CN102035260B - Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system - Google Patents

Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system Download PDF

Info

Publication number
CN102035260B
CN102035260B CN2010105930206A CN201010593020A CN102035260B CN 102035260 B CN102035260 B CN 102035260B CN 2010105930206 A CN2010105930206 A CN 2010105930206A CN 201010593020 A CN201010593020 A CN 201010593020A CN 102035260 B CN102035260 B CN 102035260B
Authority
CN
China
Prior art keywords
fault
intelligent
reasoning
control system
supervisory control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2010105930206A
Other languages
Chinese (zh)
Other versions
CN102035260A (en
Inventor
张春晓
朱松林
许祖锋
王磊
张劲
黄晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nari Technology Co Ltd
Zhejiang Electric Power Co
Original Assignee
Nari Technology Co Ltd
Zhejiang Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nari Technology Co Ltd, Zhejiang Electric Power Co filed Critical Nari Technology Co Ltd
Priority to CN2010105930206A priority Critical patent/CN102035260B/en
Publication of CN102035260A publication Critical patent/CN102035260A/en
Application granted granted Critical
Publication of CN102035260B publication Critical patent/CN102035260B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/16Electric power substations

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明是一种应用于智能变电站监控系统的智能告警及故障分析实现方法,属变电站自动化技术领域,智能告警及故障分析模块负责分析测控装置、保护装置、故障录波装置送上来的各种信息,结合拓扑技术和自动识别故障推理模型中的每种故障,生成故障分析报告并上送到主站端的调度主站。大大减轻值班人员的工作负担,提高故障处理效率。可以满足智能变电站对智能告警和故障分析系统的要求,做到迅速判定和分析故障,并给出处理方案,协助值班人员迅速处理故障,减少故障带来的损失。

The invention is an intelligent alarm and fault analysis implementation method applied to an intelligent substation monitoring system, which belongs to the technical field of substation automation. The intelligent alarm and fault analysis module is responsible for analyzing various information sent by measurement and control devices, protection devices, and fault recording devices. , combined with topology technology and automatic identification of each type of fault in the fault reasoning model, a fault analysis report is generated and sent to the dispatching master station at the master station side. Greatly reduce the workload of the staff on duty and improve the efficiency of troubleshooting. It can meet the requirements of intelligent substations for intelligent alarm and fault analysis system, quickly determine and analyze faults, and provide a treatment plan to assist the on-duty personnel to quickly deal with faults and reduce losses caused by faults.

Description

智能变电站监控系统智能告警及故障分析实现方法Implementation method of intelligent alarm and fault analysis of intelligent substation monitoring system

技术领域 technical field

 本发明属变电站自动化技术领域,尤其涉及变电站自动化系统智能告警及故障分析实现方法。 The invention belongs to the technical field of substation automation, and in particular relates to a method for realizing intelligent alarm and fault analysis of a substation automation system.

背景技术 Background technique

目前,国家电网公司正在大力推进智能电网的建设,各种先进的传感测量技术、通讯技术、计算机信息技术和控制技术与物理电网高度集成,由此带来的未来电网运行控制更加严格,变电站运行作业的技术难度不断加大,运行作业的效率需要进一步提高。在目前的变电站运行作业中,传统的手工作业仍然占有很大的比重,而随着数字化变电站的推广,变电站的信号量越来越多,但运行经验表明,在变电站事故及严重异常过程中输出的大量信息中,大部分都是起辅助、佐证作用的信息或冗余信息,发生故障的时候,各种信号动作频繁,值班员监控任务较重,很容易遗漏重要告警信号,延误处理造成事故。因此,非常有必要总结变电站常见的故障类型及其故障判据,在发生故障时由计算机软件自动推理出该故障,使运行人员得以迅速获得故障分析结果:包括故障设备、跳闸开关、保护动作信息、故障相别、故障电流、故障测距、故障性质、处理措施等,这对于提高事故处理的速度、效率、质量具有重要意义。 At present, the State Grid Corporation of China is vigorously promoting the construction of smart grids. Various advanced sensing and measurement technologies, communication technologies, computer information technologies, and control technologies are highly integrated with the physical grid. The technical difficulty of running jobs continues to increase, and the efficiency of running jobs needs to be further improved. In the current operation of substations, traditional manual work still occupies a large proportion. With the promotion of digital substations, there are more and more signals in substations. However, operating experience shows that during substation accidents and serious abnormalities, the output Most of the large amounts of information are auxiliary and supporting information or redundant information. When a fault occurs, various signal actions are frequent, and the duty officer has a heavy monitoring task, so it is easy to miss important alarm signals, delaying processing and causing accidents. . Therefore, it is very necessary to summarize the common fault types and fault criteria of substations. When a fault occurs, the computer software can automatically deduce the fault, so that the operator can quickly obtain the fault analysis results: including fault equipment, trip switches, protection action information , fault phase difference, fault current, fault distance, fault nature, handling measures, etc., which are of great significance for improving the speed, efficiency, and quality of accident handling.

发明内容 Contents of the invention

本发明的目的是提供一种变电站自动化系统智能告警及故障分析实现方法,可作为智能变电站监控系统的一项高级应用模块,做到迅速判定和分析故障,给出故障分析报告并上送调度系统,给值班人员提供处理方案,协助其迅速处理故障,减少故障带来的损失。 The purpose of the present invention is to provide a method for implementing intelligent alarm and fault analysis of the substation automation system, which can be used as an advanced application module of the intelligent substation monitoring system to quickly determine and analyze faults, give a fault analysis report and send it to the dispatching system , to provide a solution to the on-duty personnel, assist them to quickly deal with the fault, and reduce the loss caused by the fault.

本发明采用以下技术方案: The present invention adopts following technical scheme:

智能变电站监控系统智能告警及故障分析实现方法,其特征在于包括以下步骤: The method for realizing intelligent alarm and failure analysis of an intelligent substation monitoring system is characterized in that it includes the following steps:

本方法以软件模块的方式嵌入到智能变电站监控系统中,从智能变电站一体化信息平台获取需要的告警信息、遥测值、设备状态、保护信息、故障录波文件等信息,可以有效保证及时获得各种故障判据。 This method is embedded in the smart substation monitoring system in the form of a software module, and the required information such as alarm information, telemetry value, equipment status, protection information, and fault recording files are obtained from the integrated information platform of the smart substation, which can effectively ensure timely access to various A fault criterion.

(1)变电站每种故障类型对应一个或多个故障启动信号,当推理机软件收到启动信号后,启动相应的故障类型推理逻辑; (1) Each fault type in the substation corresponds to one or more fault start signals. When the inference engine software receives the start signal, it starts the corresponding fault type reasoning logic;

(2)对变电站设备进行拓扑连接分析,根据设备的带电情况,获取当前启动信号所属设备的运行状态,比如母线上在当前有哪些开关正在运行、与线路相连接的开关、主变各侧的开关等; (2) Analyze the topological connection of substation equipment, and obtain the operating status of the equipment to which the current start signal belongs according to the electrification of the equipment, such as which switches are currently running on the busbar, the switches connected to the line, and the switches on each side of the main transformer switch, etc.;

(3)对启动信号发生时间前后一段时间内的遥信、遥测、保护信息、开关的位置状态等进行分析处理,参照步骤(2)中获得的相关联设备,检查是否满足推理逻辑; (3) Analyze and process the remote signaling, telemetry, protection information, switch position status, etc. within a period of time before and after the start signal occurs, and check whether the reasoning logic is satisfied by referring to the associated equipment obtained in step (2);

(4)如满足步骤(3)中的故障类型推理逻辑,等待录波装置送上来的录波HDR文件,从中获得故障相别、故障电流、故障测距等信息; (4) If the reasoning logic of the fault type in step (3) is met, wait for the wave recording HDR file sent by the wave recording device, and obtain information such as fault phase difference, fault current, and fault distance;

(5)从知识库中取该故障类型对应的故障处理预案,结合步骤(4)的信息生成故障分析报告并保存到历史库; (5) Take the fault handling plan corresponding to the fault type from the knowledge base, combine the information in step (4) to generate a fault analysis report and save it to the history database;

(6)将故障报告通过远动系统以IEC104扩展报文格式传送至调度,同时将故障分析报告存本地历史库供用户调阅及打印。 (6) The fault report is sent to the dispatcher in the IEC104 extended message format through the telecontrol system, and the fault analysis report is stored in the local history library for users to read and print.

对于变电站的常见故障,运行人员掌握每种故障的产生原因、处理方法是十分重要的,但是同时也是烦杂的,经常需要去查阅预案。鉴于现在变电站的设计越来越标准化,相同电压等级的变电站的网络结构和设备情况都大同小异,本方法总结了一个设计推理机软件的故障推理模型,它涵盖了变电站常见的故障类型及其判据,支持的故障类型有:线路单相瞬时故障、线路单相永久故障、线路相间及三相故障、线路接受远跳信号跳闸、线路手合于故障、线路重合闸时间内转化故障、线路重合闸时间外转化故障、线路单相故障故障相失灵、线路相间故障开关故障相失灵、单相永久故障开关非故障相失灵、母线故障、母线故障故障相失灵、母线故障非故障相失灵、主变故障、主变故障开关故障相失灵、主变内部故障重瓦斯动作、电容器故障、电抗器故障、站用变故障、直流消失故障等。因此推理机软件会自动识别这些故障并在简报窗故障推理页面报告故障推理结果。该方法总结了变电站的常见故障类型的发生条件,可自动推理并报告变电站的常见故障,不需要用户输入复杂的逻辑,具有维护简单,通用性强的特点。 For common faults in substations, it is very important for operators to master the causes and treatment methods of each fault, but it is also complicated and often needs to consult the plan. In view of the fact that the design of substations is becoming more and more standardized, and the network structure and equipment conditions of substations with the same voltage level are similar, this method summarizes a fault reasoning model for designing reasoning machine software, which covers common fault types and their criteria in substations , supported fault types are: line single-phase transient fault, line single-phase permanent fault, line phase-to-phase and three-phase fault, line receiving long jump signal tripping, line manual closing fault, line reclosing time conversion fault, line reclosing time External conversion fault, line single-phase fault fault phase failure, line phase-to-phase fault switch fault phase failure, single-phase permanent fault switch non-fault phase failure, bus fault, bus fault fault phase failure, bus fault non-fault phase failure, main transformer fault, Main transformer fault switch fault phase failure, main transformer internal fault heavy gas action, capacitor fault, reactor fault, station transformer fault, DC disappearance fault, etc. Therefore, the reasoning machine software will automatically identify these faults and report the fault reasoning results on the fault reasoning page of the briefing window. The method summarizes the occurrence conditions of common fault types in substations, can automatically reason and report common faults in substations, does not require users to input complex logic, and has the characteristics of simple maintenance and strong versatility.

为区分用作故障判据的不同遥信,本方法在智能变电站监控系统数据库中的遥信定义表内设置了一个遥信类型域将遥信分为不同的类型,该类型用于识别参与逻辑推理的遥信,主要有线路保护跳A、线路保护跳B、线路保护跳C、线路保护动作、母差动作、失灵动作、重合闸、主变主保护动作、主变后备保护动作、主变本体重瓦斯、开关保护动作、电容器保护动作、电抗器保护动作、站用变保护动作、三相不一致、保护远跳动作、就地判别装置动作、直流消失、开关位置、开关A相位置、开关B相位置、开关C相位置等。推理机软件根据这些遥信类型从发生故障后收到的众多遥信中找出有用的信号参与故障判断。 In order to distinguish different remote signaling used as fault criteria, this method sets a remote signaling type field in the remote signaling definition table in the intelligent substation monitoring system database to divide remote signaling into different types, which are used to identify the participating logic Reasonable remote signaling mainly includes line protection trip A, line protection trip B, line protection trip C, line protection action, bus differential action, failure action, reclosing, main transformer main protection action, main transformer backup protection action, main transformer Main body weight gas, switch protection action, capacitor protection action, reactor protection action, station substation protection action, three-phase inconsistency, protection long jump action, local discrimination device action, DC loss, switch position, switch A phase position, switch B phase position, switch C phase position, etc. The inference engine software finds useful signals from many remote signals received after a fault occurs to participate in fault judgment according to these types of remote signals.

要精确判断一个故障,需要在智能变电站监控系统收到的信号缓冲区中截取一个时间片的信号作为推理依据,只对该时间片内收到的信息及设备状态进行推理判断,这个时间片称为“故障时间窗”。“故障时间窗”要跨收到的某故障类型启动信号前后各一段时间。“故障时间窗”太短容易漏过推理条件,造成漏判,但太长又容易造成误判。该时间窗可由用户根据变电站实际情况进行灵活设定,一般可以整定为5~15秒,并可以根据现场时间运行情况灵活调整。 To accurately judge a fault, it is necessary to intercept the signal of a time slice in the signal buffer received by the smart substation monitoring system as the reasoning basis, and only reason and judge the information and equipment status received in the time slice. This time slice is called is the "failure time window". The "failure time window" should span a period of time before and after receiving a certain type of fault start signal. If the "failure time window" is too short, it is easy to miss the reasoning conditions, resulting in missed judgment, but if it is too long, it is easy to cause misjudgment. The time window can be flexibly set by the user according to the actual situation of the substation, generally it can be set to 5-15 seconds, and can be flexibly adjusted according to the on-site time operation situation.

制定了简洁而实用的知识库结构,包括故障名称、故障等级、故障图解、所属调度、故障原因、处理措施等。 A concise and practical knowledge base structure has been formulated, including fault name, fault level, fault diagram, affiliated scheduling, fault cause, and treatment measures.

在遥信定义表中设置知识库域,该知识库域用于索引知识库表中的记录,用户可在告警窗上根据告警信息调出智能告警窗口显示该知识库的内容。 The knowledge base domain is set in the remote signaling definition table, and the knowledge base domain is used to index the records in the knowledge base table, and the user can call out the intelligent alarm window to display the content of the knowledge base according to the alarm information on the alarm window.

拓扑分析充分考虑到了现有变电站各种接线方式以及运行方式,当运行状态发生改变时,故障判断逻辑也相应调整,比如,判断母线故障时,只将当前运行的线路加入判断逻辑,停电的线路则不参与逻辑判断。 Topology analysis fully takes into account the various wiring modes and operating modes of existing substations. When the operating status changes, the fault judgment logic is also adjusted accordingly. Logical judgments are not involved.

仅当收到某一故障类型的启动信号后才开始该故障类型的推理判断,如满足条件,推理结果会显示在告警窗的一个单独的推理结果页面,并有醒目提示及语音报警,以便用户迅速处理故障。 The reasoning and judgment of a certain fault type will start only after receiving the start signal of a certain fault type. If the conditions are met, the reasoning result will be displayed on a separate reasoning result page in the warning window, and there will be eye-catching prompts and voice alarms, so that users Troubleshoot quickly.

生成故障报告时结合了故障录波的信息,可显示故障发生时的故障电流、故障相别、故障测距等信息。 When the fault report is generated, the information of the fault wave recording is combined, and the fault current, fault phase difference, fault distance measurement and other information can be displayed when the fault occurs.

故障分析报告通过远动系统传送到主站端,以便调度人员第一时间取得变电站故障的详细情况,取代传统的电话汇报。 The fault analysis report is transmitted to the main station through the telecontrol system, so that the dispatcher can obtain the detailed situation of the substation fault at the first time, replacing the traditional telephone report.

本发明所达到的有益效果:对于调度端来说,以往发生故障后,需要变电站运行人员从告警窗众多信息中梳理出有用的信息,再结合保护信息、故障录波文件综合分析才能整理出故障分析报告,然后向调度汇报,既费时又费力,本分明可以在故障发生后自动生成故障分析报告并传送到调度,大大减轻值班人员的工作负担,提高故障处理效率。对于无人值守变电站来说,这种功能更是非常必要。 The beneficial effects achieved by the present invention: for the dispatching end, after a fault occurred in the past, it is necessary for the operator of the substation to sort out the useful information from the numerous information in the alarm window, and then combine the protection information and the comprehensive analysis of the fault recording file to sort out the fault It is time-consuming and labor-intensive to analyze the report and then report to the dispatcher. Benming can automatically generate a fault analysis report and send it to the dispatcher after a fault occurs, greatly reducing the workload of the on-duty personnel and improving the efficiency of fault handling. For unattended substations, this function is very necessary.

附图说明 Description of drawings

图1为本发明网络结构图; Fig. 1 is a network structure diagram of the present invention;

图2为500kV典型接线图; Figure 2 is a typical wiring diagram of 500kV;

图3为本发明程序流程图。 Fig. 3 is a flow chart of the program of the present invention.

具体实施方式 Detailed ways

下面结合附图对本发明作进一步描述。以下实施例仅用于更加清楚地说明本发明的技术方案,而不能以此来限制本发明的保护范围。 The present invention will be further described below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.

如图1所示为本发明网络结构图。变电站端包含智能变电站监控系统、测控装置、保护装置、故障录波装置等部分,智能告警及故障分析模块作为智能变电站监控系统的一个高级应用模块,负责分析测控装置、保护装置、故障录波装置等送上来的各种信息,结合拓扑技术和自动识别故障推理模型中的每种故障,生成故障分析报告并上送到主站端的调度主站。 As shown in FIG. 1, it is a network structure diagram of the present invention. The substation end includes intelligent substation monitoring system, measurement and control device, protection device, fault recording device and other parts. As an advanced application module of the intelligent substation monitoring system, the intelligent alarm and fault analysis module is responsible for analyzing the measurement and control device, protection device, and fault recording device. All kinds of information sent up, combined with topology technology and automatic identification of each type of fault in the fault reasoning model, generate a fault analysis report and send it to the dispatching master station at the master station side.

如图2所示以500kV典型接线图为例,结合图3本发明的程序实现流程图,以故障“500kV线路一A相瞬时故障,重合成功”为例说明本发明的推理分析过程。 As shown in Figure 2, take the 500kV typical wiring diagram as an example, in conjunction with the program realization flow chart of the present invention in Figure 3, take the fault "500kV line-A phase transient fault, successful reclosing" as an example to illustrate the reasoning and analysis process of the present invention.

推理机会不停对所收到信号的类型做检查,当检测到有类型为“线路保护跳A”的信号时,会立即启动一个定时器,等待故障时间窗结束,确保该故障应该收到的信号全部收到,随即启动“线路A相瞬时故障,重合成功”的故障类型推理模块。线路一般会配两套线路保护,任何一套保护的线路保护跳A信号都会启动该故障类型推理模块。该故障类型推理模块会进行拓扑分析,根据启动信号所属的线路得到与其有连接关系的断路器,根据接线方式及运行状态不同有可能是一个或两个断路器,对应于本例应该得到断路器5011及断路器5012,然后推理机在对应于该故障时间窗的信号缓冲区中根据信号所属设备及遥信类型来判断断路器5011及断路器5012是否按时间顺序发生了A相分闸及A相合闸,是否有断路器5011及断路器5012的重合闸信号,满足以上条件则在告警窗的故障推理页面报告“500kV某线路A相瞬时故障,重合成功”。接着推理机等待故障录波文件的上传,当收到该线路保护的故障录波HDR文件后,会从中取出该故障的故障电流、故障相别、故障测距等信息,再从知识库中找到对应于该故障的知识库记录,生成该故障的故障分析报告,存在历史库中,等值班员调阅或打印,并且会将此故障分析报告通过运动系统上送调度。 The inference machine keeps checking the type of the received signal. When a signal of the type "line protection trip A" is detected, a timer will be started immediately to wait for the end of the fault time window to ensure that the fault should be received. After all the signals are received, the fault type inference module of "line A phase transient fault, successful reclosing" is started immediately. The line is generally equipped with two sets of line protection, and the A signal of the line protection of any set of protection will start the fault type reasoning module. The fault type inference module will perform topology analysis, and obtain the circuit breaker connected to it according to the line to which the start signal belongs. Depending on the wiring mode and operating status, there may be one or two circuit breakers. Corresponding to this example, the circuit breaker should be obtained 5011 and circuit breaker 5012, and then the inference engine judges whether the circuit breaker 5011 and circuit breaker 5012 have A phase opening and A Phase closing, whether there are reclosing signals of circuit breaker 5011 and circuit breaker 5012, if the above conditions are met, it will report "transient phase A fault of 500kV certain line A, successful reclosing" on the fault reasoning page of the alarm window. Then the inference engine waits for the upload of the fault recording file. After receiving the fault recording HDR file of the line protection, it will take out the fault current, fault phase difference, fault distance and other information from the fault, and then find it from the knowledge base. Corresponding to the knowledge base record of the fault, a fault analysis report of the fault is generated, stored in the historical database, and waited for the on-duty staff to read or print, and the fault analysis report will be sent to the dispatcher through the motion system.

其它故障类型的推理判断过程和本例类似,只是具体的判断逻辑不一样。对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。 The reasoning and judgment process of other fault types is similar to this example, but the specific judgment logic is different. For those of ordinary skill in the art, without departing from the technical principle of the present invention, some improvements and modifications can be made, and these improvements and modifications should also be regarded as the protection scope of the present invention.

Claims (9)

1. intelligent substation supervisory control system intelligent alarm and accident analysis implementation method may further comprise the steps:
(1) the corresponding one or more fault initiating signals of every kind of fault type of transformer station after inference machine software is received said fault initiating signal, start corresponding fault type inference logic;
(2) substation equipment is carried out topology and connect analysis,, obtain the running status of current said fault initiating signal corresponding device according to the charged situation of equipment;
Remote signalling before and after when (3) said fault initiating signal being taken place in a period of time, remote measurement, protection information are or/and the location status relevant information of switch is carried out analyzing and processing; With reference to the equipment that obtains in the step (2); Information and this equipment state to receiving in this time period are carried out reasoning and judging, and whether inspection satisfies said fault type inference logic;
(4) as satisfying the fault type inference logic in the step (3), wait for the record ripple HDR file that wave recording device is sent up, obtain therefrom that fault is separate, fault current is or/and the fault localization relevant information;
(5) from knowledge base, transfer the corresponding troubleshooting prediction scheme of this fault type, the information of integrating step (4) generates far and is saved in history library;
(6) with far through sending scheduling on the telecontrol system, deposit far in local history library simultaneously and supply the user to have access to and print.
2. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method is characterized by: this method comprises the occurrence condition of the most common failure type of transformer station, and automated reasoning is also reported the most common failure of transformer station.
3. according to claim 1 described intelligent substation supervisory control system intelligent alarm and accident analysis implementation method; It is characterized by: in the remote signalling definition list of this method in intelligent substation supervisory control system database the remote signalling type field is set; Remote signalling is divided into different types, is used to discern the remote signalling of participating in reasoning from logic.
4. intelligent substation supervisory control system intelligent alarm according to claim 3 and accident analysis implementation method; It is characterized by: the knowledge base territory is set in the remote signalling definition list; This knowledge base territory is used for the record of index knowledge base table, and the user accesses the content that the intelligent alarm window shows this knowledge base according to warning information on the alarm window.
5. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method; It is characterized by: the structure of said knowledge base comprises that fault title, fault level, fault diagram, affiliated scheduling, failure cause are or/and treatment measures.
6. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method is characterized by: topological analysis is according to the existing various modes of connection of transformer station and operational mode, corresponding adjustment fault judgement logic.
7. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method; It is characterized by: the signal of a timeslice of intercepting is as the reasoning foundation in the buffering area of the signal that said system is received; Set one fault time window; Only information and the equipment state received in this time window are carried out reasoning and judging, this timeslice is set according to transformer station's actual conditions by the user.
8. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method; It is characterized by: the reasoning and judging of fault type is started by the enabling signal of this fault type; The reasoning results is presented at an independent The reasoning results page of alarm window, and highlight indication and audio alert prompting user processing fault are arranged.
9. intelligent substation supervisory control system intelligent alarm according to claim 1 and accident analysis implementation method; It is characterized by: combine the information of failure wave-recording to generate far, show that fault current, the fault when fault takes place is separate or/and the fault localization relevant information.
CN2010105930206A 2010-12-17 2010-12-17 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system Active CN102035260B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105930206A CN102035260B (en) 2010-12-17 2010-12-17 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105930206A CN102035260B (en) 2010-12-17 2010-12-17 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system

Publications (2)

Publication Number Publication Date
CN102035260A CN102035260A (en) 2011-04-27
CN102035260B true CN102035260B (en) 2012-08-15

Family

ID=43887760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105930206A Active CN102035260B (en) 2010-12-17 2010-12-17 Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system

Country Status (1)

Country Link
CN (1) CN102035260B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235240A (en) * 2013-04-25 2013-08-07 国家电网公司 Alarm diagnosis method and system based on protection message
CN103368266A (en) * 2013-07-29 2013-10-23 深圳供电局有限公司 Remote omnibearing monitoring method and device for transformer substation fault and advance notice information

Families Citing this family (54)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102255384B (en) * 2011-05-20 2013-10-09 国电南瑞科技股份有限公司 A Data Communication Method for Distributed Fault Diagnosis
CN102290865A (en) * 2011-08-22 2011-12-21 国电南瑞科技股份有限公司 Integrated intelligent unit of intelligent substation
CN102355060B (en) * 2011-10-10 2014-10-08 国电南瑞科技股份有限公司 Intelligent interlocking system of transformer substation
CN102497024B (en) * 2011-12-16 2014-01-29 广东电网公司茂名供电局 Intelligent Alarm System Based on Integer Programming
CN102497027B (en) * 2011-12-20 2013-09-18 浙江省电力公司 Automatic modeling method of digital fault recorder
CN102931644B (en) * 2011-12-27 2015-07-15 许继电气股份有限公司 Regional power grid fault isolation and recovery method
CN102523433A (en) * 2011-12-27 2012-06-27 浙江省电力公司 Video monitoring system and data acquisition monitoring system linkage equipment and method thereof
CN103293401A (en) * 2012-02-28 2013-09-11 鹤岗电业局 Transformer substation failure analysis device
CN103376784A (en) * 2012-04-23 2013-10-30 长沙日晶电器科技开发有限公司 Intelligent remote transformer substation monitoring system
CN102707199B (en) * 2012-06-29 2015-03-18 广东电网公司佛山供电局 Intelligent diagnosis method and system of dispatching warning message of power grid
CN102789223A (en) * 2012-08-31 2012-11-21 河南省电力公司鹤壁供电公司 Intelligent auxiliary real-time monitoring system of iSaSCADA transformer substation
JP2014067399A (en) * 2012-09-10 2014-04-17 Ricoh Co Ltd Report generation device, report generation system, and program
CN102967780B (en) * 2012-11-21 2015-04-08 国电南瑞科技股份有限公司 Modeling method for substation intelligent alarm
CN103197200B (en) * 2013-02-05 2015-05-13 广东电网公司佛山供电局 Method and system for rapidly collecting and transmitting fault ranging information of power grid line
CN203930461U (en) * 2013-03-12 2014-11-05 阿斯科动力科技公司 For the system of infrastructure Monitoring and Controlling
CN103259333B (en) * 2013-03-30 2016-01-27 国家电网公司 Intelligent alarm and comprehensive analysis of fault system
CN103281410B (en) * 2013-06-14 2016-08-31 江苏省广电有线信息网络股份有限公司南京分公司 Broadcast television network intelligent obstacle pretreatment method and system
CN104424602A (en) * 2013-08-19 2015-03-18 国家电网公司 Online on-off operation checking method based on maintenance plan
CN103903107A (en) * 2014-04-22 2014-07-02 国网重庆市电力公司永川供电分公司 An intelligent real-time alarm method for energy management system
CN104064001B (en) * 2014-06-19 2016-03-30 国家电网公司 A smart substation alarm reasoning method
CN104111988A (en) * 2014-07-03 2014-10-22 国家电网公司 Building method of alarm reasoning knowledge base of intelligent transformer substation
CN104125103B (en) * 2014-08-13 2017-02-22 国家电网公司 Intelligent transformer substation process layer network communication fault locating method based on list of proof
CN104242470A (en) * 2014-10-17 2014-12-24 成都四为电子信息股份有限公司 Signal power source monitoring device
CN104318394B (en) * 2014-10-27 2017-12-15 南京磐能电力科技股份有限公司 Communication processor intelligent warning system and method based on more action alert modes
CN104459474B (en) * 2014-12-22 2017-05-17 国网上海市电力公司 Intelligent distribution network fault recognition method
CN105015565B (en) * 2015-07-31 2018-03-20 株洲南车时代电气股份有限公司 A kind of train fault information automatic displaying method
CN105139158A (en) * 2015-10-10 2015-12-09 国家电网公司 Power grid abnormal information intelligent alarming and assistant decision-making method
CN105762932B (en) * 2015-12-01 2018-11-09 许继集团有限公司 A kind of intelligent substation intelligent warning system based on Plugin Mechanism
CN105911424B (en) * 2016-04-08 2018-11-27 国网福建省电力有限公司 A kind of recognition methods based on fault detector false positive signal
CN105914894A (en) * 2016-06-27 2016-08-31 柳州电器科学研究所有限公司 Fault monitoring sub-system for substation relay protection
CN106329728B (en) * 2016-09-09 2019-03-15 国家电网公司 A kind of power supply management method and system
CN106505740B (en) * 2016-12-06 2019-01-15 嘉兴凯蒂市场营销策划有限公司 Intelligent monitoring device, system and the intelligent control system of power equipment
CN106707101A (en) * 2016-12-09 2017-05-24 云南电力试验研究院(集团)有限公司 Distribution network operating state monitoring device with four-remote function
CN106771841B (en) * 2017-03-30 2019-02-22 西安西热节能技术有限公司 A kind of through-flow system of substation S type and method
CN107069966A (en) * 2017-04-18 2017-08-18 广州供电局有限公司 A kind of transformer station's remote online monitoring and status assessing system
CN107069975B (en) * 2017-06-20 2019-08-02 国网山东省电力公司诸城市供电公司 A kind of distribution transmission facility status data feedback system and its method
CN107276085B (en) * 2017-07-26 2019-12-20 广东电网有限责任公司东莞供电局 A method for realizing intelligent alarm by telemotor
CN107689886A (en) * 2017-08-11 2018-02-13 北京小度信息科技有限公司 Data-interface fault handling method, device and electronic equipment
CN107357237A (en) * 2017-08-31 2017-11-17 北京蓝海华业科技股份有限公司 A kind of system of intelligent monitoring transformer station
CN107658980B (en) * 2017-09-29 2020-12-18 国网浙江省电力公司 An analysis method and system for reviewing power grid monitoring and alarm information
CN107861000A (en) * 2017-11-01 2018-03-30 南京国电南自电网自动化有限公司 A kind of method of automatic test substation intelligent alarm function
CN108280278B (en) * 2018-01-12 2024-07-02 中国电力科学研究院有限公司 Simulation method and system for high-voltage direct-current flow anti-gas dynamic characteristics
CN108399579B (en) * 2018-01-15 2021-04-02 国网天津市电力公司 Intelligent Analysis System for Monitoring Data Signals of Substation Equipment
CN108537344B (en) * 2018-02-01 2021-09-14 贵州电网有限责任公司 Secondary equipment intelligent operation and maintenance method based on closed-loop knowledge management
CN108512223B (en) * 2018-04-11 2020-07-03 江苏电力信息技术有限公司 Intelligent auxiliary judgment method for substation switch tripping in power transmission and transformation operation inspection and control platform
CN109255445A (en) * 2018-08-22 2019-01-22 中国南方电网有限责任公司 A kind of intelligent periodical inspection method of the protective device based on multi-source data analysis
CN109387740A (en) * 2018-09-18 2019-02-26 中国路桥工程有限责任公司 A kind of railway distribution net fault message diagnostic system and method
CN109633250B (en) * 2018-11-09 2024-09-03 国网浙江省电力有限公司台州供电公司 Terminal strip potential automatic acquisition pre-judging system for protection measurement and control device in transformer substation
CN109696591B (en) * 2018-11-30 2021-07-30 南京国电南自电网自动化有限公司 Testing method for intelligently acquiring fault recording based on ATS automatic testing platform
CN110854843B (en) * 2019-10-15 2023-08-18 保定市冀能电力自动化设备有限公司 Intelligent power distribution network metering and fault protection demarcation switch controller control calculation method
CN114357113A (en) * 2022-01-04 2022-04-15 广东电网有限责任公司 Remote signaling alarm information checking method and device, electronic equipment and storage medium
CN114495007A (en) * 2022-01-27 2022-05-13 国网北京市电力公司 Substation fault point monitoring method and device
CN114710390A (en) * 2022-02-18 2022-07-05 联通沃悦读科技文化有限公司 Monitoring and alarming method and system, equipment and medium for Internet system
CN117294004B (en) * 2023-09-13 2024-04-09 国网江苏省电力有限公司淮安供电分公司 Intelligent identification system and method for relay protection operation mode of transformer substation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101799512B (en) * 2009-12-31 2011-12-28 清华大学 Single-terminal failure wave-recording and distance-measuring device facing single space in transformer substation
CN101752908B (en) * 2010-01-19 2012-10-03 华北电网有限公司 Method for distributed wave recording of intelligent substation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103235240A (en) * 2013-04-25 2013-08-07 国家电网公司 Alarm diagnosis method and system based on protection message
CN103235240B (en) * 2013-04-25 2015-08-05 国家电网公司 Based on the warning diagnostic method and system of protection message
CN103368266A (en) * 2013-07-29 2013-10-23 深圳供电局有限公司 Remote omnibearing monitoring method and device for transformer substation fault and advance notice information

Also Published As

Publication number Publication date
CN102035260A (en) 2011-04-27

Similar Documents

Publication Publication Date Title
CN102035260B (en) Intelligent warning and fault analysis realizing method for intelligent transformer substation monitoring system
CN103941158B (en) Power distribution network fault diagnosis method based on multi-source information
CN106026405B (en) Relay protection in-service monitoring based on EMS system and analysis system
CN111596171A (en) Intelligent distribution network fault diagnosis and positioning integrated system under artificial intelligence deep learning
CN202230153U (en) Abnormal power utilization real-time monitoring system for rural power grid distribution station
CN102882274B (en) Terminal fusion system applied to distribution network
CN102707178B (en) Method for prewarning and monitoring failures of secondary equipment of power system
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN203166626U (en) Intelligent traction substation
CN103259333B (en) Intelligent alarm and comprehensive analysis of fault system
CN104753178A (en) Power grid fault handling system
CN104297616B (en) A kind of 10kV distribution line broken string method for detecting interacted based on multi-system information
CN203422438U (en) Real-time monitoring and fault location system for overhead lines of power distribution network
CN110930669B (en) Monitoring and early warning system and method for tripping and closing loop of transformer substation
CN105515188A (en) Power distribution network centralized feed line automatic fault processing method
CN108983043A (en) Power distribution network mesolow side operational monitoring main website management system
CN103325019A (en) Event-driven power grid fault information judgment method
CN105093063A (en) Online power grid fault diagnosis method based on multisource data characteristic unit combination judgment
CN105871645A (en) Automatic collecting and publishing device for grid fault information
CN113922326A (en) Bus/line grounding line selection wheel cutting method based on SCADA data
CN106199337B (en) A kind of grid fault analytical method judged based on analog quantity and switching value combination
CN106601534A (en) High-voltage isolating switch and high-voltage isolating switch transmission mechanism fault monitoring method
CN111157838A (en) Intelligent management system for big data of running state of railway power distribution network
CN104297679B (en) Early warning method of breaker tripping messages
CN116668261A (en) Multi-source data fusion-based power transformation intelligent gateway system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant