[go: up one dir, main page]

CN101972782A - Device and method for cooling intermediate rolled blank of hot rolled strip - Google Patents

Device and method for cooling intermediate rolled blank of hot rolled strip Download PDF

Info

Publication number
CN101972782A
CN101972782A CN2010102838960A CN201010283896A CN101972782A CN 101972782 A CN101972782 A CN 101972782A CN 2010102838960 A CN2010102838960 A CN 2010102838960A CN 201010283896 A CN201010283896 A CN 201010283896A CN 101972782 A CN101972782 A CN 101972782A
Authority
CN
China
Prior art keywords
cooling
intermediate billet
header
control valve
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102838960A
Other languages
Chinese (zh)
Other versions
CN101972782B (en
Inventor
张立杰
余伟
刘涛
何春雨
詹智敏
韩爽
邓宏玉
程知松
徐言东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Beijing USTB
Original Assignee
University of Science and Technology Beijing USTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Beijing USTB filed Critical University of Science and Technology Beijing USTB
Priority to CN2010102838960A priority Critical patent/CN101972782B/en
Publication of CN101972782A publication Critical patent/CN101972782A/en
Application granted granted Critical
Publication of CN101972782B publication Critical patent/CN101972782B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Metal Rolling (AREA)
  • Control Of Metal Rolling (AREA)

Abstract

本发明提供一种热轧带钢轧制中间坯的冷却装置及其冷却方法。该装置包括安装在辊道上方上集管和安装在辊道之间下集管;其中,上集管和下集管上均设有喷嘴和开闭控制阀,并通过集管供水管路与车间循环水系统连接;集管供水管路上设置流量控制阀。所述开闭控制阀和流量控制阀由可编程控制器控制。在每两根辊道之间布置了多组可单独控制开闭的、流量较小的冷却集管,采用喷射水流冷却中间坯,并根据中间坯的传输速度对冷却速度进行相应的动态控制。本发明的特点是:设备相对简单,维护方便,对水质的要求低,水流稳定性好,不受粗轧机升速和抛钢减速限制,生产效率高;采用轧机冷却水,无需单独的给排水系统;中间坯晶粒显著细化,改善钢板力学性能。

The invention provides a cooling device and a cooling method for a hot-rolled strip rolling intermediate billet. The device includes an upper header installed above the roller table and a lower header installed between the roller tables; wherein, the upper header and the lower header are equipped with nozzles and opening and closing control valves, and are connected with the water supply pipeline of the header. The workshop circulating water system is connected; the flow control valve is set on the header water supply pipeline. The on-off control valve and the flow control valve are controlled by a programmable controller. Between every two roller tables, multiple groups of cooling headers with low flow rate that can be individually controlled to open and close are arranged, and the intermediate billet is cooled by spraying water, and the cooling speed is dynamically controlled according to the transfer speed of the intermediate billet. The characteristics of the invention are: relatively simple equipment, convenient maintenance, low requirements on water quality, good water flow stability, not limited by roughing mill speed up and steel throwing deceleration, high production efficiency; using rolling mill cooling water, no separate water supply and drainage system; the grains of the intermediate billet are significantly refined to improve the mechanical properties of the steel plate.

Description

一种热轧带钢轧制中间坯的冷却装置及其冷却方法 Cooling device and cooling method for hot-rolled strip rolling intermediate billet

技术领域technical field

本发明属于轧钢生产冷却技术,特别涉及一种热轧带钢轧制中间坯的冷却装置及其冷却方法。The invention belongs to the cooling technology of steel rolling production, in particular to a cooling device and cooling method for hot-rolled strip steel rolling intermediate blank.

背景技术Background technique

为提高钢材的强度和韧性,经过控制轧制细化奥氏体晶粒或增多变形奥氏体晶粒内部的位错滑移带,即增加有效晶界面积,为相变时铁素体形核提供更多、更分散的形核位置,得到细小分散的铁素体和珠光体或贝氏体组织。细化铁素体晶粒不仅能提高钢的强度,而且改善钢的韧性。然而,传统的控制轧制理论发展至今始终超越不了三个阶段控制轧制技术,即:奥氏体再结晶区轧制、奥氏体未再结晶区轧制以及α+γ两相区轧制。因α+γ两相区轧制温度角度,变形抗力大,考虑对轧机负荷带来的不利影响,工业实际普遍采用的是以奥氏体再结晶区轧制的粗轧阶段和以奥氏体未再结晶区轧制的精轧阶段。这就意味着,控制轧制过程必须在粗轧和精轧中间避开部分再结晶区,以最大化降低混晶组织给力学性能带来的负面影响。In order to improve the strength and toughness of steel, the austenite grains are refined by controlled rolling or the dislocation slip bands inside the deformed austenite grains are increased, that is, the effective grain boundary area is increased, which is the ferrite nucleation during phase transformation. Provide more and more dispersed nucleation sites, and obtain finely dispersed ferrite and pearlite or bainite structures. Refining ferrite grains can not only increase the strength of steel, but also improve the toughness of steel. However, the development of the traditional controlled rolling theory has not surpassed the three-stage controlled rolling technology, namely: rolling in the austenite recrystallization zone, rolling in the austenite non-recrystallization zone, and rolling in the α+γ two-phase zone. . Due to the rolling temperature angle in the α+γ two-phase region, the deformation resistance is large, and considering the adverse effects on the load of the rolling mill, the industry generally adopts the rough rolling stage of rolling in the austenite recrystallization region and the austenite rolling stage. Finishing stage of rolling in the non-recrystallized zone. This means that the controlled rolling process must avoid the partial recrystallization zone between rough rolling and finish rolling, so as to minimize the negative impact of the mixed crystal structure on the mechanical properties.

目前,国内外普遍采用的方法是让粗轧后的钢板在传送辊道上空冷待温,直至温降到未再结晶区后进行精轧。钢板在空气中冷却速度慢,耗时长,轧机生产节奏慢,严重制约了钢铁生产的经济效率。对于粗轧机与精轧机之间有热卷箱的热轧带钢生产线,则由于中间辊道长度较短,中间坯降温能力不足,导致生产效率降低或可轧制钢种的规格受到限制。At present, the method commonly used at home and abroad is to allow the steel plate after rough rolling to be air-cooled on the conveying roller table until the temperature drops to the non-recrystallized area before finishing rolling. The cooling speed of the steel plate in the air is slow and time-consuming, and the production rhythm of the rolling mill is slow, which seriously restricts the economic efficiency of steel production. For the hot-rolled strip steel production line with hot coil boxes between the roughing mill and the finishing mill, due to the short length of the intermediate roller table, the cooling capacity of the intermediate billet is insufficient, resulting in a reduction in production efficiency or restrictions on the specifications of the rolled steel grades.

发明专利《热轧带钢中间坯层流冷却方法》(申请号:02144825.6)公开了一种热轧带钢中间坯冷却方法,其特征是:在粗轧机出口处安装层流冷却装置,形成长度为L的层流冷却区,通过计算中间坯每一点经过层流冷却区的时间和一块中间坯经过层流冷却区的总时间,按照中间坯的钢种和规格,计算出为使该中间坯冷却到所要求温度的冷却水流量,并使用层流冷却装置对中间坯进行冷却。The invention patent "Laminar Flow Cooling Method of Hot-rolled Strip Intermediate Billet" (application number: 02144825.6) discloses a hot-rolled strip intermediate billet cooling method, which is characterized in that a laminar cooling device is installed at the exit of the roughing mill to form a length is the laminar flow cooling zone of L, by calculating the time for each point of the intermediate billet to pass through the laminar flow cooling zone and the total time for a piece of intermediate billet to pass through the laminar flow cooling zone, according to the steel type and specification of the intermediate billet, it is calculated to make the intermediate billet Cool the cooling water flow to the required temperature, and use the laminar flow cooling device to cool the intermediate billet.

在热轧带钢生产领域,对于冷却过程的温降要求较严,一般要求冷却后的实际温度与目标温度相差在10℃之内。而目前已有的热轧带钢中间坯冷却形式,都是在两根辊道之间采用一组冷却器,其冷却强度过大,温度的控制精度一般在20℃左右,难以满足上述要求。上述热轧带钢中间坯层流冷却方法,设备较为复杂,需要在车间外和车间内建造水箱,并且对冷却水质要求较高,需要建立单独的水循环系统,导致整体投资较大,在一定程度上限制了其使用。In the field of hot-rolled strip steel production, there are strict requirements on the temperature drop in the cooling process. Generally, the difference between the actual temperature after cooling and the target temperature is required to be within 10°C. However, the existing cooling methods for hot-rolled strip intermediate blanks all use a set of coolers between two roller tables. The cooling intensity is too large, and the temperature control accuracy is generally around 20°C, which is difficult to meet the above requirements. The above laminar flow cooling method for the hot-rolled strip intermediate billet requires relatively complicated equipment, and requires the construction of water tanks outside and inside the workshop, and has high requirements for cooling water quality, and requires the establishment of a separate water circulation system, resulting in a large overall investment. restrictions on its use.

发明专利《一种中间坯冷却系统及冷却控制工艺》(申请号/专利号:200910104025)公开了一种中间坯冷却系统,其特征是:在粗轧机和精轧机之间,设置气雾冷却装置本体。所述的气雾冷却装置本体由上部冷却集管和下部冷却集管组成,在上部冷却集管和下部冷却集管的冷却水管上安装气雾喷嘴和压缩空气管;冷却水管和压缩空气管的开闭控制阀和流量控制阀与控制阀站连接。在轧机前后的辊道附近设置的冷却集管,通过对冷却集管喷射的水雾控制工艺技术对中间坯气雾冷却工艺进行控制。该发明可用于中厚板生产线。Invention patent "An intermediate billet cooling system and cooling control process" (application number/patent number: 200910104025) discloses an intermediate billet cooling system, which is characterized in that an air mist cooling device is installed between the roughing mill and the finishing mill ontology. The air mist cooling device body is composed of an upper cooling header and a lower cooling header, and an air mist nozzle and a compressed air pipe are installed on the cooling water pipes of the upper cooling header and the lower cooling header; the cooling water pipe and the compressed air pipe The on-off control valve and the flow control valve are connected with the control valve station. The cooling headers installed near the roller tables before and after the rolling mill control the intermediate billet gas mist cooling process through the water mist control technology sprayed on the cooling headers. The invention can be used in medium and thick plate production lines.

在中厚板尤其是宽厚板生产领域,由于冷却过程温降十分缓慢,钢板厚度方向和宽度方向均匀性控制难度大等特点,给中间坯控制冷却的实现带来了诸多难题。上面所述的气雾冷却形式的中间坯冷却系统,设备较为复杂,并且对气路、水路的洁净度以及压力控制范围要求较高,导致整体投资较大,在一定程度上限制了其使用。In the production field of medium and thick plates, especially wide and thick plates, due to the slow temperature drop in the cooling process and the difficulty in controlling the uniformity of the thickness direction and width direction of the steel plate, many difficulties have been brought to the realization of the controlled cooling of the intermediate billet. The intermediate billet cooling system in the form of gas mist cooling mentioned above has relatively complicated equipment, and has high requirements on the cleanliness of the air and water channels and the pressure control range, resulting in a large overall investment and limiting its use to a certain extent.

发明内容Contents of the invention

本发明的目的是提供一种设备制造工艺相对简单,维护方便,对水质的要求低,水流稳定性好,减少中间坯在粗轧和精轧中间的待温时间,加快轧制节奏,提高生产效率的热轧带钢轧制中间坯的冷却装置及其冷却方法。The purpose of the present invention is to provide an equipment with relatively simple manufacturing process, convenient maintenance, low requirements on water quality, good water flow stability, reducing the waiting time of the intermediate billet between rough rolling and finishing rolling, speeding up the rolling rhythm, and improving production. Efficient cooling device and cooling method for hot-rolled strip rolling intermediate billet.

本发明的技术方案是:一种热轧带钢轧制中间坯的冷却装置,该装置包括安装在辊道上方上集管和安装在辊道之间下集管;其中,所述上集管和下集管上均设有喷嘴和开闭控制阀,并通过集管供水管路与车间循环水系统连接;所述集管供水管路上设置流量控制阀。所述开闭控制阀和流量控制阀由可编程控制器控制。The technical solution of the present invention is: a cooling device for hot-rolled strip rolling intermediate billet, the device includes an upper header installed above the roller tables and a lower header installed between the roller tables; wherein, the upper header Nozzles and opening and closing control valves are provided on the header and the lower header, and are connected to the workshop circulating water system through the header water supply pipeline; a flow control valve is set on the header water supply pipeline. The on-off control valve and the flow control valve are controlled by a programmable controller.

本发明另一目的是提供一种热轧带钢轧制中间坯的冷却装置的冷却方法,具体步骤如下:Another object of the present invention is to provide a cooling method of a cooling device for hot-rolled strip rolling intermediate billet, the specific steps are as follows:

步骤1:在粗轧机出口的输送辊道上安装24-48组冷却装置,形成冷却区域,将由粗轧机轧制成厚度为20~60mm的中间坯送入所述冷却区域;Step 1: install 24-48 sets of cooling devices on the conveying roller table at the exit of the roughing mill to form a cooling area, and send the intermediate billet rolled by the roughing mill with a thickness of 20 to 60 mm into the cooling area;

步骤2:计算机根据所述中间坯的厚度、宽度、钢种和温度,以及所述中间坯要求冷却到的温度计算冷却水量;Step 2: The computer calculates the amount of cooling water according to the thickness, width, steel type and temperature of the intermediate billet, and the temperature to which the intermediate billet is required to be cooled;

步骤3:计算机通过可编程控制器控制开闭控制阀的开闭数量和流量控制阀的流量,上下集管实施冲击射流对所述中间坯控制冷却,冷却速度控制在3~30℃/s,达到设定温度后,进入下一工序。Step 3: The computer controls the opening and closing quantity of the opening and closing control valve and the flow rate of the flow control valve through the programmable controller, and the upper and lower headers implement impact jets to control the cooling of the intermediate billet, and the cooling rate is controlled at 3 to 30°C/s. After reaching the set temperature, enter the next process.

进一步,所述步骤还包括,热轧带钢过程中中间坯的传输过程中会有减速或加速变化,根据速度变化采用调整集管供水流量和改变集管开闭相结合控制精度和调整冷却速度的动态控制。Further, the steps also include that there will be deceleration or acceleration changes in the transmission process of the intermediate billet during the hot strip rolling process, and according to the speed change, the combination of adjusting the water supply flow of the header and changing the opening and closing of the header is used to control the accuracy and adjust the cooling speed dynamic control.

所述的冲击射流水冷却压力控制为0.3~1.0MPa。The cooling pressure of the impinging jet water is controlled to be 0.3-1.0 MPa.

本发明的优点在于:The advantages of the present invention are:

1.由于分散布置的冷却集管不易发生钢板表面过度冷却,使钢板厚度方向冷却比较均匀,这一优点对于热轧带钢是很重要的。1. Since the scattered cooling headers are not easy to over-cool the surface of the steel plate, the cooling in the thickness direction of the steel plate is relatively uniform. This advantage is very important for hot-rolled strip steel.

2.设备制造工艺相对简单,维护方便,对水质的要求低,水流稳定性好。2. The equipment manufacturing process is relatively simple, easy to maintain, low in water quality requirements, and good in water flow stability.

3.由于在每两根辊道之间布置了多组可单独控制开闭的、流量较小的冷却集管,并根据中间坯的传输速度对冷却速度进行相应的动态控制,钢板温度的控制精度得到提高。3. Due to the arrangement of multiple groups of cooling headers that can be individually controlled to open and close with a small flow rate between every two roller tables, and the cooling speed is dynamically controlled according to the transmission speed of the intermediate billet, the control of the steel plate temperature Accuracy is improved.

4.冷却能力调节比较灵活,可采用调整集管供水流量和改变集管开闭组合相结合的手段来改善钢板冷却温度的控制精度和调整冷却速度。4. The adjustment of cooling capacity is relatively flexible. The method of adjusting the water supply flow of the header and changing the opening and closing combination of the header can be used to improve the control accuracy of the cooling temperature of the steel plate and adjust the cooling speed.

5.实施中间坯控制冷却时,不受粗轧机升速和抛钢减速限制,生产效率高。5. When the intermediate billet is controlled and cooled, it is not limited by the speed up of the roughing mill and the deceleration of the throwing steel, and the production efficiency is high.

6.控制冷却后中间坯晶粒显著细化,改善了钢板的力学性能。6. After controlled cooling, the grains of the intermediate billet are significantly refined, which improves the mechanical properties of the steel plate.

7.对冷却水质的要求低,可直接使用车间已有的轧机冷却中压水,使用后的冷却水直接进入车间循环水系统,无需单独的给排水系统,大大降低了水系统的投资。7. The requirements for cooling water quality are low, the existing rolling mill in the workshop can be directly used to cool the medium-pressure water, and the used cooling water can directly enter the circulating water system of the workshop, without a separate water supply and drainage system, which greatly reduces the investment in the water system.

8.冲击射流冷却中压水的控制压力为0.3~1.0MPa,可用压力范围宽。8. The control pressure of the pressure water in the impact jet cooling is 0.3-1.0MPa, and the available pressure range is wide.

9.冷却强度大,冷却水的利用率高。在相同比水量条件下,具有一定压力的冷却水单位体积带走的热量大,加大了核沸腾传热所占的比例,使换热系数提高,冷却速度快,尤其可以满足厚规格中间坯要求更快速的冷却能力。9. High cooling intensity and high utilization rate of cooling water. Under the condition of the same specific water volume, cooling water with a certain pressure will take away more heat per unit volume, increasing the proportion of nucleate boiling heat transfer, increasing the heat transfer coefficient and cooling speed, especially for thick intermediate billets. Faster cooling capacity is required.

本发明的方法可广泛应用于热轧带钢生产领域,适用范围广,可以满足不同轧钢车间的布置需要。在粗、精轧机之间采用待温辊道或者是热卷箱的热轧带钢生产线上,均可实现这种方法。The method of the invention can be widely used in the field of hot-rolled steel strip production, has a wide application range, and can meet the layout requirements of different rolling workshops. This method can be realized on the hot-rolled strip steel production line that adopts the warming roller table or the hot coil box between the roughing and finishing mills.

附图说明Description of drawings

图1为本发明的冷却(IC)装置的集管布置形式示意图。Fig. 1 is a schematic diagram of the header layout of the cooling (IC) device of the present invention.

图2为本发明在粗轧机和热卷箱之间设置冷却(IC)装置的布置示意图。Fig. 2 is a schematic diagram of the arrangement of a cooling (IC) device between the roughing mill and the hot coil box according to the present invention.

图3为本发明在粗轧机和精轧机之间设置中间坯控制冷却(IC)装置的布置示意图。Fig. 3 is a schematic diagram of the arrangement of an intermediate billet controlled cooling (IC) device between the roughing mill and the finishing mill in the present invention.

图中:In the picture:

1.粗轧机           2.冷却装置1. Rough rolling mill 2. Cooling device

3.切头剪           4.精轧机3. Cutting shears 4. Finishing mill

5.热卷箱           6.辊道5. Hot coil box 6. Roller table

7.上集管           8.下集管7. Upper header 8. Lower header

9.中间坯           10.供水管路9. Intermediate billet 10. Water supply pipeline

11.流量调节阀      12.开闭控制阀11. Flow regulating valve 12. Opening and closing control valve

13.喷嘴            14.可编程控制器13. Nozzle 14. Programmable controller

具体实施方式Detailed ways

下面结合附图和实施例对本发明的技术方案做进一步说明。The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.

如图1所示为一种热轧带钢轧制中间坯的冷却装置。该装置的上集管7通过支架安装在辊道6上方,下集管8安装在辊道6之间,上集管7和下集管8上均设有喷嘴13和开闭控制阀12,并通过集管供水管路10与车间循环水系统连接;集管供水管路10上设置有流量控制阀11;开闭控制阀12和流量控制阀11通过电缆与可编程控制器14连接,可编程控制器14通过通讯电缆与自动控制系统的计算机连接,可编程控制器14使上集管7和下集管8均匀喷出喷射水流冷却中间坯。As shown in Figure 1, it is a cooling device for hot strip rolling intermediate billet. The upper header 7 of the device is installed above the roller table 6 through a bracket, and the lower header 8 is installed between the roller tables 6. Both the upper header 7 and the lower header 8 are provided with nozzles 13 and opening and closing control valves 12. And be connected with workshop circulating water system by header water supply pipeline 10; The flow control valve 11 is arranged on the header water supply pipeline 10; On-off control valve 12 and flow control valve 11 are connected with programmable controller 14 by cable, can The programmable controller 14 is connected with the computer of the automatic control system through a communication cable, and the programmable controller 14 makes the upper header 7 and the lower header 8 evenly spray jet water to cool the intermediate billet.

如图2所示为本发明在粗轧机和热卷箱之间设置冷却(IC)装置的布置示意图。如图2所示,粗轧机1与热卷箱5之间的传输辊道,设置有冷却装置2,热卷箱5与精轧机4的传输辊道,设置有切头剪3。Figure 2 is a schematic diagram of the layout of the cooling (IC) device installed between the roughing mill and the hot coil box according to the present invention. As shown in FIG. 2 , the transmission roller table between the rough rolling mill 1 and the hot coil box 5 is provided with a cooling device 2 , and the transmission roller table between the hot coil box 5 and the finishing mill 4 is provided with a cropping shear 3 .

如图3所示为本发明在粗轧机和精轧机之间设置冷却(IC)装置的布置示意图。如图3所示,粗轧机1与精轧机4之间的传输辊道,设置有冷却装置2和切头剪3。Figure 3 is a schematic diagram of the arrangement of cooling (IC) devices between the rough rolling mill and the finishing mill in the present invention. As shown in FIG. 3 , the transfer roller table between the roughing mill 1 and the finishing mill 4 is provided with a cooling device 2 and a cropping shear 3 .

实例一:Example one:

用控制轧制工艺生产18.5mm厚度×80管线钢采用如图3所示的布置形式实施中间坯控制冷却。在粗轧机出口的输送辊道上安装48组冷却装置形成冷却区域,冷却水压力为1.0MPa,先由粗轧机轧将原料坯制成厚度为55mm的中间坯,中间坯温度为1030-1050℃,在轧制同时送入冷却区域;计算机根据所述中间坯的厚度、宽度、钢种和温度,以及所述中间坯的目标冷却温度计算冷却水量,通过可编程控制器操作控制开闭控制阀的开闭数量和流量控制阀的流量,上下集管实施冲击射流对所述中间坯控制冷却,冷却速度控制在3℃/s;中间坯头部进入冷却区域时速度稳定,无需减少冷却集管;中间坯抛钢时速度降低,计算机根据中间坯速度对集管开闭组数进行动态调整,中间坯抛钢减速时间段,减少集管组数,直到中间坯尾部完全通过冷却区域。中间坯经冷却后达到设定温度920~950℃后,进入下一工序-切头和精轧。To produce 18.5mm thick × 80 pipeline steel by controlled rolling process, the arrangement shown in Figure 3 is used to implement controlled cooling of the intermediate billet. 48 groups of cooling devices are installed on the conveying roller table at the exit of the roughing mill to form a cooling area. The cooling water pressure is 1.0MPa. First, the raw billet is rolled by the roughing mill into an intermediate billet with a thickness of 55mm. The temperature of the intermediate billet is 1030-1050°C. While rolling, it is sent into the cooling area; the computer calculates the amount of cooling water according to the thickness, width, steel type and temperature of the intermediate billet, and the target cooling temperature of the intermediate billet, and controls the opening and closing of the control valve through the programmable controller. The number of opening and closing and the flow rate of the flow control valve, the upper and lower headers implement impact jets to control the cooling of the intermediate billet, and the cooling speed is controlled at 3°C/s; when the head of the intermediate billet enters the cooling area, the speed is stable, and there is no need to reduce the cooling header; The speed decreases when the intermediate billet is thrown, and the computer dynamically adjusts the number of opening and closing groups of headers according to the speed of the intermediate billet. During the deceleration period of intermediate billet throwing, the number of header groups is reduced until the tail of the intermediate billet completely passes through the cooling area. After the intermediate billet reaches the set temperature of 920-950°C after cooling, it enters the next process-cutting and finishing rolling.

实例二:Example two:

铁素体轧制工艺生产2.0mm厚度的IF钢,采用如图2所示的布置形式实施中间坯控制冷却。在粗轧机出口的输送辊道上安装32组冷却装置形成冷却区域,冷却水压力为0.40MPa,先由粗轧机轧将原料坯制成厚度为22mm的中间坯,中间坯温度为1020-1050℃,在轧制同时送入冷却区域;计算机根据所述中间坯的厚度、宽度、钢种和温度,以及所述中间坯的目标冷却温度计算冷却水量,通过可编程控制器操作开闭控制阀的开闭数量和流量控制阀的流量,上下集管实施冲击射流对所述中间坯控制冷却冷却速度控制在20℃/s;中间坯头部进入冷却区域时速度仍升高,计算机根据中间坯速度对集管开闭组数进行动态调整,中间坯升速轧制时间段增加集管组数;中间坯抛钢时速度降低,计算机根据中间坯速度对集管开闭组数进行动态调整,中间坯抛钢减速时间段,减少集管组数,直到中间坯尾部完全通过冷却区域。中间坯经冷却后达到设定温度840~860℃后,进入下工序-卷取、开卷、切头和精轧。The ferritic rolling process produces IF steel with a thickness of 2.0 mm, and the layout shown in Figure 2 is used to implement controlled cooling of the intermediate billet. 32 groups of cooling devices are installed on the conveying roller table at the exit of the roughing mill to form a cooling area, the cooling water pressure is 0.40MPa, the raw billet is first rolled by the roughing mill into an intermediate billet with a thickness of 22mm, and the temperature of the intermediate billet is 1020-1050°C. While rolling, it is sent into the cooling area; the computer calculates the amount of cooling water according to the thickness, width, steel type and temperature of the intermediate billet, and the target cooling temperature of the intermediate billet, and the opening and closing control valve is operated by the programmable controller. The closing quantity and the flow rate of the flow control valve, the upper and lower headers implement impact jets to control the cooling rate of the intermediate billet at 20°C/s; when the head of the intermediate billet enters the cooling area, the speed still increases, and the computer adjusts the temperature according to the speed of the intermediate billet. The number of header opening and closing groups is dynamically adjusted, and the number of header groups is increased during the rising speed rolling period of the intermediate billet; the speed is reduced when the intermediate billet is thrown, and the computer dynamically adjusts the number of header opening and closing groups according to the speed of the intermediate billet During the deceleration period of steel throwing, reduce the number of header groups until the tail of the intermediate billet completely passes through the cooling area. After the intermediate billet reaches the set temperature of 840-860°C after cooling, it enters the next process - coiling, uncoiling, head cutting and finishing rolling.

实例三:Example three:

生产3.0mm焊瓶钢HP295采用如图2所示的布置形式实施中间坯控制冷却。在粗轧机出口的输送辊道上安装36组冷却装置形成冷却区域,冷却水压力为0.60MPa,先由粗轧机轧将原料坯制成厚度为32mm的中间坯,中间坯温度为1010-1040℃,在轧制同时送入冷却区域;计算机根据所述中间坯的厚度、宽度、钢种和温度,以及所述中间坯的目标冷却温度计算冷却水量,通过可编程控制器操作开闭控制阀的开闭数量和流量控制阀的流量,上下集管实施冲击射流对所述中间坯控制冷却,冷却速度控制在30℃/s;中间坯头部进入冷却区域时速度仍升高,计算机根据中间坯速度对集管开闭组数进行动态调整,中间坯升速轧制时间段增加集管组数;中间坯抛钢时速度降低,计算机根据中间坯速度对集管开闭组数进行动态调整,中间坯抛钢减速时间段,减少集管组数,直到中间坯尾部完全通过冷却区域。中间坯经冷却后达到设定温度930~950℃后,进入下工序-切头和精轧。The production of 3.0mm welded bottle steel HP295 adopts the arrangement shown in Figure 2 to implement controlled cooling of the intermediate billet. 36 groups of cooling devices are installed on the conveying roller table at the exit of the roughing mill to form a cooling area. The cooling water pressure is 0.60MPa. First, the roughing mill rolls the raw billet into an intermediate billet with a thickness of 32mm. The temperature of the intermediate billet is 1010-1040°C. While rolling, it is sent into the cooling area; the computer calculates the amount of cooling water according to the thickness, width, steel type and temperature of the intermediate billet, and the target cooling temperature of the intermediate billet, and the opening and closing control valve is operated by the programmable controller. The closing quantity and the flow rate of the flow control valve, the upper and lower headers implement impact jets to control the cooling of the intermediate billet, and the cooling speed is controlled at 30°C/s; when the head of the intermediate billet enters the cooling area, the speed still increases. The number of header opening and closing groups is dynamically adjusted, and the number of header groups is increased during the rising speed rolling period of the intermediate billet; the speed is reduced when the intermediate billet is thrown, and the computer dynamically adjusts the number of header opening and closing groups according to the speed of the intermediate billet. During the deceleration period of billet throwing, reduce the number of header groups until the tail of the intermediate billet completely passes through the cooling area. After the intermediate billet reaches the set temperature of 930-950°C after cooling, it enters the next process-cutting and finishing rolling.

Claims (4)

1.一种热轧带钢轧制中间坯的冷却装置:该装置包括安装在辊道上方上集管(7)和安装在辊道之间下集管(8);其特征在于,所述上集管(7)和下集管(8)上均设有喷嘴(13)和开闭控制阀(12),并通过集管供水管路(10)与车间循环水系统连接;所述集管供水管路(10)上设置有流量控制阀(11),所述开闭控制阀(12)和所述流量控制阀(11)由可编程控制器(14)控制。1. A cooling device for hot-rolled steel strip rolling intermediate billet: the device includes an upper header (7) installed above the roller table and a lower header (8) installed between the roller table; it is characterized in that the Nozzles (13) and on-off control valves (12) are provided on the upper header (7) and the lower header (8), and are connected to the workshop circulating water system through the header water supply pipeline (10); A flow control valve (11) is arranged on the pipe water supply line (10), and the opening and closing control valve (12) and the flow control valve (11) are controlled by a programmable controller (14). 2.根据权利要求1所述的热轧带钢轧制中间坯的冷却装置的冷却方法:具体步骤如下:2. the cooling method of the cooling device of the hot-rolled steel strip rolling intermediate billet according to claim 1: the concrete steps are as follows: 步骤1:在粗轧机出口的输送辊道上安装24-48组冷却装置,形成冷却区域,将由粗轧机轧制成厚度为20~60mm的中间坯送入所述冷却区域;Step 1: install 24-48 sets of cooling devices on the conveying roller table at the exit of the roughing mill to form a cooling area, and send the intermediate billet rolled by the roughing mill with a thickness of 20 to 60 mm into the cooling area; 步骤2:计算机根据所述中间坯的厚度、宽度、钢种和温度,以及所述中间坯要求冷却到的温度计算冷却水量;Step 2: The computer calculates the amount of cooling water according to the thickness, width, steel type and temperature of the intermediate billet, and the temperature to which the intermediate billet is required to be cooled; 步骤3:计算机通过可编程控制器控制开闭控制阀的开闭数量和流量控制阀的流量,对所述中间坯实施冲击射流控制冷却,冷却速度控制在3~30℃/s,达到设定温度后,进入下一工序。Step 3: The computer controls the opening and closing quantity of the opening and closing control valve and the flow rate of the flow control valve through the programmable controller, implements impact jet control cooling on the intermediate billet, and controls the cooling rate at 3-30°C/s to reach the set After the temperature is reached, enter the next process. 3.根据权利要求2所述的冷却方法,其特征在于,所述步骤还包括,热轧带钢过程中中间坯的传输会有减速或加速,所述步骤还包括,热轧带钢过程中中间坯的传输会有减速或加速变化,可采用改变集管开闭组合相结合控制精度和调整冷却速度的动态控制。3. cooling method according to claim 2, is characterized in that, described step also comprises, the transmission of intermediate slab in the process of hot-rolling steel strip has deceleration or acceleration, and described step also comprises, in the process of hot-rolling steel strip The transmission of the intermediate billet will change in deceleration or acceleration, and the dynamic control of changing the opening and closing combination of the header combined with the control accuracy and adjusting the cooling speed can be adopted. 4.根据权利要求2所述的冷却方法,其特征在于,所述的冲击射流水冷却压力控制为0.3~1.0MPa。4. The cooling method according to claim 2, characterized in that the cooling pressure of the impinging jet water is controlled to be 0.3-1.0 MPa.
CN2010102838960A 2010-09-15 2010-09-15 Device and method for cooling intermediate rolled blank of hot rolled strip Expired - Fee Related CN101972782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010102838960A CN101972782B (en) 2010-09-15 2010-09-15 Device and method for cooling intermediate rolled blank of hot rolled strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010102838960A CN101972782B (en) 2010-09-15 2010-09-15 Device and method for cooling intermediate rolled blank of hot rolled strip

Publications (2)

Publication Number Publication Date
CN101972782A true CN101972782A (en) 2011-02-16
CN101972782B CN101972782B (en) 2012-06-06

Family

ID=43572705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010102838960A Expired - Fee Related CN101972782B (en) 2010-09-15 2010-09-15 Device and method for cooling intermediate rolled blank of hot rolled strip

Country Status (1)

Country Link
CN (1) CN101972782B (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102343367A (en) * 2011-10-14 2012-02-08 东北大学 Control method for lowering head and tail undercooled sections of steel plate in pressure jet cooling process
CN103555914A (en) * 2013-11-25 2014-02-05 南京钢铁股份有限公司 On-line quenching and plate shape controlling technology for 12MnNiVR steel plate
CN103861879A (en) * 2014-03-28 2014-06-18 东北大学 Online cooling device and control method for moderate-thickness plate
CN103894425A (en) * 2013-12-30 2014-07-02 北京首钢股份有限公司 Control method and device of finish rolling temperature
CN104174667A (en) * 2013-05-23 2014-12-03 宜兴市新芳铜厂有限公司 Copper rod cleaning system
CN104785555A (en) * 2015-05-04 2015-07-22 中冶南方工程技术有限公司 Superstrong cooling device
CN105855305A (en) * 2016-05-26 2016-08-17 钢铁研究总院华东分院 Cooling equipment between racks and hot core rolling technology
CN106269932A (en) * 2016-10-25 2017-01-04 东北大学 A kind of hot rolled seamless steel tube On-line Control cooling device
CN106311763A (en) * 2016-10-25 2017-01-11 东北大学 Annular jet cooling device for controlled cooling of hot-rolled seamless steel tubes
CN106964655A (en) * 2017-05-31 2017-07-21 攀钢集团西昌钢钒有限公司 A kind of hot-rolled intermediate billet cooling means and cooling device
CN110252830A (en) * 2019-07-04 2019-09-20 北京科技大学 A mechanical way to move the intermediate rolling piece off-line control rolling equipment
CN110523787A (en) * 2019-09-30 2019-12-03 攀钢集团攀枝花钢铁研究院有限公司 A method for ultra-rapid cooling of hot continuous rolling steel intermediate billet
CN110711785A (en) * 2019-10-10 2020-01-21 中冶南方连铸技术工程有限责任公司 Method and system for controlling temperature of fixed-length casting blank before rolling
CN113828643A (en) * 2020-06-23 2021-12-24 上海梅山钢铁股份有限公司 Temperature control method for rolling strip steel in ferrite area
CN114378120A (en) * 2022-02-23 2022-04-22 聊城市科环新材料科技有限公司 Efficient cooling air cooling device for producing super-thick-wall seamless pipes
CN114417530A (en) * 2022-01-14 2022-04-29 北京科技大学 A method and device for optimal scheduling of a laminar cooling water supply pump station for hot tandem rolling
CN114618895A (en) * 2022-04-11 2022-06-14 福建三宝特钢有限公司 Hot rolled strip rolling system based on dynamic adjustment
CN114643292A (en) * 2022-03-17 2022-06-21 河北鑫达钢铁集团有限公司 Strip steel cooling device
CN115647085A (en) * 2022-11-21 2023-01-31 鑫鹏源(聊城)智能科技有限公司 Cooling device for cooling liquid and rolling mill cooling circulation system
CN116287971A (en) * 2021-10-26 2023-06-23 广西柳州钢铁集团有限公司 High-stability low-yield ratio hot-rolled welded bottle steel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2310116A1 (en) * 1972-03-02 1973-09-06 Wean United Inc COOLANT CONTROL FOR HOT STRIP ROLLING MILLS
CN2261898Y (en) * 1996-07-05 1997-09-10 鞍山钢铁公司 Plate control cooling device
JP2006212688A (en) * 2005-02-07 2006-08-17 Nippon Steel Corp Steel sheet cooling equipment and method for cooling steel sheet
CN201309954Y (en) * 2008-11-25 2009-09-16 中冶南方工程技术有限公司 Water spraying cooler capable of controlling water supply automatically
CN101642780A (en) * 2009-06-05 2010-02-10 中冶赛迪工程技术股份有限公司 Intermediate blank cooling system and cooling control technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2310116A1 (en) * 1972-03-02 1973-09-06 Wean United Inc COOLANT CONTROL FOR HOT STRIP ROLLING MILLS
CN2261898Y (en) * 1996-07-05 1997-09-10 鞍山钢铁公司 Plate control cooling device
JP2006212688A (en) * 2005-02-07 2006-08-17 Nippon Steel Corp Steel sheet cooling equipment and method for cooling steel sheet
CN201309954Y (en) * 2008-11-25 2009-09-16 中冶南方工程技术有限公司 Water spraying cooler capable of controlling water supply automatically
CN101642780A (en) * 2009-06-05 2010-02-10 中冶赛迪工程技术股份有限公司 Intermediate blank cooling system and cooling control technology

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102343367B (en) * 2011-10-14 2015-01-14 东北大学 Control method for lowering head and tail undercooled sections of steel plate in pressure jet cooling process
CN102343367A (en) * 2011-10-14 2012-02-08 东北大学 Control method for lowering head and tail undercooled sections of steel plate in pressure jet cooling process
CN104174667A (en) * 2013-05-23 2014-12-03 宜兴市新芳铜厂有限公司 Copper rod cleaning system
CN103555914A (en) * 2013-11-25 2014-02-05 南京钢铁股份有限公司 On-line quenching and plate shape controlling technology for 12MnNiVR steel plate
CN103555914B (en) * 2013-11-25 2015-07-22 南京钢铁股份有限公司 On-line quenching and plate shape controlling technology for 12MnNiVR steel plate
CN103894425A (en) * 2013-12-30 2014-07-02 北京首钢股份有限公司 Control method and device of finish rolling temperature
CN103894425B (en) * 2013-12-30 2016-06-29 北京首钢股份有限公司 The control method of finishing temperature and device
CN103861879A (en) * 2014-03-28 2014-06-18 东北大学 Online cooling device and control method for moderate-thickness plate
CN104785555A (en) * 2015-05-04 2015-07-22 中冶南方工程技术有限公司 Superstrong cooling device
CN105855305A (en) * 2016-05-26 2016-08-17 钢铁研究总院华东分院 Cooling equipment between racks and hot core rolling technology
CN105855305B (en) * 2016-05-26 2018-06-15 钢研晟华科技股份有限公司 Interstand cooling is equipped and earnest rolling mill practice
CN106311763B (en) * 2016-10-25 2019-04-26 东北大学 An annular jet cooling device for controlled cooling of a hot-rolled seamless steel pipe
CN106269932A (en) * 2016-10-25 2017-01-04 东北大学 A kind of hot rolled seamless steel tube On-line Control cooling device
CN106311763A (en) * 2016-10-25 2017-01-11 东北大学 Annular jet cooling device for controlled cooling of hot-rolled seamless steel tubes
CN106964655A (en) * 2017-05-31 2017-07-21 攀钢集团西昌钢钒有限公司 A kind of hot-rolled intermediate billet cooling means and cooling device
CN110252830A (en) * 2019-07-04 2019-09-20 北京科技大学 A mechanical way to move the intermediate rolling piece off-line control rolling equipment
CN110523787A (en) * 2019-09-30 2019-12-03 攀钢集团攀枝花钢铁研究院有限公司 A method for ultra-rapid cooling of hot continuous rolling steel intermediate billet
CN110711785A (en) * 2019-10-10 2020-01-21 中冶南方连铸技术工程有限责任公司 Method and system for controlling temperature of fixed-length casting blank before rolling
CN113828643A (en) * 2020-06-23 2021-12-24 上海梅山钢铁股份有限公司 Temperature control method for rolling strip steel in ferrite area
CN116287971A (en) * 2021-10-26 2023-06-23 广西柳州钢铁集团有限公司 High-stability low-yield ratio hot-rolled welded bottle steel
CN114417530A (en) * 2022-01-14 2022-04-29 北京科技大学 A method and device for optimal scheduling of a laminar cooling water supply pump station for hot tandem rolling
CN114378120A (en) * 2022-02-23 2022-04-22 聊城市科环新材料科技有限公司 Efficient cooling air cooling device for producing super-thick-wall seamless pipes
CN114643292A (en) * 2022-03-17 2022-06-21 河北鑫达钢铁集团有限公司 Strip steel cooling device
CN114643292B (en) * 2022-03-17 2023-06-30 河北鑫达钢铁集团有限公司 Strip steel cooling device
CN114618895A (en) * 2022-04-11 2022-06-14 福建三宝特钢有限公司 Hot rolled strip rolling system based on dynamic adjustment
CN114618895B (en) * 2022-04-11 2022-11-08 福建三宝特钢有限公司 Hot rolled strip rolling system based on dynamic adjustment
CN115647085A (en) * 2022-11-21 2023-01-31 鑫鹏源(聊城)智能科技有限公司 Cooling device for cooling liquid and rolling mill cooling circulation system

Also Published As

Publication number Publication date
CN101972782B (en) 2012-06-06

Similar Documents

Publication Publication Date Title
CN101972782B (en) Device and method for cooling intermediate rolled blank of hot rolled strip
CN101642780B (en) An intermediate billet cooling system and cooling control process
CN101829688A (en) Cooling method of heavy and medium plate controlled rolling intermediate blank
CN102424902B (en) Vapor cooling system for use in offline heat treatment of thin medium and thick plates
CN101755058B (en) Process for hot rolling and for heat treatment of a steel strip
CN101381806B (en) Refrigerating device of belt steel and cooling and controlling method thereof
CN109174981B (en) A kind of hot continuous rolling intermediate blank cooling device and its application method
CN100580102C (en) Process for producing high strength hardened and tempered steel by steekle mill on-line quenching
CN102513384B (en) Method for cooling intermediate billet of medium-thickness plate by using equipment for cooling after rolling
CN106734201A (en) A kind of method that application continuous casting and rolling technique of sheet bar produces Thin Specs low-alloy high-strength steel
CN101879531A (en) A laminar flow cooling device for hot-rolled strip steel with controllable cooling plate shape
CN102513383B (en) Ultra fast cooling and conventional laminar flow cooling method for medium plate
CN202762752U (en) Spray cooling device used for steel plate or strip steel
CN101412042A (en) Method for controlling shape of X80 pipeline steel hot rolling middle plate
CN103894427A (en) Medium and heavy plate online multifunctional cooling device
CN104017975B (en) A kind of injected cool radiator cooler of long steel rail press quenching unit
CN106311776A (en) Intermediate billet inclined jet flow cooling and shape control method
CN102029296B (en) Method for fast cooling low-carbon hot-rolling small H-shaped steel
CN108070710B (en) A kind of steel plate temperature control process for quenching based on roller quenching machine
CN102061363A (en) Direct quenching device for medium plate and quenching process thereof
CN201744506U (en) Controllable hot-rolled strip steel laminar cooling device shaped like cooling panel
CN103740925B (en) Method for linkage production of high-toughness pipeline steel by adopting jetting and laminar cooling
CN107828951B (en) A method and device for manufacturing cold-rolled high-strength steel
CN108495723B (en) The manufacturing method of the manufacturing equipment column and hot rolled strip of hot rolled strip
CN108602102B (en) The manufacturing method of the manufacturing equipment column and hot rolled strip of hot rolled strip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120606