discharging gas through air on fully mechanized coal face
CN103362514A (en) * 2013-08-08 2013-10-23 六盘水师范学院 Speedy tunneling method for gas drainage roadway
CN103628911A (en) * 2013-12-06 2014-03-12 中国矿业大学 Fully-mechanized coal mining/ caving working face sectional type gob-side entry retaining method
CN105178962A (en) * 2015-06-24 2015-12-23 何满潮 Longwall mining method 110
WO2016206618A1 (en) * 2015-06-24 2016-12-29 何满潮 Longwall mine construction method n00
CN106884674A (en) * 2017-03-09 2017-06-23 山东黄金矿业(莱州)有限公司焦家金矿 False lane construction systems and construction method
CN107620605A (en) * 2017-08-10 2018-01-23 长春黄金研究院 A kind of underground mine goaf large area air-leakage control method
CN108005655A (en) * 2017-11-29 2018-05-08 中国矿业大学 A kind of projecting coal bed double lane arrangements of high methane are without pillar mining method
CN109098714A (en) * 2018-09-19 2018-12-28 三门峡龙王庄煤业有限责任公司 A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN110469329A (en) * 2018-05-10 2019-11-19 华亭煤业集团有限责任公司 The recovery method in mine back production latter stage
CN110905507A (en) * 2019-12-06 2020-03-24 河南力行科创矿山技术开发有限公司 Advanced roof cutting pressure relief gob-side entry retaining process for high-gas large-mining-height high-efficiency mining working face
CN111594251A (en) * 2020-05-22 2020-08-28 淮南矿业(集团)有限责任公司顾桥煤矿 Ventilation method for roadway layout system of deep well working surface
CN111594250A (en) * 2020-05-22 2020-08-28 淮南矿业(集团)有限责任公司顾桥煤矿 Ventilation method of roadway arrangement system for solving multiple disasters of deep well working face
US11008860B2 (en) 2015-06-24 2021-05-18 Manchao He Equipment system for no-roadway no-coal-pillar retained roadway mining method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4770086A (en) * 1987-08-20 1988-09-13 Gabster Jeffrey C Portable ventilation safety device
AU2355599A (en) * 1998-04-03 1999-10-14 Michael Mapp Mining system for excavating and ventilating tunnels
CN101476475A (en) * 2008-11-24 2009-07-08 杜志刚 Ventilation method for chief wind road on fire
CN201301723Y (en) * 2008-11-26 2009-09-02 山西焦煤集团有限责任公司 Fully-mechanized mining working plane ventilating structure
CN101644163A (en) * 2009-08-24 2010-02-10 吴江市宏达通风制冷设备厂 Air return device for coal mine
CN101718208A (en) * 2009-12-17 2010-06-02 山西晋城无烟煤矿业集团有限责任公司 Ventilating system arranged in U+H shape under coal mine
CN201568069U (en) * 2009-12-20 2010-09-01 山西晋城无烟煤矿业集团有限责任公司 Three-in three-return centralized roadway of large-area panel under coal mine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4770086A (en) * 1987-08-20 1988-09-13 Gabster Jeffrey C Portable ventilation safety device
AU2355599A (en) * 1998-04-03 1999-10-14 Michael Mapp Mining system for excavating and ventilating tunnels
CN101476475A (en) * 2008-11-24 2009-07-08 杜志刚 Ventilation method for chief wind road on fire
CN201301723Y (en) * 2008-11-26 2009-09-02 山西焦煤集团有限责任公司 Fully-mechanized mining working plane ventilating structure
CN101644163A (en) * 2009-08-24 2010-02-10 吴江市宏达通风制冷设备厂 Air return device for coal mine
CN101718208A (en) * 2009-12-17 2010-06-02 山西晋城无烟煤矿业集团有限责任公司 Ventilating system arranged in U+H shape under coal mine
CN201568069U (en) * 2009-12-20 2010-09-01 山西晋城无烟煤矿业集团有限责任公司 Three-in three-return centralized roadway of large-area panel under coal mine

Cited By (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287212B (en) * 2011-09-09 2014-03-26 兖州煤业股份有限公司 Y-shaped ventilation method
CN102287212A (en) * 2011-09-09 2011-12-21 贾民 Y-shaped ventilation method
CN102392642A (en) * 2011-11-02 2012-03-28 王晓利 Method for arranging roadways on coal-pillar-free stope
CN102425431A (en) * 2011-11-14 2012-04-25 新汶矿业集团有限责任公司 Extremely-close coal seam mining roadway arrangement method
CN102425431B (en) * 2011-11-14 2014-01-15 新汶矿业集团有限责任公司 Ultra-close coal layer mining roadway distributing method
CN102410040A (en) * 2011-12-06 2012-04-11 中国神华能源股份有限公司 Gas control method for return air corner of coal mining working face
CN102797494A (en) * 2012-08-22 2012-11-28 山西晋城无烟煤矿业集团有限责任公司 Method for discharging gas through air on fully mechanized coal face
CN103362514A (en) * 2013-08-08 2013-10-23 六盘水师范学院 Speedy tunneling method for gas drainage roadway
CN103362514B (en) * 2013-08-08 2015-06-03 六盘水师范学院 Speedy tunneling method for gas drainage roadway
CN103628911B (en) * 2013-12-06 2016-04-20 中国矿业大学 Work plane segmented gob-side entry retaining method is adopted/put to a kind of combining
CN103628911A (en) * 2013-12-06 2014-03-12 中国矿业大学 Fully-mechanized coal mining/ caving working face sectional type gob-side entry retaining method
WO2016206618A1 (en) * 2015-06-24 2016-12-29 何满潮 Longwall mine construction method n00
US10494924B2 (en) 2015-06-24 2019-12-03 Manchao He Longwall mine construction method N00
CN105178962A (en) * 2015-06-24 2015-12-23 何满潮 Longwall mining method 110
US11008860B2 (en) 2015-06-24 2021-05-18 Manchao He Equipment system for no-roadway no-coal-pillar retained roadway mining method
EA035591B1 (en) * 2015-06-24 2020-07-13 Маньчао Хэ Longwall mine construction method
CN106884674A (en) * 2017-03-09 2017-06-23 山东黄金矿业(莱州)有限公司焦家金矿 False lane construction systems and construction method
CN106884674B (en) * 2017-03-09 2019-10-11 山东黄金矿业(莱州)有限公司焦家金矿 False lane construction systems and construction method
CN107620605A (en) * 2017-08-10 2018-01-23 长春黄金研究院 A kind of underground mine goaf large area air-leakage control method
CN108005655A (en) * 2017-11-29 2018-05-08 中国矿业大学 A kind of projecting coal bed double lane arrangements of high methane are without pillar mining method
CN110469329A (en) * 2018-05-10 2019-11-19 华亭煤业集团有限责任公司 The recovery method in mine back production latter stage
CN109098714A (en) * 2018-09-19 2018-12-28 三门峡龙王庄煤业有限责任公司 A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN110905507A (en) * 2019-12-06 2020-03-24 河南力行科创矿山技术开发有限公司 Advanced roof cutting pressure relief gob-side entry retaining process for high-gas large-mining-height high-efficiency mining working face
CN111594251A (en) * 2020-05-22 2020-08-28 淮南矿业(集团)有限责任公司顾桥煤矿 Ventilation method for roadway layout system of deep well working surface
CN111594250A (en) * 2020-05-22 2020-08-28 淮南矿业(集团)有限责任公司顾桥煤矿 Ventilation method of roadway arrangement system for solving multiple disasters of deep well working face

Also Published As

Publication number Publication date
CN102071958B (en) 2012-07-25

Similar Documents

Publication Publication Date Title
CN102071958A (en) Inverse Y-shaped ventilation method for coal mining working face
CN102493838B (en) A fully mechanized coal mining method with continuous filling in steeply inclined coal seams
CN201723246U (en) Ventilating structure for pumping and exhausting gas at coal face
WO2018045632A1 (en) Method for recycling room coal pillars by solid backfilling in coordination with artificial pillars
CN101749018B (en) Coal mining method with direct coal pillar recovery
CN104632219B (en) The high gob-side entry retaining method of thick seam large mining
CN108005655A (en) A kind of projecting coal bed double lane arrangements of high methane are without pillar mining method
CN103899350B (en) Fully mechanized coal face frame carries top coal gas drainage system
CN104179520A (en) Z-shaped ventilation method and system for gob-side entry of coalface
CN105298496B (en) Complete adopt of reserved working face coal column is set to fill coal-mining method entirely
CN102720518B (en) A U+U-shaped ventilation system for fully mechanized top-coal caving face
CN101498225A (en) U+I type ventilating system for top-coal caving face
CN103953345B (en) A kind of small section entry retaining along gob side exploitation method
CN104790953B (en) Corner coal shortwall even adopts roadway layout and stays equipment, method with coal column
CN103821515A (en) Double-unit face filling and mining technology
CN102146797B (en) Short-section temporary gob-side entry retaining method
CN110792469A (en) A method for synergistic control of gas and coal spontaneous combustion in ultra-long mining face of inclined coal seam
CN204152537U (en) Retaining Roadways Along Goaf at Coal Face Z-type ventilation system
CN105545309A (en) Method for filling bilateral parts beside pillar with repeatedly-mined left-over coal pillars in residual mining area
CN102748064A (en) Large-mining-height fully-mechanized caving face gas control method
CN104196554A (en) U-U-type ventilation method and system for coalfaces
CN101892860A (en) Method of building walls and retaining lanes next to steel cylinder pillar lanes
CN103174424B (en) Breast and pillar method under long-wall arrangement
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN103603673A (en) Stope face parallel dual-U-type roadway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Nong

Inventor after: Yuan Liang

Inventor after: Han Changliang

Inventor after: Li Guichen

Inventor after: Liu Guanxue

Inventor after: Han Jiaguang

Inventor after: Zheng Xigui

Inventor before: Zhang Nong

Inventor before: Yuan Liang

Inventor before: Han Changliang

Inventor before: Li Guichen

Inventor before: Liu Guanxue

Inventor before: Han Jiaguang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG NONG YUAN LIANG HAN CHANGLIANG LI GUICHEN LIU GUANXUE KAN JIAGUANG TO: ZHANG NONG YUAN LIANG HAN CHANGLIANG LI GUICHEN LIU GUANXUE KAN JIAGUANG ZHENG XIGUI

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120725

Termination date: 20170121

CF01 Termination of patent right due to non-payment of annual fee