CN101886466A CN 201010224364 CN201010224364A CN101886466A CN 101886466 A CN101886466 A CN 101886466A CN 201010224364 CN201010224364 CN 201010224364 CN 201010224364 A CN201010224364 A CN 201010224364A CN 101886466 A CN101886466 A CN 101886466A
Authority
CN
China
Prior art keywords
formwork
steel
support
steel structure
support platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010224364
Other languages
Chinese (zh)
Other versions
CN101886466B (en
Inventor
刘明
崔忠辉
张华骞
杨康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201010224364XA priority Critical patent/CN101886466B/en
Publication of CN101886466A publication Critical patent/CN101886466A/en
Application granted granted Critical
Publication of CN101886466B publication Critical patent/CN101886466B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

一种捣固式焦炉煤塔模板支撑结构的施工方法,按照以下步骤进行:①钢结构支撑平台基础的处理;②钢结构支撑平台的制作与安装;③钢结构支撑平台的预压:预压材料采用焦炉抵抗墙和地下室预制板,按照110%的设计荷载进行超载预压,预压时间为7天,设观测点,每天观测1次;④各个模板脚手架的安装;⑤脚手架及钢结构支撑平台的拆除。本施工方法通过对大跨度、高支、重荷模板支撑系统精心设计,有效监测,取得了良好的效果,尤其开创了国内34.045米跨度煤塔梁不出现裂缝的先河;解决了大跨度、高支、重荷载结构施工的难题;适应焦化工程向大型化、捣鼓焦炉的发展方向,工期短、周转材料省、安全可靠、便于质量控制、混凝土结构强度高。

Figure 201010224364

A construction method for a tamping-type coke oven coal tower formwork support structure, which is carried out in accordance with the following steps: ① treatment of the foundation of the steel structure support platform; ② manufacture and installation of the steel structure support platform; ③ preloading of the steel structure support platform: Coke oven resistance walls and basement prefabricated slabs are used as pressing materials, and overload preloading is carried out according to 110% of the design load. The preloading time is 7 days, and observation points are set up, and observations are made once a day; Removal of structural support platforms. This construction method has achieved good results through careful design and effective monitoring of the large-span, high-support, and heavy-load formwork support system, especially creating a domestic precedent for 34.045-meter-span coal tower beams without cracks; solved the problem of large-span, high-support 1. Difficulties in heavy-load structure construction; adapt to the development direction of coking engineering towards large-scale coke ovens, short construction period, low turnover materials, safe and reliable, convenient for quality control, and high concrete structure strength.

Figure 201010224364

Description

捣固式焦炉煤塔模板支撑结构的施工方法 Construction method of tamping type coke oven coal tower formwork support structure

技术领域technical field

本发明涉及一种大型焦化工程施工过程中用到的模板施工方法,特别是一种大跨度、高支、重荷的捣固式焦炉煤塔模板支撑结构的施工方法。The invention relates to a formwork construction method used in the construction process of a large-scale coking project, in particular to a construction method for a large-span, high-support and heavy-load tamping-type coke oven coal tower formwork support structure.

背景技术Background technique

捣固式焦炉煤塔大跨度、高支、重荷模板支撑系统具有空间受力复杂,搭设高度大(15.49m和26.3m挑檐),跨度大(34.045m),荷载大(结构自重1600T),且施工过程中存在不均匀受力等。目前国内普遍采用扣件式钢管脚手架作为模板支撑系统,存在如下弊端:The tamping type coke oven coal tower has a large span, high support, and heavy-duty formwork support system with complex space stress, large erection height (15.49m and 26.3m canopy), large span (34.045m), and large load (structural weight 1600T) , and there are uneven forces in the construction process. At present, fastener-type steel pipe scaffolding is generally used as the formwork support system in China, which has the following disadvantages:

1、对扣件式钢管脚手架作为三维空间结构的研究还很不充分,类似计算的时间和费用成本极高,很多企业更不具备这样的条件;1. The research on fastener-type steel pipe scaffolding as a three-dimensional space structure is still insufficient, and the time and cost of similar calculations are extremely high, and many companies do not have such conditions;

2、模板支撑体系刚度差,梁下容易产生裂缝,严重影响混凝土的结构强度以及耐久性;2. The rigidity of the formwork support system is poor, and cracks are prone to occur under the beam, which seriously affects the structural strength and durability of the concrete;

3、整体性、稳定性差,支撑煤塔1600T自重存在安全隐患,危及生命安全;3. The integrity and stability are poor, and there are potential safety hazards in supporting the 1600T self-weight of the coal tower, which endangers life safety;

4、钢管间距密,需要大量钢管,工作量大、施工工期长,施工费用高。4. The distance between the steel pipes is dense, requiring a large number of steel pipes, resulting in heavy workload, long construction period and high construction cost.

发明内容Contents of the invention

本发明是针对现有施工技术中存在的诸多不足,提供一种工期短、安全可靠、制作成本低的捣固式焦炉煤塔大跨度、高支、重荷模板施工方法。The invention aims at many deficiencies in the existing construction technology, and provides a construction method of a tamping type coke oven coal tower with a large span, high branch and heavy load formwork with short construction period, safety and reliability, and low production cost.

实现上述目的采用的技术方案是:一种捣固式焦炉煤塔模板支撑结构的施工方法,这种模板的支撑结构包括用于支撑模板整体的钢结构支撑平台,还包括用于支撑各个模板的支撑架,所述施工方法按照以下步骤进行:The technical solution adopted to achieve the above purpose is: a construction method for the formwork support structure of the tamping type coke oven coal tower. The support structure of the formwork includes a steel structure support platform for supporting the formwork as a whole, and also includes The support frame, the construction method is carried out according to the following steps:

①钢结构支撑平台基础的处理:① Treatment of steel structure support platform foundation:

a、基底处理:将作为基底的回填土分层夯实,各层的厚度≤250mm,压实系数≥0.96;a. Substrate treatment: The backfill soil used as the substrate shall be compacted layer by layer, the thickness of each layer shall be ≤250mm, and the compaction coefficient shall be ≥0.96;

b、预埋件处理:基底处理完后,浇筑厚度为250mm厚的钢筋混凝土,在钢柱柱脚处作加深处理,按钢结构支撑平台设计方案中钢柱的位置,测量放线,安装事先制作好预埋锚板;b. Embedded parts treatment: After the base treatment, pour reinforced concrete with a thickness of 250mm, deepen the treatment at the foot of the steel column, measure and lay out the line according to the position of the steel column in the design plan of the steel structure support platform, and install it in advance Make a pre-embedded anchor plate;

c、养生处理:养生时间≥7d,待基底上钢筋混凝土的强度达到设计强度的75%时,安装钢结构支撑平台;c. Health treatment: curing time ≥ 7 days, when the strength of the reinforced concrete on the base reaches 75% of the design strength, install a steel structure support platform;

②钢结构支撑平台的制作与安装:② Fabrication and installation of steel structure support platform:

a、根据钢结构模板支撑体系施工图放样、号料,并逐个核对图纸之间的尺寸和方向,H型钢、工字钢的下料采用锯切;a. According to the construction drawing of the steel structure formwork support system, set out and number the materials, and check the size and direction between the drawings one by one. The blanking of H-shaped steel and I-shaped steel is sawing;

b、钢柱采用单机垂直起吊,钢梁采用两点绑扎水平吊装,钢柱均固定在预埋的锚板上;b. The steel column is hoisted vertically by a single machine, the steel beam is hoisted horizontally by two-point lashing, and the steel column is fixed on the pre-buried anchor plate;

c、在起重机起重能力范围内,将钢柱和钢梁在地面组拼成吊装单元,一次吊装就位;c. Within the scope of the crane's lifting capacity, assemble the steel column and steel beam on the ground to form a hoisting unit, and hoist it in place at one time;

d、钢柱与钢梁之间焊接牢固;d. The welding between the steel column and the steel beam is firm;

③钢结构支撑平台的预压:预压材料采用焦炉抵抗墙和地下室预制板,按照110%的设计荷载进行超载预压,预压时间为7天,设观测点,每天观测1次;③ Preloading of the steel structure support platform: The preloading materials are coke oven resistance walls and prefabricated slabs in the basement, and the overload preloading is carried out according to 110% of the design load. The preloading time is 7 days, and observation points are set up, and observations are made once a day;

④各个模板脚手架的安装:④Installation of each template and scaffold:

Figure BSA00000186375700021
楼板模板和挑檐模板的支撑架:
Figure BSA00000186375700021
slab formwork and Support frame for cornice formwork:

a、这两处模板的支撑架均采用扣件式钢管脚手架,钢结构支撑平台预压结束后开始搭设

Figure BSA00000186375700023
楼板模板和
Figure BSA00000186375700024
挑檐模板的支撑架;脚手架搭设时,先在钢结构支撑平台次钢梁的翼缘中心焊接多个钢筋;a. The supporting frame of the two formworks adopts fastener-type steel pipe scaffolding, and the steel structure supporting platform starts to be erected after preloading
Figure BSA00000186375700023
slab formwork and
Figure BSA00000186375700024
The support frame of the eave formwork; when the scaffold is erected, a plurality of steel bars are welded in the center of the flange of the secondary steel beam of the steel structure support platform;

b、支撑架按照扣件式钢管脚手架的规范要求搭设;b. The support frame is erected according to the specification requirements of fastener type steel pipe scaffolding;

钢筋混凝土双曲线漏斗模板的支撑架,双曲线漏斗模板包括双曲线模板和漏斗主梁模板:Support frame of reinforced concrete hyperbolic funnel formwork, hyperbolic funnel formwork includes hyperbolic formwork and funnel main beam formwork:

a、钢筋混凝土双曲线模板,主龙骨通过扣件及支撑钢管固定在脚手架上,再将事先弯压成双曲线的钢筋作为内外漏斗壁木模板的次龙骨,按照150mm的间距固定在主龙骨上,按照500mm的间距用对拉螺栓将主龙骨与次龙骨固定;a. Reinforced concrete hyperbolic formwork, the main keel is fixed on the scaffold through fasteners and supporting steel pipes, and then the steel bars bent and pressed into hyperbolas are used as the secondary keel of the inner and outer funnel wall wood formwork, and fixed on the main keel according to the spacing of 150mm , according to the distance of 500mm, the main keel and the secondary keel are fixed with pull bolts;

b、漏斗主梁模板的下方用钢管脚手架支撑在

Figure BSA00000186375700025
楼板上,脚手架中的立杆排布为横向间距470mm,纵向间距500mm,步距1000mm,且立杆底端纵向设置槽钢,立杆顶端设置顶丝,顶丝上设置的工字钢作为主梁模板的主龙骨,次龙骨则是设置在主龙骨上方的木方,且相邻木方间距为200mm;b. The lower part of the main girder formwork of the funnel is supported by steel pipe scaffolding
Figure BSA00000186375700025
On the floor, the vertical poles in the scaffolding are arranged with a horizontal spacing of 470mm, a vertical spacing of 500mm, and a step distance of 1000mm. The main keel of the beam formwork, the secondary keel is the wooden square set above the main keel, and the distance between adjacent wooden squares is 200mm;

楼板模板的支撑架: Support frame for floor formwork:

待钢筋混凝土双曲线漏斗主梁模板的混凝土强度达到设计强度100%时,方可拆除支撑模板的支撑架及漏斗主梁梁底模板,开始搭设

Figure BSA00000186375700027
楼板模板的支撑架,该支撑采用扣件式钢管脚手架,且按照扣件式钢管脚手架的规范要求搭设;When the concrete strength of the reinforced concrete hyperbolic funnel main beam formwork reaches 100% of the design strength, the support frame supporting the formwork and the funnel main beam bottom formwork can be dismantled and erected
Figure BSA00000186375700027
The support frame of the floor formwork, the support adopts the fastener type steel pipe scaffolding, and is erected according to the specification requirements of the fastener type steel pipe scaffolding;

⑤脚手架及钢结构支撑平台的拆除:⑤Removal of scaffolding and steel structure support platform:

a、当钢筋混凝土双曲线模板和漏斗主梁模板的混凝土强度达到设计强度100%时,拆除全部脚手架,并及时对高空大跨度的混凝土结构进行检查、验收;a. When the concrete strength of the reinforced concrete hyperbolic formwork and the funnel main beam formwork reaches 100% of the design strength, all scaffolding shall be removed, and the high-altitude and large-span concrete structure shall be inspected and accepted in time;

b、待外装修验收合格后,全面拆除钢结构支撑平台,按照后搭设的先拆,先搭设的后拆的顺序拆除,并及时将拆下来的材料清运出场外。b. After the exterior decoration is accepted, the steel structure support platform shall be dismantled in an all-round way, in the order of dismantling those erected later and demolishing those erected first, and the dismantled materials shall be cleared and transported out of the site in time.

与现有技术相比,本工程的施工方法通过对大跨度、高支、重荷模板支撑系统精心设计,有效监测,取得了良好的效果,尤其开创了国内34.045米跨度煤塔梁不出现裂缝的先河;解决了大跨度、高支、重荷载结构施工的难题;适应焦化工程向大型化、捣鼓焦炉的发展方向,其取得效果如下:Compared with the existing technology, the construction method of this project has achieved good results through careful design and effective monitoring of the large-span, high-support, and heavy-duty formwork support system, especially creating a domestic 34.045-meter-span coal tower beam without cracks It is the first of its kind; it solves the construction problems of large-span, high-branch, and heavy-load structures; it adapts to the development direction of coking engineering towards large-scale and tinkering with coke ovens. The results are as follows:

1、工期短:钢结构支撑平台可在场外加工预制,不占用主导工期、不占用施工场地,可提供立体交叉作业的条件;1. Short construction period: the steel structure support platform can be processed and prefabricated outside the site, which does not occupy the dominant construction period and construction site, and can provide the conditions for three-dimensional cross operation;

2、周转材料省:利用钢结构支撑平台,将高支模转换成普通模板支撑系统,节省了大量的钢管脚手架材料的投入,其中型钢可以回收重复使用;2. Saving turnover materials: Using the steel structure support platform, the high formwork is converted into a common formwork support system, which saves a lot of investment in steel pipe scaffolding materials, and the section steel can be recycled and reused;

3、安全可靠:钢结构支撑平台受力明确、性能可靠,而钢管脚手架很难一次搭设到位,存在安全隐患,现将高空作业的高支模转换成具有可靠安全防护的作业条件,提高安全系数,安全可靠;3. Safe and reliable: The steel structure support platform has clear force and reliable performance, but steel pipe scaffolding is difficult to put in place at one time, and there are potential safety hazards. Now, the high formwork for high-altitude operations is converted into operating conditions with reliable safety protection to improve the safety factor. ,Safe and reliable;

4、便于质量控制:在钢平台上施工高空大跨度混凝土结构和外装饰装修工程、设备安装等工程,操作条件安全方便,便于检查、验收,有利于提高施工质量;4. Facilitate quality control: construction of high-altitude and large-span concrete structures and exterior decoration works, equipment installation and other projects on steel platforms, the operating conditions are safe and convenient, easy to check and accept, and conducive to improving construction quality;

5、混凝土结构强度高,耐久性好:钢结构支撑平台刚度大、整体性好,施工时梁不会下挠产生裂缝,因此混凝土结构强度高,耐久性好。5. The concrete structure has high strength and good durability: the steel structure supporting platform has high rigidity and good integrity, and the beam will not deflect and cause cracks during construction, so the concrete structure has high strength and good durability.

附图说明Description of drawings

图1为本发明的模板支撑系统整体结构示意图。Fig. 1 is a schematic diagram of the overall structure of the template support system of the present invention.

图2为本发明的模板支撑系统平面布置图。Fig. 2 is a plane layout diagram of the template support system of the present invention.

图3为图1中的A-A向剖视图。Fig. 3 is a sectional view taken along line A-A in Fig. 1 .

图4为图1中的B-B向剖视图。Fig. 4 is a sectional view taken along the line B-B in Fig. 1 .

图5为双曲线漏斗支模结构示意图。Fig. 5 is a schematic diagram of the formwork support of the hyperbolic funnel.

图6为图5中的C部局部放大图。FIG. 6 is a partially enlarged view of part C in FIG. 5 .

其中:支撑平台1,挑檐支撑架2,挑檐3,

Figure BSA00000186375700031
楼板4,双曲线模板5,漏斗主梁模板6,
Figure BSA00000186375700032
楼板7,
Figure BSA00000186375700033
楼板支撑架8,钢柱9,主钢梁10,次钢梁11,檩条12,角钢13,槽钢14,主梁模板支撑架15,槽钢16,顶丝17,工字钢18,木方19,漏斗主梁梁底木模板20,三字卡21,次龙骨22,对拉螺栓23,主龙骨24,漏斗壁木模板25。Among them: supporting platform 1, overhanging eaves support frame 2, overhanging eaves 3,
Figure BSA00000186375700031
Floor 4, hyperbolic formwork 5, funnel girder formwork 6,
Figure BSA00000186375700032
Floor 7,
Figure BSA00000186375700033
Floor support frame 8, steel column 9, main steel beam 10, secondary steel beam 11, purlin 12, angle steel 13, channel steel 14, main beam formwork support frame 15, channel steel 16, top wire 17, I-beam 18, wood Square 19, funnel main beam bottom wooden formwork 20, three-character card 21, secondary keel 22, pull bolt 23, main keel 24, funnel wall wooden formwork 25.

具体实施方式Detailed ways

下面结合附图和实施例对本发明作进一步说明。The present invention will be further described below in conjunction with drawings and embodiments.

参见附图1-6,本实施例中,这种捣固式焦炉煤塔大跨度、高支、重荷模板支撑结构的施工方法,这种模板的支撑结构包括用于支撑模板整体的钢结构支撑平台1,还包括用于支撑各个模板的支撑架,这些支撑架包括用于支撑楼板模板4、

Figure BSA00000186375700035
楼板模板7、
Figure BSA00000186375700036
挑檐模板3、双曲线漏斗模板中的双曲线模板5、漏斗主梁模板6的模板支撑架。Referring to accompanying drawings 1-6, in this embodiment, the construction method of the large-span, high-branch, heavy-duty formwork support structure of the tamping type coke oven coal tower, the support structure of this formwork includes the steel structure used to support the formwork as a whole The supporting platform 1 also includes supporting frames for supporting each template, and these supporting frames include supporting frames for supporting Floor template 4,
Figure BSA00000186375700035
Floor template 7,
Figure BSA00000186375700036
Overhanging eave formwork 3, hyperbolic formwork 5 in the hyperbolic funnel formwork, formwork support frame of funnel main beam formwork 6.

其中:钢结构支撑平台1的钢柱9采用H型钢H250×250×14×14,与锚板焊接。钢柱9间的支撑采用L75×6角钢13,节点板δ8。钢结构支撑平台1的钢梁包括主钢梁10、次钢梁11、檩条12,主钢梁10采用工字钢I 32a,横向布置;次钢梁11采用工字钢I25a间距1250mm;檩条12采用工字钢I10a@500横向布置。钢结构支撑平台1起拱高度为跨度的1/1000。煤塔漏斗嘴处有大量预埋螺栓,固定螺栓采用梁底铺δ4钢板。Among them: the steel column 9 of the steel structure support platform 1 is made of H-shaped steel H250×250×14×14, which is welded with the anchor plate. The support between the steel columns 9 adopts L75×6 angle steel 13, and the gusset plate δ8. The steel beams of the steel structure support platform 1 include main steel beams 10, secondary steel beams 11, and purlins 12. The main steel beams 10 adopt I-beam I 32a, and are arranged horizontally; I-beam I10a@500 is used for horizontal arrangement. The arching height of the steel structure support platform 1 is 1/1000 of the span. There are a large number of pre-embedded bolts at the funnel mouth of the coal tower, and the fixed bolts are made of δ4 steel plates laid on the bottom of the beam.

所述施工方法按照以下步骤进行:Described construction method carries out according to the following steps:

①钢结构支撑平台1基础的处理:① Treatment of the foundation of the steel structure support platform 1:

a、基底处理:将作为基底的回填土分层夯实,分层的厚度≤250mm,压实系数≥0.96;a. Substrate treatment: The backfill soil used as the substrate shall be compacted in layers, the thickness of the layers shall be ≤250mm, and the compaction coefficient shall be ≥0.96;

b、预埋件处理:基底处理完后,在基底上面浇筑厚度为250mm的C25钢筋混凝土,在钢柱柱脚处作加深处理,一般的加深处理就是作出深500mm、长1000mm、宽800mm的基础坑,按钢结构支撑平台的设计方案中钢柱的平面位置,测量出埋件位置,安装时用水准仪控制埋件标高,在基础坑内安装事先制作好的预埋锚板,该锚板的尺寸为600×800×16(mm),锚板上塞焊有锚爪,每个锚板底部的锚爪为12根直径为22mm、长450mm的螺纹钢;b. Treatment of pre-embedded parts: After the base treatment, pour C25 reinforced concrete with a thickness of 250mm on the base, and deepen the treatment at the foot of the steel column. The general deepening treatment is to make a foundation with a depth of 500mm, a length of 1000mm, and a width of 800mm According to the plane position of the steel column in the design plan of the steel structure support platform, the position of the embedded parts is measured. During installation, the level of the embedded parts is controlled by a level gauge, and the pre-made embedded anchor plate is installed in the foundation pit. The size of the anchor plate It is 600×800×16(mm), the anchor plate is plug-welded with anchor claws, and the anchor claws at the bottom of each anchor plate are 12 rebars with a diameter of 22mm and a length of 450mm;

c、养生处理:养生时间≥7d,待基底上钢筋混凝土的强度达到设计强度的75%时,安装钢结构支撑平台1。c. Health treatment: curing time ≥ 7 days, when the strength of the reinforced concrete on the base reaches 75% of the design strength, install the steel structure support platform 1 .

②钢结构支撑平台1的制作与安装:② Manufacture and installation of steel structure support platform 1:

a、根据钢结构模板支撑体系施工图放样、号料,并逐个核对图纸之间的尺寸和方向,各部件之间的连接点、连接尺寸和连接方式要与施工图一一对应,H型钢、工字钢的下料采用锯切,防止变形;a. According to the construction drawing of the steel structure formwork support system, set out and number the materials, and check the size and direction between the drawings one by one. The blanking of the I-beam is cut by sawing to prevent deformation;

b、钢柱9采用单机垂直起吊,且做到回转扶直,起吊回转过程中应避免同其他已安装的构建碰撞,吊索应预留有效高度,钢柱9扶直前应将登高爬梯挂设在钢柱预定的位置并绑扎牢固,起吊就位后临时固定、校正垂直度,钢柱安装到位,对准轴线、固定牢固后才能松开吊索;钢梁采用两点绑扎水平吊装,吊装过程中必须保证钢梁保持水平,吊多根钢梁时绑扎牢固,并逐一安装,安装时,钢柱均固定在预埋的锚板上,保证钢柱支撑的稳定性;钢柱与钢梁之间的支撑采用槽钢14,钢柱之间的支撑采用L75×6的角钢13,保证稳定性;b. The steel column 9 is hoisted vertically by a single machine, and it can be turned and straightened. During the lifting and turning process, collision with other installed structures should be avoided. The effective height of the sling should be reserved, and the climbing ladder should be hung before the steel column 9 is straightened. At the predetermined position of the steel column and fasten it firmly, temporarily fix it after hoisting in place, correct the verticality, install the steel column in place, align the axis, and fix it firmly before releasing the sling; the steel beam is hoisted horizontally by two-point tying During installation, it is necessary to ensure that the steel beams remain horizontal. When hanging multiple steel beams, they are bound firmly and installed one by one. During installation, the steel columns are all fixed on the pre-buried anchor plates to ensure the stability of the steel column support; The support between the columns adopts channel steel 14, and the support between the steel columns adopts L75×6 angle steel 13 to ensure stability;

c、在起重机起重能力范围内,将钢柱和钢梁在地面组拼成吊装单元,如钢柱与钢支撑、钢梁组拼等,一次吊装就位;c. Within the scope of the lifting capacity of the crane, assemble the steel column and steel beam on the ground to form a hoisting unit, such as steel column and steel support, steel beam assembly, etc., and hoist it in place at one time;

d、钢柱与各钢梁之间焊接牢固,接头处的主焊缝两端必须配置引弧板和引出板,其材质应与被焊母材相同,坡口形式应与被焊焊缝相同,禁止使用其他材质的材料充当引弧板和引出板。d. The welding between the steel column and each steel beam is firm. The two ends of the main weld at the joint must be equipped with an arc strike plate and a lead plate. The material should be the same as the base metal to be welded, and the groove form should be the same as the weld to be welded , It is forbidden to use materials of other materials as the arc strike plate and lead-out plate.

③钢结构支撑平台1的预压:预压材料采用焦炉抵抗墙和地下室预制板,按照110%的设计荷载进行超载预压,预压时间为7天,设观测点,每天观测1次。③ Preloading of steel structure support platform 1: The preloading materials are coke oven resistance walls and basement prefabricated slabs, and overload preloading is carried out according to 110% of the design load. The preloading time is 7 days, and observation points are set up to observe once a day.

④各个模板支撑架的安装:④Installation of each template support frame:

Figure BSA00000186375700041
楼板模板4和
Figure BSA00000186375700042
挑檐模板3的支撑架:
Figure BSA00000186375700041
Slab Formwork 4 and
Figure BSA00000186375700042
The supporting frame of the cornice formwork 3:

a、这两处模板的支撑架均采用扣件式钢管脚手架,钢结构支撑平台1预压结束后开始搭设

Figure BSA00000186375700043
楼板模板支撑架8及
Figure BSA00000186375700044
挑檐支撑架2。脚手架搭设时,在钢结构平台1的次钢梁11的翼缘中心线上,按照搭设支撑架中的立杆间距焊接φ25钢筋,长100mm,它的作用是防止立杆滑移,避免工字钢偏心受力;a. The supporting frame of the two formworks adopts fastener-type steel pipe scaffolding, and the steel structure supporting platform 1 starts to be erected after preloading
Figure BSA00000186375700043
Floor formwork support frame 8 and
Figure BSA00000186375700044
Overhanging eaves support frame 2. When scaffolding is erected, on the center line of the flange of the secondary steel beam 11 of the steel structure platform 1, φ25 steel bars are welded according to the vertical rod spacing in the erected support frame, with a length of 100mm. Its function is to prevent vertical rods from slipping and avoid I-shaped Steel eccentric force;

b、支撑架按照扣件式钢管脚手架规范要求搭设;b. The support frame shall be erected in accordance with the specification requirements of fastener-type steel pipe scaffolding;

钢筋混凝土双曲线漏斗模板的支撑架,双曲线漏斗模板包括双曲线模板5和漏斗主梁模板6:The support frame of the reinforced concrete hyperbolic funnel formwork, the hyperbolic funnel formwork includes hyperbolic formwork 5 and funnel main beam formwork 6:

a、钢筋混凝土双曲线模板5主龙骨24采用钢管Φ48×3.5,主龙骨24通过扣件及支撑钢管固定在主梁模板支撑架15上,其间距500mm;再将事先弯压成双曲线的钢筋作为内外漏斗壁模板25的次龙骨22,钢筋采用螺纹钢Φ22其间距150mm绑扎在主龙骨24上;对拉螺栓23用三字卡21固定主龙骨24上,对拉螺栓21采用直径为12mm的圆钢制成;a. The main keel 24 of reinforced concrete hyperbolic formwork 5 adopts steel pipe Φ48×3.5, and the main keel 24 is fixed on the main beam formwork support frame 15 through fasteners and supporting steel pipes, with a distance of 500mm; As the secondary keel 22 of the inner and outer funnel wall formwork 25, the steel bars are bound on the main keel 24 with threaded steel Φ22 at a distance of 150mm; made of round steel;

b、漏斗主梁模板6的下方用钢管脚手管支撑在

Figure BSA00000186375700051
楼板上,该支撑架15中钢管的规格为Φ48×3.5,脚手管中的立杆排布为横向间距470mm,纵向间距500mm,步距1000mm,且立杆底端纵向设置槽钢16,用于扩散压力;立杆顶端设置顶丝17,顶丝17上设置的10号的工字钢18作为主梁模板的主龙骨,次龙骨则是设置在主龙骨上方的木方19,该木方19的规格为50×100mm,且相邻木方19的间距为200mm;立杆即为竖直设置的钢管,各立杆之间不得搭接,必须按照图纸的尺寸计算并切割精准的尺寸,以保证脚手架的稳定性。b. The lower part of the main girder formwork 6 of the funnel is supported by steel pipe scaffolding
Figure BSA00000186375700051
On the floor, the specifications of the steel pipes in the support frame 15 are Φ48×3.5, the vertical poles in the scaffolding pipe are arranged with a horizontal spacing of 470 mm, a longitudinal spacing of 500 mm, and a step distance of 1000 mm, and channel steel 16 is arranged longitudinally at the bottom of the vertical poles. Due to the diffusion pressure; the top of the pole is provided with a top wire 17, and the No. 10 I-beam 18 set on the top wire 17 is used as the main keel of the main beam formwork, and the secondary keel is the wooden square 19 arranged on the top of the main keel. The specification of 19 is 50×100mm, and the distance between adjacent wooden squares 19 is 200mm; the vertical poles are steel pipes installed vertically, and the vertical poles must not be overlapped, and must be calculated according to the size of the drawing and cut to an accurate size. To ensure the stability of the scaffolding.

楼板7模板的支撑架: The support frame of the slab 7 formwork:

待钢筋混凝土双曲线漏斗主梁模板6的混凝土强度达到设计强度100%时,方可拆除支撑模板的支撑架及漏斗主梁梁底模板20,开始搭设

Figure BSA00000186375700053
楼板模板7的支撑架,该支撑架采用扣件式钢管脚手架,它按照扣件式钢管脚手架规范要求搭设。When the concrete strength of the reinforced concrete hyperbolic funnel main beam formwork 6 reaches 100% of the design strength, the support frame supporting the formwork and the funnel main beam bottom formwork 20 can be dismantled, and the construction begins
Figure BSA00000186375700053
The support frame of the floor template 7, the support frame adopts a fastener type steel pipe scaffold, which is erected according to the specification requirements of the fastener type steel pipe scaffold.

⑤支撑架及钢结构支撑平台的拆除:⑤Removal of support frame and steel structure support platform:

a、当钢筋混凝土双曲线模板和漏斗主梁模板的混凝土强度达到设计强度100%时,拆除全部支撑架,并及时对高空大跨度的混凝土结构进行检查、验收;a. When the concrete strength of the reinforced concrete hyperbolic formwork and the funnel main beam formwork reaches 100% of the design strength, remove all the supporting frames, and timely inspect and accept the high-altitude and large-span concrete structure;

b、待外装修验收合格后,全面拆除钢结构支撑平台,按照后搭设的先拆,先搭设的后拆的顺序拆除,并及时将拆下来的材料清运出场外。b. After the exterior decoration is accepted, the steel structure support platform shall be dismantled in an all-round way, in the order of dismantling those erected later and demolishing those erected first, and the dismantled materials shall be cleared and transported out of the site in time.

钢结构支撑平台上,应设置密目的安全网和脚手板作双重安全防护,应有专人负责及时清理平台上的杂物,防止高空物体造成安全事故。钢结构支撑平台的周边还应该预先设置安全防护栏杆。On the steel structure support platform, dense safety nets and scaffolding boards should be set up for double safety protection, and special personnel should be responsible for cleaning up sundries on the platform in time to prevent safety accidents caused by high-altitude objects. The perimeter of the steel structure supporting platform should also be pre-set with safety protection railings.

Claims (1)

1.一种捣固式焦炉煤塔模板支撑结构的施工方法,其特征在于,这种模板的支撑结构包括用于支撑模板整体的钢结构支撑平台,还包括用于支撑各个模板的支撑架,所述施工方法按照以下步骤进行:1. A construction method of a tamping-type coke oven coal tower formwork support structure, characterized in that the support structure of this formwork comprises a steel structure support platform for supporting formwork as a whole, and also includes a support frame for supporting each formwork , the construction method is carried out according to the following steps: ①钢结构支撑平台基础的处理:① Treatment of steel structure support platform foundation: a、基底处理:将作为基底的回填土分层夯实,各层的厚度≤250mm,压实系数≥0.96;a. Substrate treatment: The backfill soil used as the substrate shall be compacted layer by layer, the thickness of each layer shall be ≤250mm, and the compaction coefficient shall be ≥0.96; b、预埋件处理:基底处理完后,浇筑厚度为250mm厚的钢筋混凝土,在钢柱柱脚处作加深处理,按钢结构支撑平台设计方案中钢柱的位置,测量放线,安装事先制作好预埋锚板;b. Embedded parts treatment: After the base treatment, pour reinforced concrete with a thickness of 250mm, deepen the treatment at the foot of the steel column, measure and lay out the line according to the position of the steel column in the design plan of the steel structure support platform, and install it in advance Make a pre-embedded anchor plate; c、养生处理:养生时间≥7d,待基底上钢筋混凝土的强度达到设计强度的75%时,安装钢结构支撑平台;c. Health treatment: curing time ≥ 7 days, when the strength of the reinforced concrete on the base reaches 75% of the design strength, install a steel structure support platform; ②钢结构支撑平台的制作与安装:② Fabrication and installation of steel structure support platform: a、根据钢结构模板支撑体系施工图放样、号料,并逐个核对图纸之间的尺寸和方向,H型钢、工字钢的下料采用锯切;a. According to the construction drawing of the steel structure formwork support system, set out and number the materials, and check the size and direction between the drawings one by one. The blanking of H-shaped steel and I-shaped steel is sawing; b、钢柱采用单机垂直起吊,钢梁采用两点绑扎水平吊装,钢柱均固定在预埋的锚板上;b. The steel column is hoisted vertically by a single machine, the steel beam is hoisted horizontally by two-point lashing, and the steel column is fixed on the pre-buried anchor plate; c、在起重机起重能力范围内,将钢柱和钢梁在地面组拼成吊装单元,一次吊装就位;c. Within the scope of the crane's lifting capacity, assemble the steel column and steel beam on the ground to form a hoisting unit, and hoist it in place at one time; d、钢柱与钢梁之间焊接牢固;d. The welding between the steel column and the steel beam is firm; ③钢结构支撑平台的预压:预压材料采用焦炉抵抗墙和地下室预制板,按照110%的设计荷载进行超载预压,预压时间为7天,设观测点,每天观测1次;③ Preloading of the steel structure support platform: The preloading materials are coke oven resistance walls and prefabricated slabs in the basement, and the overload preloading is carried out according to 110% of the design load. The preloading time is 7 days, and observation points are set up, and observations are made once a day; ④各个模板脚手架的安装:④Installation of each template and scaffold: 楼板模板和
Figure FSA00000186375600012
挑檐模板的支撑架:
slab formwork and
Figure FSA00000186375600012
Support frame for cornice formwork:
a、这两处模板的支撑架均采用扣件式钢管脚手架,钢结构支撑平台预压结束后开始搭设
Figure FSA00000186375600013
楼板模板和挑檐模板的支撑架;脚手架搭设时,先在钢结构支撑平台次钢梁的翼缘中心焊接多个钢筋;
a. The supporting frame of the two formworks adopts fastener-type steel pipe scaffolding, and the steel structure supporting platform starts to be erected after preloading
Figure FSA00000186375600013
slab formwork and The support frame of the eave formwork; when the scaffold is erected, a plurality of steel bars are welded in the center of the flange of the secondary steel beam of the steel structure support platform;
b、支撑架按照扣件式钢管脚手架的规范要求搭设;b. The support frame is erected according to the specification requirements of fastener type steel pipe scaffolding; 钢筋混凝土双曲线漏斗模板的支撑架,双曲线漏斗模板包括双曲线模板和漏斗主梁模板:Support frame of reinforced concrete hyperbolic funnel formwork, hyperbolic funnel formwork includes hyperbolic formwork and funnel main beam formwork: a、钢筋混凝土双曲线模板,主龙骨通过扣件及支撑钢管固定在脚手架上,再将事先弯压成双曲线的钢筋作为内外漏斗壁木模板的次龙骨,按照150mm的间距固定在主龙骨上,按照500mm的间距用对拉螺栓将主龙骨与次龙骨固定;a. Reinforced concrete hyperbolic formwork, the main keel is fixed on the scaffold through fasteners and supporting steel pipes, and then the steel bars bent and pressed into hyperbolas are used as the secondary keel of the inner and outer funnel wall wood formwork, and fixed on the main keel according to the spacing of 150mm , according to the distance of 500mm, the main keel and the secondary keel are fixed with pull bolts; b、漏斗主梁模板的下方用钢管脚手架支撑在
Figure FSA00000186375600015
楼板上,脚手架中的立杆排布为横向间距470mm,纵向间距500mm,步距1000mm,且立杆底端纵向设置槽钢,立杆顶端设置顶丝,顶丝上设置的工字钢作为主梁模板的主龙骨,次龙骨则是设置在主龙骨上方的木方,且相邻木方间距为200mm;
b. The lower part of the main girder formwork of the funnel is supported by steel pipe scaffolding
Figure FSA00000186375600015
On the floor, the vertical poles in the scaffolding are arranged with a horizontal spacing of 470mm, a vertical spacing of 500mm, and a step distance of 1000mm. The main keel of the beam formwork, the secondary keel is the wooden square set above the main keel, and the distance between adjacent wooden squares is 200mm;
Figure FSA00000186375600021
楼板模板的支撑架:
Figure FSA00000186375600021
Support frame for floor formwork:
待钢筋混凝土双曲线漏斗主梁模板的混凝土强度达到设计强度100%时,方可拆除支撑模板的支撑架及漏斗主梁梁底模板,开始搭设
Figure FSA00000186375600022
楼板模板的支撑架,该支撑采用扣件式钢管脚手架,且按照扣件式钢管脚手架的规范要求搭设;
When the concrete strength of the reinforced concrete hyperbolic funnel main beam formwork reaches 100% of the design strength, the support frame supporting the formwork and the funnel main beam bottom formwork can be dismantled and erected
Figure FSA00000186375600022
The support frame of the floor formwork, the support adopts the fastener type steel pipe scaffolding, and is erected according to the specification requirements of the fastener type steel pipe scaffolding;
⑤脚手架及钢结构支撑平台的拆除:⑤Removal of scaffolding and steel structure support platform: a、当钢筋混凝土双曲线模板和漏斗主梁模板的混凝土强度达到设计强度100%时,拆除全部脚手架,并及时对高空大跨度的混凝土结构进行检查、验收;a. When the concrete strength of the reinforced concrete hyperbolic formwork and the funnel main beam formwork reaches 100% of the design strength, all scaffolding shall be removed, and the high-altitude and large-span concrete structure shall be inspected and accepted in time; b、待外装修验收合格后,全面拆除钢结构支撑平台,按照后搭设的先拆,先搭设的后拆的顺序拆除,并及时将拆下来的材料清运出场外。b. After the exterior decoration is accepted, the steel structure support platform shall be dismantled in an all-round way, in the order of dismantling those erected later and demolishing those erected first, and the dismantled materials shall be cleared and transported out of the site in time.
CN201010224364XA 2010-07-09 2010-07-09 Construction method for support structure of coal tower template for tamping type coke oven Active CN101886466B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010224364XA CN101886466B (en) 2010-07-09 2010-07-09 Construction method for support structure of coal tower template for tamping type coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010224364XA CN101886466B (en) 2010-07-09 2010-07-09 Construction method for support structure of coal tower template for tamping type coke oven

Publications (2)

Publication Number Publication Date
CN101886466A true CN101886466A (en) 2010-11-17
CN101886466B CN101886466B (en) 2011-09-14

Family

ID=43072539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010224364XA Active CN101886466B (en) 2010-07-09 2010-07-09 Construction method for support structure of coal tower template for tamping type coke oven

Country Status (1)

Country Link
CN (1) CN101886466B (en)

Cited By (42)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094524A (en) * 2010-12-28 2011-06-15 山东万鑫建设有限公司 Construction method of high-altitude large-span beam-slab template steel support system
CN104695692A (en) * 2015-02-13 2015-06-10 中国五冶集团有限公司 Scaffold on basis of resistance wall of coke oven
CN105544873A (en) * 2015-12-16 2016-05-04 中国建筑第二工程局有限公司 Wave-shaped hollow roof and construction method thereof
CN109098441A (en) * 2018-09-03 2018-12-28 江苏省建筑工程集团有限公司 H profile steel rail mounted moulding bed with stopper
CN109610461A (en) * 2019-01-24 2019-04-12 中建筑港集团有限公司 A kind of module type inspection well concrete grout device and method
CN111206768A (en) * 2020-01-16 2020-05-29 天津鼎维固模架工程股份有限公司 Light beam plate structure platform and construction method thereof
WO2020140092A1 (en) * 2018-12-28 2020-07-02 Suncoke Technology And Development Llc Heat recovery oven foundation
CN112177323A (en) * 2020-09-09 2021-01-05 中国一冶集团有限公司 Cell body structure assembled support system
US10968393B2 (en) 2014-09-15 2021-04-06 Suncoke Technology And Development Llc Coke ovens having monolith component construction
US10968395B2 (en) 2014-12-31 2021-04-06 Suncoke Technology And Development Llc Multi-modal beds of coking material
US11008518B2 (en) 2018-12-28 2021-05-18 Suncoke Technology And Development Llc Coke plant tunnel repair and flexible joints
US11008517B2 (en) 2012-12-28 2021-05-18 Suncoke Technology And Development Llc Non-perpendicular connections between coke oven uptakes and a hot common tunnel, and associated systems and methods
US11053444B2 (en) 2014-08-28 2021-07-06 Suncoke Technology And Development Llc Method and system for optimizing coke plant operation and output
US11071935B2 (en) 2018-12-28 2021-07-27 Suncoke Technology And Development Llc Particulate detection for industrial facilities, and associated systems and methods
CN113216696A (en) * 2021-06-02 2021-08-06 中铁二十一局集团第二工程有限公司 Supporting system for SRC beam integrated construction and construction method thereof
US11098252B2 (en) 2018-12-28 2021-08-24 Suncoke Technology And Development Llc Spring-loaded heat recovery oven system and method
US11117087B2 (en) 2012-12-28 2021-09-14 Suncoke Technology And Development Llc Systems and methods for removing mercury from emissions
US11214739B2 (en) 2015-12-28 2022-01-04 Suncoke Technology And Development Llc Method and system for dynamically charging a coke oven
US11359145B2 (en) 2012-12-28 2022-06-14 Suncoke Technology And Development Llc Systems and methods for maintaining a hot car in a coke plant
US11359146B2 (en) 2013-12-31 2022-06-14 Suncoke Technology And Development Llc Methods for decarbonizing coking ovens, and associated systems and devices
US11395989B2 (en) 2018-12-31 2022-07-26 Suncoke Technology And Development Llc Methods and systems for providing corrosion resistant surfaces in contaminant treatment systems
US11441077B2 (en) 2012-08-17 2022-09-13 Suncoke Technology And Development Llc Coke plant including exhaust gas sharing
US11486572B2 (en) 2018-12-31 2022-11-01 Suncoke Technology And Development Llc Systems and methods for Utilizing flue gas
US11508230B2 (en) 2016-06-03 2022-11-22 Suncoke Technology And Development Llc Methods and systems for automatically generating a remedial action in an industrial facility
CN116025150A (en) * 2023-01-31 2023-04-28 中国核工业华兴建设有限公司 Nuclear power station spent fuel pool roof/conversion layer floor slab supporting system and construction method
CN116044157A (en) * 2023-01-31 2023-05-02 中国三冶集团有限公司 A construction method of formwork support structure in the side wall of coke oven flue
US11643602B2 (en) 2018-12-28 2023-05-09 Suncoke Technology And Development Llc Decarbonization of coke ovens, and associated systems and methods
CN116201163A (en) * 2023-02-13 2023-06-02 中交第二航务工程局有限公司 Frame type variable cross-section wind tower construction structure and method
US11692138B2 (en) 2012-08-17 2023-07-04 Suncoke Technology And Development Llc Automatic draft control system for coke plants
US11746296B2 (en) 2013-03-15 2023-09-05 Suncoke Technology And Development Llc Methods and systems for improved quench tower design
US11760937B2 (en) 2018-12-28 2023-09-19 Suncoke Technology And Development Llc Oven uptakes
US11767482B2 (en) 2020-05-03 2023-09-26 Suncoke Technology And Development Llc High-quality coke products
US11788012B2 (en) 2015-01-02 2023-10-17 Suncoke Technology And Development Llc Integrated coke plant automation and optimization using advanced control and optimization techniques
US11845898B2 (en) 2017-05-23 2023-12-19 Suncoke Technology And Development Llc System and method for repairing a coke oven
US11851724B2 (en) 2021-11-04 2023-12-26 Suncoke Technology And Development Llc. Foundry coke products, and associated systems, devices, and methods
US11939526B2 (en) 2012-12-28 2024-03-26 Suncoke Technology And Development Llc Vent stack lids and associated systems and methods
US11946108B2 (en) 2021-11-04 2024-04-02 Suncoke Technology And Development Llc Foundry coke products and associated processing methods via cupolas
US12110458B2 (en) 2022-11-04 2024-10-08 Suncoke Technology And Development Llc Coal blends, foundry coke products, and associated systems, devices, and methods
CN118933404A (en) * 2024-08-02 2024-11-12 中国二十二冶集团有限公司 Construction method of aerial high and heavy load formwork support system
US12227699B2 (en) 2019-12-26 2025-02-18 Suncoke Technology And Development Llc Oven health optimization systems and methods
US12325828B2 (en) 2012-12-28 2025-06-10 Suncoke Technology And Development Llc Exhaust flow modifier, duct intersection incorporating the same, and methods therefor
US12410369B2 (en) 2023-11-21 2025-09-09 Suncoke Technology And Development Llc Flat push hot car for foundry coke and associated systems and methods

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB915207A (en) * 1958-04-24 1963-01-09 Holzmann Philipp Ag Improvements in or relating to formwork
DE20318912U1 (en) * 2003-12-05 2004-03-04 Doka Industrie Gmbh formwork table
CN100537975C (en) * 2007-07-31 2009-09-09 龙信建设集团有限公司 Construction method of cable-stayed steel truss high-formwork structural system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB915207A (en) * 1958-04-24 1963-01-09 Holzmann Philipp Ag Improvements in or relating to formwork
DE20318912U1 (en) * 2003-12-05 2004-03-04 Doka Industrie Gmbh formwork table
CN100537975C (en) * 2007-07-31 2009-09-09 龙信建设集团有限公司 Construction method of cable-stayed steel truss high-formwork structural system

Cited By (68)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094524B (en) * 2010-12-28 2012-07-04 山东万鑫建设有限公司 Construction method of high-altitude large-span beam-slab template steel support system
CN102094524A (en) * 2010-12-28 2011-06-15 山东万鑫建设有限公司 Construction method of high-altitude large-span beam-slab template steel support system
US12195671B2 (en) 2012-08-17 2025-01-14 Suncoke Technology And Development Llc Automatic draft control system for coke plants
US11441077B2 (en) 2012-08-17 2022-09-13 Suncoke Technology And Development Llc Coke plant including exhaust gas sharing
US11692138B2 (en) 2012-08-17 2023-07-04 Suncoke Technology And Development Llc Automatic draft control system for coke plants
US11117087B2 (en) 2012-12-28 2021-09-14 Suncoke Technology And Development Llc Systems and methods for removing mercury from emissions
US11008517B2 (en) 2012-12-28 2021-05-18 Suncoke Technology And Development Llc Non-perpendicular connections between coke oven uptakes and a hot common tunnel, and associated systems and methods
US12325828B2 (en) 2012-12-28 2025-06-10 Suncoke Technology And Development Llc Exhaust flow modifier, duct intersection incorporating the same, and methods therefor
US11359145B2 (en) 2012-12-28 2022-06-14 Suncoke Technology And Development Llc Systems and methods for maintaining a hot car in a coke plant
US11845037B2 (en) 2012-12-28 2023-12-19 Suncoke Technology And Development Llc Systems and methods for removing mercury from emissions
US11939526B2 (en) 2012-12-28 2024-03-26 Suncoke Technology And Development Llc Vent stack lids and associated systems and methods
US11746296B2 (en) 2013-03-15 2023-09-05 Suncoke Technology And Development Llc Methods and systems for improved quench tower design
US11359146B2 (en) 2013-12-31 2022-06-14 Suncoke Technology And Development Llc Methods for decarbonizing coking ovens, and associated systems and devices
US11053444B2 (en) 2014-08-28 2021-07-06 Suncoke Technology And Development Llc Method and system for optimizing coke plant operation and output
US10968393B2 (en) 2014-09-15 2021-04-06 Suncoke Technology And Development Llc Coke ovens having monolith component construction
US11795400B2 (en) 2014-09-15 2023-10-24 Suncoke Technology And Development Llc Coke ovens having monolith component construction
US10968395B2 (en) 2014-12-31 2021-04-06 Suncoke Technology And Development Llc Multi-modal beds of coking material
US10975310B2 (en) 2014-12-31 2021-04-13 Suncoke Technology And Development Llc Multi-modal beds of coking material
US10975311B2 (en) 2014-12-31 2021-04-13 Suncoke Technology And Development Llc Multi-modal beds of coking material
US12338394B2 (en) 2014-12-31 2025-06-24 Suncoke Technology And Development Llc Multi-modal beds of coking material
US11788012B2 (en) 2015-01-02 2023-10-17 Suncoke Technology And Development Llc Integrated coke plant automation and optimization using advanced control and optimization techniques
CN104695692A (en) * 2015-02-13 2015-06-10 中国五冶集团有限公司 Scaffold on basis of resistance wall of coke oven
CN105544873A (en) * 2015-12-16 2016-05-04 中国建筑第二工程局有限公司 Wave-shaped hollow roof and construction method thereof
CN105544873B (en) * 2015-12-16 2017-12-26 中国建筑第二工程局有限公司 Construction method of wave-shaped hollow roof
US11214739B2 (en) 2015-12-28 2022-01-04 Suncoke Technology And Development Llc Method and system for dynamically charging a coke oven
US12190701B2 (en) 2016-06-03 2025-01-07 Suncoke Technology And Development Llc Methods and systems for automatically generating a remedial action in an industrial facility
US11508230B2 (en) 2016-06-03 2022-11-22 Suncoke Technology And Development Llc Methods and systems for automatically generating a remedial action in an industrial facility
US11845898B2 (en) 2017-05-23 2023-12-19 Suncoke Technology And Development Llc System and method for repairing a coke oven
CN109098441B (en) * 2018-09-03 2020-11-20 江苏省建筑工程集团有限公司 H-shaped steel jig frame
CN109098441A (en) * 2018-09-03 2018-12-28 江苏省建筑工程集团有限公司 H profile steel rail mounted moulding bed with stopper
US12060525B2 (en) 2018-12-28 2024-08-13 Suncoke Technology And Development Llc Systems for treating a surface of a coke plant sole flue
US11261381B2 (en) 2018-12-28 2022-03-01 Suncoke Technology And Development Llc Heat recovery oven foundation
US11008518B2 (en) 2018-12-28 2021-05-18 Suncoke Technology And Development Llc Coke plant tunnel repair and flexible joints
US11597881B2 (en) 2018-12-28 2023-03-07 Suncoke Technology And Development Llc Coke plant tunnel repair and flexible joints
US11098252B2 (en) 2018-12-28 2021-08-24 Suncoke Technology And Development Llc Spring-loaded heat recovery oven system and method
US12305119B2 (en) 2018-12-28 2025-05-20 Suncoke Technology And Development Llc Decarbonization of coke ovens and associated systems and methods
US11643602B2 (en) 2018-12-28 2023-05-09 Suncoke Technology And Development Llc Decarbonization of coke ovens, and associated systems and methods
US11505747B2 (en) 2018-12-28 2022-11-22 Suncoke Technology And Development Llc Coke plant tunnel repair and anchor distribution
US11680208B2 (en) 2018-12-28 2023-06-20 Suncoke Technology And Development Llc Spring-loaded heat recovery oven system and method
US11845897B2 (en) 2018-12-28 2023-12-19 Suncoke Technology And Development Llc Heat recovery oven foundation
US11365355B2 (en) 2018-12-28 2022-06-21 Suncoke Technology And Development Llc Systems and methods for treating a surface of a coke plant
US11760937B2 (en) 2018-12-28 2023-09-19 Suncoke Technology And Development Llc Oven uptakes
WO2020140092A1 (en) * 2018-12-28 2020-07-02 Suncoke Technology And Development Llc Heat recovery oven foundation
US11071935B2 (en) 2018-12-28 2021-07-27 Suncoke Technology And Development Llc Particulate detection for industrial facilities, and associated systems and methods
US11193069B2 (en) 2018-12-28 2021-12-07 Suncoke Technology And Development Llc Coke plant tunnel repair and anchor distribution
US11819802B2 (en) 2018-12-31 2023-11-21 Suncoke Technology And Development Llc Methods and systems for providing corrosion resistant surfaces in contaminant treatment systems
US11395989B2 (en) 2018-12-31 2022-07-26 Suncoke Technology And Development Llc Methods and systems for providing corrosion resistant surfaces in contaminant treatment systems
US11486572B2 (en) 2018-12-31 2022-11-01 Suncoke Technology And Development Llc Systems and methods for Utilizing flue gas
CN109610461A (en) * 2019-01-24 2019-04-12 中建筑港集团有限公司 A kind of module type inspection well concrete grout device and method
US12227699B2 (en) 2019-12-26 2025-02-18 Suncoke Technology And Development Llc Oven health optimization systems and methods
CN111206768A (en) * 2020-01-16 2020-05-29 天津鼎维固模架工程股份有限公司 Light beam plate structure platform and construction method thereof
US11767482B2 (en) 2020-05-03 2023-09-26 Suncoke Technology And Development Llc High-quality coke products
US12215289B2 (en) 2020-05-03 2025-02-04 Suncoke Technology And Development Llc High-quality coke products
CN112177323A (en) * 2020-09-09 2021-01-05 中国一冶集团有限公司 Cell body structure assembled support system
CN113216696A (en) * 2021-06-02 2021-08-06 中铁二十一局集团第二工程有限公司 Supporting system for SRC beam integrated construction and construction method thereof
US12319976B2 (en) 2021-11-04 2025-06-03 Suncoke Technology And Development Llc Foundry coke products, and associated systems, devices, and methods
US11946108B2 (en) 2021-11-04 2024-04-02 Suncoke Technology And Development Llc Foundry coke products and associated processing methods via cupolas
US12331367B2 (en) 2021-11-04 2025-06-17 Suncoke Technology And Development Llc Foundry coke products, and associated systems, devices, and methods
US11851724B2 (en) 2021-11-04 2023-12-26 Suncoke Technology And Development Llc. Foundry coke products, and associated systems, devices, and methods
US12110458B2 (en) 2022-11-04 2024-10-08 Suncoke Technology And Development Llc Coal blends, foundry coke products, and associated systems, devices, and methods
US12286591B2 (en) 2022-11-04 2025-04-29 Suncoke Technology And Development Llc Coal blends, foundry coke products, and associated systems, devices, and methods
CN116044157A (en) * 2023-01-31 2023-05-02 中国三冶集团有限公司 A construction method of formwork support structure in the side wall of coke oven flue
CN116025150A (en) * 2023-01-31 2023-04-28 中国核工业华兴建设有限公司 Nuclear power station spent fuel pool roof/conversion layer floor slab supporting system and construction method
CN116201163A (en) * 2023-02-13 2023-06-02 中交第二航务工程局有限公司 Frame type variable cross-section wind tower construction structure and method
CN116201163B (en) * 2023-02-13 2025-10-21 中交第二航务工程局有限公司 Construction structure and method of frame-type variable-section wind tower
US12410369B2 (en) 2023-11-21 2025-09-09 Suncoke Technology And Development Llc Flat push hot car for foundry coke and associated systems and methods
CN118933404B (en) * 2024-08-02 2025-06-13 中国二十二冶集团有限公司 Construction method of aerial high and heavy load formwork support system
CN118933404A (en) * 2024-08-02 2024-11-12 中国二十二冶集团有限公司 Construction method of aerial high and heavy load formwork support system

Also Published As

Publication number Publication date
CN101886466B (en) 2011-09-14

Similar Documents

Publication Publication Date Title
CN101886466B (en) Construction method for support structure of coal tower template for tamping type coke oven
CN103452311B (en) A kind of erection method of shaped steel suspended structural support frame
CN110512719B (en) Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN108677962B (en) Subway entrance and exit segment foundation pit formwork installing and dismantling method
CN113550578A (en) A kind of high-altitude cantilever structure formwork support and construction method of upper protection system
CN111779248A (en) High-support formwork system and its construction method
CN110409624B (en) Reverse calculation and construction method for large equipment installation and main body structure
CN104261232A (en) Lifting device attached to special-shaped section and installation method thereof
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN114658214A (en) High-rise building disc buckle type high-altitude large-cantilever support frame support and anchor pressing integrated construction method
CN212507296U (en) High formwork system
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN217151150U (en) Overhanging steel truss formwork supporting platform for aluminum mould-full concrete outer wall
CN107090772A (en) A construction method of cast-in-place girder supports for side spans of extra-large cable-stayed bridges
CN112609966B (en) Construction method for constructing super-thick concrete top plate by utilizing simple latticed column laminated slab system
CN219931554U (en) A cantilevered steel structure construction platform with formwork system
CN108951643B (en) Super high-rise deep foundation pit basement core tube large-span large-area support changing construction method
CN203531002U (en) Steel platform tower crane foundation
CN210025768U (en) A operation platform system for caisson template installation
CN108019040B (en) A construction method for the Bailey frame platform of the transfer floor of a high-rise building
CN117927017A (en) Construction technology of section steel combined triangular support formwork and outer protection scaffold
CN115506260A (en) High-altitude and site-limited gate pier construction method and application method
CN116657875A (en) Cantilever steel structure construction platform with formwork system and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant