CN101998616B - 无线通信系统基站及其数据传输的同步方法 - Google Patents
无线通信系统基站及其数据传输的同步方法 Download PDFInfo
- Publication number
- CN101998616B CN101998616B CN200910170969.2A CN200910170969A CN101998616B CN 101998616 B CN101998616 B CN 101998616B CN 200910170969 A CN200910170969 A CN 200910170969A CN 101998616 B CN101998616 B CN 101998616B
- Authority
- CN
- China
- Prior art keywords
- time
- downlink data
- rrh
- bbu
- data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 57
- 238000004891 communication Methods 0.000 title claims abstract description 54
- 230000005540 biological transmission Effects 0.000 title claims abstract description 33
- 238000012545 processing Methods 0.000 claims abstract description 94
- 238000005259 measurement Methods 0.000 claims abstract description 21
- 230000008569 process Effects 0.000 claims abstract description 21
- 238000005070 sampling Methods 0.000 claims description 32
- 230000001360 synchronised effect Effects 0.000 claims description 20
- 238000012546 transfer Methods 0.000 claims description 16
- 238000004148 unit process Methods 0.000 claims description 5
- 238000011144 upstream manufacturing Methods 0.000 description 15
- 238000010295 mobile communication Methods 0.000 description 14
- 230000006870 function Effects 0.000 description 12
- 238000010586 diagram Methods 0.000 description 9
- 238000004590 computer program Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 3
- 241000931526 Acer campestre Species 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000012937 correction Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001960 triggered effect Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000009432 framing Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 238000012958 reprocessing Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W56/00—Synchronisation arrangements
- H04W56/004—Synchronisation arrangements compensating for timing error of reception due to propagation delay
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W56/00—Synchronisation arrangements
- H04W56/0055—Synchronisation arrangements determining timing error of reception due to propagation delay
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W88/00—Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
- H04W88/08—Access point devices
- H04W88/085—Access point devices with remote components
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
- Synchronisation In Digital Transmission Systems (AREA)
Abstract
本发明公开了一种用于无线通信系统基站远程射频头、无线通信系统基站及其数据传输的同步方法,所述无线通信系统基站包括通过网络可通信地连接的远程射频头RRH和基带单元BBU,其中,BBU处理并向RRH发送下行数据,所述无线通信系统基站进一步包含:延时测量单元,位于RRH中,用于测量下行数据从BBU到达RRH时的延时;延时报告单元,位于RRH中,用于从RRH向BBU报告关于延时测量单元所测量的延时的延时数据;同步单元,位于BBU中,用于将BBU处理和发送下行数据的启动时间,提前一个根据延时报告单元所报告的延时数据获得的时间量。本发明通过测量下行数据帧到达基站的RRH的延迟,修正启动BBU侧处理和传输下行数据的定时脉冲,由此可以减少或消除因BBU处理延迟和数据传输抖动引起的RRH接收延时。
Description
技术领域
本发明总体涉及无线通信系统,尤其涉及无线接入网络中无线通信系统基站的基带单元与远程射频头之间的数据传输的同步。
背景技术
无线接入网络(wireless access network)是无线网络中的重要部分。现有技术中已经提出的用于下一代无线接入网络的体系结构,提供基于开放的IT体系结构的计算和传输资源池,以支持无线接入网络。在软件射频(SWR)技术的支持下,不同无线标准的软件均能在这种资源池上运行,提供无线接入网络的功能,既能通过大规模的负载平衡提高资源利用率,又具有支持各种无线标准、不同种类的部署和不同的商业模式的灵活性。
用于无线接入网络的远程射频头(RRH-remote radio header)技术,允许基站的射频头和天线,远离基站的基带单元(BBU-Baseband Unit),这样,基站就可以集中汇聚多个BBU,分布式地部署远程射频头RRH和天线。图1表示支持对不同的BBU板(boards)的动态RRH流交换(dynamic RRHstream-switching)的体系结构,其中,多个BBU板作为一个资源池,以随其所需的方式为RRH提供处理资源。这是实现用于下一代无线接入网络的体系结构的关键。
在数字通信网络中,可靠地传输语音、视频和数据,要求精确的定时和同步。在传统的BBU与RRU通信的实现中,基站的BBU与RRU之间由TDM(时分复用)线路直接连接,数据是依照TDM链路的时钟节拍传输的,传输延时一般固定不变,且不产生传输抖动(jitter);并且,由于采用基于DSP/FPGA等没有操作系统的计算平台,因此,处理延时一般也是固定的。
用于下一代无线接入网络的体系结构,采用分时双工(TDD)模式的无线通信系统,BBU与RRU之间的数据传输,基于Ethernet和Infiniband及交换机组成分组交换网络(包交换网络),数据传输的延时一般不固定,且会有抖动产生;由于采用基于开放的IT体系结构的计算和传输资源池,在操作系统的影响下(如任务调度等),处理延时也不固定。
发明内容
为此,本发明提出一种无线通信系统基站及其数据传输的同步方法。
一方面,本发明提供一种无线通信系统基站的远程射频头RRH,所述远程射频头RRH通过网络与无线通信系统基站的基带单元BBU可通信地连接,其中,BBU处理并向RRH发送下行数据,所述远程射频头RRH进一步包含:延时测量单元,用于测量下行数据从BBU到达RRH时的延时;延时报告单元,用于从RRH向BBU报告关于延时测量单元所测量的延时的延时数据,所述延时数据用于将BBU处理和发送下行数据的启动时间,提前一个根据所述延时数据获得的时间量。
另一方面,本发明提供一种无线通信系统基站,包括通过网络可通信地连接的远程射频头RRH和基带单元BBU,其中,BBU处理并向RRH发送下行数据,所述无线通信系统基站进一步包含:RRH中的延时测量单元,用于测量下行数据从BBU到达RRH时的延时;RRH中的延时报告单元,用于从RRH向BBU报告关于延时测量单元所测量的延时的延时数据;BBU中的同步单元,用于将BBU处理和发送下行数据的启动时间,提前一个根据延时报告单元所报告的延时数据获得的时间量。
另一方面,本发明提供一种用于无线通信系统基站的数据传输的同步方法,所述无线通信系统基站包含通过网络可通信地连接的远程射频头RRH和基带单元BBU,其中,BBU处理并向RRH发送下行数据,所述同步方法包含:测量下行数据从BBU到达RRH时的延时;从RRH向BBU报告关于所测量的延时的延时数据;将BBU处理和发送下行数据的启动时间,提前一个根据所报告的延时数据获得的时间量。
本发明通过测量下行数据帧到达基站的RRH的延迟,修正启动BBU侧处理和传输下行数据的定时脉冲,由此可以减少或消除因BBU处理延迟和数据传输抖动引起的RRH接收延时。
附图说明
通过对附图中本发明示例实施例的更详细描述,将使本发明的上述、以及其它目的、特征和优点变得更加明显;附图中相同或类似的标记,一般表示本发明示例性实施例中的相同或相类似的部件或部分。
图1示意性地表示一种可以在其中实施本发明技术方案的体系结构;
图2示意性地表示一个无线通信系统基站的局部结构和工作方式;
图3示意性地表示按照本发明实施例的无线通信系统基站的局部结构和工作方式;
图4示意性地表示按照本发明实施例的基带处理脉冲的变化。
图5示意性地表示按照本发明的实施例的延时测量单元的电路;
图6示意性表示按照本发明的实施例的方法的流程图。
具体实施方式
下面参照附图更加详细地描述本发明的实施方式,在附图中显示了本发明的实施例。然而,本发明可以以各种形式实现,而不应该理解为受到所描述的实施方式的限制。在不妨碍所属技术领域的技术人员理解和实施本发明的情况下,实施例和附图中省略了与本发明的内容没有直接关系的部件或细节,这是为了更加突出本发明的内容,使所属技术领域的技术人员更清楚地理解本发明的实质。
首先参看图1。图1示意性地表示一种可以在其中实施本发明技术方案的无线通信系统基站的体系结构。图中显示的无线通信系统基站,包含若干个远程射频头RRH和若干个汇聚在一起的基带单元BBU,远程射频头与基带单元之间通过网络(例如基于Ethernet和Infiniband的分组交换网络)可通信地连接,通过(通常邻近基带单元一侧)交换机,可以把任何一个远程射频头与任何一个基带单元连接,形成上行链路或下行链路。远程射频头通过模数转换器A/D等功能部件,从移动通信终端(未予示出)接收上行数据,通过网络发送到基带单元进行处理;远程射频头通过网络从基带单元接收下行数据,通过数模转换器D/A等功能部件,向移动通信终端发送下行数据。
图2示意性地表示一个无线通信系统基站的局部结构和工作方式。在图2所示的无线通信系统基站(以下亦称“基站”)中,仅仅示意性地包含一个射频头(以下亦简称“RRH”)和一个基带单元(以下亦简称“BBU”),RRH与BBU通过例如分组交换网络(或称“包交换网络”,例如Ethernet)可通信地连接,采用TDD通信方式传输数据。
如图所示,RRH包含收发单元100,脉冲发生器20,模数转换器(以下亦简称“A/D”)130和数模转换器(以下亦简称“D/A”)140;BBU包含数据处理单元200和定时器250。
RRH的收发单元100用于在A/D 130与BBU之间以及D/A140与BBU之间接收和发送数据,进一步包括上行单元110和下行单元120,其中,上行单元110用于从A/D 130接收数据,处理所接收的数据,并将处理过的数据通过网络传输到BBU;下行单元120用于通过网络从BBU接收下行数据,并将所接收的下行数据传输到D/A 140。
BBU的数据处理单元200用于接收和处理来自RRH的上行数据,以及处理和发送去往RRH的下行数据。数据处理单元200进一步包括上行数据处理单元210和下行数据处理单元220。数据处理单元210用于接收和处理来自RRH的上行数据,下行数据处理单元220用于处理和发送去往RRH的下行单元120的下行数据。
基站工作时,在上行模式与下行模式之间切换。
当基站处于上行模式时,通信硬件电路服务于由BBU接收来自移动通信设备(未予示出)的数据,即上行数据。A/D 130从移动通信设备接收模拟信号,将其转换为数字信号,发送给RRH的收发单元100。收发单元100对数字信号进行处理,例如分组和封装成帧结构,然后通过分组交换网络发送到BBU,供BBU的数据处理单元200作进一步处理。
当基站处于下行模式时,通信硬件电路服务于BBU向移动通信设备发送数据,即下行数据。BBU将数据处理单元200处理过的数据,通过分组交换网络发送到RRH的收发单元100,收发单元100处理所接收的数据,例如从帧结构中恢复数据,将处理过的数据发送到D/A 140,D/A 140将数据转换为模拟信号,发送给移动通信设备。
脉冲发生器150,用于为RRH的各种电路模块发出定时脉冲,其中包括上行脉冲TUL、下行脉冲TDL和转换脉冲Ts。
在上行模式中,上行脉冲TUL触发A/D 130从移动通信设备接收上行数据;在下行模式中,下行脉冲TDL触发D/A 140向移动通信设备发送下行数据。
转换脉冲Ts,触发上行模式与下行模式之间的转换。在下行模式中,当脉冲发生器150发出转换脉冲Ts后,D/A停止向移动通信设备发送数据,RRU的硬件电路转换至处理上行数据的状态。在上行模式中,当脉冲发生器150发出转换脉冲Ts后,A/D停止从移动通信设备接收数据,RRU的硬件电路转换至处理下行数据的状态。
所属技术领域的技术人员知道,脉冲发生器150可以提供的定时脉冲,远不止于上述脉冲,而且上述脉冲也可以由物理上分立的不同脉冲发生器生成,在此不予赘述。
定时器250可以为BBU的各种电路模块发出定时脉冲,其中包括定式基带处理脉冲TDP。数据处理脉冲TDP触发数据处理单元200的触发下行数据处理单元220的操作,即启动处理要向RRH传送的下行数据,例如将数据封装成帧结构,向RRH传送下行数据帧(以下简称“下行帧”)。
所属技术领域的技术人员知道,下行帧由帧头和帧体组成,帧体可包含一个或多个数据采样(data sample),每个数据采样是一定长度(例如16或32比特)的数据。
RRH的收发单元100,接收来自BBU的下行帧,完整接收一个下行帧需要一定的时间,该时间称为下行帧持续时间。类似地,从RRH向BBU传送的上行数据帧(以下简称“上行帧”),包含帧头和一个或多个数据采样,完整传送一个上行帧需要的时间,称为上行帧持续时间。
从一个下行帧开始到一个上行帧结束的循环,构成一个上下行周期。上下行周期长度=下行帧持续时间+下行模式与上行模式之间切换所需时间+上行帧持续时间。例如,在一种配置下,上下行周期是10ms,下行帧持续时间是4.5ms,DL与UL之间切换所需时间是0.5ms,上行帧的持续时间是5ms。
下行脉冲TDL的频率被设置得与上下行周期匹配,例如,如果上下行周期为10ms,则TDL的频率为100Hz,即脉冲发生器150每隔10ms发出一个下行脉冲TDL。
正常情况下,RRH与BBU中的定时机制,使得下行帧在BBU与RRH之间同步,即下行帧与下行脉冲TDL和转换脉冲Ts同步,就是说,当下行脉冲TDL发出时,下行帧的第一个数据采样应当已经到达收发单元100,被收发单元100接收;并且当转换脉冲Ts发出时,下行帧的最后一个数据采样应当已经到达收发单元100。否则,整个下行帧都不会被D/A 140在当前周期内向移动通信设备发送。
所属技术领域的技术人员应当明白,数据处理单元200处理和发送的下行数据的延时(处理延时)以及传输线路的抖动,都可能影响下行帧的数据采样到达收发单元的时间。例如,BBU的数据处理单元200的处理延时,可能导致下行帧的第一个数据采样延迟到达收发单元。
以下参看图3,介绍本发明的各种实施方式。图3示意性地表示按照本发明实施例的无线通信系统基站的局部结构和工作方式。图3与图2的内容大部分相同,主要区别在于,图3中还包括位于RRH中的延时测量单元180和延时报告单元170,以及位于BBU中的同步单元290。
图3中的RRH,是本发明的用于无线通信系统基站的远程射频头RRH一个实施例,通过网络与包含同步单元290的基带单元BBU可通信地连接,构成本发明的无线通信系统基站。下面结合附图对所述远程射频头RRH和基站作详细说明。
延时测量单元180用于测量下行数据从BBU到达RRH时的延时。可以通过在RRH中设置一个计时器,分别记录下行数据应当到达RRH的收发单元100的时间和实际到达收发单元的时间,计算二者的差,从而测量出下行数据从BBU到达收发单元时的延时,也即到达RRH时的延时。关于延时测量单元的具体实施方式,将在下文结合图5进一步介绍。
延时报告单元170用于向BBU报告关于延时测量单元180所测量的延时的延时数据。具体来说,延时报告单元170可以从延时测量单元180接收关于下行数据从BBU到达RRH时的延时的延时数据,对该延时数据进行适当的处理,例如封装成帧结构,在传输上行帧的间隙,传送给BBU。按照本发明的一个实施例,延时报告单元170可以在从下行方式切换到上行方式之后,在上行单元发送完一个上行帧之后,紧接着该上行帧之后向BBU传送延时数据,如图3中上半部分所示的那样。为了方便对延时数据的处理和传送,按照本发明的一个实施例,可以将延时报告单元设置在RRH的上行单元110中,或者对上行单元稍加改造,使得上行单元还具有上述延时报告单元的功能,对于所属技术领域的技术人员来说,显然这些都不难实现,因此无须赘述。
同步单元(290),用于将BBU处理和发送下行数据的启动时间,提前一个根据延时报告单元170所报告的延时数据TD获得的时间量。
例如,BBU的数据处理单元200(例如上行数据处理单元210)按照预定的协议(例如通过上行单元110)从RRH接收到RRH延时数据后,对该延时数据进行处理(例如从帧结构中恢复出延时数据),然后传送给同步单元290。同步单元290以延时数据作为调节参数,例如使数据处理单元200此后处理和发送下行数据的时间,提前延时数据所表明的延时量,从而使下一个下行帧能更早地到达RRH。
所述技术领域的技术人员应当明白,测量到的帧首延时Td1,通常是由BBU的数据处理单元200处理下行数据的处理延时引起的,帧尾延时Td2表征的是帧首延时Td1与传输一个数据帧的抖动延时之和,因此,一般来说,例如,如果Td1=Td2,表明基站的数据传输没有抖动;再例如,如果Td2明显大于Td1,则表明数据传输存在明显的抖动。在实施本发明时,可以根据不同的修正算法对时钟进行修正,以调节数据处理单元200处理和发送下行数据的触发时间或启动时间,实际上就是把数据处理单元200处理和发送下行数据的触发时间或启动时间。按照本发明的一个实施例,可以以Td2和Td1之中的较大值为基准参数,进行上述调节,例如,如果Td2大于Td1,则把数据处理单元200处理和发送下行数据的启动时间提前一个时间量Td2。
考虑到抖动是一种快变的情况,如果每次都根据Td2进行调整,整个系统就容易陷入不稳定的状态。按照本发明的一个实施例,例如在Td1与Td2之差不明显时,可以仅以Td1为基准参数进行调节,例如把数据处理单元200处理和发送下行数据的启动时间提前一个时间量Td1。
当然,在具体实现中,可以根据Td1和Td2的具体范围,采用更复杂的基准参数来进行调节。按照本发明的一个实施例,例如取一段时间内(Td2-Td1)的平均值与当前的Td1之和作为基准参数进行调节。例如,以当前上下行周期之前的N个周期内的每个周期的(Td2-Td1)的平均值与当前的Td1之和,作为基准参数,进行调节,其中,N是大于1的整数。
按照本发明的一个实施例,同步单元可以用常规技术中的定时修正单元来实现,定时修正单元根据用于触发下行数据处理单元启动处理和发送下行数据的定时基带处理脉冲和所述延时数据,生成延时后的时钟脉冲以取代用于触发下行数据处理单元220启动处理和发送下行数据的定时基带处理脉冲,使所述下行数据处理单元处理和发送下行数据的启动时间,提前所述时间量。参看图4,该图示意性地表示按照本发明实施例使用定时修正单元后对触发下行数据处理单元启动处理和发送下行数据的定时基带处理脉冲的产生的变化。图4左下侧表示修正前的定时基带处理脉冲,右下侧表示延时后的定时基带处理脉冲,即经过修正单元调整后的定式基带处理脉冲。以上方的同一个高频系统时钟脉冲为基准比较左下侧的定时基带处理脉冲与右下侧的延时后的定时基带处理脉冲,延时后的定式基带脉冲的频率较高,因此,受延时后的定式基带脉冲触发的下行数据处理单元220启动处理和发送下行数据的时间将被提前。
如图3中表示了按照本发明的一个实施例的定时修正单元292,其中,修正单元292以定时器250发出的定式基带脉冲TDP作为一个输入,作为调节参数的延迟数据TD是其另一个输入,修正单元292的输出是延时后的定式基带处理脉冲TDP’。熟悉电子线路的技术人员知道,这样的定时修正单元292是常规技术中容易实现的电路结构,因此,这里无须赘述细节。需要指出的是,虽然图3中的修正单元292是以定式基带脉冲TDP作为一个输入,在实际实施中,也可以把修正单元输出的延时后的定式基带处理脉冲TDP’作为修正单元的输入,形成反馈,这也是所属技术领域的技术人员普遍知晓的做法,因此也不再叙述具体细节。
下面进一步说明本发明的延时测量单元的实施例。在BBU中用脉冲发生器150来生成触发D/A 140开始向移动通信设备发送下行数据的下行脉冲TDL的情况下,本发明的帧首延时测量装置181可以通过获得这个下行脉冲的时间,来获得D/A 140开始向移动通信设备发送下行数据的时间;此外,由于是下行单元120从BBU接收下行帧的第一个数据采样,因此又可以从下行单元获得下行帧的第一个数据采样到达RRH的时间。这样,帧首延时测量装置通过这两个计时器和一个减法器,就可以实现为一个测量下行脉冲TDL的发生时间与BBU的下行帧的第一个数据采样到达下行单元的时间之间的时间差的装置。类似地,帧尾延时测量装置182可以进一步简单地实现为一个测量转换脉冲Ts的发生时间与BBU的下行帧的最后一个数据采样到达下行单元的时间之间的第二时间差的装置。
图5示例性表示按照本发明方案的延时测量装置的电路实现的实施例。如图5所示,帧首延时测量装置181包含计数器510,减法器520和除法器530,其中,计数器的输入是下行脉冲TDL、来自下行单元的表示下行帧的第一个数据采样到达下行单元120的通知以及节拍时钟脉冲CLKDA,其中,节拍时钟脉冲CLKDA是系统时钟为D/A 140的对下行数据的数据采样一一进行模转换操作而提供的节拍时钟脉冲,与脉冲TDL和TUL相比,属于高频脉冲,并且也可以由同一个脉冲发生器150生成。
计数器510对CLKDA的时钟脉冲不断进行计数。如图所示,当下行脉冲TDL发生时,触发计数器510输出当前计数值C11;例如下行单元120发出的下行帧的第一个数据采样到达下行单元120的通知,触发计数器510输出当前计数值C12,将两个计数值C11和C12经过减法器运算后得到的差值的绝对值,如标记530的方框中的“/F_clkDA”所示,在除法器530中将所述绝对值除以节拍时钟脉冲CLKDA的频率F_clkDA,就得到帧首延时Td1,上述电路可以表达为:
Td1=|C11-C12|/F_CLKDA
其中,C11是TDL发生时计数器510的当前计数值;C12是下行帧的第一个数据采样到达时计数器520的当前计数值,F_CLKDA是节拍时钟脉冲CLKDA的频率)。
可以用同样功能的另一个计数器、加法器和除法器组成的电路(图中没有具体显示),来计算帧尾延时Td2=|C21-C22|/F_CLKDA
其中,C21是转换脉冲TS到达时计数器的当前计数值;C22是下行帧的最后一个数据采样到达时计数器的当前计数值。
上述用来计算Td1和Td2的电路,仅仅是示意性的,可以有各种变化,例如计算Td1的电路Td2的电路的分别包含的计数器,可以共用一个减法器和除法器,这两个计数器甚至也可以是同一个计数器。显然,所属技术领域的技术人员可以用其他各种方式来实现延时测量装置180。
以上结合图1-5说明了按照本发明的无线通信系统基站的各种实施方式。所属技术领域的技术人员应当明白,从上述的各种实施方式中,还可以获得上文中虽然直接描述但是却可以导出的其它实施方式。
按照同一个发明构思,本发明还提供一个用于无线通信系统基站的数据传输的同步方法。图6示意性表示按照本发明的实施例的方法的流程图。
按照本发明的一个实施例的数据传输的同步方法所用于的无线通信系统基站包含通过网络可通信地连接的远程射频头RRH和基带单元BBU,其中,BBU处理并向RRH发送下行数据。如图所示,本发明的数据传输的同步方法主要包含以下步骤:
从步骤610开始,首先,测量下行数据从BBU到达RRH时的延时;
然后在步骤620,从RRH向BBU报告关于所测量的延时的延时数据TD;
然后在步骤630,将BBU处理和发送下行数据的启动时间,提前一个根据所报告的延时数据获得的时间量。
按照本发明的一个实施例,可以通过下述方式测量下行数据从BBU到达RRH时的延时:测量RRH中包含的数模转换器D/A开始向无线通信设备发送下行数据的时间与下行数据的数据帧的第一个数据采样到达RRH的时间之间的时间差Td1,该时间差在本文中也称第一时间差。这样,在步骤620从RRH向BBU报告关于所测量的延时的延时数据TD包含所述第一时间差Td1;所述时间量等于所述第一时间差Td1。
按照本发明的一个实施例,可以通过下述方式测量下行数据从BBU到达RRH时的延时:测量无线通信系统基站从下行模式向上行模式切换的时间与下行数据的数据帧的最后一个数据采样到达RRH的时间之间的第二时间差Td2,该时间差在本文中也称第二时间差,这样,在步骤620从RRH向BBU报告关于所测量的延时的延时数据TD除了包含第一时间差Td1,还包含所述第二时间差Td2。
在所述延时数据TD包含第一时间差Td1和第二时间差Td2的情况下,按照本发明的一个实施例,则上文所述的步骤630,根据所报告的延时数据第一时间差Td1和第二时间差Td2,将BBU处理和发送下行数据的启动时间提前的时间量,等于第一时间差Td1与第二时间差Td2之间较大的值。
按照本发明的另一个实施例,上文所述的步骤630,根据所报告的延时数据第一时间差Td1和第二时间差Td2,将BBU处理和发送下行数据的启动时间提前的时间量,等于当前上下行周期之前的N个周期内的每个周期的第二时间差Td2与第一时间差Td1的平均值与当前的Td1之和,其中,N是大于1的整数。
按照本发明的一个实施例,测量数模转换器D/A开始向无线通信设备发送下行数据的时间与下行数据的数据帧的第一个数据采样到达RRH的时间之间的第一时间差Td1可以通过下述步骤实现:测量用于生成触发D/A向移动通信设备发送下行数据的下行脉冲TDL的发生时间与来自BBU的下行帧的第一个数据采样到达下行单元的时间之间的时间差,作为第一时间差Td1。
按照本发明的一个实施例,脉冲发生器用于生成触发无线通信系统基站在下行模式与上行模式之间切换的转换脉冲Ts,测量无线通信系统基站从下行模式向上行模式切换的时间与下行数据的数据帧的最后一个数据采样到达RRH的时间之间的第二时间差Td2可以通过下述步骤实现:测量脉冲发生器生成的触发无线通信系统基站在下行模式与上行模式之间切换的转换脉冲Ts的发生时间与来自BBU的下行帧的最后一个数据采样的时间之间的时间差,作为第二时间差Td2。
按照本发明的一个实施例,所述将BBU处理和发送下行数据的启动时间提前一个根据所报告的延时数据获得的时间量进一步包含:根据BBU中的定时器生成的用于触发BBU的下行数据处理单元启动处理和发送下行数据的定时基带处理脉冲和所述延时数据,生成延时后的时钟脉冲,该延时后的时钟脉冲取代定时器生成的定时基带处理脉冲,触发BBU的下行数据处理单元启动处理和发送下行数据,由此使所述下行数据处理单元处理和发送下行数据的启动时间,提前所述的时间量。
以上概略性地描述说明了本发明的用于无线通信系统基站的数据传输的同步方法,应当明白,为了简要,上述说明省略了许多与对本发明的无线通信系统基站的说明中相同或相似的细节。然而,所属技术领域的技术人员根据说明书中对无线通信系统基站及其各种实施方式的上述描述,可以实施本发明方法的各种实施方式。
以上参照附图描述了本发明及其示例性实施例,但是应该理解本发明并不严格限于这些实施例,在不背离本发明的范围和宗旨的情况下,本领域普通技术人员能对实施例进行各种变化和修改。所有这些变化和修改意欲包含在所附权利要求中限定的本发明的范围中。
并且根据上述描述,所属技术领域的技术人员知道,本发明可以体现为装置、方法或计算机程序产品。因此,本发明可以具体实现为以下形式,即,可以是完全的硬件、完全的软件(包括固件、驻留软件、微代码等)、或者本文一般称为“电路”、“模块”或“系统”的软件部分与硬件部分的组合。此外,本发明还可以采取体现在任何有形的表达介质中的计算机程序产品的形式,该介质中包含计算机可用的程序码。
可以使用一个或多个计算机可用的或计算机可读的介质的任何组合。计算机可用的或计算机可读的介质例如可以是——但不限于——电的、磁的、光的、电磁的、红外线的、或半导体的系统、装置、器件或传播介质。计算机可读介质的更具体的例子(非穷举的列表)包括以下:有一个或多个导线的电连接、便携式计算机磁盘、硬盘、随机存取存储器(RAM)、只读存储器(ROM)、可擦式可编程只读存储器(EPROM或闪存)、光纤、便携式紧凑磁盘只读存储器(CD-ROM)、光存储器件、诸如支持因特网或内部网的传输介质、或者磁存储器件。注意计算机可用的或计算机可读的介质甚至可以是上面印有程序的纸张或者其它合适的介质,这是因为,例如可以通过电扫描这种纸张或其它介质,以电子方式获得程序,然后以适当的方式加以编译、解释或处理,并且必要的话在计算机存储器中存储。在本文件的语境中,计算机可用的或计算机可读的介质可以是任何含有、存储、传达、传播、或传输供指令执行系统、装置或器件使用的或与指令执行系统、装置或器件相联系的程序的介质。计算机可用的介质可包括在基带中或者作为载波一部分传播的、由其体现计算机可用的程序码的数据信号。计算机可用的程序码可以用任何适当的介质传输,包括——但不限于——无线、电线、光缆、RF等等。
用于执行本发明的操作的计算机程序码,可以以一种或多种程序设计语言的任何组合来编写,所述程序设计语言包括面向对象的程序设计语言——诸如Java、Smalltalk、C++之类,还包括常规的过程式程序设计语言——诸如”C”程序设计语言或类似的程序设计语言。程序码可以完全地在用户的计算上执行、部分地在用户的计算机上执行、作为一个独立的软件包执行、部分在用户的计算机上部分在远程计算机上执行、或者完全在远程计算机或服务器上执行。在后一种情形中,远程计算机可以通过任何种类的网络-包括局域网(LAN)或广域网(WAN)-连接到用户的计算机,或者,可以(例如利用因特网服务提供商来通过因特网)连接到外部计算机。
此外,本发明的流程图和/或框图的每个方框以及流程图和/或框图中各方框的组合,都可以由计算机程序指令实现。这些计算机程序指令可以提供给通用计算机、专用计算机或其它可编程数据处理装置的处理器,从而生产出一种机器,使得通过计算机或其它可编程数据处理装置执行的这些指令,产生实现流程图和/或框图中的方框中规定的功能/操作的装置。
也可以把这些计算机程序指令存储在能指令计算机或其它可编程数据处理装置以特定方式工作的计算机可读介质中,这样,存储在计算机可读介质中的指令产生一个包括实现流程图和/或框图中的方框中规定的功能/操作的指令装置的制造品,
也可以把计算机程序指令加载到计算机或其它可编程数据处理装置上,使得在计算机或其它可编程数据处理装置上执行一系列操作步骤,以产生计算机实现的过程,从而在计算机或其它可编程装置上执行的指令就提供实现流程图和/或框图中的方框中规定的功能/操作的过程。
附图中的流程图和框图,图示了按照本发明各种实施例的系统、方法和计算机程序产品的可能实现的体系架构、功能和操作。在这点上,流程图或框图中的每个方框可以代表一个模块、程序段、或代码的一部分,所述模块、程序段、或代码的一部分包含一个或多个用于实现规定的逻辑功能的可执行指令。也应当注意,在有些作为替换的实现中,方框中所标注的功能也可以以不同于附图中所标注的顺序发生。例如,两个接连地表示的方框实际上可以基本并行地执行,它们有时也可以按相反的顺序执行,这依所涉及的功能而定。也要注意的是,框图和/或流程图中的每个方框、以及框图和/或流程图中的方框的组合,可以用执行规定的功能或操作的专用的基于硬件的系统来实现,或者可以用专用硬件与计算机指令的组合来实现。
Claims (19)
1.一种用于无线通信系统基站的远程射频头RRH,所述远程射频头RRH通过网络与无线通信系统基站的基带单元BBU可通信地连接,其中,BBU处理并向RRH发送下行数据,所述远程射频头RRH进一步包含:
延时测量单元,用于测量下行数据从BBU到达RRH时的延时;
延时报告单元,用于从RRH向BBU报告关于延时测量单元所测量的延时的延时数据,所述延时数据用于将BBU处理和发送下行数据的启动时间,提前一个根据所述延时数据获得的时间量。
2.权利要求1的远程射频头RRH,进一步包含数模转换器D/A,用于向无线通信设备发送下行数据,其中,延时测量单元包含:
帧首延时测量装置,用于测量D/A开始向无线通信设备发送下行数据的时间与下行数据的数据帧的第一个数据采样到达RRH的时间之间的第一时间差Td1,
其中,所述延时数据包含所述第一时间差Td1。
3.权利要求2的远程射频头RRH,其中,远程射频头RRH所在的无线通信系统基站在下行模式与上行模式之间切换,延时测量单元进一步包含:
帧尾延时测量装置,用于测量无线通信系统基站从下行模式向上行模式切换的时间与下行数据的数据帧的最后一个数据采样到达RRH的时间之间的第二时间差Td2;
其中,所述延时数据进一步包含所述第二时间差Td2。
4.权利要求2的远程射频头RRH,其中,所述时间量等于所述第一时间差Td1。
5.权利要求3的远程射频头RRH,其中,所述时间量等于第一时间差Td1与第二时间差Td2之间较大的值。
6.权利要求3的远程射频头RRH,其中,所述时间量等于无线通信系统基 站当前上下行周期之前的N个周期内的每个周期的第二时间差Td2与第一时间差Td1的平均值与当前的Td1之和,其中,N是大于1的整数。
7.权利要求2的远程射频头RRH,进一步包含下行单元和脉冲发生器,下行单元用于从BBU接收下行数据,脉冲发生器用于生成触发D/A向无线通信设备发送下行数据的下行脉冲TDL,帧首延时测量装置进一步包含:
用于测量下行脉冲TDL的发生时间与来自BBU的下行帧的第一个数据采样到达下行单元的时间之间的时间差的装置。
8.权利要求3的远程射频头RRH,其中,RRH进一步包含下行单元和脉冲发生器,下行单元用于从BBU接收下行数据,脉冲发生器用于生成触发无线通信系统基站在下行模式与上行模式之间切换的转换脉冲Ts,帧尾延时测量装置进一步包含:
用于测量转换脉冲Ts的发生时间与来自BBU的下行帧的最后一个数据采样到达下行单元的时间之间的时间差的装置。
9.一种无线通信系统基站,包含基带单元BBU和通过网络可通信地连接的权利要求1-8的任何一个所述的用于无线通信系统基站的远程射频头RRH,其中,所述BBU进一步包含:
同步单元,用于将BBU处理和发送下行数据的启动时间,提前一个根据延时报告单元所报告的延时数据获得的时间量。
10.权利要求9的无线通信系统基站,其中,BBU进一步包括下行数据处理单元和定时器,其中,下行数据处理单元用于处理和发送下行数据,定时器用于生成用于触发下行数据处理单元启动处理和发送下行数据的定时基带处理脉冲,所述同步单元包含定时修正单元,定时修正单元根据用于触发下行数据处理单元启动处理和发送下行数据的定时基带处理脉冲和所述延时数据,生成延时后的时钟脉冲以取代用于触发下行数据处理单元启动处理和发送下行数据的定时基带处理脉冲,使所述下行数据处理单元处理和发送下行数据的启动时间,提前所述时间量。
11.一种用于无线通信系统基站的数据传输的同步方法,所述无线通信系统基站包含通过网络可通信地连接的远程射频头RRH和基带单元BBU,其中,BBU处理并向RRH发送下行数据,所述同步方法包含:
测量下行数据从BBU到达RRH时的延时;
从RRH向BBU报告关于所测量的延时的延时数据,其中,所述延时数据用于将BBU处理和发送下行数据的启动时间,提前一个根据所报告的延时数据获得的时间量。
12.权利要求11的同步方法,其中,RRH包含数模转换器D/A,用于向无线通信设备发送下行数据,所述测量下行数据从BBU到达RRH时的延时包含:
测量D/A开始向无线通信设备发送下行数据的时间与下行数据的数据帧的第一个数据采样到达RRH的时间之间的第一时间差Td1,
其中,所述延时数据包含所述第一时间差Td1。
13.权利要求12的同步方法,其中,无线通信系统基站在下行模式与上行模式之间切换,所述测量下行数据从BBU到达RRH时的延时进一步包含:
测量无线通信系统基站从下行模式向上行模式切换的时间与下行数据的数据帧的最后一个数据采样到达RRH的时间之间的第二时间差Td2;
其中,所述延时数据进一步包含所述第二时间差Td2。
14.权利要求12的同步方法,其中,所述时间量等于所述第一时间差Td1。
15.权利要求13的同步方法,其中,所述时间量等于第一时间差Td1与第二时间差Td2之间较大的值。
16.权利要求13的同步方法,其中,所述时间量等于当前上下行周期之前的N个周期内的每个周期的第二时间差Td2与第一时间差Td1的平均值与当前的Td1之和,其中,N是大于1的整数。
17.权利要求12的同步方法,其中,RRH进一步包含下行单元和脉冲发生器,下行单元用于从BBU接收下行数据,脉冲发生器用于生成触发D/A向无线通信设备发送下行数据的下行脉冲TDL,所述测量D/A开始向无线通信设备发送 下行数据的时间与下行数据的数据帧的第一个数据采样到达RRH的时间之间的第一时间差Td1进一步包含:
测量下行脉冲TDL的发生时间与来自BBU的下行帧的第一个数据采样到达下行单元的时间之间的时间差。
18.权利要求13的同步方法,其中,RRH进一步包含下行单元和脉冲发生器,下行单元用于从BBU接收下行数据,脉冲发生器用于生成触发无线通信系统基站在下行模式与上行模式之间切换的转换脉冲Ts,所述测量无线通信系统基站从下行模式向上行模式切换的时间与下行数据的数据帧的最后一个数据采样到达RRH的时间之间的第二时间差Td2进一步包含:
测量转换脉冲Ts的发生时间与来自BBU的下行帧的最后一个数据采样的时间之间的时间差。
19.权利要求11-18的任何之一的同步方法,其中,BBU包括下行数据处理单元和定时器,其中,下行数据处理单元用于处理和发送下行数据,定时器用于生成用于触发下行数据处理单元启动处理和发送下行数据的定式基带处理脉冲,所述方法进一步包含:
根据用于触发下行数据处理单元启动处理和发送下行数据的定时基带处理脉冲和所述延时数据,生成延时后的时钟脉冲以取代所述用于触发下行数据处理单元启动处理和发送下行数据的定时基带处理脉冲,使所述下行数据处理单元处理和发送下行数据的启动时间,提前所述时间量。
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910170969.2A CN101998616B (zh) | 2009-08-31 | 2009-08-31 | 无线通信系统基站及其数据传输的同步方法 |
PCT/EP2010/061960 WO2011023592A1 (en) | 2009-08-31 | 2010-08-17 | Wireless communication system |
JP2012526002A JP5593388B2 (ja) | 2009-08-31 | 2010-08-17 | 無線通信システム |
US13/392,887 US8767710B2 (en) | 2009-08-31 | 2010-08-17 | Wireless communication system |
EP10744577A EP2443884B1 (en) | 2009-08-31 | 2010-08-17 | Wireless communication system |
US13/571,534 US8780886B2 (en) | 2009-08-31 | 2012-08-10 | Wireless communication system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910170969.2A CN101998616B (zh) | 2009-08-31 | 2009-08-31 | 无线通信系统基站及其数据传输的同步方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101998616A CN101998616A (zh) | 2011-03-30 |
CN101998616B true CN101998616B (zh) | 2014-05-14 |
Family
ID=42830417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910170969.2A Expired - Fee Related CN101998616B (zh) | 2009-08-31 | 2009-08-31 | 无线通信系统基站及其数据传输的同步方法 |
Country Status (5)
Country | Link |
---|---|
US (2) | US8767710B2 (zh) |
EP (1) | EP2443884B1 (zh) |
JP (1) | JP5593388B2 (zh) |
CN (1) | CN101998616B (zh) |
WO (1) | WO2011023592A1 (zh) |
Families Citing this family (75)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5480916B2 (ja) | 2009-02-03 | 2014-04-23 | コーニング ケーブル システムズ リミテッド ライアビリティ カンパニー | 光ファイバベースの分散型アンテナシステム、構成要素、及びその較正のための関連の方法 |
AU2010210766A1 (en) | 2009-02-03 | 2011-09-15 | Corning Cable Systems Llc | Optical fiber-based distributed antenna systems, components, and related methods for monitoring and configuring thereof |
US9673904B2 (en) | 2009-02-03 | 2017-06-06 | Corning Optical Communications LLC | Optical fiber-based distributed antenna systems, components, and related methods for calibration thereof |
US8280259B2 (en) | 2009-11-13 | 2012-10-02 | Corning Cable Systems Llc | Radio-over-fiber (RoF) system for protocol-independent wired and/or wireless communication |
US8275265B2 (en) | 2010-02-15 | 2012-09-25 | Corning Cable Systems Llc | Dynamic cell bonding (DCB) for radio-over-fiber (RoF)-based networks and communication systems and related methods |
US9252874B2 (en) | 2010-10-13 | 2016-02-02 | Ccs Technology, Inc | Power management for remote antenna units in distributed antenna systems |
WO2012148938A1 (en) * | 2011-04-29 | 2012-11-01 | Corning Cable Systems Llc | Determining propagation delay of communications in distributed antenna systems, and related components, systems and methods |
WO2012148940A1 (en) | 2011-04-29 | 2012-11-01 | Corning Cable Systems Llc | Systems, methods, and devices for increasing radio frequency (rf) power in distributed antenna systems |
CN102325366B (zh) * | 2011-05-24 | 2014-07-09 | 大唐移动通信设备有限公司 | 一种数据同步方法、系统及装置 |
CN102802226B (zh) * | 2011-05-25 | 2016-06-22 | 联芯科技有限公司 | 射频通道切换时调整终端定时的系统及方法 |
KR101773517B1 (ko) * | 2011-08-03 | 2017-09-12 | 에스케이텔레콤 주식회사 | 통신 시스템 및 방법 |
EP2842245A1 (en) | 2012-04-25 | 2015-03-04 | Corning Optical Communications LLC | Distributed antenna system architectures |
US8934452B2 (en) * | 2012-07-17 | 2015-01-13 | Alcatel Lucent | Method, apparatus and computer readable medium for timing alignment in overlaid heterogeneous wireless networks |
US9125047B2 (en) * | 2012-07-26 | 2015-09-01 | Nec Laboratories America, Inc. | Cloud-based radio access network for small cells |
EP2883416A1 (en) | 2012-08-07 | 2015-06-17 | Corning Optical Communications Wireless Ltd. | Distribution of time-division multiplexed (tdm) management services in a distributed antenna system, and related components, systems, and methods |
US9455784B2 (en) | 2012-10-31 | 2016-09-27 | Corning Optical Communications Wireless Ltd | Deployable wireless infrastructures and methods of deploying wireless infrastructures |
US9647758B2 (en) | 2012-11-30 | 2017-05-09 | Corning Optical Communications Wireless Ltd | Cabling connectivity monitoring and verification |
US9380466B2 (en) | 2013-02-07 | 2016-06-28 | Commscope Technologies Llc | Radio access networks |
US9936470B2 (en) | 2013-02-07 | 2018-04-03 | Commscope Technologies Llc | Radio access networks |
US9414399B2 (en) | 2013-02-07 | 2016-08-09 | Commscope Technologies Llc | Radio access networks |
EP3094156B1 (en) * | 2013-02-07 | 2023-05-17 | CommScope Technologies LLC | Radio access networks in which remote units synchronize clocks with a controller |
CN108811189B (zh) | 2013-02-22 | 2021-12-10 | Adc电信股份有限公司 | 通用远程无线电头 |
JP6131670B2 (ja) * | 2013-03-27 | 2017-05-24 | 富士通株式会社 | 無線基地局、無線制御装置、無線装置、及び、遅延量測定方法 |
CN105452951B (zh) | 2013-06-12 | 2018-10-19 | 康宁光电通信无线公司 | 电压控制式光学定向耦合器 |
EP3008828B1 (en) | 2013-06-12 | 2017-08-09 | Corning Optical Communications Wireless Ltd. | Time-division duplexing (tdd) in distributed communications systems, including distributed antenna systems (dass) |
US9247543B2 (en) | 2013-07-23 | 2016-01-26 | Corning Optical Communications Wireless Ltd | Monitoring non-supported wireless spectrum within coverage areas of distributed antenna systems (DASs) |
US9661781B2 (en) | 2013-07-31 | 2017-05-23 | Corning Optical Communications Wireless Ltd | Remote units for distributed communication systems and related installation methods and apparatuses |
US9385810B2 (en) | 2013-09-30 | 2016-07-05 | Corning Optical Communications Wireless Ltd | Connection mapping in distributed communication systems |
WO2015064938A1 (ko) * | 2013-10-28 | 2015-05-07 | 주식회사 케이엠더블유 | 도우너 유니트, 리모트 유니트 및 이를 구비한 이동통신 기지국 시스템 |
KR101528324B1 (ko) * | 2013-10-28 | 2015-06-16 | 주식회사 케이엠더블유 | 도우너 유니트, 리모트 유니트 및 이를 구비한 이동통신 기지국 시스템 |
US9178635B2 (en) | 2014-01-03 | 2015-11-03 | Corning Optical Communications Wireless Ltd | Separation of communication signal sub-bands in distributed antenna systems (DASs) to reduce interference |
US9775123B2 (en) | 2014-03-28 | 2017-09-26 | Corning Optical Communications Wireless Ltd. | Individualized gain control of uplink paths in remote units in a distributed antenna system (DAS) based on individual remote unit contribution to combined uplink power |
CN110557690B (zh) * | 2014-04-29 | 2021-11-09 | 华为技术有限公司 | 射频拉远集线器rhub、室内通信系统、信号传输方法 |
JP6247999B2 (ja) * | 2014-05-29 | 2017-12-13 | 株式会社Nttドコモ | 分散アンテナシステム及び分散アンテナシステムにおける遅延補正方法 |
US9357551B2 (en) | 2014-05-30 | 2016-05-31 | Corning Optical Communications Wireless Ltd | Systems and methods for simultaneous sampling of serial digital data streams from multiple analog-to-digital converters (ADCS), including in distributed antenna systems |
CN106797641B (zh) | 2014-06-09 | 2021-07-16 | 艾尔瓦纳有限合伙公司 | 在无线电接入网络中调度相同的资源 |
US9730228B2 (en) | 2014-08-29 | 2017-08-08 | Corning Optical Communications Wireless Ltd | Individualized gain control of remote uplink band paths in a remote unit in a distributed antenna system (DAS), based on combined uplink power level in the remote unit |
US9451571B2 (en) * | 2014-09-22 | 2016-09-20 | Alcatel Lucent | Determining uplink and downlink delays between a baseband unit and a remote radio head |
US9602210B2 (en) | 2014-09-24 | 2017-03-21 | Corning Optical Communications Wireless Ltd | Flexible head-end chassis supporting automatic identification and interconnection of radio interface modules and optical interface modules in an optical fiber-based distributed antenna system (DAS) |
US9420542B2 (en) | 2014-09-25 | 2016-08-16 | Corning Optical Communications Wireless Ltd | System-wide uplink band gain control in a distributed antenna system (DAS), based on per band gain control of remote uplink paths in remote units |
CN105704806B (zh) * | 2014-11-28 | 2020-06-12 | 中兴通讯股份有限公司 | 一种数据传输时延的校正方法及装置 |
EP3245777B1 (en) * | 2015-01-13 | 2021-04-28 | RANIOT Technologies Oy | A base station and a method thereto |
US20160249365A1 (en) | 2015-02-19 | 2016-08-25 | Corning Optical Communications Wireless Ltd. | Offsetting unwanted downlink interference signals in an uplink path in a distributed antenna system (das) |
EP3269118B8 (en) | 2015-03-11 | 2021-03-17 | CommScope, Inc. of North Carolina | Distributed radio access network with adaptive fronthaul |
CN104730483B (zh) * | 2015-03-13 | 2017-07-28 | 郑州万特电气股份有限公司 | 一种无线脉冲同步采样方法 |
US9681313B2 (en) | 2015-04-15 | 2017-06-13 | Corning Optical Communications Wireless Ltd | Optimizing remote antenna unit performance using an alternative data channel |
US11444809B2 (en) * | 2015-04-16 | 2022-09-13 | Andrew Wireless Systems Gmbh | Uplink signal combiners for mobile radio signal distribution systems using ethernet data networks |
US10039097B2 (en) * | 2015-05-04 | 2018-07-31 | Verizon Patent And Licensing Inc. | Remote head simultaneously transmitting radio wave |
EP3305011B1 (en) * | 2015-05-29 | 2020-03-18 | Telefonaktiebolaget LM Ericsson (publ) | Communication between base stations in a radio access network |
US10177898B2 (en) | 2015-06-17 | 2019-01-08 | Telefonaktiebolaget Lm Ericsson (Publ) | Methods for signal detection in a system with sparse synchronization signal rate |
US9948349B2 (en) | 2015-07-17 | 2018-04-17 | Corning Optical Communications Wireless Ltd | IOT automation and data collection system |
US10560214B2 (en) | 2015-09-28 | 2020-02-11 | Corning Optical Communications LLC | Downlink and uplink communication path switching in a time-division duplex (TDD) distributed antenna system (DAS) |
US10608734B2 (en) | 2015-10-22 | 2020-03-31 | Phluido, Inc. | Virtualization and orchestration of a radio access network |
US10785791B1 (en) | 2015-12-07 | 2020-09-22 | Commscope Technologies Llc | Controlling data transmission in radio access networks |
JP6134024B1 (ja) * | 2016-02-29 | 2017-05-24 | ソフトバンク株式会社 | 通信システム及びスモールセル基地局 |
US10236924B2 (en) | 2016-03-31 | 2019-03-19 | Corning Optical Communications Wireless Ltd | Reducing out-of-channel noise in a wireless distribution system (WDS) |
FR3052945B1 (fr) * | 2016-06-16 | 2018-07-06 | Thales Sa | Procede ameliore de transmission de donnees par satellite, a tres haut debit |
WO2018017468A1 (en) | 2016-07-18 | 2018-01-25 | Phluido, Inc. | Synchronization of radio units in radio access networks |
CN107979421B (zh) * | 2016-10-24 | 2020-03-27 | 中兴通讯股份有限公司 | 一种在rru侧进行时延补偿的方法及装置 |
CN108322275B (zh) * | 2017-01-18 | 2021-07-16 | 深圳市中兴微电子技术有限公司 | 一种基于单位脉冲响应的链路时延测量方法及装置 |
US10356002B2 (en) | 2017-01-24 | 2019-07-16 | Nokia Solutions And Networks Oy | Processing real-time multipoint-to-point traffic |
US10772060B2 (en) * | 2017-04-20 | 2020-09-08 | Huawei Technologies Co., Ltd. | Remote radio head equipped with user equipment terminal capability |
US11678358B2 (en) | 2017-10-03 | 2023-06-13 | Commscope Technologies Llc | Dynamic downlink reuse in a C-RAN |
US12016084B2 (en) | 2018-01-04 | 2024-06-18 | Commscope Technologies Llc | Management of a split physical layer in a radio area network |
CN111989971A (zh) | 2018-05-16 | 2020-11-24 | 康普技术有限责任公司 | C-ran中的动态上行链路重复使用 |
EP3794889B1 (en) | 2018-05-16 | 2023-07-05 | CommScope Technologies LLC | Downlink multicast for efficient front-haul utilization in a c-ran |
US10798667B2 (en) | 2018-06-08 | 2020-10-06 | Commscope Technologies Llc | Automatic transmit power control for radio points of a centralized radio access network that primarily provide wireless service to users located in an event area of a venue |
US12219510B2 (en) | 2018-08-29 | 2025-02-04 | Commscope Technologies Llc | Clock synchronization in a centralized radio access network having multiple controllers |
JP7302603B2 (ja) * | 2018-08-29 | 2023-07-04 | 日本電気株式会社 | 通信装置、方法、及びプログラム |
CN112640379A (zh) | 2018-09-04 | 2021-04-09 | 康普技术有限责任公司 | 用于集中式无线电接入网络中的前传速率降低 |
US11689939B2 (en) * | 2018-10-31 | 2023-06-27 | John Mezzalingua Associates, LLC | Orchestrator and interconnection fabric mapper for a virtual wireless base station |
CN111615074B (zh) * | 2020-05-12 | 2021-09-24 | 京信网络系统股份有限公司 | 室内分布式系统、数据传输方法和存储介质 |
US11431425B2 (en) * | 2020-09-24 | 2022-08-30 | Corning Research & Development Corporation | Measuring an end-to-end delay(s) in a distributed communications system |
US20230337024A1 (en) * | 2022-04-14 | 2023-10-19 | Qualcomm Incorporated | Wake-up signal based semi-persistent scheduling configuration for extended reality traffic |
WO2024225939A1 (en) * | 2023-04-24 | 2024-10-31 | Telefonaktiebolaget Lm Ericsson (Publ) | A network entity for synchronization over a packet-based fronthaul network |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1698295A (zh) * | 2003-01-30 | 2005-11-16 | 三星电子株式会社 | 用于测量和补偿在由光缆相互连接的主基站和远程基站之间的延迟的装置和方法 |
WO2006040653A1 (en) * | 2004-10-12 | 2006-04-20 | Telefonaktiebolaget Lm Ericsson (Publ) | Communication between a radio equipment control node and multiple remote radio equipment nodes |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08307932A (ja) * | 1995-03-09 | 1996-11-22 | Kokusai Electric Co Ltd | 移動通信基地局間tdm同期方法及び移動通信基地局間tdm同期システム |
EP0896492A1 (en) * | 1997-08-06 | 1999-02-10 | TELEFONAKTIEBOLAGET L M ERICSSON (publ) | A method and an arrangement supporting propagation delay compensation |
US6016322A (en) | 1997-09-22 | 2000-01-18 | Kor Electronics, Inc. | Apparatus and method for self synchronization in a digital data wireless communication system |
WO2001069853A2 (en) * | 2000-03-17 | 2001-09-20 | British Telecommunications Public Limited Company | Synchronised data delivery |
US20030012158A1 (en) | 2001-01-25 | 2003-01-16 | Hang Jin | System and method for synchronizing a base station in a distributed radio system |
US7493129B1 (en) | 2002-09-12 | 2009-02-17 | At&T Mobility Ii Llc | Method and apparatus to maintain network coverage when using a transport media to communicate with a remote antenna |
US20040057543A1 (en) * | 2002-09-24 | 2004-03-25 | Arie Huijgen | Synchronizing radio units in a main-remote radio base station and in a hybrid radio base station |
AU2004208744B8 (en) | 2003-01-30 | 2008-08-21 | Samsung Electronics Co., Ltd. | Apparatus and method for measuring and compensating delay between main base station and remote base station interconnected by an optical cable |
JP4139716B2 (ja) * | 2003-03-26 | 2008-08-27 | 三菱電機株式会社 | 無線基地局および位相調整方法 |
US20050157675A1 (en) | 2004-01-16 | 2005-07-21 | Feder Peretz M. | Method and apparatus for cellular communication over data networks |
KR100735344B1 (ko) | 2004-08-16 | 2007-07-04 | 삼성전자주식회사 | 통신 시스템에서 기지국들 간의 시간 동기 획득 방법 및 시스템 |
CN100426897C (zh) | 2005-01-12 | 2008-10-15 | 华为技术有限公司 | 分体式基站系统及其组网方法和基带单元 |
JP2006245800A (ja) | 2005-03-01 | 2006-09-14 | Nec Corp | W−cdma基地局 |
US20080181182A1 (en) | 2007-01-12 | 2008-07-31 | Scott Carichner | Digital radio head system and method |
WO2009048094A1 (ja) | 2007-10-09 | 2009-04-16 | Hitachi Communication Technologies, Ltd. | 無線通信システム、基地局間同期方法および基地局 |
CN101146257B (zh) * | 2007-10-16 | 2011-08-31 | 深圳国人通信有限公司 | 提高数据传输的同步精度的方法和系统 |
US8626238B2 (en) * | 2008-06-24 | 2014-01-07 | Adc Telecommunications, Inc. | Method and apparatus for switching in a TDD system |
-
2009
- 2009-08-31 CN CN200910170969.2A patent/CN101998616B/zh not_active Expired - Fee Related
-
2010
- 2010-08-17 WO PCT/EP2010/061960 patent/WO2011023592A1/en active Application Filing
- 2010-08-17 US US13/392,887 patent/US8767710B2/en not_active Expired - Fee Related
- 2010-08-17 EP EP10744577A patent/EP2443884B1/en active Active
- 2010-08-17 JP JP2012526002A patent/JP5593388B2/ja not_active Expired - Fee Related
-
2012
- 2012-08-10 US US13/571,534 patent/US8780886B2/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1698295A (zh) * | 2003-01-30 | 2005-11-16 | 三星电子株式会社 | 用于测量和补偿在由光缆相互连接的主基站和远程基站之间的延迟的装置和方法 |
WO2006040653A1 (en) * | 2004-10-12 | 2006-04-20 | Telefonaktiebolaget Lm Ericsson (Publ) | Communication between a radio equipment control node and multiple remote radio equipment nodes |
Also Published As
Publication number | Publication date |
---|---|
WO2011023592A1 (en) | 2011-03-03 |
EP2443884B1 (en) | 2012-10-03 |
US20120163299A1 (en) | 2012-06-28 |
US8780886B2 (en) | 2014-07-15 |
US20120300766A1 (en) | 2012-11-29 |
JP5593388B2 (ja) | 2014-09-24 |
EP2443884A1 (en) | 2012-04-25 |
JP2013503533A (ja) | 2013-01-31 |
US8767710B2 (en) | 2014-07-01 |
CN101998616A (zh) | 2011-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101998616B (zh) | 无线通信系统基站及其数据传输的同步方法 | |
Chih-Lin et al. | Rethink fronthaul for soft RAN | |
Luvisotto et al. | Physical layer design of high-performance wireless transmission for critical control applications | |
US11171769B2 (en) | Time synchronization method, apparatus, and system | |
CN113612564B (zh) | 一种报文处理的方法和网络设备 | |
US20140023048A1 (en) | Method and System for Phase Compensation in Multi-Path Communication Device | |
CN108964819B (zh) | 一种时钟调整、时钟偏差计算方法、设备及系统 | |
WO2020151806A1 (en) | Time synchronization mechanisms for wireless end points | |
CN106465316A (zh) | 大天线计数系统的同步 | |
EP3404866A1 (en) | Device and method for supporting clock transfer in multiple clock domains | |
WO2008125051A1 (en) | Network clock synchronization floating window and window delineation | |
JP2015523763A (ja) | 同期追跡参照信号の送信処理、受信処理方法及び装置 | |
Checko et al. | Synchronization challenges in packet-based Cloud-RAN fronthaul for mobile networks | |
CN103369662A (zh) | 适配器、基带处理单元和基站系统 | |
WO2022152037A1 (zh) | 资源配置、获取方法及装置 | |
CN101800612A (zh) | 基于IEEE 802.16d改进的MAC层同步方法 | |
JP2009231885A (ja) | Phs基地局間同期システム及び方法 | |
US9401878B2 (en) | Packet synchronization switching method and gateway device | |
CN103580845B (zh) | 一种基于虚拟交换集群的时钟同步方法及装置 | |
TWI498024B (zh) | 無線通訊系統基地台及其資料傳輸同步方法 | |
Mathew et al. | Packet generation schemes and network latency implications in SDN-enabled 5G C-RANs: Queuing model based analysis | |
CN101267390B (zh) | 异步时延网络通信方法及其系统、缓存处理装置 | |
JP2007053627A (ja) | 無線通信システム | |
JP2013030873A (ja) | 通信装置、パケット化周期変更方法、及びプログラム | |
Kim et al. | A novel synchronous duplexing method for long distance wireless backhaul system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140514 |